Minutes of 23rd SHE Committee Meeting On 18.05.2024
Minutes of 23rd SHE Committee Meeting On 18.05.2024
Page 1 of 6
Larsen & Toubro Limited
Heavy Civil Infrastructure Independent Company
MAHSR C5
Page 2 of 6
Larsen & Toubro Limited
Heavy Civil Infrastructure Independent Company
MAHSR C5
Discussed Points
Item Status /
Description of Discussion Action By Target
No. Remarks
1.0 Review of Previous SHE Committee Meetings:
1.1 It is instructed that Separate pathway for workmen 20.03.2024
Mr. Manojit
camp shall be provided as on priority. 25.04.2024 In Process
Mondal
15.06.2024
1.2 PCY in-charge suggested to communicate the
planned date & time of the mock drill activity Mr. Rakesh
Chandra/Mr.
before executing at PCY site. Noted
Vishnu/Mr. 20.07.2024
Deepsinh
2.4 No person should be allowed to work without EHS All Section In-
induction and gate pass. Temporary gate pass to be charges/Bay In- Continuous
provided if they came from other sites for specific charges and SHE Process
work. In-charge
2.5 Safety Park should be completed on priority basis. Mr. Deepsinh/Mr.
25.05.2024 Noted
Navneet Jain
2.6 The PCY In-charge instructed that provision of
All Bay In-
standard earthing of welding machines during Continuous
charges/Section In-
welding job work must be be required at PCY all charges
Process
area.
2.7 The PCY In-charge instructed that wheel guard of All Bay In-
Continuous
chop saw machine must be guarded and unlocked charges/Section In-
charges
Process
during operation.
Page 3 of 6
Larsen & Toubro Limited
Heavy Civil Infrastructure Independent Company
MAHSR C5
Reviews:
PCY In-charge reviewed the overall issues, and the above points shall be monitored on a continuous basis.
Navneet Jain
(PCY IN-charge)
Page 4 of 6
Larsen & Toubro Limited
Heavy Civil Infrastructure Independent Company
MAHSR C5
MEETING PHOTOS
Page 5 of 6
Larsen & Toubro Limited
Heavy Civil Infrastructure Independent Company
MAHSR C5
Page 6 of 6