1. ALL DIMENSIONS ARE IN MM AND LEVELS ARE IN METRES.
N 2. SIZES OF MEMBERS FOR PROPOSED WORK SHOWN IN THE
DRAWING ARE TENTATIVE & WELL BE AS PER FINAL DESIGN.
AD
3. FOR DETAILS OF PLATE ,PIERS PILES & PILE CAP ETC. REFER
TS
O
MEN
SEPARATE DRAWING.
DA R
4. DETAILED FABRICATION DRAWINGS ARE TO BE PREPARED BY THE
AN E
HUT
A
EXECUTING AGENCY AND OUR APPROVAL IS TO OBTAINED ON THE
TI P
A CK
S TH
K
SAME BEFORE EXECUTION.
RAC
APA
CK
TR
5. ANY DISCREPANCIES OR OMISSIONS TO BE BROUGHT TO OUR
AR D
TRA
AY T
G AN
NOTICE PRIOR TO EXECUTION.
WAY
DRAIN
6. PROCEDURE FOR UNDERTAKING DIGGING WORK IN THE VICINITY
TOW
WA Y
W
PHASE-I PHASE-II TOW
RAIL
ARD OF UNDERGROUND SIGNALLING, ELECTRICAL AND
PLE
RAIL
S W
EST
RAIL
LENGTH OF UNDERPASS 31050 14675 TELECOMMUNICATION CABLES CIRCULATED BY RAIWAY BOARD
TEM
35/39
LAND TO BE ACQUIRE NIL 1) 30.0 X 5.9 = 177.00 SMT T VIDE LETTER NO. 2003/Tele/RCIL/1/Pt.IX DATED 24.06.2013 SHALL BE
EAS
2) SLUMS TO BE RELOCATED 35/40 A RDS FOLLOWED BEFORE COMMENCING EXCAVATION WORK FOR
AND REHABILITATED PRO TOW FOUNDATION.
P. U
NDE
RPA
SS ISHWAR NAGAR 7. MANUAL TRENCH SHALL BE MADE TO CHECK UNDERGROUND
ROAD
UTILITIES BEFORE COMMENCING EXCAVATION WORK.
INFRINGEMENT TABLE 8. PROPER SHORING ARRANGEMENT SHALL BE PROVIDED AS
APPROVED BY ENGINEER IN CHARGE FOR EXCAVATION IN THE
DRAIN
PRESCRIBED MAXIMUM AND GPS-4
NAME OF STRUCTURE WHICH ACTUAL AMOUNT OF VICINITY OF RAILWAY TRACK.
OAD
SR. NO. LOCATION MINIMUM DIMENSION
LI
TS
INFRINGES DIMENSION INFRINGEMENT 9. PROVIDE PROTECTIVE COATING BY ALUMINUM METALZING TO ALL
AIRO
MEN
CHAPTER & ITEM NO. MAXIMUM & MINIMUM
T. R
STEEL COMPONENT OF GIRDER/ TRUSS WITH SPRAYED ALUMINUM
AS PER PROCEDURE GIVEN IN RDSO FABRICATION SPECIFICATION
EXIS
DS
HUT
D NIL NIL NIL NIL NIL NIL SUMP WELL
WATER WILL BE DRAINED OUT BY DRAIN PIPE NO. 3-1/2001 D
AR
DURING MANSOON IN EXISITNG NALLAH.
10. DEPTH OF FILLING MORE THAN 1000 STONE GABBIN WALL SHALL
TOW
BE PROVIDED TO PROTECT PATHWAY.
11. 95%%% MDD COMPAETION SHALL BE CARRIED OUT BY VIBRATORY
ROLLER
12. RCC BOX WITH SEPRET SEGMENT FOR EACH TRACK
13. PRECAST RCC SLAB WITH STAGGERED JOINT WITH RCC BOX
CL OF PROPOSED CL OF PROPOSED 35/41 14. CUT & COVER METHOD TO BE ADOPTED FOR PLACEMENT OF RCC
ELEVATED TRACK ELEVATED TRACK 35/42
BOX
RL-107.583 RL-111.56 15. IF ANY SIGNALING CABLE IS RUNNING NEAR ANY FOUNDATION, IT
KEY PLAN SHALL BE DIVERTED SUITABLY BEFORE TAKING UP THE WORK.
