E801 - Org & Role of E8 (17 Files Merged)
E801 - Org & Role of E8 (17 Files Merged)
E801 - Org & Role of E8 (17 Files Merged)
E 8 SECTION
By
Mrs. Megha Kanoje
Dy. Director (Contracts)
ORGANISATION OF E 8 SECTION
CE COMD
Jt. DG (CONTRACTS)
OR
DIR (CONTRACTS)
CE ZONE
DIR(CONTRACTS)
CWE
DCWE (CONTRACTS)
GE
AGE(CONTRACTS)
ROLE OF
E 8 SECTION
ROLE OF SURVEYOR CADRE OFFICERS & STAFF
By
Mrs. Megha Kanoje
Dy. Director (Contracts)
The list of important documents
related to E8 section/ contract section
can not be made exhaustive
However,
2. Regulations of MES
3. Technical Instructions
By
Mrs. Megha Kanoje
Dy. Director (Contracts)
VARIOUS CLASSES OF CONTRACTORS
S (a)Two works costing not less than 7.50 crore each (a) Solvent upto 4.00 crore
or or
One work costing not less than 12 crore Financially sound for engagement upto
and 15.00 crore
(b) Average annual turn over for two consecutive years shall (b)Working capital not less than 50.00 lakh
not be less than 12 crore
A (a)Two works costing not less than 4.00 crore each. (a) Solvent upto 2.00 crore
or or
One work costing not less than 6.00 crore. Financially sound for engagement upto
and Rs 7.50 crore.
(b)Average annual turnover for two consecutive years shall (b)Working capital not less than 30.00 lakh
not be less than 6.00 crore
Class Past Experience of Completed Financial Soundness (in Rs)
Works in Last 5 years & Average
Annual Turn Over
(in Rs)
B (a)Two works costing not less than 1.50 crore each. (a) Solvent upto 100 Lakh
or or
One work costing not less than 2.0 crore. Financially sound for engagement upto
and 3.00 crore.
(b) Average annual turn over for two consecutive years shall (b)Working capital not less than 12.00 lakh
not be less than 300 Lakhs
C (a)Two works costing not less than 50.00 Lakhs each (a) Solvent upto 40.00 Lakhs
or or
One work costing not less than 80.00 Lakhs Financially sound for engagement upto
and 100.00 Lakhs
(b) Average annual turn over for two consecutive years shall (b)Working capital not less than 10.00 lakh
not be less than 100 Lakhs
D (a)Two works costing not less than 25.00 Lakhs each. (a) Solvent upto 20.00 Lakhs
or or
One work costing not less than 40.00 Lakhs . Financially sound for engagement upto
and 50.00 Lakhs
(b)Average annual turnover for two consecutive years shall (b)Working capital not less than 7.50 lakh
not be less than 50.00 Lakhs
Class Past Experience of Completed Financial Soundness (in Rs)
Works in Last 5 years & Average
Annual Turn Over
(in Rs)
E (a) Three works costing not less than Rs 7.50 lakh. (a) Solvent upto 10.00 Lakhs
or or
Two work costing not less than Rs 10.00 lakh each Financially sound for engagement upto
25.00 Lakhs
or
(b)Working capital not less than 5.00 lakh
One work costing not less than Rs 20.00 lakh.
and
(b) Average annual turn over for two consecutive
years shall not be less than Rs 25.00 lakh.
GENERAL GUIDELINES
1. Application for enlistment submitted by contractor on IAFW-2190 (Revised 2020) to Registering
Authority.
2. Constitution of the firm: Affidavit
Proprietorship – Affidavit by proprietor
Partnership – Partnership deed registered with registrar of firms
Private Ltd, Public Limited- Memorandum & Articles of association
3. List of works executed during last five years (as per Appx.) including copies of Work Orders
and Completion certificates.
4. Annual turnover certificate duly supported with audited balance sheet. The turn over
certificate must bear the UDIN (Unique Document Identification Number). The turn over
certificate and audited balance sheet should be from same Chartered Accountant. In case
balance sheets are not audited, Form 26 AS and /or Annual GST return shall be forwarded in
support of turn over.
5. Balance Sheet for last 5 years for Ltd companies
GENERAL GUIDELINES
GENERAL GUIDELINES
6. Solvency certificate Issued by the Scheduled bank
7. Working Capital Certificate
The Solvency Certificate and Working Capital Certificate shall be got verified from the
issuing bank
8. Affidavit by the contractor that there is no government dues / recovery outstanding against
him/ firm.
9. Affidavit from contractor giving brief details of arbitration / litigation cases he was involved in.
Registering Authority will critically examine and shall not enlist contractor considered habitual
litigant. Contractor shall be deemed to be a habitual litigant if he moves the court more than
once ignoring arbitration clause and court does not uphold his view.
10. Affidavit by the contractor affirming whether any of their near relatives is/are working as
Gazetted/ Commissioned officer/Junior Engineer) in MES/ MoD
11. Verification of Character and Antecedents of Contractors and their Agents
For enlistment/up-gradation/renewal/reclassification in category (b)(i) to(iii) :
All such electrical works shall be executed by him through such agency only (either self
or other agency) having valid Electrical License of required class from State /Union
Territory Authorities where works are to be executed.
• Applicable for enlistment in Class ‘D’ & ‘E’
• Graduate/Diploma holder Engineer having Degree/Diploma from Govt. recognized Institute
• Following discipline:
1. Civil Engineering
2. Electrical Engineering
3. Mechanical Engineering
• Post Qualification experience:
Civil Engineering
• a(i) Building Works
• a(ii)Water Supply and Sewage Disposal
• a(v) Roads
Electrical/Mechanical Engineering
• a(ii)Water Supply and Sewage Disposal
• b(i)Low Tension Electric Works(upto 1100 Volts)
• b(ii)High Tension Electric Works(excluding 33 KV)
• d(v) Maintenance and Operation Of E/M Installation
THANK YOU
TYPES OF CONTRACTS IN MES
By
Mrs. Megha Kanoje
Dy. Director (Contracts)
PRELUDE
TYPES OF CONTRACT
MEASUREMENT CONTRACTS
LUMPSUM CONTRACTS:
GENERALLY USED FOR ORIGINAL WORKS
MEASUREMENT CONTRACT
GENERALLY USED FOR MAINTENANCE CONTRACTS
LUMP SUM CONTRACTS
THE AGREEMENT BINDS THE CONTRACTOR TO CARRY OUT THE
WORK FOR A FIXED AGREED SUM IN CONTRACT .
EPC
BASED ON PREPRICING BY MES
The cost of each building structure etc, at par with the SSR, is
estimated in advance by MES & inserted in the schedule ‘A’ (list of
work & prices).
Quantities of items of work are not supplied to the tenderer and the
accuracy of the pre-pricing done by MES is also not guaranteed.
The tenderer is required to work out the detailed quantities for each
building / structure listed in schedule ‘A’, apply his own rates and
quote the lump-sum that he will charge for the work.
MES supplies the consultant with the data, information and parameters in
the form of stipulations in the contract.
