Inspection Points Program

Manufacturing of Electrical and Electronic Equipment


PPI (Inspection Points Program)
Project NEW RWANDA INTERNATIONAL AIRPORT SST Reference AIRPORT
Project PEP ES-1019659182-0010 Serial No. ES1019659182-0010_30
Equipment WATCH TOWER CONTROL PANEL 10
Order ETF Y1826277_ED_WTCC1 Order PPD NOT APPLY

Client
Subcontractor Schneider
Inspection / Test Inspection Agency
Reference Documents Verification Verification Verification
Control Type: Check to Carry Out Name, Date, and Signature Name, Date, and Signature Name, Date, and Signature

1. Verification of the Scope of Supply


Doc. Reference 1 EACSP-MNF-000000-PRC-ECIPE00-ES-R00 Point 2.6.1.
Type of Control Workshop Order No. 4507479635
100%

2. Verification of Assembly and Cabling


Doc. Reference 1 EACSP-MNF-000000-PRC-ECIPE00-ES-R00 Point 2.6.2.
Order ETF Y1826277_ED_WTCC1
DEF/MEF ETF According to Appendix 1
IVFabricación According to Appendix 3
100%

3. Stamp or Continuity Test


Doc. Reference 1 EACSP-MNF-000000-PRC-ECIPE00-ES-R00 Point 2.6.3.
Type of Control Test
IVFabricación According to Appendix 3 100%

4. Dielectric stiffness
Doc. Reference 1 EACSP-MNF-000000-PRC-ECIPE00-ES-R00 Point 2.6.4.
Type of Control Test
IVFabricación According to Appendix 3 100%

5. Electrical Insulation
Doc. Reference 1 EACSP-MNF-000000-PRC-ECIPE00-ES-R00 Point 2.6.5.
Type of Control Test
IVFabricación According to Appendix 3 100%

6. Procedure for Availability Testing (PPD)


Doc. Reference 1 EACSP-MNF-000000-PRC-ECIPE00-ES-R00 Point 2.6.6.
Order PPD NOT APPLY
DEF/MEF PPD According to Appendix 2
IVFabricación According to Appendix 3
Type of Control Test 100%

Space reserved for recording results


Stamping Electrical Insulation Dielectric stiffness
Circuits
Equipment Used Equipment Used V Applied MΩ Measured Equipment Used V Applied Time

Dates of Last Calibration


Equipment Used Calib. Date Equipment Used Calib. Date Equipment Used Calib. Date Equipment Used Calib. Date

Observations

ES-1019659182-0010 New International Airport Rwanda PANEL TEST REPORT

Internal
#
Inspection Points Program
Manufacturing of Electrical and Electronic Equipment
RCT I (Traceability Record I)
Project NEW RWANDA INTERNATIONAL AIRPORT SST Reference AIRPORT
Project PEP ES-1019659182-0010 Serial No. ES1019659182-0010_30
Equipment WATCH TOWER CONTROL PANEL 10
Order ETF Y1826277_ED_WTCC1 Order PPD NOT APPLY

Item Name Manufacturer Reference Serial No..

SW1 Managed Fast/Gigabit Ethernet Gazelle S1020 RAISECOM S1020I-2GF-4GE-GL-AC


SW2 Managed Fast/Gigabit Ethernet Gazelle S1020 RAISECOM S1020I-2GF-4GE-GL-AC
HMIP63G10N408N3N00 +
HMI/WT1 Panel PC 19" BOX Harmony P6 Schneider Electric HMIDM6800WC
BCU/WT_Hue High-performance CPU Schneider Electric M588220002_A2.B1
BCU/WT_DIDO1 Digital Input and Digital Output Module Schneider Electric M572420002
BCU/WT_DIDO2 Digital Input and Digital Output Module Schneider Electric M572420002
FA1 Power supply unit. Input 110, Output 24 V DC/5 A Phöenix Contact TRIO-PS-2G/1AC/24DC/5
FA2 Power supply unit. Input 110, Output 24 V DC/5 A Phöenix Contact TRIO-PS-2G/1AC/24DC/5

Subcontractor Schneider Client / Inspection Agency


Verification Verification Verification
Name, Date, and Signature Name, Date, and Signature Name, Date, and Signature

