Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 5

CURRICULUM VITAE

ENG.SYED MOHAMMED
EMAIL: syedmohd77@gmail.com
HYPERLINK "mailto:syedmohd77@rediff.com" syedmohd77@rediff.com
syedmohd77@yahoo.com
Mobile Number +918297627161

Senior Project Manager (for Residential Building Construction)

OVERVIEW : Qualified Civil Engineer with extensive


practical work Experience of about 37years (About 18 years in the
Gulf) in construction of Residential & Commercial Buildings, Luxurious
Villas and Economical Villas. Excellent in controlling and managing all
site aspects in accordance with the Conditions of Contract, Contract
Specifications & Drawings, problem solving & evaluation skills,
dynamic result oriented, pro-active self driven & sincere personality
motivated by performance.

STRENGTH : Engineering background


Flexible personality
Reliable, effective, honest and disciplined

EDUCATIONAL QUALIFICATION : Bachelor Degree in Civil Engineering – B.E. Civil in 1986


 Project Management using Primavera Level I & III
 Preparing Bill of Quantities Course from Society of Engineers.
 Done PMP course
 Done STAAD.PRO course
 Knowledge of Word ,Excel & Powerpoint.

GULF EXPERIENCE :
1)Worked as Deputy Project Manager in Galfar Al Misnad Contracting in Qatar from June’15 to Sep’ 2015 for
construction of school project.
2)Worked in Abna Al Amir Contracting Dubai as Civil Engineer Incharge for the construction of villas and
buildings from Apr’15 to May 2015
3) Worked in Beam Star Contracting in Dubai as Project Manager for building construction from Jan’15 to Mar’
2015.
4) Worked as Project Manager Civil for construction of 28 story building in TriValley Contracting, Qatar from
Sep’13 to Nov’13.
5) Worked as Civil Finishing Superintendent in URS Scott Wilson India Pvt Ltd. (PMC) From 25 th January 2013 to
31st July 2013 for 3B+G+17 multi-story buildings in India.
6) Worked as Project Manager in Qatar Speedhouse in Qatar for Portacabins and 4 sheds work from Oct’12 to
Dec’ 2012.
7)Worked as Projects Manager in Golden Way L.L.C. in Muscat,Oman from 3rd June 2011 to 31 January
2012 for construction of health centres 2 nos and mosque in Qurm.-Cost of Projects R.O. 5
million
8) Worked as Project Manager with Al Qussie International Contruction Co, jeddah division, from March
2010 to March 2011 for the building renovation project for King Abdul Aziz University.-Cost of 3 projects – SR
120 Million.(Equivalent to Indian Rs 178,20 Crores)
9)Details of Works in the U.A.E. :
1999 to August 2009 : Worked with M/s. M. Al Shaikh Mubarak
Architectural & Eng. Consultants,
Dubai

Position Held : Projects Engineer

Projects Completed : Buildings:

a)
2B+G+14+Gym Building in Dubai
Cost of Project: Dhs. 70.00
Million

b) GF & G+1 storey Villas


& G+4 Building in Dubai.

c) B+G+3 Building with Gym at


Hor Al Anz, Dubai for Development Board.
Cost of Project: Dhs. 28.00
Million

d) GF & G+1
story Villas in Dubai.

e) B+G+3 Story
Residential Building at Al Karama,Dubai for M/s. Mohammed Bin
Rashid Al Maktoum Charitable & Humanitarian Foundation.
Cost of Project: Dhs. 12.00 Million

f) B+G+M+3
Building with Gym at Al Mamzar, Dubai for Development Board.
Cost of Project: Dhs.13.00
Million

Client: The Development Board,


Government of Dubai

g) G+2 Storey Residential Building at Hor-Al-Anz (East),


Dubai.
Cost of Project: Dhs. 5.00
Million
Client: The Development Board,
Government of Dubai

h) 8+4+8 Nos. GF Villas for Dubai Municipality

i) 34 Nos. G+1 Storey Villas at Jumeira, Dubai for Dubai


Municipality
j) G+2 Storey Residential Building at Al Ghusais, Dubai.
Cost of Project: Dhs. 4.50
Million
Client: The Development Board,
Government of Dubai

k) G+4 Storey Buildings at Al Qusais, Dubai

l) 39 nos. GF
Villas at Dubai for Dubai Municipality.