Standard contract form has been approved by Ministry of Defence for use
by CE formation(s) hence does not require vetting by legal Authorities or by
concerned PCDA/ CDA
ENGINEERING PROCUREMENT CONSTRUCTION
(EPC) CONTRACTS
By
Mrs. Megha Kanoje
Dy. Director (Contracts)
ACTIONS FOR ISSUES OF TENDER
• Receipt of Admin Approval sanctioned by CFA
• Receipt and scrutiny of PIP Drawings a/w List of Drawings from E-6
•Technical Sanction, Tender drawings and PIP proforma form the basic
documents for preparation of tender documents by E 8 section
• e-Tender shall not be issued for TOP Secret Works/ Strategic Works
Subject to approval of CE Zone and intimation to NHEA
Category of work
• Against the part of the work (trade) which constitutes 2/3rd
or more of the total value of work
• Acceptance Page
• Special Conditions
• Acceptance letter
PERIOD FOR SUBMISSION OF TENDER
• Time allowed to the tenderers should be adequate to enable them
to correctly calculate and check their bids before uploading on the
portal.
• Period between bid submission end date and bid opening date shall
be seven (07) days to enable the bidder to forward DD towards
cost of tender & EMD (if applicable)physically before the bid
opening date.
• The bid submission closing time for all tenders of all formations
shall be 1800 hrs
PERIOD FOR SUBMISSION OF TENDER
• Minimum period between tender publishing date and bid submission start
date in case of Re-tender
• BOQ can not be revised if bid submission start date has already
commenced.
• In case of revision of BOQ, the period between uploading of revised BOQ
and bid submission start date shall be decided based on quantum and
nature of revisions but in no case shall it be less than three days
excluding the date of publishing of corrigendum containing revised BOQ.
POINTS TO BE KEPT IN VIEW WHILE
DRAFTING OF TENDER DOCUMENTS
• Tender form and general conditions of contract should be correct.
• ENGINEERING STAFF
•YARD STICK
•Yard stick shall be included in tender documents in all Lump-sum
tenders for common and standard buildings technically checked by
Dy/Jt Director (C) and Approved by Accepting Officer.
•CONCILIATION
•To be included in tenders for works costing less than Rs Ten
(10) Crore
•BLASTING
•Whether permitted or not
THANK YOU
E- TENDERING
By
Mrs. Megha Kanoje
Dy. Director (Contracts)
E-tendering shall be done on website portal www.defproc.gov.in
Nodal Officer Level 2 shall create USERS of his office, GE(I) & Nodal Officer Level 3.
Nodal Officer of Level 3 shall create USERS of his office as well as GE’s, AGE (I)’s under his
jurisdiction
DSC - Class II
Authorize “SIGNING” and “ENCIPHERMENT”
Validity two years
The officer on posting shall carry the DSC to the new formation.
Nodal Officer of the old formation shall immediately intimate Nodal Officer
of E-in-C's Branch through email for User transfer/mapping of the individual
(moved on posting) to the new formation.
This request also can be sent by the Nodal Officer of the new formation to
E-in-C's Branch.
The movement order of the individual while being posted out shall carry
specific mention as to whether the individual is carrying DSC or not.
NORMAL WORKS
Stage 1 Complete tender document with BoQ & drawing NIT (including
Appendix ‘A’) shall be uploaded for bidding with 2 covers.
The cover 2 shall be opened for only bidders who qualify after technical bid
evaluation.
Stage 2 shall be closed limited type enabling only the qualified bidders to
access the tender.
The contractor/ bidder shall quote rates in figures and the rates in words
shall be automatically generated by the system
Misc Schedule - Shall also include other items (non SSR based) to be quoted
by the bidder as for item rate tender.
Preparation of e_tender
b) Lumpsum tender
The contractor/ bidder shall quote rates in figures and the rates in words
and percentage above / below shall be automatically generated by the
system
1. Date Corrigendum
2. Fee Corrigendum
3. BOQ Corrigendum - Revised BOQ complete is uploaded in BOQ Corrigendum
4. Other Important Documents Corrigendum
5. Technical Bid Corrigendum
6. Financial Bid Corrigendum
7. Bid Openers Corrigendum
8. Cancellation of Tender Corrigendum
9. Retender Corrigendum
10. Terms and Conditions Corrigendum
11. Others Corrigendum
Amendment to e_tender (Corrigendum)
Minimum time between bid submission start date and bid submission
end date shall be five days.
BOQ can not be revised if bid submission start date has already
Commenced.
Corrigendum [other than revised BOQ] can be issued even after bid
submission start date
After bid submission end date, if number of bids are less than 7 –
System automatically extends the bid closing date for 7 Days
Any two out of four opening officers can open the tender
During the process of uploading the date and time for opening of
Financial Bid (Cover 2) shall be fixed
Date of opening of the Finance Bid i.e. Cover 2 shall also be fixed at this
stage in the e-tender portal keeping in view the following timeline:-
(a) If technical bids of all bidders are found to be qualifying for opening
of financial bid, financial bids (Cover 2) shall be opened at the earliest
date, but not later than three working days after uploading technical bid
evaluation summary.
(b) If technical bids of one or more bidders are not found to be
qualifying for opening of finance bid, a period not less than seven days
shall be kept between uploading of technical bid evaluation summary
and finance bid (Cover 2) opening.
The disqualified bidder may appeal to next higher Engineer
Authority (NHEA) with a copy to the Accepting Officer through email.
On receipt of any such appeal from the bidder or query from
NHEA regarding such appeal, the date of opening of financial bid shall
be postponed by minimum seven clear days from the date of receipt of
such appeal/query from NHEA (whichever is later) to enable NHEA to
dispose off the representation.
Opening of Financial Bid
In case the bidder has failed to quote on the revised BOQ, such bid shall
be treated as willful negligence by the bidder and his quotation shall be
considered as non bonafide.
In such case the lowest tenderer shall be the lowest amongst the
valid/ bonafide bids only. The remark of “Non Bonafide Finance Bid”
shall be endorsed against such bidder in CST and Financial Bid Opening
Summary.
Award of contract
The acceptance letter shall be uploaded on website (under AOC Menu)
using DSC of the Evaluator
Validity of bids shall commence from the next date subsequent to the
bid submission end date (financial bid). It is normally kept as 60 days.
