METHOD STATEMENT

METHOD STATEMENT FOR THE MODIFICATION OF MV SWITCH BOARD

METHOD STATEMENT

FOR

MODIFICATION OF MV SWITCH BOARD.

TABLE OF CONTENTS

SECTION DESCRIPTION

A PURPOSE

Page 1 of 5
METHOD STATEMENT

METHOD STATEMENT FOR THE MODIFICATION OF MV SWITCH BOARD

B SCOPE

C REFERENCE OF DOCUMENT

D PERMIT

E MATERIALS

F PROCEDURE OF WORK

G TOOLS AND EQUIPMENTS

H HOUSE KEEPING

I INSPECTION

J RISK ASSESMENT - GENERAL

K RISK CONTROL- GENERAL

A. OBJECTIVE

This method statement is prepared to describe the procedures for the installation of LV, HV
Panels and Transformers.
Page 2 of 5
METHOD STATEMENT

METHOD STATEMENT FOR THE MODIFICATION OF MV SWITCH BOARD

B. SCOPE

This method statement applies for the project to transfer 2.7 MW Solar Power from the
refinery car parking shades to the waste water treatment plant substation requiring new MV
infra structure to link the Smart Solar Station to the Waste Water Treatment Plant.

C. DOCUMENTS REFERENCE.

Refinery MV Sub station & Infra structure MEP Drawings.


T120014 – MV – 3011 Sheet 01 to 12
T120014 – SS /MEP – 3011 Sheet 01 to 07

D. INSTALLATION PROCEDURE: MV PANELS.

• Physical check of the panel appearance, the components such as Relays, Meters,
Switches, Fuses, CTs, Breakers, Bus bar sizes etc shall be verified against the approved
materials, submittals and approved lay out.
• All installation shall be carried out according to the approved shop drawing for the
panel.
• Minimum clearance of 800mm shall be maintained at the rear side of the panel, so
that easy access for termination of cables and other maintenance works can be carried
out.
• MV Panel shall be installed in accordance in the manufacturers recommendations,
approved site lay out and as per the site requirement.

E. TOOLS & EQUIPMENTS

Page 3 of 5
METHOD STATEMENT

METHOD STATEMENT FOR THE MODIFICATION OF MV SWITCH BOARD

 Hand Tools.

 Wrench Spanner

 Torque Wrench.

 Measuring Instruments.

 Lifting Crane.

 Pallet Trolley.

 Portable Drill.

F. HOUSE KEEPING

The working area will be kept clean & tidy at all time during the execution and upon
completion of work.

G. INSPECTION

The Project Engineer will raise the inspection request to Petra Solar for inspection and
certification of the installation. Prior to the Petra Solar inspection, the site supervisors shall
inspect the installation to ensure the compliance of specification and drawings. Upon receiving
the approval from the consultant/client the cables shall be connected.

H. RISK ASSESSMENTS

1. Unintentional release of load

2. Crush injuries to personnel

3. Un planned movement of load

4. Damage to equipment

5. Fall of materials

6. Mishandling of materials and tools.

I. RISK CONTROLS

1. Lifting equipment will visually examined before use

2. Method of string attachments and stringing arrangements will be checked before use
Page 4 of 5
METHOD STATEMENT

METHOD STATEMENT FOR THE MODIFICATION OF MV SWITCH BOARD

3. The lifting operations will be done by trained and competent operators

4. Necessary training will be given to workers

5. Works will be carried out by experience and trained personnel

6. All compulsory PPE will be provided to workers

7. First aid will be available at site

Page 5 of 5