Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

COM949 OUT012

OUT012 TEL602
TEL602 VST601 SAFETY HEALTH AND ENVIRONMENTAL INFORMATION
VST601 PIR001 SEA004
PD HOO019 BAR600 DIS013 2 2 In addition to the hazards/ risks normally associted with the types of work detailed on this drawings, note the following

D
1

1
WPT901-2

2023.12.06 (11 am - 1 pm)

PS
2
HOO019 D
2 2 2

1
BOA919 1 1 risks and infrmation.
OUT005 1 1

2
CHA301
OUT005
HOL006 D D D Risks listed here are not exhaustive. Refer to CDM Risk Assesment Register No. ST2-BDP-XX-XX-RR-Z-000001
CHA301 WPT901-1SHE101 D

1
ENT-01-270-01

2
MIR026 CAL601 OUT121 CONSTRUCTION
Disposal Hold
U-BAS101-3 OUT012 BLI600
8 m² IPS901 P-SWC603 SWC034

2
IMG-01-164-02 DIS437 VST601 HST001 OUT121 F10A.11 Contamined land
OUT012 COM949
BIN037 SHE101 Lobby OUT012 P-BRA604 OUT012 F10A.21 Working in close proximity to railway line

1:50 User engagement - Radiotherapy MRI/CT


OUT010 OUT121 P-IMG002 CHA301 CHA301 OUT121
BOA013 BOA013 9 m² OUT012 F10A.31 Disturbing or striking existing utilies including live uncharted services
OUT030 WKT900 COM031

D
OUT012 F10A.52 High water table. Risk of flooding and slope stability

PC
WPT901-2 SEA004 HOL004

1
CAL002 COM033 INT600
CAL006 HOO019 OUT005 TEL602 P-BRA604
RAI081 HOO019

(3th round of Users Engagement)


PIR001 CLO002 P-CAB602 DEMOLITION

D
1

1
CIR-01-161-02 SWC034 P-COM600
WPT901-2 PD P-IMG002

2
Lobby CAL034 No unusual hazards/risks
CHA301 IMG-01-113-07 PD
CHA301 CAL034 56 m²

2
LOR Offices
Patient Change - Ambulant PIR001
3 m² 16 m² For information relating to Use, Cleaning and Maintenance see the Health and Safety File.
Control Room CAB605
CHA369 TAB053 OUT005 PIR001 It is assumed that all works will be carried out by a competent contractor working, where appropriate, to approved

PS
1
CAL601 IMG-01-090-07 method statment.

PD
MIR026 DIS438

BOA013 BUILDING DESIGN PARTNERSHIP SHALL HAVE NO RESPONSIBILITY FOR ANY USE MADE OF

Attendees:
MIR026 PS
1 CAL601
OUT005 HOO024 THIS DOCUMENT OTHER THAN FOR THAT WHICH IT WAS PREPARED AND ISSUED.
TVM900 HOO024
RAC089 HOO024
OUT121 HOO024
OUT012 IMG-01-071-02 The room will be IMG-01-114-08
Patient Change - Wheelchair
HOO024 COM031
COM033
OUT012
OUT012
ALL DIMENSIONS SHOULD BE CHECKED ON SITE.

2
Waiting Area
12 m² converted into a 4 m² COM033 OUT012
OUT012 DO NOT SCALE FROM THIS DRAWING

D
1
WKT900 OUT121
PIR001
Patient Clinical Prep IMG-01-164-03 COM031 OUT121

Lucy Cheeseman
CAL034 PD P-IMG002 VST601 ANY DRAWING ERRORS OR DIVERGENCIES SHOULD BE BROUGHT TO THE ATTENTION OF
Lobby RAI908 P-BRA604 HST001
BUILDING DESIGN PARTNERSHIP AT THE ADDRESS SHOWN BELOW.
Room (Cannulation
SWC034 6 m²
RAI172 COM949
COM949
CHA301
OUT012
OUT121
TEL602
CHA301
OUT005
Room).
Rebecca Furner
DRAWINGS SHALL BE READ IN CONJUNCTION WITH THE FOLLOWING BEFORE WORK
CAL012
COMMENCES:
TAB053 CHA383

