Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 7

DATE OF

ENTRY

09 May 22
09 May 22

09 May 22
09 May 22
09 May 22
09 May 22
09 May 22

09 May 22
09 May 22
09 May 22

09 May 22
13 May 22

13 May 22

10 May 22
TASK
Once in 24 hours, QC of production from pultrusion machines. Mark all ok with Green & rejected with Red. In a
diary write & take signature of operator. Also send a copy to KP
Store Rules
Documents to be prepared as soon as PO is receieved & filed in Pending Po file -
PO Summary from ERP, BOM from ERP, BOQ, Layer sequence sheet, tag no (if tank), Target Dispatch Date,
Approved QAP, Approved Drawings
hydra responsibility. All supervisors to inform about hydra requirement on stores group.
Weight data of all tanks & vessels to be dispatched
no bills to be made without digital signature
SOPs, Dos & Donts of all machines in hindi or english

4 gussets in all flanges & 8 gussets in all manholes


no manhole to be made without Handle
Courier entry in a diary & Daily follow up of receipt
White Board on Tanks Floor. To be written by QC person - Layer sequence & Resin type. To be written by Shift
supervisor - Resin Tonnage, Date & Shift
Inter Unit loading rules

Indents of all materials listed on whatsapp group during the whole day to be written in a register by RP / AP. They
will also prepare indents on ERP on daily basis. AS will prepare PO as per the indents daily morning. Local Purchase
PO shall be handed over to HJ before 11:00 AM daily only after receipt of which he can leave for market. No extra
material other than posted in group shall be purchased the next day.

Chai pe Charcha - Daily small session on all floors by Supervisors for workers for improvements.
STATUS
(IMPLEMENTED / IMPLEMENTATION
WIP) BY LOCATION REMARKS

WIP CG
WIP AS + RP + AP Stores

WIP DR + NG Office
Implemented Shop floor
Implemented Shop floor
Implemented AS + AG Office
WIP GT Office
ZK + SHP + RT + SA +
Implemented VJ Shop floor
WIP DR Shop floor
Implemented NG Office

WIP CG Shop floor


WIP AS + KP Shop floor

WIP AS + AP + RP Stores
SP + RT + ZK + SHP +
Implemented SA + VJ Shop floor
DATE OF
ENTRY
TASK
Mylar / Cardboard below mould area
Regular cleaning of dies
Invoice & challan Made two level checking of material acc.to challan will be done at the time of loading.
Also for all AOPs, packing list should have an entry of Dispatch date &
No tanks should go without transportation saddle supports - Tata or otherwise - Exception AOP
Grinding / Paint gun stand
Site challans should have clearly mentioned returnable items & devise a method to monitor
Sheet & Foundation sheets - corners cuttings to be reduced to 1 inch or less
Hanging system for Air line
Resin issued on all floors
Extra copy of challan will be checked and sign by both persons present at the time of loading
Quality check of material while entering in stores
hard copy of all calibration reports in lab
No painting on tank to be done if it has rained in last 24 hours
direction of grinding while grinding on a tank surface should be in one single direction
Final coating in presence of supervisor
During lining after completing filament fabricate stiffeners, seal them as we do (with small to larger widths). After
this apply one WR-CSM & surface
No use of grinding after this. only paper or disk to be used for minor grindings
15 people expert in Flange installation
extra ring with flange as per its collar for sticking on tank surface
IMPLEMEN MONITORI
TATION BY NG BY LOCATION REMARKS
Gratings
Gratings
Sr.No. Point need to be work on to avoid wastage
1 Electricity
2 Painting cost due to tobacco
3 Discs
4 Nut & Bolt , Clamps ( Small metal items )
5 Site expences
6 CCTV Camera's & attendance machine
7 Hand Tools
8 Pens & Markers
9 Scissors
10 Measuring Tapes
11 Labour cost for arranging space
12 Unnecessary garbage occuping space
Site- Hand tools , Brush , Local travel,efficiency ,
13 Punctuality
14 Office stationery
15 paint , hardner, pigment -container scrape sale
16 labour efficiency
17 delay in marketing jobs
18 buying cheaper material but low quality
19 Standing fans on floors
20 Tea Glasses
21
22
23