Professional Documents
Culture Documents
Proposed Electrical Works
Proposed Electrical Works
Scope of Works
I. Electrical Works
DETAILS
Materials
FL fixture for 1" Ø x 20W lamp 8 unit @ 950.00 = 7,600.00
___________
Total Direct Cost = 12,600.00
Indirect Cost
___________
Total Direct Cost = 3,000.00
Indirect Cost
___________
Total Direct Cost = 5,000.00
Indirect Cost
___________
Total Direct Cost = 4,000.00
Indirect Cost
Prepared by:
Approved by: