ITEM NO DESCRIPTION UNIT


SECTION NO. 1

BILL NO. 1

GENERAL REQUIREMENTS

NOTE: For specifications see General Specification

NOTE: For additional explanations/ clarifications see


"Preambles/Rates and Measurement Clauses"

GENERAL REQUIREMENTS

These General Requirements are applicable to the whole of the


Works. If the Contractor wishes to price any of the items contained
herein then each such item, clause or sub-clause must be
individually priced. The Contractor shall not enter any lump sums
covering more than one or all items, clauses or sub-clauses. Where
any item, clause or sub-clause of the General Requirements has not
been priced, it will be deemed that the value of such item, clause or
sub-clause is included in the rates for measured items elsewhere in
the Bills of Quantities.

Conditions of Contract

1 The Contractor shall describe and list and price herein any
obligations contained in the Conditions of Contract for which he has
not allowed elsewhere and wishes to price separately.

Item

Specifications H3

2 The Contractor shall describe and list and price herein any
obligation contained in the Specifications for which he has not
allowed elsewhere and wishes to price separately.
Item

Bills of Quantities H3

PRELIMINARIES 1/1
.

ITEM NO DESCRIPTION UNIT


1 The Contractor shall describe and list and price herein any
obligations contained in the Bills of Quantities for which he has not
allowed elsewhere and wishes to price separately.
Item

Performance Bond / Advance Payment H3

2 The Contractor should allow for the provision of the performance


bond and advance payment in accordance with the requirements of
the Contract.
Item

PRELIMINARIES 1/2
.

ITEM NO DESCRIPTION UNIT

Insurances H3

3 The Contractor should allow for insurances in accordance with the


requirements of the Contract.
Item

4 Increase of project specific Professional Indemnity Insurance in


accordance with the requirements of the Contract.
Item

Pricing Generally H3

The Contractor shall satisfy himself as to the meaning of every item


in the Bills of Quantities, and the rates and prices inserted by him
will be deemed to cover all his obligations under the Contract and
all matters and things necessary for the proper construction, and
completion of the Works including, but not by way of limitation, all
temporary work required (including any that may be required by
sub-contractors). The prices shall include for all materials and
labour and for the provision and use of all plant - whether
mechanical or non-mechanical - required for the expeditious
carrying out of the Works in their proper sequence - for shifting,
altering and adapting such temporary work and plant as may be
required during the progress of the Works and removing at
completion and making good any surfaces disturbed; and if not
included in any prices inserted against the Conditions of Contract
Clauses above; for the guarantees, insurances and bonds required;
for the costs of preparing a tender; for the work in connection with
measurements and the final account; for profit; and for all other
establishment charges and on costs of whatever nature. No claim
for additional payment will be allowed for any error or
misunderstanding by the Contractor in these respects. The selected
Contractor will be required to provide the full and detailed Tender
breakdown upon being awarded the Contract. This Tender
breakdown is to show the actual calculations of the Preliminaries,
the labour, plant and material costs of the Works, the build-up of
measured rates with on-costs and overheads and any other
allowances used to arrive at the Tender Sum.

PRELIMINARIES 1/3
.

ITEM NO DESCRIPTION UNIT


Quantities in Bills Not Basis for Ordering Materials H3

The Contractor shall not use the Quantities given in the Bills of
Quantities as a basis for ordering materials until he has satisfied
himself from the drawings and site information that the quantities
so given are correct for the work to be executed.

Building Permits and Statutory Approvals H3

The Contractor shall be responsible for obtaining all approvals


necessary for the Government Departments, the Police, local
Service Authorities (i.e. Dubai Water & Electricity Authority, Etisalat,
Civil Defence), Dubai Municipality, RTA as required in the
performances of this Contract, and for coordinating approvals and
the like with requirements necessary for the works to proceed.

The Contractor shall be responsible for coordinating the works and


obtain required NOCs from Dubai Municipality, DEWA (water),
DEWA (electricity), RTA and any other necessary authorities or
bodies and ETISALAT.

The Contractor will be responsible for obtaining the approved


demarcation drawings and permits to allow his works to start
(charges for Building Permit will be borne by the Employer).

All charges and deposits towards the temporary service connections


required for construction purposes shall be paid by the Contractor.

2 The Contractor must allow for any liaison necessary for the
successful and timely completion of the works with the
representatives of development of adjoining plots, other plots in the
development, the master plan developer and his representatives
and residential developments in the area.

Item

TEMPORARY FACILITIES H2

PRELIMINARIES 1/4
.

ITEM NO DESCRIPTION UNIT

Facilities for the Employer's Representative H3

The Contractor to operate and maintain existing site office for the
sole use of the Employer's representative including storage space,
shaded car parking spaces, complete all as per Specification.

2 Maintenance charge (time related cost). Days

3 De-mobilization charges (fixed cost). Item

1 Provide computer equipment (brand new) & software, laptops,


printers and photocopying machine for the exclusive use of the
Employer and their representative.
Item

2 Provide first aid with supplies. Item

3 Provide stationary consumables & other consumable, complete all


as per Specification.
Item

Provide telephones, internet access and fax machine for the


exclusive use of the Employer and their representative, complete all
as per Specification.
H3

4 Mobilization charges (fixed cost). Item

5 Maintenance charge (time related cost). Days

6 De-mobilization charges (fixed cost). Item

7 The Contractor shall provide 2 Nos of 4x4 Toyota Fortuner car


including maintenance, fuel, insurances. first aid kit, salik card etc.,
complete. (1 for Employer and 1 for Consultant)

Days

Attendance of staff H3

8 Provide daily cleaning attendance Days

PRELIMINARIES 1/5
.