ES-1019659182-0010 New International Airport Rwanda PANEL TEST REPORT

# Internal
Inspection Points Program
Manufacturing of Electrical and Electronic Equipment
DEF/MEF of the ETF (Deviations/Modifications to the Manufacturing Technical Specifications)
Project NEW RWANDA INTERNATIONAL AIRPORT SST Reference AIRPORT
Project PEP ES-1019659182-0010 Serial No. ES1019659182-0010_30
Equipment WATCH TOWER CONTROL PANEL 10
Order ETF Y1826277_ED_WTCC1 Order PPD NOT APPLY

Appendix
Explanatory
Incident No. Details/s or Sheet(s)
Subject Solution Adopted
Red Mine
Page/s
YES/NO
ETF

Subcontractor Schneider Client / Inspection Agency


Verification Verification Verification
Name, Date, and Signature Name, Date, and Signature Name, Date, and Signature

ES-1019659182-0010 New International Airport Rwanda PANEL TEST REPORT

Internal
#
Inspection Points Program
Manufacturing of Electrical and Electronic Equipment
DEF/MEF of the ETF (Deviations/Modifications to the Manufacturing Technical Specifications)
Project NEW RWANDA INTERNATIONAL AIRPORT SST Reference AIRPORT
Project PEP ES-1019659182-0010 Serial No. ES1019659182-0010_30
Equipment WATCH TOWER CONTROL PANEL 10

DEF/MEF Detail/s on Page "XXX" of the ETF

-0010 New International Airport Rwanda PANEL TEST REPORT

#Internal
Inspection Points Program
Manufacturing of Electrical and Electronic Equipment
DEF/MEF of the ETF (Deviations/Modifications to the Manufacturing Technical Specifications)
Project NEW RWANDA INTERNATIONAL AIRPORT SST Reference AIRPORT
Project PEP ES-1019659182-0010 Serial No. ES1019659182-0010_30
Equipment WATCH TOWER CONTROL PANEL 10

DEF/MEF Detail/s on Page "XXX" of the ETF

-0010 New International Airport Rwanda PANEL TEST REPORT

#Internal
Inspection Points Program
Manufacturing of Electrical and Electronic Equipment
DEF/MEF of the ETF (Deviations/Modifications to the Manufacturing Technical Specifications)
Project NEW RWANDA INTERNATIONAL AIRPORT SST Reference AIRPORT
Project PEP ES-1019659182-0010 Serial No. ES1019659182-0010_30
Equipment WATCH TOWER CONTROL PANEL 10

DEF/MEF Detail/s on Page "XXX" of the ETF

ES-1019659182-0010 New International Airport Rwanda PANEL TEST REPORT

#Internal
Inspection Points Program
Manufacturing of Electrical and Electronic Equipment
PID (Availability Inspection Points of the PPD)

Project NEW RWANDA INTERNATIONAL AIRPORT SST Reference AIRPORT


Project PEP ES-1019659182-0010 Serial No. ES1019659182-0010_30
Equipment WATCH TOWER CONTROL PANEL 10
Order ETF Y1826277_ED_WTCC1 Order PPD

Subcontractor Schneider Client


Inspection Agency
Verification Verification Verification
Name, Date, and Signature Name, Date, and Signature Name, Date, and Signature

1. Verification of the Scope of Supply and Previous Procedures

100%

2. Verification of Supply Circuits

100%

3. Verification of Communications

100%

4. Verification of I/O points

100%

5. Verification of the Supply Identification

100%

Space reserved for recording results


Equipment Used Brand/Model Serial No.. Date of Last Calibration

Observations

ES-1019659182-0010 New International Airport Rwanda PANEL TEST REPORT

Internal
#
Workshop Checklist
Manufacturing of Electrical and Electronic Equipment
CLT (Program of Verification Points)

Project NEW RWANDA INTERNATIONAL AIRPORT SST Reference AIRPORT

Project PEP ES-1019659182-0010 Serial No. ES1019659182-0010_30

Equipment WATCH TOWER CONTROL PANEL 10

Order ETF Y1826277_ED_WTCC1

Checklist - Manufacturing of Electrical and Electronic Equipment

No. Verification √ Observations

1 Verification of Colour and texture of the enclosure

2 Verification of Colour and texture of devices and ducts (Halogen-free or PVC)

3 Verification of Defects (dents, stains, scratches), especially for stainless.

Verification of cable entry: Position and placement of transfer plates, removable or non-
4 removable, no. of orifices, type of stuffing box, cable guide, etc...

