Details of Utilities Shifting Department in respect of District Kathua for

Delhi Katra Expressway (PkG 14)

Supervis
Cost of Total (In Total (In
S. No. District
Name of Division/ Incharge
Type of Utilities ion
shifting Lakhs) Crores)
Charges
Executive Engineer, 11KV, LT Line,
1 Distribution 743.77 18.59425 762.3643 7.62
EM&RE Div Kathua Xmers
Executive Enginner, 5 no. crossing of
2 Kathua Sub-Transmission, 232.97 5.82425 238.7943 2.39
66 KV Line
Div Kathua
Executive Engineer,
3 Water Pipe Lines 175.56 4.389 179.949 1.8
Jal Shakti
400 on 800KV
4 Powergrid 400 10 410 4.1
crossing

Pathankot 01 no. 132KV


5 PSPDCL 100 2.5 102.5 1.03
crossing
03 no. 66KV
6 PSPDCL 150 3.75 153.75 1.5375
crossing
Total 1502.3 37.5575 1539.858 18.4775