ITEM NO DESCRIPTION UNIT


9 Provide Document Controller Days

Facilities for Supervision Consultants H3

The Contractor shall provide, install and maintain proper office


facilities (temporary site office accommodation with furniture and
equipment) for the sole use of the Engineer's and Engineer's Staff
including storage space, shaded car parking spaces, complete all as
per Specification.

10 Mobilization charges (fixed cost). Item

11 Maintenance charge (time related cost). Days

12 De-mobilization charges (fixed cost). Item

1 Provide computer equipment (brand new) & software, laptops,


printers and photocopying machine, digital camera, complete all as
per Specification.
Item

2 Provide first aid with supplies. Item

3 Provide stationary consumables & other consumable, complete all


as per Specification.
Item

Provide telephones, internet access and fax machine, complete all


as per Specification.

4 Mobilization charges (fixed cost). Item

5 Maintenance charge (time related cost). Days

6 De-mobilization charges (fixed cost). Item

Attendance of staff H3

7 Provide daily cleaning attendance Days

Surveying Equipment H3

PRELIMINARIES 1/6
.

ITEM NO DESCRIPTION UNIT


8 The Contractor shall provide and keep on site an adequate supply of
surveying instruments for the proper execution of the Works. The
instruments shall all be in proper adjustment and always kept in
perfect working order and they shall be immediately available for
use whenever required, together with all necessary assistance.

Item

Facilities for the Contractor H3

The Contractor shall be responsible for the provision, erection,


maintenance offices, with all required furniture and equipment,
messrooms, sanitary accommodation and welfare facilities for his
use and by Contractor's agent and site staff, complete all as per
Specification (no temporary living / accommodation will be
permitted on the site. It is the Contractor's responsibility to make
any necessary arrangements for suitable housing of temporary
workers).

9 Mobilization charges (fixed cost). Item

1 Maintenance charge (time related cost). Days

2 De-mobilization charges (fixed cost). Item

Temporary Roads/ Diversions H3

Contractor shall provide temporary roads/diversions as may be


necessary including hardstanding and crossings, complete all as per
Specification.

3 Mobilization charges (fixed cost). Item

4 Maintenance charge (time related cost). Days

5 De-mobilization charges (fixed cost). Item

CONTRACTOR'S ADMINISTRATIVE ARRANGEMENTS H2

Generally H3

PRELIMINARIES 1/7
.

ITEM NO DESCRIPTION UNIT


Site Administration and Supervision H4

The Contractor shall provide sufficient staff and equipment to


perform the administrative duties involved in executing the
Contract. Such staff shall be properly qualified to perform their
respective duties and shall not be removed from the Site or
replaced without the prior permission.

6 The Contractor shall keep the Employer fully informed of the


sequence of all operations comprised in the Works and he shall not
delegate such responsibility to any Sub-contractor or to any other
agent except with the written permission.

Item

Security, Safety, Accidents and First Aid H4

The Contractor shall be responsible for the protection of the


materials, plant and safety and security of all employee in the site
during the working hours, Contractor to allow for but not limited to:

7 Provision of suitable lights, high visibility clothing and personal


protective equipment for site staff.
Item

1 Safety, security fire extinguishers at site. Item

2 Safety barriers, warning signs on site access roads. Item

3 Adequate protection against any form of damage or deterioration


shall be provided for all sections of the Works. This shall include
protective tapes, casings, guard rails and the like, which shall be
provided if necessary.
Item

4 First aid facilities and signage for first aid, fire, etc. Item

5 All necessary arrangement to obtain medical help and transport to


hospital, in case of accidents.
Item

6 HSE inspections and H&S performance. Item

PRELIMINARIES 1/8
.

ITEM NO DESCRIPTION UNIT


Transportation H4

7 The Contractor shall provide transportation of labour to and from


site and pay all costs in connection therewith.
Days

Labour Procurement H4

8 The Contractor shall allow for procuring all labour required to


execute the Works and shall pay all charges in connection with the
employment and discharge of such labour.
Item

CONSTRUCTION PLANT H2

Small Plant and Tools H3

9 Provide small plant and tools. Item

Cranes and Lifting Plant H3

The Contractor shall provide all constructional equipment, lifting


equipment, transport facilities, tools and services, required for the
proper execution of the Works, complete all as per Specification.

10 Mobilization charges (fixed cost) Item

11 Maintenance charge (time related cost) Days

1 De-mobilization charges (fixed cost) Item

Scaffolding H3

PRELIMINARIES 1/9
.

ITEM NO DESCRIPTION UNIT


The Contractor shall provide, erect, maintain, dismantle and clear
away at completion proper and adequate internal and external
scaffolding for his own use, and any sub-contractor ("domestic" and
"nominated") and any other directly appointed contractors, artists
and tradesmen. Any holes shall be made good to match the
adjacent surfaces as the scaffolding is dismantled. The Contractor
shall be entirely responsible for all safety precautions in connection
with scaffolding and for its entire sufficiency for the work.

2 Mobilization charges (fixed cost) Item

3 Maintenance charge (time related cost) Days

4 De-mobilization charges (fixed cost) Item

TEMPORARY WORKS H2

Temporary Hoardings H3

5 The Contractor is to erect, supply, install and maintain the


temporary fencing and hoardings. The Contractor shall provide all
means, safety signage, etc., necessary for protecting the public or
occupants for the proper execution of the Works and for meeting
the requirements of any service or other authority to the approval.
The Contractor shall handover the temporary fencing gates and
hoardings in good condition( when directed by the Employer on
completion) to the Employer.