Job Responsibilities : Controlling and managing all the site


aspects in accordance with the Conditions of Contract, Contract
Specifications & Drawings, liasoning with the Clients, Dubai
Municipality, DEWA, Civil Defense Authority, etc. and following as per
Government rules & regulations, and execution of works as per the
approved drawings. Coordinating with Main Contractor and all Sub-
Contractors by arranging regular meetings. Assessing the progress in
conjunction with the approved work program and cash flow chart, and
monitoring the site progress closely, quality control checking of
materials & work-shop drawings, preparation of interim bills, checking
of variations, completion of project as per contract with proper
documentation for snag list, testing & commissioning of MEP works,
etc.

10)1997 to 1999 : Worked with M/s. Al Ta’awun Contracting


Co., Dubai

Position Held : Civil Engineer

Projects Completed : Villas & Buildings:

a) GF, G+1, G+2 storey Villas at Dubai.

11)1995 to 1996 : Worked with M/s. Salman A. Al Duhaim


Contracting Co., Dammam, Saudi Arabia.

Position Held : Civil Engineer

Projects Completed : Buildings:

a) Mosque Building at Jubail, Saudi


Arabia.

Job Responsibilities : Execution of Architectural, Structural &


MEP Works as per the approved drawings, allocation of works to all
subordinators, controlling the Sub-Contractors’ workers, follow up with
Project Manager and Purchase Officer for arranging the required
materials, preparing bills for the Sub-contractors, preparing estimates,
bar bending schedules, calculating the quantities for the required
materials, etc., and also responsible for the quality and safety
measures at site
12)1993 to 1994 : Worked with M/s. Nehad Agronomy
Services, Suwaiq, Oman.

Position Held : Civil Engineer

Projects Completed : Buildings:

1. GF Villas Guest House & Hospital Renovation work Muscat,


Oman.

13)1992 to 1993 : Worked with M/s. Al Turki Enterprises


L.L.C., Oman.

Position Held : Civil Engineer

Projects Completed : Buildings:

a) construction
of College of Arts and Commerce Building and building for
Doctors accommodation. Completed boundary wall & steps work
for Sports Complex in Muscat,Oman

Job Responsibilities : Execution of Architectural, Structural &


MEP Works as per the approved drawings, allocation of works to all
subordinators, controlling the Sub-Contractors’ workers, follow up with
Project Manager and Purchase Officer for arranging the required
materials, preparing bills for the Sub-contractors, preparing estimates,
bar bending schedules, calculating the quantities for the required
materials, etc., and also responsible for the quality and safety
measures at site

14)1990 to 1992 : Worked with M/s. Rockline Builders,


Hyderabad, India.

Position Held : Civil Engineer

Projects Completed : Buildings:

a) construction
of 3 nos.G+2 Buildings at Hyderabad, India.

15)1989 to 1990 : Worked with M/s. Al Hajjan Contracting


Co.,Abu Dhabi, U.A.E.

Position Held : Civil Engineer

Projects Completed : Buildings:

a) 2 nos. G+1
Villas at Abu Dhabi, U.A.E.
16)1986 to 1989 : Worked with M/s. Rockline Builders,
Hyderabad, India.

Position Held : Civil Engineer

Projects Completed : Buildings:

a) construction
of 2 nos.G+2 Buildings at Hyderabad, India.

PERSONAL INFORMATION :

Nationality : Indian

Date of Birth : 29 July 1964

Marital Status : Married

Languages Known : English, Hindi ,Telugu,Urdu


&( Arabic -Reading only)

Driving Licence : Holding valid U.A.E Licence (L/V)

Permanent Address : H.No.8-1-523/203, 5th Floor


Flat No. 402, Street No. 3, Brindavan Colony, Toli Chowki, Hyderabad-
500008,Telangana State, India.

Passport No. : M3788563

You might also like