Professional Documents
Culture Documents
8 302205 PSP01 PS01 PEC10 00004 OU100054339 R0 Ap
8 302205 PSP01 PS01 PEC10 00004 OU100054339 R0 Ap
INGENIERÍA DE DETALLE
DQ-170137 / DP-170013
0 JOOKAL 23.3.2018 AKUJAA 23.3.2018 KRITUL 23.3.2018 APPROVED FOR FURTHER ENGINEERING
B JOOKAL 8.2.2018 AKUJAA 8.2.2018 KRITUL 8.2.2018 FOR INFORMATION
Name Date Name Date Name Date Revision Text
Rev
Prepared Checked Released
Status: Original Size:
APPROVED FOR FURTHER ENGINEERING
Customer: Project Lifecycle Phase: Site No.:
CODELCO CHILE DIV. CHUQUICAMATA IMPLEMENTATION 01 S-00262
Project Name: Customer Document ID:
CHUQUICAMATA FSF 17EP11-ID-5220-ME-SP-008
Replaced by: Replaces: Language:
EN
Document Title:
DUTY SPECIFICATION
SMELTING PLANT
FLASH SMELTING
HEAT EXCHANGERS
INTERCAMBIADORES DE CALOR - AREA BOMBAS
Equipment No: Item No:
Project ID: Plant Code: Plant Unit Code: Document Type: Running No: Revision: Sheet of Sheets:
TABLE OF CONTENTS
1. INTRODUCTION ................................................................................................................ 3
2. SCOPE ............................................................................................................................... 3
2.1. Engineering and documentation ................................................................................. 3
2.2. Spare parts and wearing Parts ................................................................................... 3
2.3. Work excluded ........................................................................................................... 4
2.4. Battery limits............................................................................................................... 4
3. OPERATION AND DESIGN CONDITIONS......................................................................... 4
3.1. General desing Conditions ......................................................................................... 4
3.2. Codes and standards ................................................................................................. 4
3.3. Duty description ......................................................................................................... 5
Cooling water heat exchangers 5226-INC-004 and 5226-INC-005...................................... 5
3.4. Design characteristics ................................................................................................ 5
4. EQUIPMENT DESCRIPTION ............................................................................................. 6
4.1. Mechanical ................................................................................................................. 6
4.2. Materials and welding ................................................................................................. 6
4.3. Surface treatment and painting .................................................................................. 7
4.4. Instrumentation and automation ................................................................................. 7
5. ASSEMBLY ........................................................................................................................ 8
5.1. Shop assembly........................................................................................................... 8
6. COMMISSIONING AND TESTING ..................................................................................... 8
6.1. Shop tests .................................................................................................................. 8
6.2. Tests after Installation ................................................................................................ 8
7. ATTACHMENTS ................................................................................................................. 8
Project ID: Plant Code: Plant Unit Code: Document Type: Running No: Revision: Sheet of Sheets:
1. INTRODUCTION
This specification covers the minimum requirements of heat exchangers to be used
for the Primary Cooling Water System area in the Flash Smelting process.
The equipment shall be supplied as a complete functional and operational unit
incorporating all necessary auxiliary materials except as specifically excluded in
section
Note 1: If the supply deviates from this specification, complete technical and
economic arguments for the alternative solutions are to be stated.
Note 2: All SI-units of volume stated in this specification refer to the temperature
of 0C and the pressure of 101,325 kPa (NTP).
Note 3: All document references included in this specification refer to the latest
revision of the document in question.
2. SCOPE
The equipment shall consist of but not be limited to the following items:
The equipment shall include at least, but not be limited to the following:
- Plate type heat exchangers
- Flanged inlets and outlet for primary water circuit
- Flanged inlets and outlet for secondary water circuit
- Local temperature gauges for inlet and outlet water circuit
- Local pressure gauges for inlet and outlet water circuit
All work and equipment required for a complete operating unit shall be included
except as specifically excluded below:
Foundation anchor bolts
Field erection and installation
Access platforms, handrails and stairs not mounted on the unit
Piping unless an integral part of the equipment assemblies or of this
specification
Anchor bolts
Project ID: Plant Code: Plant Unit Code: Document Type: Running No: Revision: Sheet of Sheets:
Drawings:
All design and drawings shall be done in Spanish language, using metric system
and SI-units and projection shall be according to first angle projection.
Cooling water heat exchangers are for cooling the furnace jacket cooling water
circuit. Jacket (primary) cooling water is cooled with secondary cooling water
circulation.
The heat exchangers shall be of plate type heat exchangers.
Heat exchanger 5226-INC-004 are in operation and 5226-INC-005 is stand-by.
- Inlet temperature 43 °C 30 °C
- Outlet temperature 35 °C 38 °C
- Inlet pressure, max 650 kPa(g) TBC kPa(g)
- Pressure loss, max 100 kPa
4.1. Mechanical
The heat exchangers shall be of plate and frame type.
The frame shall be sized to provide space for 25-50 % additional plates.
There shall be manual tightening of clamping bolts.
The construction must allow for easy opening, cleaning and inspection of the plate
pack.
The frame must be constructed so that it is stable enough to carry the weight of the
heat exchanger without being attached to the foundation.
The Supplier shall recommend suitable materials of construction compatible with the
material being handled.
Plate: AISI 316
Frame: Carbon Steel
Sealing: NBR
Connections: AISI 316
Project ID: Plant Code: Plant Unit Code: Document Type: Running No: Revision: Sheet of Sheets:
The properties of filler metal have to correspond to the values of the basic material.
All cleaning, painting or finishing will be done in full accordance with the latest
edition of SSPC standard and in accordance with standard practices of the supplier.
Supplier shall recommend if other painting options are their standard in use.
Insulated steel structures shall have transport protection.
Surface treatment and painting of standard components shall be according to
manufacturer’s standard practice.
Surface treatment for stainless steel parts.
Corrosion protection work in the work shop:
All defects and contaminations of Stainless Steel parts surfaces such as welding
oxide, heat tint or scale shall be cleaned with stainless steel brush or acid pickled
and passivated.
Project ID: Plant Code: Plant Unit Code: Document Type: Running No: Revision: Sheet of Sheets:
5. ASSEMBLY
5.1. Shop assembly
Components and installation shall be shop assembled to the maximum extent
regarding the fabrication, transportation and installation. Seller is responsible to
consult with the Client about the extent of the shop assembly.
7. ATTACHMENTS
Project ID: Plant Code: Plant Unit Code: Document Type: Running No: Revision: Sheet of Sheets: