DOCUMENT TITLE: CW-A10 - INSPECTION AND MAINTENANCE: TOWING OF BOWSER HSE RISK ASSESSMENT SHEET PAGE: 1 of 9
(b) Pre-employment,
Annual and exit
Medicals will also
include the following:
Medical
examinations as
prescribed by
the OHS Act as
to:
Detect, prevent
and treat any
occupational
disease
timeously.
Employee’s
medical and
physical
condition to be
suitable for the
work that he/she
has to perform.
Examination to identify disease
or conditions that are indicative
of their appropriate exposure at
work to enable Kentz to control,
eliminate or minimize
exposures.
PPE:
Unauthorised Accidents / property damages / X 5 5 E Elimination Control: N/A 1 2 L
persons towing. take vehicles without authorisation Substitution: N/A
Engineering Control:
No person, other than an
authorised employee will be
allowed to tow a bowser or
any other trailer of any kind.
gooseneck as an extra
safety measure should
it dislodge.
The Bowser / trailer
without a safety chain
will not be towed under
any circumstance.
Admin Control:
PPE:
Filling of machine with Elimination Control: N/A
diesel Substitution: N/A
Engineering Control:
Bowser will be equipped with
the information labels as
Filling wrong chemicals into bowser
Unknown HCS x X 5 5 E prescribed in the Road Traffic 1 2 L
causing chemical reactions
Act for the transportation of
Hazardous materials at all
times.
Admin Control:
PPE:
Spilling of diesel / Environmental Pollution x x x 5 5 E Elimination Control: N/A 1 2 L
petrol - Substitution: N/A
Environmental Engineering Control:
Pumping of diesel will only
commence once that nozzle is
secure in the inlet of the tank of
the machine and if there is not
possibility that the nozzle will
come out whilst pumping Diesel.
An assistant will assist in
ensuring that the nozzle does
not dislodge out of the tank.
observations on the
authorised employees at least
once a month.
Only authorised employees
will be allowed to pump
Diesel.
Record of the training and
planned job observations will
be kept.
In the event of spillage, it will
be treated In terms of the
(EIA) Environmental Impact
Assessment and procedure
Admin Control:
PPE:
Reverse of vehicle to Bump into Serious injuries and property Elimination Control: N/A
connect bowser or employees and damages Substitution: N/A
trailer onto vehicle trailers Engineering Control:
x 5 5 E Ensure that the vehicle is guide 1 2 L
into position.
Admin Control:
PPE:
Vehicle and Pedestrian Other vehicle Accidents, property damage and Elimination Control: N/A
Traffic users and serious injuries Substitution: N/A
Pedestrians Engineering Control:
Be aware of your surrounding
while travel with vehicles and
adhered to speed limits /
Pedestrians have the right of
way on Sasol. Please stop and
x 5 5 E 1 2 L
ensure they crossed the road
safely before your carry on
driving.(From time to time
pedestrians do not stop at the
pedestrian crossing, be aware
of the risk at all time).
Admin Control:
PPE:
Assessment prepared by:L. Bezuidenhout Approval by:
Immediate action required, activity must not start or be stopped if started. Senior management to be involved in approval to proceed. General manager /
15-25 E = EXTREME
project director / project manager to be involved in approval to proceed. Communication to the top management as required.
General manager / project director / project manager attention required to manage the impacts and ensure nominated controls are implemented and
8-14 H = HIGH meeting required objectives. Site / construction manager / office administration manager needs to be involved. Immediate action is required where
necessary. Manage by routine HSSE monitoring and inspections.
Site / construction manager / office administration manager attention required to manage the impacts and ensure nominated controls are implemented
4-7 M = MEDIUM
and meeting required objectives. Manage by routine HSSE monitoring and level 2 inspections.
1-3 L = LOW Identify aspects and implement the nominated controls to manage impacts. Manage by routine HSSE monitoring.