UNIT-2 START, ST

BOILER OIL BURNER STG

DATE COMES TO
TRIPPED RE-STARTED STARTED STOPPED TRIPPED ROLLING
HOME LOAD
AT AT AT AT AT STARTED AT
AT
1-Sep-15 10:09:00
4-Sep-15 12:44:00
7-Sep-15 5:50:00
11:00:00
8-Sep-15
17:32:00
6:04:00
6:26:00
9-Sep-15 9:47:00 13:00:00
14:46:00
16:02:00
11-Sep-15 22:10:00
0:21:00
13-Sep-15 14:46:00
18:20:00
16-Sep-15 7:06:00 8:08:00 11:00:00
8:14:00

19-Sep-15 5:15 PM 17:17:00

21-Sep-15 17:59:00
UNIT-2 START, STOP, TRIP & HOME LOAD HISTORY FOR THE MONTH OF SEPTEMBER -- 2015
STG

SYNCHRONISED SYNCHRONISED HOUSE LOAD


OUTAGE
WITH BLACK WITH PLN GRID RUNNING
HOURS
START DG AT AT HOURS
10:16:00 0:07

6:38:00
11:13:00
17:52:00
6:07:00
6:50:00
13:19:00
15:02:00
16:16:00
22:28:00
0:23:00
14:50:00
18:24:00

8:24:00

17:17:00

18:01:00
19:31:00

Total 0:07 0.00


ISTORY FOR THE MONTH OF SEPTEMBER -- 2015

REMARKS

Plant comes to home load. MT-1&2 HT breakers and MT-2 LT breaker opened for earth fault.
Manually tripped for take a change over from Turbine-2 to Turbine-1.
STG-2 taken in line due to STG-1 upper casing alignment pin comes out.
STG-2 taken home load mamually as per PLN instruction. At the same time PLN line change over taken from J-5 to J-1(J-5 lin
STG-2 taken home load mamually as per PLN instruction. Line J-5 maintanance completed and change over taken from line
Plant comes to home load due to Line-2, MT-2 both breakers and MT-1 HT breaker opened for earth fault.
Plant comes to home load due to Line-2, MT-2 both breakers and MT-1 HT breaker opened for earth fault.
Plant get black-out due to PLN line J-5 breaker opend and at the same time STG-2 breaker opend for under voltage and ove
Plant comes to home load due to MT-2 both breakers are opened for eart fault. (PLN side line J-1 & J-5 line checking is goin
Plant comes to home load due to MT-2 both breakers are opened for eart fault. (PLN side line J-1 & J-5 line checking is goin
Plant comes to home load due to Line-2, MT-2 both breakers and MT-1 HT breaker opened for earth fault.
Plant comes to home load due to MT-2 both breakers are opened for earth fault.
Plant comes to home load due to MT-2 both breakers are opened for earth fault.
Plant comes to home load due to MT-2 both breakers are opened for earth fault.
Boiler change over taken from unit-1 to unit-2 due to boiler-1 bed temperatures are maintaining higher side.
Plant comes to home load due to MT-2 both breakers and line-2 breakers are opened for earth fault.
Plant get black-out due to MT-2 both breakers and line-2 breaker opened. At the same time STG breaker opened for over f
tripped and having rated speed 3000RPM. So, immediately excitation ON and synchronisation done and power getting for
After getting clearance from PLN, STG-2 synchronised with PLN.
Plant comes to home load due to MT-2 both breakers are opened for earth fault. PLN line change over taken from J-5 to J-1