AC SIDE WORK
v
Switchyard - 22 kV
o
Civil Foundation With 4 Pole structure including
l
CT, PT &,Erection with Fencing with 3 gates (End
105 v set 1
to End) With HT meter(2nos) Transformer & LT
e
panel erection with civil work (materials supply
for earthing is not included)
106 Transformer & VCB Plinth Nos 1
107 Firewall Nos 1
108 LT panel room civil work Sq.ft 480
109 Stickers(For Inverter Identification) Lot 1
110 Paint Green Colour Ltrs 5
Paint
111 Other expenses Paint Black Colour Ltrs 5
112 Name Boards Name board nos 8
113 Security Salary (4 months) 3 shifts/day person 12
114 Other MateriAL Freight Nos 1
115 Insurance Insurance Engineer Insurance Charge LS 1
116 Router with Simcard Port Nos 1
117 Evvo Brush Nos 2
Module Cleaning System Supreme/ Reputed
118 Pipe Line for module cleaning MWp 0.0
119 Transformer : 25kVA resincast Indoor type Nos 1
Auxilary Power Supply
120 1kva ups Nos 1
121 Bay Extension 22 kV Bay Extension at substation MW 2.25
Trasnmission Line
122 OH Transmission line 22 kV Transmission line Mw 2.25
Work
123 ROW ROW Will be charged on actuals MW 2.25
Square type room without partition, with electrical
124 Evolve Control room - Evolve wiring, with RCC roof & Electrical connections - Lot 300
1250 sqft
Square type room without partition, with electrical
125 Customer control room Evolve wiring, with GI sheet roof & Electrical connections - Lot 200
1250 sqft
126 40 W Street Light Including Pipeline & Cables Nos 30
Periphery Lighting EVVO
127 2C * 6 Sqmm cu ar Cable Nos 950
128 Pole for Street Light Nos 30
129 Cameras Camera Outdoor, Bullet type camera Nos 8
130 2C 1 sq.mm cu flex. Cable Mtrs 600
131 Pipes LS 450
132 Security Cabin Security Cabin Nos 1
133 Gate Gate Nos 1
134 Fencing Prefabricated - 5830RFT Rft 1328
135 Borewell with 4 Hp Pump no 1
Addons Evolve
136 Pressure pump at sump Nos 1
137 Sump for water storage no 1