16. CRS SANCTION WILL BE OBTAINED BEFORE COMMENCEMENT OF
WORK.
17. APPROVAL IS SUBJECTED TO COMPLIANCE OF ISSUES
COMMUNICATED VIDE LETTER NO. W294/TAD/FOB DTD.29.11.2017
50(GAP) ADDRESSED TO CPM/MRVC.
14675 31050 18. CRS SANCTION WILL BE OBTAINED BEFORE COMMENCEMENT OF
PHASE - II PHASE - I WORK.
3100 27000 4050 19. APPROVAL IS SUBJECTED TO COMPLIANCE OF ISSUES
TO TO
WEST EAST COMMUNICATED WIDE LETTER NO. W.294/TAD/FOB DT. 29.11.17
CL OF TRACK ADDRESSED TO CPM/MRVC.
CL OF TRACK CL OF TRACK CL OF TRACK 20. RDSO DWG. FOR RCC BOX AND FACE WALL IS RDSO/B-10153 AND
RDSO/B10153/1.
7000 1463 3852 5229 13120 21. VERIFIED LAND PLAN NO. GM(W)BB/LAND PLAN NO. 6547.
CL OF HUME PIPE
22. SPEED RESTRICTION REQUIRED DURING WORK - 20KMPH.
RL+103.664 RL+103.734 RL+103.798 BRIDGE EXIST. COMPOUND WALL 23. MAINTENANCE OF SUBWAY WILL BE DONE AS PER RLY BOARD'S L.
800
FL+102.864 FL+102.998 NO. 2016/CE-IV/MISC/2(RUB) DTD. 03.07.2018.
24. SIX HOURS BLOCK REQUIRED FOR CUT AND COVER METHOD AND
ROAD
SEPARATE TAD WILL BE SUBMITTED BEFORE COMMENCEMENT OF
ROAD LEVEL+101.664 WORK.
2400
ROAD LEVEL+101.097 PATHWAY
PROPOSED UNDERPASS 25. PROTECTION OF WORK SITE WILL BE DONE AS PER PROVISION OF
SLOPE 1 IN 1000 IRPWM.
TOP OF SLAB +100.014 Ø1
200 26. SANCTION DETAILS : PART WORK OF MUTP-3
PINK BOOK 2016-17, SR. NO. 708.
27. S&T UTILITY SHIFTING WILL BE DONE BY S&T MRVC.
150 THK WEARING COURSE
28. IF PUSHING METHOD IS ADOPTED THEN SEPARATE TAD WILL BE
PRECAST BOX UNIT SUMP WELL SUBMITTED FOR APPROVAL OF HQ.
150 THK PCC
SECTION A-A 29. THIS GAD SUPERCEDES EARLIER APPROVED GAD BEARING NO.
C SCALE 1:100 GM(W)BB/P-16001. C
UPSTREAM DOWN STREAM
SPECIFICATION:-
1. GRADE OF CONCRETE:-
i. M35- FOR CAST-IN SITU DECK SLAB,RCC BOX RCC
RAMP,STARCASE,RCC WALL
ii. M25- FOR PATHWAY SLAB
iii. M20- PCC/LOVLING COURSE
2. REINFORCEMENT STEEL - FE:500 HYSD STEEL CONFORMING TO
IS:1786-2008.
3. WATER TO BE USED IN CONCRETING, GROUTING & CURING
WALL
SHALL CONFIRM TO CLAUSE 4.3 OF IRS CONCRETE BRIDGE CODE.