D1
CHA369 CHA369 CAL006 D D • THE CDM DESIGN ISSUES REGISTER
HOO019 RAI161 1 D 1 • THE BDP RISK SERIES OF DRAWINGS

Steve Morgan
LOC9000 HOO019 MIR026 SHE101 1
LOC9000 LOC9000 R PC 2 2 2 2 • THE PROJECT CDM RISK REGISTER
LOC9000 LOC9000 2
LOC9000 LOC9000

Mark Hosmer NOTES


Julie Warner
ENT-01-215-01
Wheelchair park PS
MIR002 HOL016 R
? HOO019
IPS903 CAL601 PC
1 m² U-WCH608-R1 BIN028

R
U-WCH601R

Abdul Adam
IPS902 EQUIPMENT GRAPHICS ARE INDICATIVE OF THE TYPE OF EQUIPMENT & NOT SPECIFIC TO ANY
CAL006
PC HOO019 OUT052 PARTICULAR PRODUCT.
HOO019 CAL012
CAL601
FINAL DESIGN AND M&E DEVELOPMENT MAY AFFECT ROOM LAYOUTS.

PD
Emily Spence
ENT-01-285-01 ENT-01-040-01

PS
PIR001
PD WC - Ambulant Retail Unit
3 m² IPS903 32 m² FINAL STRUCTURE, COLUMN AND SHEAR WALL LOCATIONS AND BUIL-UPD MAY AFFECT ROOM
HOO024 PIR001 HOL004 LAYOUTS

Rupert Horne
ENT-01-117-01 HOO024 IPS902
Baby - Feed HOO024 ENT-01-284-01 U-BAS605L-1
CAL002 DIS013
5 m² WC - Independent Wheelchair User/Accessible FINAL COORDINATION OF DRAINAGE AND PIPES, BOXING-OUTS, RISERS, etc MAY AFFECT
8 m² ROOM LAYOUTS

Eleni Kaltsogianni
OUT012 HOL004
RAC089 RAI908
CAL034 DIS013
IPS903 FINAL DOOR SET SPECIFICATIONS TO BE COORDINATED AGAINST APPROVED DOOR PACKAGE
U-BAS605L-1
CHA308

Joao Pinto

D
ENT-01-285-02
SWC031 EQUIPMENT PLANS ARE SUBJECT TO INFECTION CONTROL SIGN-OFF.

1
CHA368

2
HOL003 WC - Ambulant PIR001
OUT005

PD
SHE100

PS
CLO002 3 m²
CAL601 IPS902 FF&E ELEMENTS TO MAIN WAITING AREAS AND SUB-WAITS WERE POSITIONED AS A PLACE

Karen Green
U-WCH601R
HOL016 HOLDER. FURTHER DEVELOPMENT TO ID AND SERVICES TO THESE AREAS ARE REQUIRED.
CHA369 HOL004 CAL006
DIS013 OUT010
CAL012

2
IPS901 TAB904 HOO019
CAL601
BIN028 FIREFIGHTING EQUIPMENT LOCATIONS i.e. EXTINGUISHERS AND FIRE BLANKETS, NOT
U-BAS101-1 OUT052 PC

John Osbourne
IDENTIFIED ON PLAN. FINAL LOCATIONS TO BE AGREED AND LOCATED AS PER FIRE
MIR026 MIR002 R
PS
SPECIALIST SUPPLIER
TAB053 2
OUT012 1 OUT005
OUT121
D SWC034 EQUIPMENT PLANS ARE DEPENDENT ON TRUST OPERATIONAL MANAGEMENT.
1 TVM900
D
POWER TO OPEN PLAN DESKS SUBJECT TO AGREED SERVICE DESK STRATEGY.
TAB053
TAB053 TAB053
AVSU PANELS, FIRE PANELS, BMS PANELS QUANTATIES AND LOCATION IS TO BE AGREED AND
CONFIRMED.