5 Verification of transport and anchoring accessories (lugs, bolts, frames)

Verification of Doors and closing mechanisms: opening and closing lever, type of lock, plan
6 holder

7 Verification of the direction and degree of openness for Doors and frame

Verification of identification and traceability, colour, finish, and position according to ETF,
8 logos and other adhesives defined in the ETF

9 Verification of Plates and/or mounting panels: arrangement of ducts, DIN rails, chassis, etc.

Verification of the item Assembly: Complete equipment according to ETF, all equipment well-
10 attached or firm (no loose pieces)

11 Verification of item Assembly: Firm attachment of all elements.

12 Verification of interior Cleanliness: absence of the remains of cables, shavings, screws.

13 Verification of cabling inside ducts: well combed, not crossed

14 Verification of cabling inside ducts: there are not cables inside reserved ducts.

15 Verification of the placement of the Luminaire, door switches according to the ETF

Verification of the tightness of Block terminal connections, communication connectors (RJ45,


17 OF, etc..) grounding protection

20 Verification of the Grounding for doors, roof, and lateral panels

21 Verification of the Grounding for mounting plates and/or panels

22 Verification of Grounding for the chassis or mechanical parts of electrical equipment (F.A.)

Verification of couplers (colour, letter size, legibility, order of identification "Source-


23 Destination" or "Destination-Origin" according to ETF.

Verification of the Numbering of terminal blocks including those with special identification
24 such as the PE (all according to the ET).

Verification of Corrugated Tubes: When opening and closing they do not rub against the
25 metal parts, the length is correct without forcing cables, etc.

Subcontractor Schneider Client / Inspection Agency


Verification Verification Verification
Name, Date, and Signature Name, Date, and Signature Name, Date, and Signature

Internal
#
Workshop Checklist
Manufacturing of Electrical and Electronic Equipment
CLT (Program of Verification Points)

Project NEW RWANDA INTERNATIONAL AIRPORT SST Reference AIRPORT

Project PEP ES-1019659182-0010 Serial No. ES1019659182-0010_30

Equipment WATCH TOWER CONTROL PANEL 10

Order ETF Y1826277_ED_WTCC1

ES-1019659182-0010 New International Airport Rwanda PANEL TEST REPORT

Internal
#
Workshop Checklist
Manufacturing of Electrical and Electronic Equipment
CLT (Program of Verification Points)

Project NEW RWANDA INTERNATIONAL AIRPORT SST Reference AIRPORT

Project PEP ES-1019659182-0010 Serial No. ES1019659182-0010_30

Equipment WATCH TOWER CONTROL PANEL 10

Order ETF Y1826277_ED_WTCC1

Checklist - Manufacturing of Electrical and Electronic Equipment

No. Verification √ Observations

Verification of Communications Connectors: colours, with plastic or metallic casing, with or


26 without sleeve, long or short sleeve...

Verification of supply cables for main equipment (cable size and colour, correct connection to
27 equipment according to ETF, etc...)

Verification of photographic report (photos with door closed of all the sizes, photo of serial no.
28 top-down photos of cabinet devices etc...)

Verification that there are enough cables, no tension nor paths that damage the cabling
29
(especially when there is F.O.)

30 Verification that there are no points or conductive parts exposed to the air

31 Verification of a single grounding connection per screw

Verification of the possibility of access and re-cabling of devices with a difficult mechanical
32
position in the cabinet.

Verification of cabinets with Rack 19" of attachment for equipment with a large depth, tie, or
33
attachment on the back without the possibility of vibration or breakage during transport.

34 Verification that there are not three or more cables on any device electrical connection

35 Verification of door retainers or pivoting lever (if applicable)

36 Verification of the place of fuses in the case of block terminals with fuse or fuse holder N.A.

Verification of power strip bridge according to ETF and/or special terminal blocks such as
37
disconnect, fuse holder, with diode etc.