Prevention of cartelization
All accepting officers shall examine the MIS report on the web portal
and ensure that there is no cartelization
eTENDERING
BOQ IS TO BE PREPARED IN SUITABLY FORMATTED EXCEL FILE
DOWNLOADED FROM PORTAL
eTENDERING
eTENDERING
eTENDERING
MODIFICATIONS IN NOTICE INVITING TENDER
eTENDERING
MODIFICATIONS IN NOTICE INVITING TENDER
eTENDERING
MODIFICATIONS IN NOTICE INVITING TENDER
eTENDERING
DIGITAL CERTIFICATE AUTHENTICATION
DASHBOARD: All actions to be taken are highlighted here
TENDER CREATION AND LIST OF TENDERS
NEW CALL FOR TENDER CAN BE CREATED OR THE TENDER IN
PROCESS OF CREATION CAN BE DELETED
TENDER CREATION: BASIC DETAILS
TENDER CREATION: COVER CONTENTS: COVER 1
TENDER CREATION: COVER CONTENTS: COVER 1
TENDER CREATION: COVER CONTENTS: COVER 1
TENDER CREATION: COVER CONTENTS: COVER 2: BOQ
TENDER CREATION: COVER CONTENTS: COVER 2: BOQ
TENDER CREATION: COVER CONTENTS: COVER 1 & 2
TENDER CREATION: NIT DOCUMENTS UPLOAD
TENDER CREATION: NIT DOCUMENTS UPLOAD
TENDER CREATION: NIT DOCUMENTS UPLOAD
TENDER CREATION: NIT DOCUMENTS UPLOAD: VERIFICATION
TENDER CREATION: NIT DOCUMENTS UPLOAD: VERIFICATION
TENDER CREATION: NIT DOCUMENTS UPLOAD:VERIFIED
TENDER CREATION: WORK/ ITEM DETAILS
TENDER CREATION: WORK/ ITEM DETAILS
TENDER CREATION: TENDER FEE & EMD DETAILS
TENDER CREATION: CRITICAL DATES
TENDER CREATION: LIST OF BID OPENERS
TENDER CREATION: WORK / ITEM DOCUMENTS
TENDER CREATION: WORK / ITEM DOCUMENTS: BOQ
TENDER CREATION: WORK / ITEM DOCUMENTS: BOQ: VERIFICATION
TENDER CREATION: WORK / ITEM DOCUMENTS: CHECK BOQ
TENDER CREATION: WORK / ITEM DOCUMENTS: CHECK BOQ
BOQ NOT COMPLIED. PLEASE PROTECT THE BOQ SHEET AND UPLOAD BOQ1
TENDER CREATION: WORK / ITEM DOCUMENTS: CHECK BOQ
By
Mrs. Megha Kanoje
Dy. Director (Contracts)
OPENING OF TENDERS
• The date for opening of tenders is fixed after corrigendum has
been issues/ uploaded.
• After the bid submission end date, if the number of bids received
are less than seven, the system will automatically extend the bid
closing date for a period of 7 days.
• After this extension of 7 days, the system does not show the
number of bids till the Technical bids (Cover 1) are opened.
• In case still the number of bids are assessed to be less than seven
and the Accepting Officer feels that chances of healthy competition
are less, he can take a call to postpone the bid submission end
date or to re-invite the tender.
OPENING OF TENDERS
•However, if the Accepting Officer decides to go ahead with opening
of tender, then the tender shall be opened in two steps. In the first
step, Cover 1 (Technical Bid) shall be opened. In the second step,
Cover 2 (Financial Bid) of applicants, who have been found eligible
after technical evaluation of Cover 1, shall be opened.
•In case 07 bidders are not qualifying from the eligible class and
above then bidders from one class below shall also be considered (in
case of remote and difficult area two class below shall also be
considered).
•In case qualifying bidders are still less than 07, decision shall be
taken by Accepting Officer either to go for retender or to go ahead
with opening of cover 2.
SELECTION OF CONTRACTORS/
TECHNICAL BID EVALUATION
• In case even after considering one class below and retendering, the
required competition is not achieved for a work the Accepting officer
may decide to admit tender of tenderers two class below after
obtaining permission.
•In case any bid is rejected the date of opening of financial bid shall
be after 07 days to afford opportunity to the aggrieved bidder to
approach Next Higher Engineer Authority if it so desires.
SELECTION OF CONTRACTORS/
TECHNICAL BID EVALUATION
IN CASE ONLY ONE BID IS RECEIVED
• In case only one bid is received the Accepting officer shall decide
whether to retender or to open the Technical Bid (Cover I)
• In case the bid qualifies for opening of financial Bid (Cover II) and
the financial bid is opened and found reasonable, the bid shall be
accepted after obtaining approval of NHEA in terms of Para 47 (f) of
DWP-2020. In this connection E-in-C’s Br letter No
66546Manual/594E8 dated 29 Sep 2016 can be ref.
•The above procedure shall also apply to the case wherein only one
bid qualifies for financial bid (out of more than one received)
SELECTION OF CONTRACTORS/
TECHNICAL BID EVALUATION
• For all high value works costing more than Rs 25 Crore (consultancy
work costing more than Rs 50 Lakh) & (Specialist Works costing
more than Rs 2 crore) selection of contractors shall be done through
Tender Selection Committee.
• Composition of Tender Selection Committee
• Additional Chief Engineer/ Senior most Director [CHAIRMAN]
• Director (Contracts)
• Director/ SO1 of Zone
• Officer of the rank of Director/ SO1 from outside the Zone (to be
detailed by Chief Engineer Command)
• Selection made by tender selection committee shall be
recommendatory in nature
• In case CE Deviated from the recommendations of the committee
specific reasons shall be placed on record and submitted to CE Comd
• Members of tender selection committee shall render undertaking
that none of them have any personal interest in the contractors
participating in the tendering process.
SELECTION OF CONTRACTORS FOR HIGH VALUE WORKS
• For Works costing more than Rs 50 Crore & Specialist E/M Services
costing more than Rs 5 Crore the Eligibility Criteria shall be fixed in
view of CVC Guidelines.
• Eligibility criteria shall be clearly brought out in the Notice of Tender:
• Average Annual Financial Turnover during last 3 years should be at
least 30% of the Estimated Cost
• Experience in last 7 years of completing: 03 similar works not less
than 40% or 02 similar works not less than 50% or 01 similar work
not less than 80% of the Estimated Cost
• Other criteria related to performance of works, Technical personnel
employed, equipments, T & P, etc required for the work.
• In case of deviation from CVC Guidelines case for approval of
prequalification criteria to be taken up with E-in-C’s Branch
involving similar pavement (rigid/ flexible as the case may be) may be
considered for issue of tender.
Production and vetting of satisfactory performance reports of the
qualifying runway works will be essential during scrutiny.
SELECTION OF CONTRACTORS
(ii) The contractor should have MoU with solar power firms of rating
1A/1B/1C/2A/ 2B/2C given by CRISIL/CARE/FITCH/ICRA/SMERA/Brick
Work Ratings India Pvt Ltd and having experience of having successfully
completed & commissioned Solar Power Plants in Government
Department/ PSU during last seven years ending last day of month
previous to the month of bid submission start date, should be either of
the following :-
One work of capacity not less than 80% of capacity specified in the NIT
Or
Two works of capacity not less than 50% of capacity specified in the NIT
Or
Three works of capacity not less than 40% of capacity specified in the NIT
(iii) Enlisted contractors who are either having above mentioned solar
rating themselves fulfilling the criteria laid down here-in-below or
meeting the criteria laid down for un-enlisted contractors shall also be
considered eligible
SELECTION OF CONTRACTORSFOR SOLAR POWER WORKS
FOR UNENLISTED CONTRACTORS
(i) The contractor should meet the enlistment criteria of Class # with
regard to annual turnover, financial criteria (solvency, working capital)
satisfactory completion of similar works and other requirements as per
details given in Para 1.4 & 1.5 of Section 1 of Manual on Contracts 2020.