BEDHEAD / PENDANT TYPES, CONTENTS, SETTING-OUT AND LENGTHS ARE INDICATIVE, TO BE


CHA369 ENT-01-075-02 CHA369 CHA368
CHA368 CHA368 COORDINATED WITH CLIENT AND SPECIALIST AS PART OF THIS PROCESS.
General Waiting
27 m² SECURITY EQUIPMENT NOT IDENTIFIED ON PLAN. FINAL LOCATIONS TO BE AGREED AND
CONFIRMED.
Please add
SLOPING TOPS ARE TO BE FITTED ON UPPER AND TALL CABINETS IN CLINICAL AREAS, WITH
information area with ALLOWANCES FOR DESIGN-SPECIFIC INFILL PANELS WHERE EXPLICITLY IDENTIFIED.
Maggies style table

2 2
SPA015 2

2 2 1
D
1 OUT010
D COM938

2
OUT121

COMM033
CO 602
COM 949
OUT121

OU 949
OUTT0012

1
OUT1 12
OUT012

21

D
TEL
OUT012 CHA301
OUT121 OUT012
OUT012 CHA301 AMP010
ENT-01-077-01 OUT012 COM949
COM949 COM949
Reception COM949 COM033
COM033 TEL602 HST001
20 m²

01

D
1
CHA368

CHA3
PD

2
PIR001

2
TVM9003
D OUT121
1 OUT010 HST001
PAN901
2

D
1
OUT005 TAB053
SWC034

RAC089
CHA369

CHA368 CHA369
OUT121 TAB053
OUT012
TVM900

D
1
ENT-01-075-01
General Waiting
31 m²

TAB053

TAB053 CHA368

CIR-01-161-03
Circulation
82 m²
CHA369 CHA369
STA-01-003-03
Public Lift Core 03
16 m²

SPA015

OUT121 SPA015
COM949 CHA368
COM949 CHA368 TAB053
TAB053 TAB053 TAB053 COM949 TAB053
TEL602 HST001
HST001 COM033
COM949 OUT012
COM033 OUT012
OUT012
2

COM949 AMP010
1

CHA368 CHA368 OUT012 CHA368 SPA015


D

OUT012 IMG-01-071-03
2

CHA301 CHA368
CHA368 CHA368 OUT121 CHA368 Waiting Area
2
D
1

56 m²
2

IMG-01-215-01
301 Bay - Wheelchairs
TAB053 TAB053 CHA368 CHA TAB053 TAB053
TAB053 STA-01-003-04
2 m²
PD Public Core 03
001
PIR 29 m²
IMG-01-071-03
Waiting Area
56 m²
IMG-01-077-01 CHA368
Reception
CHA368 15 m² CHA369 CHA369
CHA368 TAB053 CHA369

P03 Third Issue AC JP 01/12/2023


P02 Second Issue AC JP 03/11/2023
P01 First Issue JD JP 06/10/2023
REVISION DESCRIPTION DRAWN CHECKED DATE

KEYPLAN

STAGE

1 2

2 1 3
3 4

CLIENT

University Hospitals Sussex


NHS Foundation Trust

16 Brewhouse Yard
Clerkenwell
London
EC1V 4LJ
United Kingdom

T +44 [0]20 7812 8000


www.bdp.com

PROJECT TITLE

Brighton 3T Stage 2

BDP JOB NUMBER SUITABILITY CODE

P3002066 S2 - For Information


@ A0
DRAWING TITLE SCALE

Stage 2 - Equipment Plans - Level 01


1 : 50
DATE FIRST ISSUED

06/10/23
DRAWING No. REVISION

ST2-BDP-CC-01-LP-A-291004 P03

C:\REVIT_LOCAL\v2023\ST2-BDP-CC-XX-M3-A-000007-Clinical-Equipment_yr44192.rvt

You might also like