Item

Site Sign Boards H3

The Contractor shall be responsible for supply, installation,


maintenance, modification, re-alignment, re-location of the existing
site sign boards. Should the Contractor desire to incorporate any
other names, he must gain approval.

No other notice boards or advertisements on or around the Site will


be permitted unless approved in writing.

PRELIMINARIES 1/10
.

ITEM NO DESCRIPTION UNIT


Upon completion of the Works the Contractor shall remove the sign
boards (at agreed date with the Employer) and handover to the
Employer.

1 Mobilization charges (fixed cost) Item

2 Maintenance charge (time related cost) Days

3 De-mobilization charges (fixed cost) Item

TEMPORARY UTILITIES H2

General H3

The Contractor shall provide proper and adequate temporary


utilities for his own use.

Existing Services H4

4 The Contractor is to take particular care to avoid damage to existing


services during the course of the work. The Contractor shall be
responsible for the protection of all existing services within the Site
and shall make good any damage to existing services resulting form
his carrying out of the Works to the satisfaction of the relevant
authority.
Item

Water H4

The Contractor shall supply clean water for the Works, the
Contractor shall pay all charges for the consumption of water used
and arrange for necessary connections and installation of meters,
complete all as per Specification.

5 Mobilization charges (fixed cost) Item

6 Maintenance charge (time related cost) Days

7 De-mobilization charges (fixed cost) Item

Electrical Power and Lighting H4

PRELIMINARIES 1/11
.

ITEM NO DESCRIPTION UNIT

The Contractor shall arrange and provide for an adequate


temporary supply of all necessary electrical power and lighting for
the Works including paying all charges for the consumption of
electricity, complete all as per Specification.

1 Mobilization charges (fixed cost) Item

2 Maintenance charge (time related cost) Days

3 De-mobilization charges (fixed cost) Item

Fire Hazards / Temporary Fire Fighting Services and Precautions


H4

4 Contractor shall be responsible for ensuring that proper precautions


are taken to protect the temporary buildings and its contents where
naked flame is used, complete all as per Specification.

Item

OTHER FACILITIES H2

As-Built Drawings and Operation and Maintenance Instruction


Manual
H3

5 Allow for providing copy of each as-built drawing/ each


Maintenance Instruction Manual in the form and numbers
instructed time to time.
Item

Shop Drawings H3

6 The Contractor shall provide shop drawings, complete all as per


Specification.
Item

QA / QC Procedures H3

7 The Contractor shall allow for QA/QC service and Quality Control
procedures, complete all as per Specification.
Item

PRELIMINARIES 1/12
.

ITEM NO DESCRIPTION UNIT


Geotechnical Report H3

1 Geotechnical report is part of tender document. However, the


Contractor shall be responsible for carrying out any additional
investigations and any verifications as he considers necessary.

Item

Progress Photographs H3

2 The Contractor shall supply and handover set of progress


photographs as specified.
Item

Records / Progress Reports H3

3 The Contractor shall provided records/progress reports as specified.


Item

Project Closeout / Clearing Away Rubbish H3

4 Allow for clearing away rubbish at regular intervals during the


progress of the Work and at completion and for leaving the Site and
perimeter tidy at completion, to the satisfaction.

Days

Topographical Survey H3

5 As soon as the Contract has been signed, the Contractor shall check
and confirm the accuracy of the existing ground levels that are
shown on the drawings.
Item

6 A permanent datum point must be established during this operation


to the approval.
Item

Setting Out of the Works H3

7 The Contractor shall be responsible for the time and proper setting-
out of works in relation to original points and lines and levels of
reference given.
Item

PRELIMINARIES 1/13
.

ITEM NO DESCRIPTION UNIT


8 The Contractor will be responsible for obtaining the approved
demarcation drawings and permits to allow his works to start.
Item

MISCELLANEOUS H2

Police Regulations H3

1 The Contractor must ascertain and comply with Police Regulations


affecting the execution of the Works.
Item

Traffic Regulations H3

The Contractor is to observe all traffic regulations, including those


regarding the loading or unloading of or waiting by vehicles on the
public highway and the contract sum is deemed to include for strict
compliance therewith. All access roads are to be maintained clean
at all times.

2 Establishment charge (fixed cost) Item

3 Maintenance charge (time related cost) Days

4 Removal charge (fixed cost) Item

Tests H3

5 The Contractor shall allow for all tests required by the Specification
to be carried out including providing all necessary materials and
samples.
Item

Samples H3

6 When so required, samples of goods or materials are to be provided


at the Contractor's expense. Complete as specified.
Item

Green Building Regulations H3

PRELIMINARIES 1/14
.

ITEM NO DESCRIPTION UNIT


7 The Contractor should comply with Green Building Regulations of
Dubai Municipality, this requires that the Contractor to be familiar
with the credit requirements.
Item

PRELIMINARIES 1/15
.

ITEM NO DESCRIPTION UNIT


8 The Contractor is responsible for all documentation required as part
of Dubai Municipality Green Building Certification.
Item

9 Consultant De-Snagging (per Unit) No

10 Customer care De-Snagging (per Unit) No

ADDITIONAL ITEMS H2

The tenderer is to detail below any additional items with quantities


and rates not previously included to complete the build up of the
lump sum tender price for this section of the works. Should the
tenderer fail to insert any items here, it will be deemed that his
lump sum price for the tender includes all items and no subsequent
claim for any additional item will be entertained.