(ii) Contractor should have MoU with solar power firms of rating
1A/1B/1C/2A/ 2B/2C given by CRISIL/CARE/FITCH/ICRA/SMERA/Brick
Work Ratings India Pvt Ltd and having experience of having successfully
completed & commissioned Solar Power Plants in Government
Department/ PSU during last seven years ending last day of month
previous to the month of bid submission start date, should be either of
the following :-
One work of capacity not less than 80% of capacity specified in the NIT
Or
Two works of capacity not less than 50% of capacity specified in the NIT
Or
Three works of capacity not less than 40% of capacity specified in the NIT
However requirement of MoU is exempted for contractors who
themselves are having requisite rating by rating agency mentioned
here-in-before.
SELECTION OF CONTRACTORS/
TECHNICAL BID EVALUATION
• Un-enlisted contractor shall be required to submit all documents
required meeting criteria given in NIT and for enlistment in eligible
class and category in MES
• Whether there are any adverse remarks in the work load return
circulated by appropriate authority
2. Analysis of prices/
Rate analysis
3. Scrutiny of tender/
Market Rate analysis
ESTIMATION OF QUANTITIES:
Price:
Price is what you pay for goods or services you acquire.
Price is original cost + profit
Value:
Value is what goods or services pay you i.e. worth.
Value varies from customer to customer.
BASIS PRICE COST VALUE
Meaning Price is the Cost is the amount Value is the
amount paid for incurred in utility of a good
acquiring any producing and or service.
product or service. maintaining
something.
– Cost of materials
– Cost of labour
– T&P (Tools & Plants)
– Misc petty expenses
– Water Charges
– Profit & overhead expenses of contractor
Analyzed Rate of an item depend on:
Material:
– Specs of works & materials
– Quality of materials
– Proportion of mortar
– Method of construction
– Rates of materials (considering discounts)
– Distance from source of material (for transportation)
– Rate of transport
– Loading / unloading charges
– Location of site
– Wastage
Analyzed Rate of an item depend on:
Labour:
–Number of different types of labour reqd.
–Wages of labour
Acceptance of contracts
Financial Concurrence
SCRUTINY AND ACCEPTANCE OF TENDER
• The financial bids opened by the opening officers and comparative
statement of rates generated by the e-portal system shall be signed
by the opening officers on all pages and scheduled in CSTs filled and
signed in triplicate.
• The financial bids shall be checked to ensure that the tenderer has
quoted on the final revised bid only
• Check for freak rates and take action as per Appendix 3.8.
(c) Confirmation that market rates for materials are those at which
materials are being actually procured by contractors on ongoing
works or independently verified from manufacturers or their
authorised dealers whichever is less.
(d) Confirmation that market wages for labour are those actually
being paid by contractors presently on ongoing works verified from
contractor's wage books and wage sheets and at the time of
disbursement.
Financial Concurrence
By
Mrs. Megha Kanoje
Dy. Director (Contracts)
Materials [Condition 10]
• The contractor shall, at his own cost and expense, provide all
materials required for the Works other than those listed in Schedule
“B” which are to be supplied by Government.
• In the event of any claims being made or action being brought against
government or any agent, servant or employee of Government in
respect of any such matters as aforesaid, the Contractor shall
immediately be notified thereof.
• Provided that such indemnity shall not apply when such infringement
has taken place in complying with the specific direction issued by
Government but the Contractor shall pay any royalties or other
charges payable in respect of any such use, the amount so paid being
reimbursed to the Contractor only if the use was the result of any
drawing and/or specifications issued after submission of the tender.
• Condition 63- all charges on account of any tax and other duties on
materials obtained for the Works from any source (excluding materials
supplied by Government) shall be borne by the Contractor.
• If no tests are specified in the Contract, and such tests are required
by the Engineer-in-Charge, the Contractor shall provide all facilities
required for the purpose and the charges for these tests shall be
borne by the Contractor only if the tests disclose that the said
material are not in accordance with the provision of the Contract.
• (B) Materials to be supplied by Government
• For the materials listed in Schedule “B‟ the Contractor shall give a
reasonable notice in writing of his requirements to the Engineer-in-
Charge in accordance with the agreed phased programme.
• Such materials shall be supplied for the purposes of the Contract only
and the value of materials so supplied at the rates specified in the
aforesaid Schedule shall be set off or deducted from any sums then
due or which may thereafter become due to the Contractor, under the
Contract.
• (B) Materials to be supplied by Government
• The key of one lock at each door shall remain with the Engineer-in-
Charge or his representative and that of the other lock with the
Contractor’s authorized agent at Site of Works so that cement is
removed from the Godown only according to daily requirement with
the knowledge of both the parties.
• (C) General
• Storage and safe custody of materials shall be at the risk and the
responsibility of the Contractor.
• All materials brought to the Site shall become and remain the
property of Government and shall not be removed off the Site without
the prior written approval of the Engineer-in-Charge.
• But whenever the Works are finally completed the Contractor shall at
his own expense forthwith remove from the Site all surplus materials
originally supplied by him and upon such removal the same shall
revest in and become the property of the Contractor.
Tools & Plants
• Contractor at his own expense supply tools, plants and
equipment required for execution of work.
(a) Works costing Rs. 50 Lks – Rs. Degree holder in Engg. From Govt. recognized
1000 Lks Institute with atleast 4 years exp.
(b) Works costing Rs. 7.50 Lks – Degree holder in Engg. From Govt. recognized
Rs. 50 Lks Institute with atleast 2 years exp.
(c) Works costing less than Rs. Diploma holder in Engg. From Govt. recognized
7.50 Lks Institute with adequate exp.
• The number of such qualified tradesmen shall not be less than 25% of total
skilled/semi skilled tradesmen required in each trade.
• The contractor shall submit a list of such tradesmen along with requisite certificates
to GE for verification and approval.
• Notwithstanding the approval of such tradesmen by GE, if the tradesmen are found
to have inadequate skill to execute the work of their trades leading to
unsatisfactory workmanship, the contractor shall remove such tradesmen within a
week after written notice to this effect by the GE
By
Mrs. Megha Kanoje
Dy. Director (Contracts)
Performance Security [Condition 19]
• Performance Security Deposit for individual works shall be for an amount equal to
3% of the contract amount.
• The BGB submitted by the contractor shall be got confirmed from the head office of
the issuing Nationalized/ Scheduled Bank.
• In case of MES enlisted contractor amount equal to the earnest money stipulated in
the notice inviting tender shall be notified to the tenderer for depositing the amount
through MRO.
Performance Security [Condition 19]
• Issue of tenders to such tenderer shall remain suspended till the
aforesaid amount equal to the earnest money is deposited in
government treasury.
• In the event of contract being cancelled under condition 52, 53, & 54
of GCC, the performance security shall be forfeited in full and shall be
credited into consolidated fund of India.
