Area - R0 Area - R1

Sl. No. Building


(sqm) (sqm)
1 ICT Facilities Area
i ICT Facility
a Domestic Terminal 9,640 9,640
b International Terminal 4,840 4,840
c Cool port Terminal
d Courier Terminal 1,747 1,747
e Office Space (Mezzanine) 4,657 4,657

ii Security Block 87 87

iii Security Block at @ ICT landside entrance

iv CISF Morchas at ICT Entrace


v Cafeteria
vi Truckers Lounge
vii Security Office inside the truck parking centre
Sub-Total Built-Up Area (A) 20,971 20,971

iii Internal Roads 13,253 16,926

iv Road area North to the courier terminal 1,324 1,324

v Landscaping 6,279 6,279

vi Truck Docks 5,714 8,346

Vii Parking 6,110 9,860

viii Airside Dolly Movement area 13,440 13,440


Sub-Total External Development Area (B) 46,120 56,175
Project Total Area (Built-up and External Development Area)
67,091 77,146
(A) + (B)
Area - R2 TPL Area
Remarks
(sqm) Statement

9,640 9,640
4,840 4,840

1,747 1,747
4,657 4,657

100 87 Revised to 100 sqm considering two security rooms at airside 50


sqm each.

Although it is shown in layout it is not captured in area statement.


100 To be added & cost included in final estimate
10 To be added in scope & cost included in final estimate
350 To be added in scope & cost included in final estimate
440 To be added in scope & cost included in final estimate
180 To be added in scope & cost included in final estimate
22,064 20,971

Excluding the road opposite to future expansion. Also 6 meter fire


13,253 16,925 tender road extension to 12 meter on west side to be considered.
TPL to confirm exact area after these changes.
1,324 1,717

6,279 5,776 TPL to confirm, if side walk area is part of this. If no, where is side
walk area accounted.

5,714 6,289 Excluding the truck docks & staging area opposite to future
expansion. TPL to confirm exact area.
Considering new truck parking area, 2W, 4W, Cycle parking & bus
14,258 14,258 drop off area. TPL to confirm exact area.
13,440 12,649
54,268 57,614

76,332 78,585
TPL Remarks

The area of the same will be taken once the design of the same is
finalised

Considered as per the Latest layout received on 11-10-23


7511

Considered foot path as per the Latest layout received on 11-10-


23 88
Considered as per the Latest layout received on 11-10-23
1285
Considered as per the Latest layout received on 11-10-23
2064

1,439