Professional Documents
Culture Documents
Kalptru Power
Kalptru Power
dHISTORY
K a l p a - V r u k s h a . T h e e m b o d i m en t o f r e a l i z a t i o n b en e a t h w h i c h
o n e' s every wish would be fulfilled. The resourceful tree of
k n o w l e d g e t h a t h a s a s i gn i f i c a n t p r e s e n c e i n m y t h o l o g y . I t i s t h i s t r e e
that governs the functional and philosophical ideologies at Kalpataru,
a synonym of the word Kalpa- Vruksha.
DEVLOPMENT
K a l p a t a r u P o w e r T r a n s mi s s i o n L i mi t e d i s o n e o f t h e l e a d i n g
companies in the field of Turnkey projects for EHV Transmission
Lines up to and including 800 KV in India and Overseas. As an EPC
contractor, our scope of work includes design, testing, fabrication,
galvanizing of towers and construction activities from survey, civil
works/ foundation, erection to stringing and commissioning of EHV
lines, besides procurement of items such as conductors, insulators,
hardware accessories etc. We also participate in Substation projects
on a partnership basis.
COMPANY PROFILE
E X E C UT I V E M A NA G EM E N T
• K. V. Ma n i Ma n a gi n g Di r e c t or
• Aj a y Mu n o t E xe c u t i ve Di r e c t or
• Ma n i s h Mu n o t E xe c u t i ve Di r e c t or
B US I N E S S H E A D S
• B. K. Satish P r e s i d e n t & C E O - ( Di s t r i b u t i o n P r o j e c t s )
E-mail: mktg@kalpatarupower.com
C O R P O RA T E O F F I C E & R E A L E S T A T E D I V I S I O N
E-mail: kptl@kalpataru.com
P I P E L I N E S D I VI S I O N
M A N UF A C T UR I N G S K I L L S
SHIFT TIME
Th i r d s h i f t 11:00 to 7:00
MISSION STATEMANT
BIOMASS POWER
B e s i d e s b e i n g e n v i r o n m en t f r i e n d l y , t h e P r o j e c t i s e x p e c t e d t o
contribute to the prosperity and sustainable development of the
region, besides generating local employment opportunities.
Kalpataru has set up its own Tower Testing Station and R & D
Centre in October 1998 at Punadra close to Gandhinagar. Over 100
tower tests have already been carried out since then for various
clients including Power Grid Corporation of India and ABB. In the
year 2000, the company tested a 500 KV Double circuit tower with
quadruple conductor for NPC, Philippines and Sumitomo, Japan
w e i g h i n g 5 3 . 3 M t s w i t h h ei g h t o f 7 9 . 2 m t s , u n d o u b t e d l y o n e o f t h e
tallest and heaviest towers ever tested.
OPERATIONS
T r a n s m i s s i o n l i n e t o w e r s a r e h i gh l y i n d e t e r m i n e n t s t r u c t u r e s
and in the design of towers a number of assumptions are made. The
p u r p o s e o f t e s t i s t o e n s u r e t h a t t h e a s s u m p t i o n s a r e r i gh t l y m a d e a n d
the tower will meet the desired performance criteria.
For this purpose the tower is erected on the test bed and the
load at various points of tower is applied by winches driven by
electrically operated motors through wire ropes and pulley blocks.
There are 41 Winches all of 3 Mts capacity, 28 housed in Transverse
M a s t W i n c h H o u s e a n d 1 3 i n L o n g i t u d i n a l M a s t Wi n c h H o u s e . S t r a i n
gauge type Load cells are mounted near the load application point of
test tower so as to make them strained by loads applied.
The company has entered into Cross Country Gas & Oil Pipeline
activity since 2005.
With the committed progress on reforms, Oil & Gas sector has
b e e n o p en e d u p . A s a r e s u l t , t h e d e m a n d o f e n e r g y p e r c a p i t a i s r i s i n g
steadily.
India has less than 15,000 kms of Oil & Gas pipelines. This is
despite the fact that pipelines are most cost effective way of
transporting petroleum products and gas. Th e pipeline network
available in India today is highly inadequate to transport the
petroleum products to demand centers in an efficient, safe and
e n v i r o n m en t f r i e n d l y w a y . T o m e e t t h e g r o w i n g d e m a n d a n d i n v i e w
o f t h e a w a r e n e s s o f p e o p l e t o w a r d s e n v i r o n m en t , i t i s p r o j e c t e d t h a t
over 4,000 kms of product and crude oil pipelines will be built in
next 5 years.