Refund of Performance Security [Condition 68]
• 1. Final bill should be signed by proprietor, partner or person having proper power of
authority of the firm duly dated. Also ensure that contractor has signed the FB without any
reservation.
• 3. Final bill should be submitted within specified period as per condition No 65 and 65 A of
IAFW 2249 General Condition of contracts.
• 4. Testing charges as per contract condition should be recovered from Final bill and
statement should be attached duly signed by contractor and EIC.
• 5. Any corrections made in the Measurement book should be initialled by contractor and
Engineer- in-charge.
TECHNICAL CHECK OF FINAL BILL(Contd)
• 6. Deduction of compensation shall be done as per contract condition and statement shall be
attached duly signed.
• 7. Recovery against STE observation shall be done from FB. Statement shall be attached with FB
and entry shall be done in recovery register. .
• 8. Recovery of Electricity and water charges should done from FB .Statement should also
be attached with FB duly signed by EIC and contractor.
• 9. Copy of Guarantee Bond on stamp paper for ATT and Water proofing treatment shall be
attached with FB. Copies of FDs submitted against Guarantee amount shall be attached
with FB or otherwise amount shall be recovered from FB.
• 10. Audited copies of RAR alongwith copies of Indices and labour wages shall be
submitted alongwith FB, to check the Escalation details submitted with FB.
• 11. All Deviations orders and Star rates shall be got approved before submission of FB.
Ensure that fair copies of Dos and Star-rates have bees attached with FB.
TECHNICAL CHECK OF FINAL BILL(Contd)
• 12. Schedule ‘B’ stores issued to the contractor to be thoroughly checked alongwith USR
statement.
• 13. While checking the abstracts, pay special attention when the quantities are converted to
reduced units for example Pointing item, road work items.
• 14. Check and ensure that Deviation limit of the contract not exceeded.
• 15. In case Road work is Involved in the work , check that rolling register has been enclosed
with FB. Rolling hours to be checked properly. Recovery on account of in-sufficient rolling,
if any shall be done.
• 16. Ensure that Final bill is enclosed with all documents such as abstracts, work/deviation
orders, completion certificates, Receipt vouchers for return of stores, correction slip to
DOs(if any).etc
• 17. Ensure that all previous payments made to the contractor ,are properly accounted for.
Recovery from Contractor
Condition 67
(a) Whenever any claim(s) for payment of sum of money arise(s) out of or under
this Contract against the contractor, the Contractor shall on demand make
the payment of the same or agree for effecting adjustment from any
amounts due to him by the Government.
under this or any other Contract with the Government or from any other
sum due to the Contractor from the Government (which may be available
with the Government) or from the Contractor’s Performance Security Amount
(or from contractor’s Standing Security Deposit Amount or Security Bond, if
performance security amount is not adequate), and
till the claim(s) arising out of or under this Contract is/are settled
or adjudicated upon
(e) Government reserve the right to carry out post-payment audit and
technical examination of the works and Final Bill, including all supporting
vouchers, abstracts, etc. Government further reserve the right to carry
out the aforesaid examination and enforce recovery when detected,
notwithstanding the fact that the amount of the Final Bill may have been
included by one of the parties as an item of dispute before an Arbitrator
appointed under the Arbitration clause of the Contract and
notwithstanding the fact that the amount of the Final Bill figures in the
Arbitrator’s award.
Recovery from Contractor [Condition 67]
(f) If, as a result of such audit and technical examination,
any over-payment is discovered in respect of the work done under this
Contract, the contractor shall on demand make payment of a sum equal to the
amount of over-payment or agree for effecting necessary adjustment from any
amounts due to him by Government.
shall not extend beyond a period of two years from the date of
payment of the undisputed portion of the Final Bill or in the case of a
minus Bill, from the date, the net amount of the final bill is communicated
to the Contractor.
(h) All notices under this condition shall be given by the G.E.
Foreclosure
OR
[Condition 57 of IAFW-2249(General
Conditions of Contract)]
57. Special Powers of Determination (Applicable only
to Measurement and Lump Sum Contracts)
[Condition 59 of IAFW-
2249(General
Conditions of
Contract)]
59. Determination of Contract in the event of Force
Majeure
(b) being a company shall pass a resolution or the Court shall make an
order for the liquidation of its affairs or a receiver or manager on behalf of
the debenture holders shall be appointed or circumstances shall arise
which entitle the Court or debenture holders to appoint a receiver or
manager; or
If the Contractor-
(a) makes default in commencing the Works within a reasonable time
from the date of the handing over the site, and continues in that state
after a reasonable notice from G.E.
OR
(b) in the opinion of the G.E. at any time, whether before or after the
date or extended date for completion, makes default in proceeding with
the Works, with due diligence and continues in that state after a
reasonable notice from G.E.
OR
(c) fails to comply with any of the terms and conditions of the Contract,
or after reasonable notice in writing with orders properly issued
thereunder,
OR
(d) fails to complete the Works, Work order and items of Works, with
individual dates for completion and clear the Site on or before the date of
completion.
Cancellation of contract for Contractor’s Default [C-54]
(In case of contracts not covered under Performance
Security Clause)
The Government shall also be at liberty to use the materials, tackle, machinery
and other stores on Site of the Contractor as they think proper in completing the
work and the Contractor will be allowed the necessary credit. The value of the
materials and stores and the amount of credit to be allowed for tackle and
machinery belonging to the Contractor and used by the Government in
completing the work shall be assessed by the G.E. and the amount so assessed
shall be final and binding.
Cancellation of contract for Contractor’s Default [C-54]
(In case of contracts covered under Performance Security Clause)
Act-1872 Illustrations;
(a) A promises to pay B a sum of money. A may
perform this promise, either by personally paying the
money to B or by causing it to be paid to B by another
; and, if A dies before the time appointed for
payment, his representatives must perform the
promise, or employ some proper person to do so
CONDITION 6 A OF IAFW-2249
Discrepancies and Adjustment of Errors
• The several documents forming the contract are to be taken as
mutually explanatory of one another;
• Detailed drawings shall be followed in preference to small scale
drawings and
• Figured dimensions in preference to scale.
• In the case of discrepancy between Schedule ‘A’, the Bills of
Quantities, the Specifications and/or the Drawings, the following
order of precedence shall be observed:-
(a) Description of Schedule ‘A’/Bills of Quantities.
(b) Particular Specifications.
(c) Drawings.
(d) General Specifications.
Discrepancies and Adjustment of Errors
• If there are varying or conflicting provisions made in any one
document forming part of the Contract the Accepting Officer shall be
the sole deciding authority with regard to the intention of the
document and his decision in this respect shall be final and binding.
• Suspension order for the work shall be issued by GE with prior approval
of Accepting officer.
(b) for reasons other than contractor’s default[under (b) & (c) above]:
The format of Letters/ Notices to be issued to the contractor during currency of contract and during defect liability period have
been given in Appendix 16.1 to 16.17 of Manual on Contracts
Appx No Description
Continued….
