Flood Test Garden Tower
Flood Test Garden Tower
Purpose
1. Hose
2. Pressure washer Machine with pressure Gauge - 30psi
3. Water Container (Drum)
Theory of Procedure
The tests will be conducted in accordance with Glass Canopy for leak testing.
1. A glass window test assembly shall comply w/ a.) Though b.) Below at the conclusion of the test
procedure described.
Gap shall either remain secured or maintain the securement of the gap component.
A sample shall show no evidence of progressive leak from w/in or between any of the
components of the assembly.
2. The test is terminated when the glass window test assembly does not comply w/ the
completion of A designated water pressure holds for 5 minutes where no leak failure has
occurred.
3. Repairs or modifications, except to stop leakage along the periphery, are not to be made to
assembly during the test.
5. Acceptance criteria
- Acceptance criteria - Comply with QAQC Checklist during inspections. There must be at least
5mm discrepancy based on tolerance.