CAPACITY
OPERATIONS
T r a n s m i s s i o n l i n e t o w e r s a r e h i gh l y i n d e t e r m i n e n t s t r u c t u r e s
and in the design of towers a number of assumptions are made. The
p u r p o s e o f t e s t i s t o e n s u r e t h a t t h e a s s u m p t i o n s a r e r i gh t l y m a d e a n d
the tower will meet the desired performance criteria.
For this purpose the tower is erected on the test bed and the
load at various points of tower is applied by winches driven by
electrically operated motors through wire ropes and pulley blocks.
There are 41 Winches all of 3 Mts capacity, 28 housed in Transverse
M a s t W i n c h H o u s e a n d 1 3 i n L o n g i t u d i n a l M a s t Wi n c h H o u s e . S t r a i n
gauge type Load cells are mounted near the load application point of
test tower so as to make them strained by loads applied.
SALIENT FEATURES
CAPACITIES
SPECIAL FEATURES
• Testing can be done in three modes viz. Manual, Semi Auto and
Auto mode.
• R e s o l u t i o n o f d i g i t a l i n d i c a t o r s o r c a n b e s e t t h r o u gh t h e
computer.
• Print out of the Test results and Test date of peak load on
Destructive Test can be obtained.
MAIN EQUIPMENT
FA B R IC A T I O N P L A N T – 1
F A B R I C A T I O N P LA N T - 2 E X C L US I V E L Y F O R
EXPORTS/EOU
INSTALLED CAPACITY
FACILITIES
• Tower Testing Station and R&D Centre for testing upto 800KV
D/C towers with Tower Base width - 27M x 27M (square and
rectangle), Height - 85mts and uplift capacity per leg of 500
MT is one of the largest facility of its kind in the world.
• O v e r 12 n o s . o f T e n s i o n S t r i n g i n g e q u i p m e n t s u p t o 8 / 1 6 T o n n e s
(capable of pulling quadruple conductors)
TURANKEY SOLUTION
K A L P A T A R U o w n s 12 s e t s o f T e n s i o n S t r i n g i n g E q u i p m e n t a n d
have additional sets at their disposal at various locations, besides
plethora of Cranes & Fork lifts.
The Company has strong relationships with the best-in-class
Vendors for Conductors, Insulators, OPGW, Hardware, Earthwire, etc
-both in India and across the world, and is able to source quality
material at competitive prices
KALPATARU HORIZON
K A L P A T A R U H A R MO N Y
KALPATARU ROYALE
SIDDHACHAL VI
CONSTRUCTION COMPETENES
F I R M F O O T I N G , M EG A S T R I E D E S
comes from the fact that it also customises the structures as per the
u n i q u e n e e d s o f i t s I n s t i t u t i o n a l c l i e n t s . Th e e x q u i s i t e l y d e s i g n e d
complex of three 7-storeyed residential quarters for State Bank of
India employees at Mahim. The complex of 4 residential buildings at
Boat Club Road, Pune for NABARD. And the 65,000 sq.ft.
commercial complex at Vakola for Asian Paints. All are perfect
example of its calibrated efforts towards tailored convenience.
K a l p a t a r u ' s h i g h l i gh t s , o v e r t h e y e a r s , i n c l u d e t h e 3 3 - s t o r e y e d
'Kshitij' at Napean Sea Road, the 39 storeyed, "Kalpataru Heights" at
Mumbai Central and the sprawling 211 - acre "Srishti complex",
complete with a school, college and hospital, Kalpataru Residency at
Sion, Kalpataru Habitat at Parel, Kalpatar Horizon at Worli,
M e g a p o l i s ( M a l l ) a t Th a n e , K a l p a t a r u S y n e r g y a t S a n t a c r u z . A m o n g
others, of course.
QUALITY POLICY
T RA I N I N G A N D D E V E L O P M E N T
1. TRAINING:
doing a particular job. Training raises the skill level and increase the
versatility and adaptability.
• METHODS OF TRAINING
Following type of methods are given under the On the job training:
• On specific job.
• On job rotation.
• A p p r en t i c e s h i p .
• Simulation.
JOBS
• Academic qualification
• Nature of experience
• Interview performance
RE CRUIT MENT
DEFINITION
Sources of Recruitment
1. Internal Sources
2. External Sources
Selection
Stage If the candidates are found to be capable for doing the task,
h e i s s e l e c t e d . Th e s t a g e s a r e a s u n d e r : I t i n c l u d e s s e l e c t i o n o f t h e
candidates who passes through some
Reception of
Applicant
Preliminary
interview
Application Blank
Employment Tests
Interview
Investigation of
past career
Preliminary
selection
Final selection
Placement
PERFORMANCE APPRAISAL
IV & above
In this system they have been given questionnaires, which they
have to fill up, by themselves. For every question there are five
options:
The system is like this First reviewing officer checks the form
that is superior or boss of the employee.