ISSUE OF NOTICES, CORRESPONDENCE WITH THE CONTRACTORS
Appx No Description
16.10 Notification of Slow Progress by GE to contractor before recommending
cancellation
16.11 Final Notice to be served by Accepting Officer before cancellation of contract
16.12 Letter from Accepting officer to contractor for Cancellation of contract
16.13 Letter by CWE to contractor for foreclosing a contract by the Government
16.14 Letter by CE/CWE/GE to contractor to safeguard against section 18 & 19 of
Limitation Act 1963
Condition 61 of IAFW-2249
Records and Measurement [Condition 61]
• Work carried out for agreed lump sums will be described and similarly
recorded.
• The Contractor shall bear all the costs of his own measurement.
Records and Measurement [Condition 61]
and such note shall be signed and dated by both parties engaged
in taking the measurements.
Records and Measurement [Condition 61]
• If as a result of such objection,
provided that
But where the net errors amount to 5 per cent or over of the said
value, then the cost is to be borne by the other Party.
In any case, if the net value of errors found exceeds Rs.5000/-, the
expense of re-measurement is to be borne by the other party.
(RAR Payment)
Condition 64 of IAFW-
2249
Interim payment (RAR) Advances on Account: Condition 64
• Periodicity of RAR shall be not less than 30 days for contracts of value
less than Rs 50 lakh and 15 days for the contracts of value more than
Rs 50 lakh
• The claim for RAR shall be submitted on IAFW-2263 provided the sum
due is not less than Rs 50,000/-
• For Term Contracts: Not more than two claims can be preferred
• However, in case this retention money is more than Rs 1.5 Lakh, then
after retaining an amount of Rs 1.5 Lakh or 1% of contract amount as
executed, whichever is more, the balance amount of retention money
shall be refunded to the contractor on satisfactory completion of work
as certified by the GE.
• Any sum due from the contractor on account of Sch ‘B’ Stores issued,
Schedule ‘C’ Tools & Plants & Schedule ‘D’ Transport hired to contractor
shall be deducted from the first or next subsequent advance (RAR)
Interim payment (RAR) Advances on Account: Condition 64
• Advances on materials issued under Sch ‘B’ lying at site but not
incorporated in the work are payable after cost of such materials is
recovered from the contractor in a manner similar to advance on
materials directly arranged by him.
• All previous “On Account” payments made to the contractor are taken
into account before making a further on account payment.
• Qty of cement, steel and other major items is estimated and compared
with procurement/ incorporation to crosscheck any under-consumption.
• After completion of work and before receipt of final bill, RAR payments
shall continue to be governed by the terms of the contract
• In case of any dispute, the disputed part of the bill can be considered
for interim payment and disputes can be referred to arbitration.
or
or
and
(c) Short recovery of materials and tools and plant issued to the
Contractor under Schedules ‘B’ and ‘C’, Water and Electricity changes and
rental for Government accommodation for storage purposes etc.
(f) not having valid Bank Guarantee Bond for retention money.
(a) Efforts shall be made to pay the RAR at the earliest on receipt from
contractor complete in all respects but not exceeding the number of days
as under:
(c) Executives shall ensure speedy checking and clearance of RAR and
any deficiency noticed shall be conveyed to the contractor by FAX/ SMS/
WATSAPP/ EMAIL etc to avoid delay.
(d) RAR Bill shall be processed along-with movement slip for monitoring
delay
Final Bill: Condition 65
&
Payments of Bills: Condition 66
Final Bill: Condition 65
• The contractor shall be entitled to be paid the final sum less the value of
payments already made of account, subject to the certification of the final
bill by the GE.
• After payment of the amount of the final bill payable as aforesaid has been made,
the Contractor, may if he so desires, reconsider his position in respect of the disputed
portion of the final bill and if he fails to do so within 90 days, his disputed claim shall
be dealt with as provided in the Contract.
Final Bill: Condition 65 & 66
• Technical check of FB for TC & Handling contracts & rate contract for supply
of materials up to Rs 25000.00 and other FB up to Rs 2.5 Lakh will be
checked by JE QS & C and then by AGE (C) in GE office
• In case of CE Contracts final Bill shall be Technical Check by AGE (C) of GE
office & then by Jt Dir/ Deputy Director/ AAD (Contracts) of CE office
• In case of CWE/GE Contracts final Bills shall be Technical Check by AGE (C)
of GE office and then by DCWE (Contracts) of CWE office, wherein
•For TC & Handling contracts minimum 20% bills are to be checked in
CWE office
•For other bills upto Rs 15 lakh gross value minimum 25% bills are to be
checked in CWE office
•For bills more than Rs 15 lakh gross value 100% Bills are to be checked
in CWE Office
Pre-Audit By PCDA/CDA
Final Bill for contracts, gross value of which is less than Rs 5 lakh can be
audited and passed by AAO, GE without pre-audit by PCDA/ CDA,
Final Bill for contracts, gross value of which is less than Rs 10 lakh can be
audited and passed by AO, GE without pre-audit by PCDA/ CDA,
Final Bill: Condition 65 & 66
DEVIATION LIMIT
Lump sum Contracts based on drgs and specifications - 10%
All other types of contracts:
Estimated cost not more than Rs 10 Lakh - 20%
Estimated cost exceeding Rs 10 Lakh - 10%
RESTRICTIONS ON ORDERING OF DEVIATIONS:
(a) Net effect (algebraical sum) of all additions & deductions shall not
exceed the deviation limit
(b) Arithmetical sum of all additions & deductions shall not exceed
twice the deviation limit
(c) DOs on items of individual trade included ion the contract shall not
exceed +/- 25% of the value of that trade in the contract as a whole
or half the DO limit whichever is less
(d) Value of additions of items of any individual trade not already
included in the contract shall not exceed 10% of the Deviation limit
DEVIATION ORDERS
Deviations under conditions 7 shall not have the effect of increasing the
value of work beyond the powers of Accepting officer of the contract.
In case it exceeds facts shall be brought to the notice of NHEA within whose
powers of acceptance the overall expenditure lies and his sanction obtained.
• In un-avoidable circumstances
The value of items of work covered by deviation order shall be ascertained for
various types of contracts as per following order of precedence:
a) At applicable rate in the BOQ for the building/ item of work, in which the
deviation is involved;
c) At pro-rata based on lowest rate for analogous item in the BOQ for the
building/ item of work, to which the deviation refers;
d) At pro-rata based on lowest rate for analogous item in any other BOQ
Valuation of Deviations: Condition 62
The value of items of work covered by deviation order shall be ascertained for
various types of contracts as per following order of precedence:
The Rates at (a) to (d) above shall be subject to the contractor’s percentage
Valuation of Deviations: Condition 62
The value of items of work covered by deviation order shall be ascertained for
various types of contracts as per following order of precedence:
The Rates at (a) to (d) above shall be subject to the contractor’s percentage
The value of items of work covered by deviation order shall be ascertained for
various types of contracts as per following order of precedence
The Rates at (a) & (b) above shall be subject to the contractor’s percentage.
