Professional Documents
Culture Documents
B 8453 b162 Assembly Model
B 8453 b162 Assembly Model
B 8453 b162 Assembly Model
P098 P116
-
173
P098
40 1734 86 P113
3 ø 22 P227 1) SURFACE PREPARATION FOR GALVANIZATION:
UB254*146*37 x 1860 7 118 SANDBLASTING SA21/2.
P113
53
2) GALVANIZATION: ASTM A123/A123M
75
200
P098 P227
P378
46
3) WELDING WHERE NOT INDICATED SHALL BE CONTINUOUS
P098 P369
75
A A B
3 ø 22 P113 2 ø 18 FILLET WELD. DIMENSION "S" OF NON-DIMENSIONED FILLET
60
T1
P378 WELDS SHALL AT LEAST BE EQUAL TO:
53
P116
46
394
T = MIN (T1, T2) Fy = STEEL YIELD STRENGTH OF THE
ELEMENTS TO BE CONNECTED.
106
3 SHALL BE USED.
A B - B 6) ALL STRUCTURAL STEEL, INCLUDING PLATFORMS,
A - A
A HANDRAILS , LADDERS, CAGES, STAIR TREADS, CHEQUERED
B PLATES & GRATINGS SHALL BE HOT DIP GALVANIZED ONLY,
P116 EXCEPT CRANES, LIFTING BEAMS, MONORAILS, DAVITS WHICH
1308 491 60
ARE GALVANIZED AND PAINTED RAL 1004 SAFETY YELLOW.
- FOR DETAILS REFER TO PROJECT SPECIFICATION 14.192.028”
3 ø 26 3 ø 26
P369
SD-UJV
10
10
DOCUMENT STATUS SIGNED DATE
10
- -
10
10
REVISE AND RESUBMIT
- 2 -
INCORPORATE COMMENTS, UP-REV AND RESUBMIT
147 446 156 REJECTED - Document unacceptable, REVise and resubmit
42 75 75 42 3 -
- - (work can proceed where not impacted by this rejection)
223
P227
347
140
140
348
70 ISSUE OF CERTIFIED FINAL DOCUMENT DOES NOT RELIUPES SUPPLIER OF
210
85 67
P378
70
70
120
125
100
P113
- CWP No:A10-WP5.4-020-FI-MC-101
30
15
P369 12
P116 3 ø 26 12 3 ø 26
495 15 63 602
2 ø 18
234
295 75 75 50 -
76 134 392
-
- -
1860 OB RE-ISSUED FOR REVIEW UP 30/06/23 ET 30/06/23 EA 30/06/23
40 1820
OA RE-ISSUED FOR REVIEW UP 01/03/23 ET 01/03/23 EA 01/03/23
O ISSUED FOR REVIEW UP 02/02/23 ET 02/02/23 EA 02/02/23
3 ø 22 REV DESCRIPTION DWN DATE CHKD DATE APPD DATE
REVISIONS
53
This Document is confidential. The copyright therein is vested in Nigeria LNG Ltd, Nigeria.
75
P098 Recipient must obtain the written authority of the said company before wholly or partially duplicating.
All rights reserved.
75
PO No: 1423030
VENDOR DRAWING. No. NIGERIA LIQUEFIED NATURAL GAS
TGIL-AD-19589-310 NLNG - BONNY
- DRAWN: UP PROJECT
DATE: 30/06/23 NLNG TRAIN 7
CHECKED: ET
VENDOR NAME
DATE: 30/06/23
THOMPSON & GRACE INVESTMENTS LTD.
APPROVED: EA
LOCATION DISCIPLINE UNIT No
DATE: 30/06/23
BONNY ISLAND, NIGERIA CIV 2000
APPD. LNG:
TITLE
DATE: PO 1423030 Thompson & Grace: ASSEMBLY DRAWING
CONTRACTOR DRAWING. No.
1 No.BEAM REQUIRED AS DRAWN MARKED B-8453-B162 {QRCODE}
L020-CD-B-19589 FOR STEEL STRUCTURE FOR B-8453
Tekla structures