Product Structure Tree

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 12

Rockfall

System

HSBN HSBN Anchor Anchors


Assembly Assembly System assembly

Joints
assembly

Steel Wire
Ropes Clamp Bolts and Nuts Washer DT MESH
Rockfall Protection
System

HSBN Assembly DT Mesh Anchor System

Steel Wire Ropes Joints assembly SDA assembly

Clamp Anchor

Bolts and Nuts Coupler


Bolts and Nuts Coupler

Washer Drill bit

Nut

Plate

Cement
kfall Protection
System

Anchor System TRM Assembly

sembly Solid anchor Crimped Yarn


assembly

Anchor Anchors Stitching Twine

Coupler Nut PP Netting


Coupler Nut PP Netting

Drill bit Plate

Nut Cement

Plate Coupler

Cement
Item
Scope Load Detector

VOC GOC Functions Primary / Secondary Priority

Correct
detection of Correct detection
GTFL Primary 1
load at the time of load
of event

Realtime
communication
GTFL Communication Primary 1
of values to
server

Targets Design targets 1. Criteria for early warning , measuring load, location of event, magnitude of vibration
2. Performance in the remote locations, extreme climate conditions,
3. cost
4. Capacity of measuring load
5. 10 years warranty
6. Design Life 50 years
7.coverage (resolution)
Item Functions Sheet
Type of failure modes

How much? When? No Function Partial Function Degraded Function Over Function

Within +/- at the Results variation is


No detection of the Sometimes showing malfunctioning over
3% actual time of lesser than
load values the period
load event tolerance

Periodical delay in
Within 100
Realtime No communication communication due to communication
miliseconds
situation like rain and over the period
sunlight,

n of event, magnitude of vibration


mate conditions,
Intermittent Unintended
Function Function

Showing values
without event or
excessive values
of small events

Fluctuations in
communication
Critical Milestones
A. Load Detector
1. VOC of Internal and external customers ( For Full product)
2. List of Functions (PST, BD, IFS, IM, P-D,) ( For Full product)
3. Load cell Failure Modes, Effect, Cause, Control (type A,B,C)
4. Risk assessment
5. Action priority, plan and target date
6. Visit ISectr and Review
7.Steering team review

8.
B. Transreciever,
C. Vibration Detector,
D. Software,
E. Integration

9. Final Steering team review


FPR Completion Date

VRK 8th March


YP 11th March
GT 15th March
GT 15th March
VRK 15th March
Team + Mr. Vishwanathan 18th March
Team 21th March

Team 27th March

Team + Mr. Vishwanathan 29th March


Intraction matrics - For Load detection device

Battery
Controller Battery Wire Data cable
Load sensors Monitor
Load P E X + X + X + + + +
sensors I M + X X X X X + X +
x x X + X + + + +
Controller + x + X + X + X +
Battery X + X + X +
Monitor X X + X + X

Battery

Wire
Data cable
+
X
+
X

You might also like