WEEKLY DIARY

th
(6 SEM CAPSTONE PROJECT EXECUTION)
Topic: (Wifi-Slax) Wifi Cracking & Security

Submitted in partial fulfilment of the requirements for the award of

Diploma in Computer Engineering

Submitted to

Maharashtra State Board of Technical Education, Mumbai (M.S)

Submitted by

Roll Student Name Enrollment


No. No.
03 Deeraj.C.Patgar 2103630130

02 Raj.R.Shingavi 2103630090

01 Rujuta.S.Barve 2103630093

Guided By

Lect. A. A. Deshpande

Department of Computer Engineering

Shri Jain Vidya Prasarak Mandal Rasiklal M Dhariwal Institute of Technology


Approved by MSBTE, Recognized by DTE,
Mumbai
(2023-2024)

Group A
Week no: 01 Date: 01/01/24

Activities planned:
1. Defined project objectives for the integration of Linset [Rujuta]
2. Conducted initial research on Linset [Deeraj]
3. Explored challenges and risks with Linset [Raj]

Activities Executed:

✓ Defined project objectives for the integration of Linset


✓ Conducted initial research on Linset
✓ Explored challenges and risks with Linset

Reason for delay if any: N/A

Corrective measures adopted

Remark and Signature of the Guide

Group A
Week no: 02 Date: 08/01/24

Activities planned:
1. Researched compatibility issues with Linset [Deeraj]
2. Updated project plan to account for Linset tasks [Raj]

Activities Executed:
✓ Researched compatibility issues with Linset
✓ Updated project plan to account for Linset tasks

Reason for delay if any: N/A

Corrective measures adopted

Remark and Signature of the Guide

Group A
Week no: 03 Date: 15/01/24

Activities planned:

1. Tested Linset functionality for WIFI cracking [Raj]


2. Configured Linset for better performance [Deeraj]

Activities Executed:

✓ Tested Linset functionality for WIFI cracking


✓ Configured Linset for better performance

Reason for delay if any: N/A

Corrective measures adopted

Remark and Signature of the Guide

Group A
Week no: 04 Date: 22/01/24

Activities planned:

1. Analyzed feedback from Linset testing [Raj]


2. Implemented various functions for stability [Deeraj,Rujuta]

Activities Executed:

✓ Analyzed feedback from Linset testing


✓ Implemented various functions for stability

Reason for delay if any: N/A

Corrective measures
adopted

Remark and Signature of the


Guide

Group A
Week no: 05 Date:

Activities planned:
1. Started documenting of black book chapterwise [All Member]
2. Gathered information of chapter 1&2 [Deeraj,Rujuta]
3. Gathered information of chapter 3&4 [Rujuta,Raj]

Activities Executed:

✓ Started documenting of black book chapterwise


✓ Gathered information of chapter 1&2
✓ Gathered information of chapter 3&4

Reason for delay if any: N/A

Corrective measures
adopted

Remark and Signature of the


Guide

Group A
Week no: 06 Date: 05/02/24

Activities planned:
1. Gathered information of chapter 5&6 [Deeraj]
2. Gathered information of chapter 7&8 [Deeraj,Raj]
3. Finalizing black book from our respected guide [All Members]

Activities Executed:
✓ Gathered information of chapter 5&6
✓ Gathered information of chapter 7&8
✓ Finalizing black book from our respected guide

Reason for delay if any: N/A

Corrective measures
adopted

Remark and Signature of the


Guide

Group A
Week no: 07 Date: 12/02/24

Activities planned:

1. Verified Linset functionality on different networks [Deeraj,Raj]


2. Addressed any issues or bugs related to Linset [Rujuta,Raj]

Activities Executed:

✓ Verified Linset functionality on different networks


✓ Addressed any issues or bugs related to Linset

Reason for delay if any: N/A

Corrective measures
adopted

Remark and Signature of the


Guide

Group A
Week no: 08 Date: 19/02/24

Activities planned:
1. Implemented optimizations to improve WIFI cracking speed [Deeraj]

2. Reviewed Linset for any security vulnerabilities [Rujuta]

Activities Executed:

✓ Implemented optimizations to improve WIFI cracking speed


✓ Reviewed Linset for any security vulnerabilities

Reason for delay if any: N/A

Corrective measures
adopted

Remark and Signature of the


Guide

Group A
Week no: 09 Date: 26/02/24

Activities planned:

1. Designed the architecture of WifiSlax [Deeraj]


2. Gathered information about the methodology and results after the
execution [Raj]

Activities Executed:

✓ Designed the architecture of WifiSlax.


✓ Gathered information about the methodology and results after the
execution.

Reason for delay if any: N/A

Corrective measures
adopted

Remark and Signature of the


Guide

Group A
Week no: 10 Date: 04/03/24

Activities planned:
1. Allocated the tasks specifically to each member [All Members]
2. Converted the Spanish information in Linset into English [Raj]
3. Finalized Linset documentation [Raj]

Activities Executed:
✓ Allocated the tasks specifically to each member
✓ Converted the Spanish information in Linset into English
✓ Finalized Linset documentation

Reason for delay if any: N/A

Corrective measures adopted

Remark and Signature of the Guide

Group A
Week no: 11 Date: 11/03/24

Activities planned:
1. Revised execution materials specifically for Linset [Deeraj]
2. Implemented measures to prevent from future bugs [Deeraj]
3. Communicated with teachers for any bug resolution [Rujuta]

Activities Executed:
✓ Revised execution materials specifically for Linset.
✓ Implemented measures to prevent from future bugs.
✓ Communicated with teachers for any bug resolution.

Reason for delay if any: N/A

Corrective measures adopted

Remark and Signature of the Guide

Group A
Week no: 12 Date: 18/03/24

Activities planned:
1. Reviewed WifiSlax backup and recovery [Deeraj]
2. Conducted backup tests to ensure data can be restored [Raj]
3. Implemented enhancements for Linset backup also [Rujuta,Deeraj]

Activities Executed:
✓ Reviewed WifiSlax backup and recovery
✓ Conducted backup tests to ensure data can be restored
✓ Implemented enhancements for Linset backup also

Reason for delay if any: N/A

Corrective measures
adopted

Remark and Signature of the


Guide

Group A
Week no: 13 Date: 25/03/24

Activities planned:

1. Gathered information for adding Firewall protection to WifiSlax [Raj]


2. Conducted Firewall installation on the OS [Deeraj]
3. Finding any errors during the execution [Rujuta]
4. Finalizing the Firewall activities [Deeraj]

Activities Executed:

✓ Gathered information for adding Firewall protection to WifiSlax


✓ Conducted Firewall installation on the OS
✓ Finding any errors during the execution
✓ Finalizing the Firewall activities

Reason for delay if any: N/A

Corrective measures adopted

Remark and Signature of the Guide

Group A
Week no: 14 Date: 1/04/24

Activities planned:

1. Evaluating success and challenges to Linset [Raj]


2. Used insights from the review to inform planning for future iterations and
projects involving WifiSlax [Deeraj]

Activities Executed:

✓ Evaluating success and challenges to Linset.


✓ Used insights from the review to inform planning for future iterations and
projects involving WifiSlax.

Reason for delay if any: N/A

Corrective measures adopted

Remark and Signature of the Guide

Group A
Group A