Professional Documents
Culture Documents
Product Structure Tree
Product Structure Tree
Product Structure Tree
System
Joints
assembly
Steel Wire
Ropes Clamp Bolts and Nuts Washer DT MESH
Rockfall Protection
System
Clamp Anchor
Nut
Plate
Cement
kfall Protection
System
Nut Cement
Plate Coupler
Cement
Item
Scope Load Detector
Correct
detection of Correct detection
GTFL Primary 1
load at the time of load
of event
Realtime
communication
GTFL Communication Primary 1
of values to
server
Targets Design targets 1. Criteria for early warning , measuring load, location of event, magnitude of vibration
2. Performance in the remote locations, extreme climate conditions,
3. cost
4. Capacity of measuring load
5. 10 years warranty
6. Design Life 50 years
7.coverage (resolution)
Item Functions Sheet
Type of failure modes
How much? When? No Function Partial Function Degraded Function Over Function
Periodical delay in
Within 100
Realtime No communication communication due to communication
miliseconds
situation like rain and over the period
sunlight,
Showing values
without event or
excessive values
of small events
Fluctuations in
communication
Critical Milestones
A. Load Detector
1. VOC of Internal and external customers ( For Full product)
2. List of Functions (PST, BD, IFS, IM, P-D,) ( For Full product)
3. Load cell Failure Modes, Effect, Cause, Control (type A,B,C)
4. Risk assessment
5. Action priority, plan and target date
6. Visit ISectr and Review
7.Steering team review
8.
B. Transreciever,
C. Vibration Detector,
D. Software,
E. Integration
Battery
Controller Battery Wire Data cable
Load sensors Monitor
Load P E X + X + X + + + +
sensors I M + X X X X X + X +
x x X + X + + + +
Controller + x + X + X + X +
Battery X + X + X +
Monitor X X + X + X
Battery
Wire
Data cable
+
X
+
X