On the basis of this system the head office decides that whom
to promote and whom to suspend of what action have to be taken.
IIFCO do not have feedback system. They never discuss about
PROMOTION
1. Academic performance
3. Nature of experience
4. Interview performance
( S t a g e 1)
ENELPOWER Italy 400 Tourgourt - 4,500 2001-02
Biskra in Algeria
Downer, PTR Australia 225 Stanwell- 4,000 2001-02
Broadsound
GyM. Peru 138/220 Aguaytia-Pycalla 550 2001-02
/
Oraya - Viczarra
ALSTOM USA 220 San Roque Power 550 2001-02
Project In
Philippines
EEPCO Ethiopia 66 Shakisso-Negele 1,600 2001
Borene & Maika
Wakana- Gobesa
NPC/SUMITO Philippines 500 Isilan-Cut in 4,500 2000
MO Point
ADWEA/PTC- Abu Dhabi 33 Western Rg. 660 2000
ETA Expansion
EVN Vietnam 220 Pha Lai-Socson- 2,100 1999-00
Bacgiang
EGAT/ABB Thailand 500 Greater Bangkok 6,200 1998-99
Area
NPC Philippines 138 Leyte – Samar 2,400 1998-99
NPC/AER Philippines 230 Casecnan–San 800 1998-99
Const. Manuel
NPC Philippines 69 Negros III – 1,600 1998-99
Panay III
PEEGT Syria 230 Various Lines 6,200 1998-00
CFE Mexico 400 Mexique- 9,000 1998-99
Mexico/ALST Villahermosa
OM
PT. PLN Indonesia 150 Central Southern 2,500 1997-98
(PERSERO) Sumatera
HEC – Australia 220 Liapootan– 2,000 1997-98
Tasmania / Palmerston
ABB
B R EA K T H R O UG H A C H I E VE M E N T S
T h e c o m p a n y h a s a l s o r e c e i v e d a n o r d e r o f R s . 2 4 0 Mn f r o m
Reliance for its 28" Spur Lines. The company has invested in over 30
Nos. Pipe layers, multiple Boring Machine / Bending Machine,
Sourcing
Culture
Even the best of talents can be wasted if not provided with the
right infrastructure. Our non-formal approach to HR gives individuals
a platform to interact, express and innovate.
C A R E E R D E VE L O P M E N T
TRAINING INITIATIVE
OVERSEAS UTILITIES
E G A T , Th a i l a n d Sonelgaz, Algeria
ABB, Germany
Cegelec, France
Cobra, Spain
GYM, Peru
Pivot, Nigeria
SAG, Germany
EXPORT
Month of Incorporation (as HT Power Structures April 1981
Pvt. Ltd.)
Month of first 220 KV contract April, 1984
DOMESTIC CUSTOMERS
INTERNATIONAL CUSTOMERS
v. EEPCO (ETHOPIA),
EXPORT MARKETS
SOUTH MI D D L E AFRICA
EAST ASIA EAST AUSTRALIA
USA
CANADA
Also the Company has worked closely with reputed International EPC
contractors like:
ENVIRONMENTAL POLICY
FINANCE DEPARTMENT
INVESTOR INFO
Kalpataru Power Transmission Limited is a Public Listed Company with its shares listed
Kalpataru Group holds 63.68% of the equity share capital of the company with the
remaining shares held by over 12,000 shareholders.
PERFORMANCE
Compound Average growth rate of Profitability for the last 5 years at over 50%
PRODUCTION
Kalpataru Power Transmission Ltd., a global player providing EPC services for the
Power T&D sectors, has shown a powerful performance by reporting 26% increase in the
total revenue for the second quarter ended September 30, 2007 vis-à-vis corresponding
period by achieving Rs. 3,852 Million revenue as against Rs. 3066 Million revenue in the
same period of previous year.
The PBT has jumped by 21% to Rs. 450 Million as against Rs.372 Million in the
corresponding quarter. The PAT has also jumped by 18% to Rs.321 Million as against
Rs.272 Million in the corresponding period of previous year. For the 6 months period
ended Sept 07, revenues rose 25% to Rs 7645 million and Profit before tax rose by 25 % to
Rs 965 Million.