38 Verification of correct operation of circuit breakers and differentials.

39 Verification of the label with Cabinet Serial No.

40 Verification of Schneider Logo

Verification of the moveable parts in the cabinet (removable trays, articulated arms,
41
corrugated tubes, doors, etc...)

42 Verification of Quality Documentation (in RCT correct Project Name, PEP, etc...)

43 Verification of Quality Documentation (Testing equipment and valid calibration certificate)

44

45

Subcontractor Schneider Client / Inspection Agency


Verification Verification Verification
Name, Date, and Signature Name, Date, and Signature Name, Date, and Signature

Internal
#
Workshop Checklist
Manufacturing of Electrical and Electronic Equipment
CLT (Program of Verification Points)

Project NEW RWANDA INTERNATIONAL AIRPORT SST Reference AIRPORT

Project PEP ES-1019659182-0010 Serial No. ES1019659182-0010_30

Equipment WATCH TOWER CONTROL PANEL 10

Order ETF Y1826277_ED_WTCC1

ES-1019659182-0010 New International Airport Rwanda PANEL TEST REPORT

Internal
#
Workshop Checklist
Manufacturing of Electrical and Electronic Equipment
CLT (Program of Verification Points)

Project NEW RWANDA INTERNATIONAL AIRPORT SST Reference AIRPORT

Project PEP ES-1019659182-0010 Serial No. ES1019659182-0010_30

Equipment WATCH TOWER CONTROL PANEL 10

Order ETF Y1826277_ED_WTCC1

Checklist - Manufacturing of Electrical and Electronic Equipment

No. Verification √ Observations

46 Point to point test

47

48

49 Power Supply Battery 1 circuits

50 Power Supply Battery 2 circuits

51 Power Supply ac circuits

52 SW1 power supply

53 SW1 communication cables

54 SW2 power supply

55 SW2 communication cables

56 SAITEL power supply

57 SAITEL dc circuits (digital iNputs)

58 SAITEL digital outputs

59 SAITEL communication cables

60 HMI power supply

61 HMI communication cables

62 Patch PANEL communication cables

63

64

65

Subcontractor Schneider Client / Inspection Agency


Verification Verification Verification

Internal
#
Workshop Checklist
Manufacturing of Electrical and Electronic Equipment
CLT (Program of Verification Points)

Project NEW RWANDA INTERNATIONAL AIRPORT SST Reference AIRPORT

Project PEP ES-1019659182-0010 Serial No. ES1019659182-0010_30

Equipment WATCH TOWER CONTROL PANEL 10

Order ETF Y1826277_ED_WTCC1

Name, Date, and Signature Name, Date, and Signature Name, Date, and Signature

ES-1019659182-0010 New International Airport Rwanda PANEL TEST REPORT

Internal
#
Workshop Checklist
Manufacturing of Electrical and Electronic Equipment
CLT (Program of Verification Points)

Project NEW RWANDA INTERNATIONAL AIRPORT SST Reference AIRPORT

Project PEP ES-1019659182-0010 Serial No. ES1019659182-0010_30

Equipment WATCH TOWER CONTROL PANEL 10

Order ETF Y1826277_ED_WTCC1

Checklist - Manufacturing of Electrical and Electronic Equipment

No. Verification √ Observations

66

67

68

69

70

71

72

73

74

75

76

77

78

79

80

81

82

83

84

85

86

Subcontractor Schneider Client / Inspection Agency

Internal
#
Workshop Checklist
Manufacturing of Electrical and Electronic Equipment
CLT (Program of Verification Points)

Project NEW RWANDA INTERNATIONAL AIRPORT SST Reference AIRPORT

Project PEP ES-1019659182-0010 Serial No. ES1019659182-0010_30

Equipment WATCH TOWER CONTROL PANEL 10

Order ETF Y1826277_ED_WTCC1

Verification Verification Verification


Name, Date, and Signature Name, Date, and Signature Name, Date, and Signature

ES-1019659182-0010 New International Airport Rwanda PANEL TEST REPORT