4. CLEAR COVER TO STEEL IS 35 FOR CAST IN SITU SLAB, 50 FOR
COMPOUND
PIER, WALL AND 75 FOR PILE CAP / FOOTING
HUTMENTS
DRAIN
LEGEND :
37944 PROPOSED WORK
EXIST. RAILWAY BOUNDARY
FUTURE WORK
SANCTIONED WORK
D
R OA CL CENTER LINE
TOWARDS THANE
G AR RAILWAY BOUNDARY
R NA G.L. +101.209 RAILWAY LINE
35/39 35/40 WA 0.00
ISH 0.50 Filling materials PATHWAY
TO T 1.00 ROAD
EAS FOUNDING LEVEL
BOTTOM OF BOX LEVEL =1.533
2.00
HUTMENTS
A
Moderately weathered BASALT
3.00
CL OF PROPOSED UNDERPASS
G
SBC = 20 T/SMT
IN
AD
4.00
TEMPLE
Y
IC
WA
RR
5.00
TH
Slightly weathered BASALT
BA
B B
10867
10824
PA
6.00
DE
WI
7.00
M
B C Fresh BASALT
3
3100 50 27000 50 4000
P.
8.00
O
GANPATI PADA ROAD
PR
9.00
450
DRAIN
A CBE Date: 2021.03.15 17:19:30 +05'30'
5900
3000
TO
PROPOSED
WEST Digitally signed by AKHILESH KUMAR SAXENA
AKHILESH KUMAR SAXENA
WALL
3000 DYCE-BR-II
BRIDGE
Date: 2021.03.15 11:02:45 +05'30'
PROP. 3 M WIDE PATHWAY
Ram Verma Digitally signed by Ram Verma
450
SSE-ROB-RUB-HQ
COMPOUND
CL OF BOX Date: 2021.03.12 11:09:56 +05'30'
BARRICADING
800
RL+103.664 SHALABH GOEL Digitally signed by SHALABH GOEL
1000 2100 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 1000 DRM-BB
Date:2021.02.22 04:18:17 +05'30'
300 X 7 SEG.-1 SEG.-2 SEG.-3 SEG.-4 SEG.-5 SEG.-6 SEG.-7 SEG.-8 SEG.-9 300 X 10 TOP OF SLAB +102.864
PROPOSED RLY. BOUNDARY ASHUTOSH GUPTA Digitally signed by ASHUTOSH GUPTA
450
14675 31050 ADRM-INFRA-BB
(LAND TO BE ACQUIRE) Date:2021.02.22 03:55:30 +05'30'
PHASE - II PHASE-I HARMEET SINGH SOOD Digitally signed by HARMEET SINGH
B C SRDEE-G-BB SOOD
2400
450 3000 450 Date:2021.02.22 11:55:35 +05'30'
RAMESH KUMAR CHAUVE Digitally signed by RAMESH KUMAR
30000 19599 PANEL SUMP WELL TOP OF SLAB +100.014 SRDEE-TD-BB CHAUVE
7711 ROOM
HUTLINE
450
BOTTOM OF SLAB + 99.564 Date:2021.02.22 11:42:52 +05'30'
2.4 X 2.4 NARPAT SINGH Digitally signed by NARPAT SINGH
ROAD LINE
ROAD LINE
SRDOM-CO-BB
Date:2021.02.22 03:32:29 +05'30'
A BOXN/N
200
3000
200
DYCSTE-MRVC
Date:2021.02.03 04:54:03 +05'30'
SURENDRASINGH JAGMOHAN SINGH CHAUHAN Digitally signed
by SURENDRASINGH JAGMOHAN SINGH CHAUHAN
A
Date:2021.02.04 12:02:10 +05'30'
NARESH PAL SINGH Digitally signed by NARESH PAL SINGH
1200
CEE-MRVC
Date:2021.02.05 11:46:20 +05'30'
GR. LEVEL+101.664 RAJENDRA RAMBHAU POTDAR Digitally signed by RAJENDRA
BOXN/N
SRDSTE-EAST-BB RAMBHAU POTDAR
Date:2021.02.18 12:52:24 +05'30'
WALL
MUMBAI RAILWAY VIKAS CORPORATION LTD.
COMPOUND
2.40 M HEIGHT PEDESTRIAN SUBWAY AT KM 35-41
HUTLINE
1 2 3 4 5 6