Valuation of Deviations: Condition 62
The value of items of work covered by deviation order shall be ascertained for
various types of contracts as per following order of precedence
The value of items of work covered by deviation order shall be ascertained for
various types of contracts as per following order of precedence
(F) Contracts Comprising Sections/ Parts conforming to types (A) to (E) above:
If any work, the rate of which can not be obtained by any of the methods
referred to in paras (A) to (E) above has been ordered on the contractor, the
rate shall be decided by the GE on the basis of the cost to contractor at the
site of work plus 15% to cover all overheads and profit.
[Star Rates]
Technical check by DCWE (Contracts) for star rate upto FE of Rs 50000/- and
by Director (Contracts) beyond FE of Rs 50000/-
Star rate shall be fixed / approved by CWE for any financial effect, during
currency of contract (original or extended) relating to contracts accepted by
him or any higher authority and after obtaining sanction of Accepting officer
in case of completed works.
By
Iqbal Singh,
Dir(Contracts)
ADMINISTRATION OF CONTRACT
OR CONTRACT MANAGEMENT
ADMINISTRATION
Decisions should be taken after thorough study of documents
OF CONTRACT/
CONTRACT
MANAGEMENT Decisions should be firm and final
During Execution
of the Work
Contract Administration means fulfillment
of contractual obligations and generally
involves following actions
• During Execution of Work
• Thorough study of contract provisions and specifications;
• Approval of samples of material and fittings & fixtures;
• Placing Variation in Quantity Deviation Order for
Provisional Schedules;
• Timely finalization of Deviation orders, Amendment to
Contract,
• Decision of competent authority on disputed matters
• Acceptance, testing of Materials and Verification of
Purchase Voucher & Test Certificate;
• Maintenance of work Site Documents;
• Exercising checks and Quality Control;
• Recording measurements in respect of measurable
schedules/services as the work proceeds;
• To keep close watch on Progress of Work & Deviations
from Contract Provisions;
Contract Administration means fulfillment
of contractual obligations and generally
involves following actions
• During Execution of Work(Contd….)
• Issue necessary notices to contractor as and when
required;
• Processing of RAR Payment including checking
Escalation Claim; watching BGBs
• Passing and inspection of works
• Ensure precautions against risk & MES Safety code is
implemented
• Issue of completion certificate
• Reconciliation of issue and receipt of stores
• Correct Measurement of work & Forwarding of
abstracts of work done and recovery statement
• Processing of Final Bill
• Initiation of performance report of the firm
• Monitoring of defects observed during the defect
liability period and issue defect rectification certificate
ISSUE OF NOTICES. CORRESPONDENCE WITH THE CONTRACTORS
The format of Letters/ Notices to be issued to the contractor during
currency of contract and during defect liability period have been given in
Appendix 16.1 to 16.17 of Manual on Contracts-2020
Appx No Description
Continued….
ISSUE OF NOTICES, CORRESPONDENCE WITH THE CONTRACTORS
Appx No Description
16.10 Notification of Slow Progress by GE to contractor before recommending
cancellation
16.11 Final Notice to be served by Accepting Officer before cancellation of contract
16.12 Letter from Accepting officer to contractor for Cancellation of contract
16.13 Letter by CWE to contractor for foreclosing a contract by the Government
16.14 Letter by CE/CWE/GE to contractor to safeguard against section 18 & 19 of
Limitation Act 1963
In e tendering:
Estimated total amount based on SSR rates will be
inserted as an item in the BOQ.
The percentage shall be derived in the excel sheet
automatically by the system in the excel sheet BOQ
based on the amount quoted against this item by the
tenderer.
Prime Cost or Prime Cost Sum:
Condition 5 of GCC refers
Refund of
Performance Security
Condition 68
With in 28 days of receipt of letter of acceptance, the
successful contractor shall deliver to the Accepting Officer a
performance security, in form of a Bank Guarantee Bond or
Government Securities, FDR or any other government
instruments stipulated by the Accepting Officer, for an amount
equivalent to 5% of the contract sum.
• Faulty administration
• Default by the
contractor
• Unreasonable
attitude adopted by
the contractors
FAULTY CONTRACTS
• Discrepancy/ambiguity in the same
document or different documents
forming part of the contract
• Failure in taking initial and final levels at site before and during
execution of earthwork and
• Decision not taken & recorded w.r.t strata met with at site of
work
• BY JUDICIAL PROCESS
(LITIGATION IN CIVIL COURTS)
NEGOTIATION
MEDIATION
CONCILIATION
ARBITRATION
NEGOTIATION
• Direct one to one interaction
between parties
• No third party intervention
• Reaching to conclusion by discussion
• No imposition of decision
MEDIATION
• THERE IS A THIRD PARTY: A MEDIATOR
4/15/2023
4/15/2023
Section 2: Definitions
4/15/2023
SECTION 11: Appointment of an Arbitrator
4/15/2023
(2) A plea that the arbitral tribunal does not have
jurisdiction shall be raised not later than the
submission of the statement of defence; however, a
party shall not be precluded from raising such a plea
merely because that he has appointed , or
participated in the appointment of, an arbitrator.
(3) A plea that the arbitral tribunal is exceeding the
scope of its authority shall he raised as soon as the
matter alleged to be beyond the scope of its
authority is raised during the arbitral proceedings.
(4) The arbitral tribunal may, in either of the cases
referred to in sub-section (2) or sub-section (3), admit
a later plea if it considers the delay justified.
4/15/2023
(5) The arbitral tribunal shall decide on a plea referred
to in sub-section (2) or sub-section (3) and, where the
arbitral tribunal takes a decision rejecting the plea,
continue with the arbitral proceedings and make an
arbitral award.
4/15/2023
Section 33.Correction and interpretation of award;
additional award
(1) Within thirty days from the receipt of the arbitral
award, unless another period of time has been agreed
upon by the parties:
(a) a party, with notice to the other party, may request
the arbitral tribunal to correct any computation errors,
any electrical or
typographical errors or any other errors of a similar
nature occurring in the award;
(b) if so agreed by the parties, a party, with notice to
the other party, may request the arbitral tribunal to
give an interpretation of a
specific point or part of the award.
4/15/2023
Section 33.Correction and interpretation of
award; additional award
(2) If the arbitral tribunal considers the request
made under sub-section (1) to be justified, it
shall make the correction or give the
interpretation within thirty days from the receipt
of the request and the interpretation shall form
part of the arbitral award.
(3) The arbitral tribunal may correct and error of
the type referred to in clause (a) of sub-section
(1), on its own initiative, within thirty
days from the date of the arbitral award.
(4) Unless otherwise agreed by the parties, a
party with notice to the other party, may
4/15/2023
Section 33.Correction and interpretation of
award; additional award
request, within thirty days from the receipt of
the arbitral award, the arbitral tribunal to make
an additional arbitral award as so claims
presented in the arbitral proceedings but
omitted from the arbitral award.
(5) If the arbitral tribunal considers the request
made under sub-section (4) to be justified, it
shall make the additional arbitral award
within sixty days from the receipt of such request.