H3

Additional amount for Structural Redesign & Project PI insurance


item

PRELIMINARIES 1/16
.

ITEM NO DESCRIPTION UNIT

SECTION NO. 2

BILL NO. 1

SITE WORK

NOTE: For specifications see General Specification

NOTE: For additional explanations/ clarifications see


"Preambles/Rates and Measurement Clauses"

SITE EXPLORATION GENERALLY

1 Keeping records of site observations, site tests and laboratory tests


Item

2 Samples, site observations, site tests and analyses Item

3 Providing reports Item

DEWATERING

Allowance for Dewatering the Site

PRELIMINARIES 1/17
.

ITEM NO DESCRIPTION UNIT


4 Dewatering (in days) Days

SITE PREPARATION

Sub base preparation

5 Rip up, scarify top 150mm layer and compact to 98% Modified
AASHTO density under raft foundation
m2

Approved brand of anti termite soil poison applied by a Registered


Pest Control company and guaranteed against termite infestation
for ten years

6 Under floors, etc. including forming and poisoning shallow furrow


against foundation walls etc. filling in furrows and ramming
m2

EXCAVATION

Excavation in compacted earth to:

1 Footings, pile caps, ground beams and surface bed thickening


m3

2 Lift pits, tanks, etc. m3

DISPOSAL

Disposal of material arising from excavations

3 Extra over all excavations for carting surplus excavated materials to


stockpile on site for later use
m3

ADDITIONAL ITEMS

PRELIMINARIES 1/18
.

ITEM NO DESCRIPTION UNIT


The tenderer is to detail below any additional items with quantities
and rates not previously included to complete the build up of the
lump sum tender price for this section of the works. Should the
tenderer fail to insert any items here, it will be deemed that his
lump sum price for the tender includes all items and no subsequent
claim for any additional item will be entertained.

Backfill with excavated materials m3

Carried Forward to Section Summary

SECTION NO. 2

BILL NO. 2

CONCRETE WORK

NOTE: For specifications see General Specification

PRELIMINARIES 1/19
.

ITEM NO DESCRIPTION UNIT

NOTE: For additional explanations/ clarifications see


"Preambles/Rates and Measurement Clauses"

TESTS

Concrete tests and blocks required and instructed by the


Supervision Consultant

1 Allow for testing as required by the Supervision Consultant Item

2 The costs of preliminary tests prior to approval of the Contractor's


materials and mixes shall be done by the Contractor
Item

3 The cost of subsequent tests shall be borne by the Employer unless


the test results show the materials or concrete do not conform with
specified requirements
Item

4 Should the Supervision Consultant require any load tests to be


carried out because of the Contractor's failure to comply with the
specified requirements, the costs of such load tests shall be borne
by the Contractor
Item

PLAIN CONCRETE

20MPa Concrete

5 Surface blinding to take waterproofing (waterproofing elsewhere


measured)
m3

REINFORCED CONCRETE IN FOUNDATIONS (with GGBS admixture)

40MPa Concrete

1 Footings m3

2 Tie beams m3

PRELIMINARIES 1/20
.

ITEM NO DESCRIPTION UNIT


REINFORCED CONCRETE IN SUPERSTRUCTURE (with GGBS
admixture)

40Mpa Concrete

3 Slab on grade m3

4 Concrete encasing m3

HOLLOW CORE SLABS

Note: Hollow core slabs to be priced as per Preambles, with and


including concrete propping, stoppers, reinforcement, etc. as per
general notes, details and specifications (Structural topping and
mesh elsewhere measured)

Slabs

5 150mm Thick hollow core slabs m2

Structural Toppings

6 60mm Thick structural toppings m2

REINFORCEMENT

NOTE : The Contractor is to provide the Supervision Consultant with


reinforcement details and bending schedules, which are to be
prepared from the Supervision Consultant's Dubai Municipality
submission drawings, for the Supervision Consultant's comment.
These details are to be lodged with the Supervision Consultant 21
days prior to the date on which the reinforcement will be required
on site. Only bending schedules signed and approved by the
Supervision Consultant will be considered for valuation and final
account payment.

High bond steel reinforcement

1 Bars in various diameters, cut, bent and fixed t

PRELIMINARIES 1/21
.

ITEM NO DESCRIPTION UNIT

Fabric Reinforcement

2 Type A193 Mesh reinforcement in surface beds, slabs, etc. m2

FORMWORK

Plain Smooth Finished Formwork

Formwork to sides and soffits of

3 Beams in foundations m2

4 Formwork to foundations m2

5 Formwork to concrete encasing m2

PRECAST CONCRETE

Note: All Pre-cast elements to be priced as per Preambles, with and


including dowel bars, back-up rods, sealant, insulation, expansion
joint covers, etc. as per details and specifications

Solid Panels

6 PC-H - 100mm Thick Precast Solid Cladding Panel (GSP10/FSP10)


m2

7 PC-K - 150mm Thick Precast Solid Cladding Panel (GSP15/FSP15)


m2

8 PC-L - 200mm Thick Precast Solid Cladding Panel (GSP20/FSP20)


m2

9 PC-N - 300mm Thick Precast Solid Cladding Panel m2

PRELIMINARIES 1/22
.

