1 2 3 4 5 6 7

APEX LINE
15000
COMPOSITE PANEL

TOP OF ROOF
13300

300 1700
WOOD FINISH LOUVER
FOURTH CEILING
LINELINE
13000
FOURTH FLOOR TEMPERED DOUBLE SLIDING
PLAN GLASS WINDOW

2700
10300

THIRD CEILING
300

LINE
10000
2700

THIRD FLOOR PLAN CHB WALL WITH PLASTER


7300 ON BOTH SIDE
15000

SECOND CEILING
300

LINE
7000
2700

SECOND FLOOR
PLAN
4300
300

CEILING LINE
STAINLESS STEEL RAILINGS
4000
3000

GROUND FLOOR
PLAN
1000
1000

NGL
0

LEFT SIDE ELEVATION


1 1 : 100
7 6 5 4 3 2 1
COMPOSITE PANEL
APEX LINE
15000
WOOD FINISH LOUVER
TOP OF ROOF
13300
300 1700

LAMINATED GLASS
FOURTH CEILING
LINELINE
13000
2700

FOURTH FLOOR
PLAN CHB WALL WITH PLASTER
ON BOTH SIDE
10300
THIRD CEILING
300

LINE
TEMPERED DOUBLE SLIDING
10000
2700

GLASS WINDOW
THIRD FLOOR PLAN
15000

7300
SECOND CEILING
300

LINE
7000
2700

SECOND FLOOR
PLAN
300

4300
CEILING LINE
4000
STAINLESS STEEL RAILINGS
3000

GROUND FLOOR
PLAN
1000
1000

NGL
0

RIGHT SIDE ELEVATION


2 1 : 100

SCHOOL: PROJECT TITLE: SUBMITTED BY: ALAMAG , CONCEPCION, GORDON, PEDRAGOZA INSTRUCTOR: REMARKS: PLATE.:
COURSE/SEC:
BS. ARCHITECTURE/CEIT 603P
3
NEURATECH ARCHISPHERE
RIZAL TECHNOLOGICAL UNIVERSITY SUBJECT/SCHD. ARCHITECTURAL DESIGN 6/T-W AR. FELIPE MAGCAMIT JR. UAP
PROJECT LOCATION BONI AVE. MANDALUYONG CITY DATE SUBM. MAY 22, 2024

You might also like