(6) The arbitral tribunal may extend, if necessary,
the period of time within which it
4/15/2023
Section 33.Correction and interpretation of
award; additional award
4/15/2023
Sec 34: Application for setting aside arbitral
award
(1) Recourse to a Court against an arbitral award
may be made only by an application for setting
aside such award in accordance with sub-section
(2) and sub-section (3).
(2) An arbitral award may be set aside by the
Court only if: (a) the party making the application
furnishes proof that:
(i) a party was under some incapacity, or
(ii) the arbitration agreement is not valid under
the law to which the parties have subjected it or,
failing any indication thereon, under
the law for the time being in force; or
4/15/2023
Sec 34: Application for setting aside arbitral
award
(iii) the party making the application was not
given proper notice of the appointment of an
arbitrator or of the arbitral proceedings or
was otherwise unable to present his case; or
(iv) the arbitral award deals with a dispute not
contemplated by or not falling within the terms
of the submission to arbitration, or it
contains decisions on matter beyond the scope
of the submission to arbitration: Provided that, if
the decisions on matters submitted to arbitration
can be separated from those not so submitted,
only that part of the arbitral award
4/15/2023
Sec 34: Application for setting aside arbitral award
which contains decisions on matters not submitted to
arbitration may be set aside; or
(v) the composition of the arbitral tribunal or the
arbitral procedure was not in accordance with the
agreement of the parties, unless
such agreement was in conflict with a provision of this
Part from which the parties cannot derogate, or, failing
such agreement, was not in accordance with this Past;
or
(b) the Court finds that: (i) the subject-matter of the
dispute is not capable of settlement by arbitration
under the law for the time being in force, or
4/15/2023
Sec 34: Application for setting aside arbitral award
(ii) the arbitral award is in conflict with the public policy
of India.
(3) An application for setting aside may not be made
after three months have elapsed from the date on which
the party making that application had received the
arbitral award, or, if a request had been made under
section 33, from the date on which that request had been
disposed of by the arbitral tribunal: Provided that if the
Court is satisfied that the applicant was prevented by
sufficient cause from making the application within the
said period of three months if may entertain the
application within a further period of thirty days, but not
thereafter.
4/15/2023
Sec 34: Application for setting aside arbitral
award
4/15/2023
INCAPACITY OF PARTY
INVALID ARBITRATION AGREEMENT
COMPOSITION OF ARBITRATION TRIBUNAL NOT
ACCORDANCE WITH AGREEMENT
PARTY UNABLE TO PRESENT THE CASE
FAILURE TO CONSIDER VITAL DOCUMENTS
AWARD BASED ON NO EVIDENCE
ARBITRATOR ACTING BEYOND SUBMISSION
AWARD IN IGNORANCE OF TERMS OF CONTRACTS
AWARD CONTRARY TO LAW AND SUBSTANCE OF
DISPUTE
INCONSISTENT FINDINGS IN AWARD
FAILURE TO ADJUCATE
AWARD BY ILLEGALLY CONSTITUTED TRIBUNAL
MATTER NOT CAPABLE OF SETTLEMENT
AWARD CONTRARY TO PUBLIC POLICY
4/15/2023
Precondition for appointment of arbitrator
(a) There should be disputes between the parties to the contract;
(b) the party who wishes to refer the disputes to arbitration should
serve a written notice to the other party of their intention (in
terms of condition 70 of IAFW-2249 GCC) before the authority
mentioned in the contract may appoint a serving engineer
officer as the sole arbitrator for adjudication of disputes.
The court case thus filed by the contractor shall be defended by the
Accepting officer relying upon Supreme Court of India judgment in case
of SBP & Co Vs Patel Engineering Ltd Para 32.1 of Contract Manual refers
Preparation & Defence of Arbitration cases
Condition 70 stipulates a period of 6 months for making and publishing
the award
The Accepting Officer may appoint a team of officers for preparation &
defence or presentation of the arbitration case
Preparation & Defence of Arbitration cases
The Government case should include for interest on Government claims
and cost of Reference and detailed justification for the same.
Decision of certain authorities have been considered as final, conclusive
and binding in contract provisions:
Such decisions shall be taken by the designated authorities and
conveyed at appropriate stage and manner &
Shall be well defended before the arbitrator stating that all such
cases fall under “Excepted Matters” and are as such outside the
jurisdiction of the arbitrator in terms of Section 16 of ACA-1996
Preparation & Defence of Arbitration cases
Documents maintained between the parties such as Site Order Book,
Works Diary, Measurement Books, Deviation Orders, Cement
Consumption Register, Work Stage Passing Register, etc shall be shown
to the contractor, for making notes/ Xerox copies, if he so desires.
Action(s) to be taken on receipt of AWARD:
(a) In respect of awards, where the total amount awarded in favour of the
contractor (excluding the final bill amount, Security Deposit, interest etc due
to the contractor) does not exceed Rs. 2,00,000/-, the Accepting Officer
[CWE in respect of GEs contracts], may himself take a decision as regards
implementation/contesting of the award in consultation with concerned Govt.
Counsel/CGSC
(b) In respect of award, where the total amount awarded in favour of the
contractor (excluding the final bill amount, Security Deposit, interest etc due
to the contractor) is in excess of Rs. 2,00,000/- but does not exceed Rs.
10,00,000/-, the Accepting Officer (CWE in respect of GE contracts) will seek
the advice of LA (Def)/Branch Sectt, Min of Law as applicable.
(c) In respect of award, where the total amount awarded in favour of the
contractor (excluding the final bill amount, Security Deposit, interest etc due
to the contractor) is in excess of Rs. 10,00,000/- the Accepting Officer (CWE
in respect of GE contracts) will seek the advice of LA (Def)/Branch Sectt, Min
of Law as applicable.
(d) While referring the case of LA (Def)/Branch Sectt, Min of Law, all relevant
documents pertaining to the arbitration such as certified copy of CA including General
Conditions of Contract, Statement of the Claims and Pleadings in Defence submitted to
the arbitrator by both the parties, copy of the arbitration award etc should be
forwarded to them.
If any Counsel had been engaged to represent the Union of India during the
arbitration hearing, his comments should also be obtained (without payment of any
fees) and the same also furnished to LA(Def)/Branch Sectt.
(i) LA (Def)/Br Sectt, Min. of Law should be re-approached with new facts for
reconsideration of advice and further action should be taken as per the final
advice.
(ii) The case should be sent to E-in-C's Branch through CE Zone, by hand
through an officer
well conversant with case, where advice of LA (Def) is required.
Procedure for implementation or filing objections against the award
Application for setting aside award U/S 34 of ACA-1996 has to be filed within
three months from the date on which the party making that application had
received the award or if a request has been made under Section 33, from the
date on which that request had been disposed of by the Arbitral Tribunal.
In few cases, the objections to the award were filed without advice of
LA (Def) and subsequently LA (Def) advised to implement the award
rendering the entire exercise of filing objections futile.
Procedure for implementation or filing objections against the award
In case, the documents for obtaining legal advice are not received in E-
in-C HQ within one month from the date of receipt of the award, the Director
(contracts) shall bring the documents personally to E-in-C HQ along-with
explanations for delay under the signature of Chief Engineer Zone.