ITEM NO DESCRIPTION UNIT

Insulated Cladding Panels

10 PC-B - 200mm Thick Precast Insulated Cladding Panel m2

1 PC-E - 250mm Thick Precast Insulated Cladding Panel


(NGIP25/NFIP25 or GIP25/FIP25)
m2

Pre-cast parapet walls

2 250mm Thick pre-cast parapet Wall (GIP25/FIP25) m2

Precast Slabs

3 150mm Thick precast pre-stressed slab (screed measured


elsewhere)
m2

4 310mm Thick precast solid slab m2

Beams

5 RB 01, 470 x 310mm deep m

6 RB 02, 470 x 310mm deep m

7 RCB 01, 360 x 310mm deep m

8 RCB 02, 470 x 310mm deep m

9 RCB 03, 420 x 310mm deep m

10 TRB 01, 410 x 310mm deep m

11 TRCB 01, 470 x 310mm deep m

12 TRCB 02, 420 x 310mm deep m

SUNDRIES

PRELIMINARIES 1/23
.

ITEM NO DESCRIPTION UNIT


Expansion joints with "Flexcell" or similar approved soft board
between vertical concrete surfaces

13 10mm Joints between slab on grade and concrete substructure


walls
m2

ADDITIONAL ITEMS

The tenderer is to detail below any additional items with quantities


and rates not previously included to complete the build up of the
lump sum tender price for this section of the works. Should the
tenderer fail to insert any items here, it will be deemed that his
lump sum price for the tender includes all items and no subsequent
claim for any additional item will be entertained.

Columns m3
Walls m3
Beams m3
Slab m3
Parapet & Sections m3

PRELIMINARIES 1/24
.

ITEM NO DESCRIPTION UNIT

Carried Forward to Section Summary

SECTION NO. 2

BILL NO. 3

MASONRY

NOTE: For specifications see General Specification

NOTE: For additional explanations/ clarifications see


"Preambles/Rates and Measurement Clauses"

WALLS AND PIERS

PRELIMINARIES 1/25
.

ITEM NO DESCRIPTION UNIT


Blockwork with OPC cement mortar including galvanised mesh
reinforcement and/ or stainless steel vertical twist type wall ties

1 Normal Blockwork - 100mm Solid block walls m2

2 Normal Blockwork - 150mm Solid block walls m2

ADDITIONAL ITEMS

The tenderer is to detail below any additional items with quantities


and rates not previously included to complete the build up of the
lump sum tender price for this section of the works. Should the
tenderer fail to insert any items here, it will be deemed that his
lump sum price for the tender includes all items and no subsequent
claim for any additional item will be entertained.

100mm Thick Solid Block Wall m2


150mm Thick Solid Block Wall m2
200mm Thick Solid Block Wall m2
250mm Thick Insulated External Wall m2

Carried Forward to Section Summary

SECTION NO. 2

BILL NO. 4

METALWORK

NOTE: For specifications see General Specification

PRELIMINARIES 1/26
.

ITEM NO DESCRIPTION UNIT

NOTE: For additional explanations/ clarifications see


"Preambles/Rates and Measurement Clauses"

NON-STRUCTURAL METALWORK

50mm IROKO hardwood hanrail fixed to glass balustrade, complete


all

1 To glass balustrade m

50mm hardwood handrail to match approved sample including


15mm dia grade316 stainless steel bracket support to handrail,
grade 316 stainless steel escutcheon, fastener / wall fixing,
complete all

2 To louver m

Laminated glass railing 6+a1.14pvb+6mm with aluminium capping


profile powdercoated to match the fins and window frames

3 1200mm High glass balustrade to ramp m

10mm Thick x 65mm powder coated galvanized steel flat bar


(spaced @ 900mm O.C bolted to wall by 16mm dia. stainless steel
expansion bolt including 32mm dia galvanized steel solid bar rung
with powder coat finish spaced @ 300mm O.C, complete all

4 Access Ladder (Ref. A-504) No

PRELIMINARIES 1/27
.

ITEM NO DESCRIPTION UNIT


ADDITIONAL ITEMS

The tenderer is to detail below any additional items with quantities


and rates not previously included to complete the build up of the
lump sum tender price for this section of the works. Should the
tenderer fail to insert any items here, it will be deemed that his
lump sum price for the tender includes all items and no subsequent
claim for any additional item will be entertained.

PRELIMINARIES 1/28
.

ITEM NO DESCRIPTION UNIT

Carried Forward to Section Summary

SECTION NO. 2

BILL NO. 5

WOODWORK

NOTE: For specifications see General Specification

NOTE: For additional explanations/ clarifications see


"Preambles/Rates and Measurement Clauses"

Vanity mirrors

6-8mm Thick clear mirror with straight edge, with and including
framework, backing and adhesive as per bathroom and powder
room drawings, complete all

1 1700 x 1200mm High vanity mirror No

2 1780 x 1200mm High vanity mirror No

Vanity Cupboards, etc.

Vanity cupboard with and including top, sides, bottom, doors,


division, shelves, skirting, ironmongery, sub frames, stone, etc.
supplied and installed complete

3 1900mm long x 600mm wide x 400mm high vanity No

4 2850mm long x 600mm wide x 400mm high vanity No

5 1900mm long x 600mm wide vanity countertop No

6 2850mm long x 600mm wide vanity countertop No

PRELIMINARIES 1/29
.