• Record order booking (including L1 positions) of above Rs. 33 Billion (USD 825
Million) as of date.
• Single largest order, the first of its kind in Power Distribution Industry for feeder
separation from Maharashtra State Electricity Distribution Company Ltd. worth
Rs.9,970 Million (USD 250 Million).
• GRTE Sonelgaz, Algeria for laying 400 KV Transmission Line Project worth Rs.1,550
Million (USD 39 Million).
• Secured Spur Lines from Reliance Gas Transportation Infrastructure Ltd. having
contract value of Rs.240 Million.
Kalpataru Power Transmission Ltd., has been adjudged the Best emerging value creator
(Mid-Size Companies) runner up for Outlook Money - NDTV Profit Awards 2007. JMC
was ranked as the Best Wealth Creator among the Construction companies by Construction
World in November, 2007 issue.
• JMC Projects (India) Ltd, in which your company holds 52% stake has reported
revenue of Rs. 1,860 Million (a rise of 61%) compared to Rs 1,160 Million and a
profit before tax of Rs. 100 Million, a rise of 89%, as against Rs. 53 Million in the
corresponding period of previous year.
• For the 6 months period ended Sept 07, revenues rose 84% to Rs 3,672 million and
Profit before tax rose by 105 % to Rs 184 Million.
• JMC has an order book of approx Rs. 21 Billion including a mix of various
factories & building, civil works for power projects, water pipelines and road
projects
For the fourth quarter ending March 07, the gross turnover rose by 43% and was
Rs.5,304 Million (USD 132 Million) from Rs.3717 Million (USD 92 Million). The PBT for
the quarter is Rs.867 Million (up almost 100%) for the year against Rs.435 Million in the
previous year and PAT is Rs.643 Million (up by 106%) against Rs 312 Million for the
previous year.
• Order backlog (including L1 bids) is approx Rs.23000 Million (USD 575 Million).
• Exports (including overseas project) for the year has constituted over 25% of total
turnover, at an all time high of Rs. 4000 Million (USD 100 Million). The company
continues to expand its global footprint and currently undertaking turnkey projects in
Algeria, Ethiopia, Kenya, Tanzania, Zambia, Nepal, Philippines & Qatar.
• During the year, the company made its first break through in rural electrification /
distribution projects in Africa with its first project in Kenya.
• The Company has also successfully entered the North American markets with securing
its first tower supplies order directly to a North American Power Utility.
The company has acquired 65% equity stake in Shree Shubham Logistics Ltd,
engaged in Warehousing activities in the state of Rajasthan. The company has planned to
invest approximately Rs 500 Million to focus on scaling up its Logistics operations in a
phased manner
• JMC Projects (India) Ltd. in which your company holds 52% stake has reported
total revenue of Rs.5,000 Million (annualized rise of 76%) and a profit before tax of
Rs.252 Million as against Rs.22 Million in the reporting period (for 6 months). PAT
for full year was Rs 159 million.
• EPS for full year was Rs.12.70 per Equity share of Rs.10/- each.
• JMC order backlog is above Rs. 12,000 Million (USD 300 Million) comprising
of multiple Factories & Building and Roads & Bridges projects across the country
JMC has entered into new strategic areas of business- firstly Civil works for Power
projects, in which company has secured multiple jobs from BHEL, L&T (at IOCL,
Panipet) and civil works for Coal Handling plant at Dadri (NTPC). It has also made
a break through in the Water pipeline segment with first job in Ahmadabad with
further more jobs expected shortly, mostly projects funded by ADB, World Bank &
/ or JNURM.
SWOT ANALYSIS
INTRODUCTION
STRENGTHS
FINDING
CONCLUSION
K a l p a t r u P o w e r T r a n s s i m s i o n H a s A L a r g e S a l e A l l O v e r Th e
Country. It Is One Of The Most Highly Producing Lamp -Post. Also
Pipe And Biomass Power Plant Is Provide Good Products To
C o n s u m e r . Th i s U n i t H a s G o o d M a n a g e m e n t .
I A m V e r y T h a n k f u l T o Wh o G i v e M e I n f o r m a t i o n A b o u t T h o s e
Industries To Top To Bottom Management, Marketing, Finance, And
Other.
BIBLIOGRAPHY
WEB-SITE
2. www.khoj.com
3. WWW.SWOT ANALYSIS.COM
SEARCH ENGINE
4. WWW.GOOGLE.COM
BOOK’S NAME
5. MARKETING MANAGEMENT