Professional Documents
Culture Documents
Item - Container Relationship - WI
Item - Container Relationship - WI
Item - Container Relationship - WI
TB-PC-ORACLE104-WI-E
Production Control
Oracle Procedure Revision Level: 1
Guide Page 1 of 2
PURPOSE
Shipping items must be linked to a container. Quantity per Container (QPC) is
established using the item container relationship form. Shipments will not process
without the QPC.
SCOPE
This work instruction describes how to link an item number to a container and set up the
QPC.
REQUIREMENTS
The following are required to define a customer cross reference:
1. Item Number
2. Container Item number
3. Quantity per container.
RESPONSIBLE PERSONNEL
Plant Production Control
Draft
Item Documents
TB-PC-ORACLE104-WI-E
Production Control
Oracle Procedure Revision Level: 1
Guide Page 2 of 2
WORK INSTRUCTION
Navigation:
Define Container Item Relationship
4. Click Save
Draft