ITEM NO DESCRIPTION UNIT


Utility Cabinets

Wooden upper and lower utility cabinets, including tops, bottoms,


sides, divisions, shelves, skirtings, drawers, doors, ironmongery,
worktops with and including all necessary cut-outs, glazing to doors
etc. (supplied and installed complete)

1 WD-05 1150mm + 1550mm long x 200mm wide x 2200mm high


(Ref. ID_211)
No

WC Back Counter, complete

2 Behind water closet 900mm high + ledge ST-01 190mm wide No

ADDITIONAL ITEMS

The tenderer is to detail below any additional items with quantities


and rates not previously included to complete the build up of the
lump sum tender price for this section of the works. Should the
tenderer fail to insert any items here, it will be deemed that his
lump sum price for the tender includes all items and no subsequent
claim for any additional item will be entertained.

PRELIMINARIES 1/30
.

ITEM NO DESCRIPTION UNIT

Carried Forward to Section Summary

SECTION NO. 2

BILL NO. 6

THERMAL AND MOISTURE PROTECTION

NOTE: For specifications see General Specification

NOTE: For additional explanations/ clarifications see


"Preambles/Rates and Measurement Clauses"

SUBSTRUCTURE WATERPROOFING

1 layer of heavy duty 1000 gauge Polythene /Polyethylene Sheet


below waterproofing, Grade/TieBeams and other Substructures
which requires same in accordance with the Specifications and as
detailed in Drawing and Engineer's Standards.

1 Polythene sheet on blinding m2

Two coats modified bituminous waterproof coating

2 On concrete foundations m2

PRELIMINARIES 1/31
.

ITEM NO DESCRIPTION UNIT

BUILDING WATERPROOFING

Acrylic resin top coating all as per manufacturer's specifications

3 On flat roofs m2

4 Additional membrane at 100mm diameter outlet No

120 GSM Geotextile protection layer, all as per manufacturer's


specifications

5 On roofs m2

Polymer modified cement waterproofing layer complete as per


drawings and specifications

6 On bathroom, shower, utility and kitchen floors m2

1 On bathroom, shower, utility and kitchen walls m2

"Linings" with 30mm crushed stone evenly spread with larger stones
around outlets

2 To 100mm diameter outlet No

COMBO ROOF SYSTEM

Combo-roof system, complete all as per drawing and manufacturers


recommendation

3 On flat roofs (lower roof) m2

ADDITIONAL ITEMS

PRELIMINARIES 1/32
.

ITEM NO DESCRIPTION UNIT


The tenderer is to detail below any additional items with quantities
and rates not previously included to complete the build up of the
lump sum tender price for this section of the works. Should the
tenderer fail to insert any items here, it will be deemed that his
lump sum price for the tender includes all items and no subsequent
claim for any additional item will be entertained.

Carried Forward to Section Summary

SECTION NO. 2

BILL NO. 7

INTERNAL DOORS AND WINDOWS

NOTE: For specifications see General Specification

PRELIMINARIES 1/33
.

ITEM NO DESCRIPTION UNIT


NOTE: For additional explanations/ clarifications see
"Preambles/Rates and Measurement Clauses"

TIMBER DOORS AND WINDOWS

TIMBER DOORS AND TIMBER FRAMES

Timber door, door frame, architrave and jamb linings including


accessories, sub-frames, installation of ironmongery, etc.installed
complete as per drawings and specifications

1 D-01 SA Single Flush 1, overall size 1300mm x 2850mm high No

2 D-02 SA Single Flush1, overall size 900mm x 2150mm High No

3 D-04 SA Single Flush1, overall size 1000mm x 2150mm high No

4 D-06 DL Double Cabinet, overall size 600mm x 2150mm high No

ALUMINUM DOORS AND WINDOWS

ALUMINUM DOORS

Frosted tempered glass door, door frame, architrave and jamb


linings including accessories, sub-frames, installation of
ironmongery, etc.installed complete as per drawings and
specifications

5 D-05 SM Singe frameless glass, overall size 800mm x 2200mm high


No

1 Extra over for single glass door D-05 No

ACCESSORIES

Other supply & install

2 Door stopper No

PRELIMINARIES 1/34
.

ITEM NO DESCRIPTION UNIT


ADDITIONAL ITEMS

The tenderer is to detail below any additional items with quantities


and rates not previously included to complete the build up of the
lump sum tender price for this section of the works. Should the
tenderer fail to insert any items here, it will be deemed that his
lump sum price for the tender includes all items and no subsequent
claim for any additional item will be entertained.

PRELIMINARIES 1/35
.

ITEM NO DESCRIPTION UNIT


Carried Forward to Section Summary

SECTION NO. 2

BILL NO. 8

EXTERNAL DOORS AND WINDOWS

NOTE: For specifications see General Specification

NOTE: For additional explanations/ clarifications see


"Preambles/Rates and Measurement Clauses"

ALUMINUM DOORS AND WINDOWS

ALUMINUM WINDOWS

Super Durable Powder coating aluminium windows, finishing,


ironmongery, building into block work or concrete wall, etc.

1 CW-01 - 1400 x 2900mm high window No

2 CW-02 - 700 x 2900mm high window No

ALUMINUM LOUVRES AND SCREENS

WPC profile as louvre color as per approved sample, complete all

3 LV-01, 5251 x 3200mm high louvre No

4 LV-02, 5250 x 4400mm high louvre No

5 LV-03, 2600 x 4400mm high louvre No

6 LV-04, 4215 x 4400mm high louvre No

7 D-03 SE-2 Single Louver-V1, overall size 900mm x 2850mm high


No

PRELIMINARIES 1/36
.

