Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

LOW VOLTAGE SWITCHBOARD CONFIRMED ORDER

DOCUMENT NUMBER:
HANDOVER FORM NEI/SALES/HOF/01
REVISION STATUS: 00
REVISION DATE:

DATE: - 24/11/2023 HANDOVER FORM No. _23P11M.47

CUSTOMER DETAILS
Client Name MR. MUSTAFA
Project Name PROPOSED ST JOSEPHS FREINADEMETZ CATHOLIC CHURCH IN RUAI
Date Drawings Required 25/11/2023
Delivery Time Given to 6-8 WEEKS AFTER RECEIPT OF ORDER.
Client
DOCUMENTS HANDED OVER
Description Received Description Received
Quotation YES Schematic Drawings YES
Bill Of Quantities YES Preliminary Layout Drawing YES
Customer Enquiry YES
Specific Customer Requirements if any
N/A

DRAWINGS FOR APPROVAL


FUNCTION Date & Sign Function Date & Sign
Date Drawings for Approval Required 25/11/2023. Date Revised Drawings for
Approval Received
Customer Comments Forwarded To Date Revised Drawings for
DLD Approval Received
Customer Comments Forwarded To Date Revised Drawings for
DLD Approval Received
Customer Comments Forwarded To Date Revised Drawings for
DLD Approval Received
Date Final Approved Drawings
Submitted to DLD

Received By (Name & Signature Handed Over By (Name & Signature)


FREDRICK S. N

1. Date 24/11/2023 1. Date 24/11/2023

NOTES

KINDLY, GENERATE SHOP DRAWINGS FOR THE ABOVE-MENTIONED PROJECT

You might also like