Professional Documents
Culture Documents
Elevations 2
Elevations 2
APEX LINE
15000
COMPOSITE PANEL
TOP OF ROOF
13300
300 1700
WOOD FINISH LOUVER
FOURTH CEILING
LINELINE
13000
FOURTH FLOOR TEMPERED DOUBLE SLIDING
PLAN GLASS WINDOW
2700
10300
THIRD CEILING
300
LINE
10000
2700
SECOND CEILING
300
LINE
7000
2700
SECOND FLOOR
PLAN
4300
300
CEILING LINE
STAINLESS STEEL RAILINGS
4000
3000
GROUND FLOOR
PLAN
1000
1000
NGL
0
LAMINATED GLASS
FOURTH CEILING
LINELINE
13000
2700
FOURTH FLOOR
PLAN CHB WALL WITH PLASTER
ON BOTH SIDE
10300
THIRD CEILING
300
LINE
TEMPERED DOUBLE SLIDING
10000
2700
GLASS WINDOW
THIRD FLOOR PLAN
15000
7300
SECOND CEILING
300
LINE
7000
2700
SECOND FLOOR
PLAN
300
4300
CEILING LINE
4000
STAINLESS STEEL RAILINGS
3000
GROUND FLOOR
PLAN
1000
1000
NGL
0
SCHOOL: PROJECT TITLE: SUBMITTED BY: ALAMAG , CONCEPCION, GORDON, PEDRAGOZA INSTRUCTOR: REMARKS: PLATE.:
COURSE/SEC:
BS. ARCHITECTURE/CEIT 603P
3
NEURATECH ARCHISPHERE
RIZAL TECHNOLOGICAL UNIVERSITY SUBJECT/SCHD. ARCHITECTURAL DESIGN 6/T-W AR. FELIPE MAGCAMIT JR. UAP
PROJECT LOCATION BONI AVE. MANDALUYONG CITY DATE SUBM. MAY 22, 2024