ITEM NO DESCRIPTION UNIT

ALUMINIUM FINS

Aluminum fins, complete all

1 200mm Wide to horizontal m

2 200mm Wide to vertical m

ADDITIONAL ITEMS

The tenderer is to detail below any additional items with quantities


and rates not previously included to complete the build up of the
lump sum tender price for this section of the works. Should the
tenderer fail to insert any items here, it will be deemed that his
lump sum price for the tender includes all items and no subsequent
claim for any additional item will be entertained.

PRELIMINARIES 1/37
.

ITEM NO DESCRIPTION UNIT

Carried Forward to Section Summary

BILL NO. 9

SCREEDS AND PLASTER

NOTE: For specifications see General Specification

NOTE: For additional explanations/ clarifications see


"Preambles/Rates and Measurement Clauses"

BACKGROUNDS

1:4 Cement plaster screeds on concrete floors complete as per


specification

1 Average 60mm thick on floors m2

2 Average 60mm thick on floors (precast floors) m2

3 Average 70mm thick on floors to falls (roofs) m2

INTERNAL FINISHES

Gypsum skim coat including all necessary surface preparation and


accessories complete as per specification

PRELIMINARIES 1/38
.

ITEM NO DESCRIPTION UNIT


4 On internal precast concrete soffits and beams m2

One coat cement and sand plaster (1:3.5/4.5) including all necessary
surface preparation and accessories complete as per specification

5 On internal pre-cast walls including returns, reveals, openings and


recesses and concrete columns to receive tiles
m2

Two coats gypsum render (1:3.5/4.5) with a smooth finish including


all necessary surface preparation and accessories complete as per
specification

6 On internal pre-cast walls including returns, reveals, openings and


recesses and concrete columns to receive paint
m2

INTERNAL FINISHES

Gypsum skim coat including all necessary surface preparation and


accessories complete as per specification

1 To external pre-cast walls, including returns, reveals, openings or


recesses and concrete columns
m2

2 On external precast concrete soffits and beams m2

ADDITIONAL ITEMS

The tenderer is to detail below any additional items with quantities


and rates not previously included to complete the build up of the
lump sum tender price for this section of the works. Should the
tenderer fail to insert any items here, it will be deemed that his
lump sum price for the tender includes all items and no subsequent
claim for any additional item will be entertained.

Ceiling Plaster m2
External Plaster m2

PRELIMINARIES 1/39
.

ITEM NO DESCRIPTION UNIT

Carried Forward to Section Summary

SECTION NO. 2

BILL NO. 10

PAINTING

NOTE: For specifications see General Specification

NOTE: For additional explanations/ clarifications see


"Preambles/Rates and Measurement Clauses"

ON INTERNAL FLOORS

Prepare and apply Heavy duty epoxy floor coating (EP-01)

1 On concrete floors m2

PRELIMINARIES 1/40
.

ITEM NO DESCRIPTION UNIT


2 S-K02, 80mm high epoxy skirting m

ON INTERNAL WALLS AND CONCRETE CEILINGS

Prepare and apply Pure acrylic emulsion paint finish on (PT01)

3 Pre-cast concrete walls including returns, reveals of openings or


recesses and columns
m2

4 Plastered precast soffit of slabs including beams m2

ON EXTERNAL WALLS AND CONCRETE CEILINGS

Prepare and apply Pure acrylic emulsion paint finish on (PT12)

5 Pre-cast concrete walls including returns, reveals of openings or


recesses and columns
m2

Prepare and apply Pure acrylic emulsion exterior paint finish on


(PT11)

6 Plastered precast soffit of slabs including beams m2

ADDITIONAL ITEMS

The tenderer is to detail below any additional items with quantities


and rates not previously included to complete the build up of the
lump sum tender price for this section of the works. Should the
tenderer fail to insert any items here, it will be deemed that his
lump sum price for the tender includes all items and no subsequent
claim for any additional item will be entertained.

PRELIMINARIES 1/41
.

ITEM NO DESCRIPTION UNIT

Carried Forward to Section Summary

SECTION NO. 2

BILL NO. 11

TILING

PRELIMINARIES 1/42
.

ITEM NO DESCRIPTION UNIT


NOTE: For specifications see General Specification

NOTE: For additional explanations/ clarifications see


"Preambles/Rates and Measurement Clauses"

PORCELAIN FLOOR TILING

600 x 600 x 9mm porcelain floor tiles or similar approved fixed with
adhesive to background (background elsewhere) and butt jointed
with colour epoxy grouting to approval including all movement
beads, sealants etc. (CT01)

1 On floors m2

2 S-K01 80mm high porcelain skirting m

300 x 300 x 9mm anti-slip porcelain floor tiles or similar approved


fixed with adhesive to background (background elsewhere) and butt
jointed with colour epoxy grouting to approval including all
movement beads, sealants etc. (CT02)

3 On floors m2

PORCELAIN WALL TILING

600 x 300 x 9mm porcelain wall tiles or similar approved fixed with
adhesive to pre-cast/plastered walls and butt jointed with colour
epoxy grouting to approval including all movement beads, sealants
etc. (CT03)

4 On walls m2

300 x 300 x 9mm porcelain wall tiles or similar approved fixed with
adhesive to pre-cast/plastered walls and butt jointed with colour
epoxy grouting to approval including all movement beads, sealants
etc. (CT04)

1 On walls m2

STONE

PRELIMINARIES 1/43
.

