4.2 Columns 25 m3
Gravel G1 31 m3 P 1,000.00 P 31,360.00
Portland Cement 254 bags P 240.00 P 60,960.00
Sand 13 m3 P 600.00 P 7,596.00
20 mm x 7.5 m 356 lnth P 924.75 P 329,211.00
10 mm x 6 m ### lnth P 184.80 P 213,444.00
Ties 110 kg P 65.00 P 7,150.00
1/2" Mar. Plywood 36 shts P 900.00 P 32,400.00
Formworks, 733 bd. Ft. P 30.00 P 21,990.00
scaffpldings, staging ### bd. Ft. P 30.00 P 71,490.00
Assorted Nails 37 kg P 76.16 2,791.26
778,392.26
Labor
2 Skilled 45 days P 500.00 P 45,000.00
10 Un-Skilled 45 days P 380.00 P 171,000.00
P 216,000.00
Equipment
2 1-Bag Mixer 20 day P 500.00 P 20,000.00
2 Concrete Vibrator 20 day P 300.00 P 12,000.00
P 32,000.00
Sub-Total P 1,026,392.26
874,675.00
2.0 Welding Machine 40 days P 550.00 44,000.00
2.0 Metal Cut off 40 days P 300.00 24,000.00
68,000.00
2.0 Skilled 40 days P 500.00 40,000.00
8.0 Un-Skilled 40 days P 380.00 121,600.00
161,600.00
Direct Cost 1,104,275.00
Mark-Up P 220,855.00
VAT P 159,015.60
ITEM COST P 1,484,145.60
6.0 MASONRY WORKS ### m2
CHN 6" ### pcs 15.00 25,312.50
CHB 4" ### pcs 12.00 156,000.00
Portland Cement 626 bags 240.00 150,240.00
Sand 52 m3 600.00 31,200.00
10 mm x 6 m 839 lnth 184.80 155,047.20
Ties 38 kg 65.00 2,444.00
494,931.20
4.0 Skilled 56 days P 500.00 112,000.00
8.0 Un-Skilled 56 days P 380.00 170,240.00
282,240.00
Direct Cost P 777,171.20
Mark-Up P 155,434.24
VAT P 111,912.65
ITEM COST P 1,044,518.09
7.0 PLASTER WORKS ### m2
Portland Cement ### bags 240.00 259,200.00
Sand 60 m3 600.00 36,000.00
295,200.00
4 Skilled 42 days 500.00 84,000.00
8 Un-Skilled 42 days 380.00 127,680.00
211,680.00
Direct Cost 506,880.00
Mark-Up 101,376.00
VAT 72,990.72
ITEM COST 681,246.72
Circuits Breakers
14 Hole Panel Board 2 sets P 5000 10,000.00
15 AT Circuit Breaker (G.E. bolt-on) 8 set. P 444.00 3,552.00
20 AT Circuit Breaker (G.E. bolt-on) 8 set. P 550.00 4,400.00
30 AT Circuit Breakers 9 set. P 600.00 5,400.00
Labor
2.0 - Skilled Worker 30 days P 500.00 /day 30,000.00
4.0 - Unskilled Worker 30 days 380.00 /day 45,600.00
75,600.00
Direct Cost 384,600.00
Mark-Up 76,920.00
VAT 55,381.24
ITEM COST 516,901.24
PROJECT COST 20,818,383.94
35 32 TOTAL
F1 F2 F3
w 2 2.2 3
l 2 2.2 3
D 1.6 1.6 1.6
V 6.4 7.744 14.4
Q 2 26 2
12.8 201.344 28.8 242.9
F1 F2 F3
w 1.4 1.6 2.4
l 1.4 1.6 2.4
t 0.35 0.35 0.35
2,219.40 V 0.686 0.896 2.016
Q 2 26 2
1.372 23.296 4.032 28.7
R 7 125 18 150
35
C1 C2 C3
w 0.3 0.4 0.50
l 0.3 0.35 0.4 Found Ground
5,267.38 h 6 6 6 Plywood 11 25
4,268.88 V 0.54 0.84 1.2 Formworks 224 509
9,536.26 Q 2 26 2 Staging/Scaff 732 1780
1.08 21.84 2.4 25.32
R 16 312 28 356
a.3) Columns
1.02 m3/MD
5,207.66
9,323.32
#REF!
Bottom Bars
12x 7.5 110.00
12x 7.6 285.00
Top 304.00
699.00
120.00 420.00 20
3,729.60
Conc pour on elev.
0.34 Slabm3/MD
Main Fire
16 mm x 6 104 104 208
0.81 12 mm x 6 80 80 160
4.94 0.13725 36.00 10 mm x 6 44 44 88
5.75 8 mm x 6 36 36 72
ties kg 17 17 34
3.29 0.183 18.00
3.29 0.37 9.00
1,970.59 6.59
852.48
325.25 3.04
216.00
3,364.32 9.63
1,589.28
Placing Footing
95.74 kg/MD
Slab on Grade
95.74 kg/MD
Columns, Beams
85 andkg/MD
R.C. Wall
369.60
1-Bagger Mixing
3.81 m3/MD
32,242.19 Fabrication68
rebars kg/MD 474.14987 MD
94.829975
T-1 T-2
2" x 2"
1-1/2" x 1-1/2"
Walls #### m2
Parafet #### m2
Septic Tank 25.00 m2
Pillar #### m2
####
####
a) CHB Laying
a.1)chb 4" 5.1 m2/MD 203.922 MD
a.2) CHB 6"4.25 m2/MD 5.88235 MD
Interior ####
Classroom
Hallways Lobby Cr
WALL Angle 50.00 132
Cross t 26
Tex screw 1/2"
#REF! pcs P 3 #REF!
a) Doors
1. Hollow Core
Fabrication
1.03 m2/MD
Installation
1.89 m2/MD
2. Panel Door
1.89 m2/MD 29.62963 MD
7.4074074
p p
Water Closet 12 sets 5,000.00 60,000.00
Urinal 6 sets 7,000.00 42,000.00
Urinal push botton6faucet sets 1,500.00 9,000.00
Landing 26.10
Riser 20.76
Run 28.80
####
a) Ceramic Glazed
5 Tilesm2/MD
b) Ceramic unglazed
1.56 Tiles
m2/MD 723.5
90.4375
a) Conduits 36 lm/MD
b) Boxes and Fittings
28 pc/MD
a) Plain Cement
16.7 Paint
m2/MD
Exterior149.432 29.886432
g) Wood Paint
23.1 m2/MD
Railings
2" x 3" x 1.5 mm Tubes
1" x 1" x 1.5 mm Tubes
2" x 1/4" Flat Bar
2" dia. Stainless steel pipe
53,850.00
57,000.00
22,000.00
18,000.00
48,000.00
50,000.00
64,000.00
50,000.00
309,000.00
Second
25 61
509 1242
1780 4292
32 16 8 1 16 28 9 16
GB1 GB2 GB3 B1 B2 B3 B4 B5