A Proposed City Council Hall Project For 14 Councilors and On A Project Site Having A 3% Slope Towards A RROW
A Proposed City Council Hall Project For 14 Councilors and On A Project Site Having A 3% Slope Towards A RROW
The local government has decided to erect a building on one of its site with a
TLA of 1,320 sq m located in Quezon City. The City Council hall shall have a
floor area of approximately 576 sqm. The main lobby should have an area of
approximately 11% of the AMBF that will include the toilet facility. The main
hall should have an area of 50% of thhe AMBF with an additional area of
gallery for 40 persons. The councilor’s lounge should have an area of 25% of
the AMBF that will also include the toilet facility. Also, provide a waiting or
mini-lobby area. The committee hearing room should have a floor area of
about 10% of the AMBF of the project.
10) Which side of the structure will be exposed to the sun for
approximately 8 months?
A. North
B. South
C. West
D. East
11) Which is not suited for a pipe chase?
A. Dry wall
B. CHB
C. Shear wall
D. None of the above
12) What is the best floor finish for the workshop place?
A. Ceramic tile
B. Plain concrete
C. Vinyl
D. Engineered Wood
A. 63.36 sq m C. 81.84 sq m
B. 75.25 sq m D. 71.50 sq m
A. 40 sq m C. 26 sq m
B. 56 sqm D. 184 sq m
17) How many boxes of 30x30 cm APO vinyl tiles are needed for the
councilor’s lounge?
A. 55 boxes C. 36 boxes
B. 146 boxes D. 400 boxes
A. 20 HP C. 15 HP
B. 18 HP D. 10 HP
21) How many gallons of Flat Latex paint is needed to paint two coats (1
coat of Primer and 1 coat of Topcoat) for the Main Hall’s ceiling?
A. 15 gallons C. 45 gallons
B. 18 gallons D. 25 gallons
22) How many 60 x 60 acoustic tiles are needed for the ceiling of the
committee hearing room?
A. 120-132 pcs
B. 150-160 pcs
C. 160 pcs- 176 pcs
D. 185 pcs - 200 pcs
27) The Occupancy of the building is the basis of the following design
requirements, except:
A. Parking slots
B. BHL
C. Fire Safety
D. Occupant Load