ITEM NO DESCRIPTION UNIT

Stone laid to approved methods to screed / plaster including ALL


cutting and waste, etc, complete all

2 TH-01, 30mm Thick x 250mm wide threshold m

3 TH-02, 30mm Thick x 100mm wide threshold m

4 TH-03, 30mm Thick x 200mm wide threshold m

Stone laid to approved methods to screed / plaster including ALL


cutting and waste, etc, complete all

5 Floor Step Riser 150mm H - ST-02, Natural Stone Flooring m2

6 ST-02, Natural Stone Flooring m2

7 ST-03, Natural Stone Flooring m2

ADDITIONAL ITEMS

The tenderer is to detail below any additional items with quantities


and rates not previously included to complete the build up of the
lump sum tender price for this section of the works. Should the
tenderer fail to insert any items here, it will be deemed that his
lump sum price for the tender includes all items and no subsequent
claim for any additional item will be entertained.

PRELIMINARIES 1/44
.

ITEM NO DESCRIPTION UNIT


Carried Forward to Section Summary

SECTION NO. 2

BILL NO. 12

SUSPENDED CEILINGS

NOTE: For specifications see General Specification

NOTE: For additional explanations/ clarifications see


"Preambles/Rates and Measurement Clauses"

SUSPENDED CEILINGS AND BULKHEADS

12mm Thick suspended gypsum plasterboard ceiling including metal


suspension system fixed in accordance with manufacturer's
instructions including all cut-outs for lighting, sprinklers, etc,
skimmed to a smooth finish ready to receive paint (CT-01)

Ceilings

1 Ceilings suspended not exceeding 1m below concrete soffit m2

2 Extra over for 250 x 250mm access panel including frame, flush key
and interior release to ceiling
No

Ceiling Drop

3 Ceiling drop not exceeding 300mm high m

12.5mm Thick moisture resistant suspended gypsum plasterboard


ceiling including metal suspension system fixed in accordance with
manufacturer's instructions including all cut-outs for lighting,
sprinklers, etc skimmed to a smooth finish ready to receive paint
(CL-02)

Ceilings

PRELIMINARIES 1/45
.

ITEM NO DESCRIPTION UNIT


4 Ceilings suspended not exceeding 1m below concrete soffit m2

Curtain Cove

1 Horizontal curtain cove not exceeding 300mm high m

ADDITIONAL ITEMS

The tenderer is to detail below any additional items with quantities


and rates not previously included to complete the build up of the
lump sum tender price for this section of the works. Should the
tenderer fail to insert any items here, it will be deemed that his
lump sum price for the tender includes all items and no subsequent
claim for any additional item will be entertained.

PRELIMINARIES 1/46
.

ITEM NO DESCRIPTION UNIT

Carried Forward to Section Summary

SECTION NO. 2

BILL NO. 13

SUNDRY BUILDER'S WORK

NOTE: For specifications see General Specification

NOTE: For additional explanations/ clarifications see


"Preambles/Rates and Measurement Clauses"

MINOR BUILDING WORKS

Sundry Builder's work

1 Builder's Work in Connection with Services Item

ADDITIONAL ITEMS

The tenderer is to detail below any additional items with quantities


and rates not previously included to complete the build up of the
lump sum tender price for this section of the works. Should the
tenderer fail to insert any items here, it will be deemed that his
lump sum price for the tender includes all items and no subsequent
claim for any additional item will be entertained.

PRELIMINARIES 1/47
.

ITEM NO DESCRIPTION UNIT

Carried Forward to Section Summary

SECTION NO. 2 H1

BILL NO. 14

SIGNAGE

NOTE: For specifications see General Specification

NOTE: For additional explanations/ clarifications see


"Preambles/Rates and Measurement Clauses"

SIGNAGE

Internal Signage

1 1 - People of Determination Overall Size: 100mm x 300mm No

2 2 - Male Toilet/Changing Room Overall Size: 100mm x 300mm


No

3 3 - Female Toilet/Changing Room Overall Size: 100mm x 300mm


No

4 4 - Electrical Room Overall Size: 100mm x 300mm No

PRELIMINARIES 1/48
.

ITEM NO DESCRIPTION UNIT


5 5 - Equipment Room Overall Size: 100mm x 300mm No

6 6 - WC Overall Size: 100mm x 150mm No

7 7 - (Shower) Overall Size: 100mm x 150mm No

External Signage

8 Pool House Ref. A-302 No

9 Allow for Profit and attendance %

ADDITIONAL ITEMS

The tenderer is to detail below any additional items with quantities


and rates not previously included to complete the build up of the
lump sum tender price for this section of the works. Should the
tenderer fail to insert any items here, it will be deemed that his
lump sum price for the tender includes all items and no subsequent
claim for any additional item will be entertained.

PRELIMINARIES 1/49
.

ITEM NO DESCRIPTION UNIT

Carried Forward to Section Summary

SECTION NO. 2

BILL NO. 15

VARIATIONS & DAYWORKS

NOTE: For specifications see General Specification

NOTE: For additional explanations/ clarifications see


"Preambles/Rates and Measurement Clauses"

VARIATIONS

PRELIMINARIES 1/50
.

ITEM NO DESCRIPTION UNIT


Provide the following for Variations to be expended at the sole
discretion of the Employer in terms of Clause 22.3 (Valuation of
Variation Orders) of the Conditions of Contract

1 Demolish and remove reinforced concrete not exceeding 1m3


m3

2 Demolish and remove reinforced concrete exceeding 1m3 m3

3 Scrabble surface of concrete to a depth of 30mm m2

4 Demolish and remove 100mm solid block wall m2

5 Demolish and remove 100mm solid block wall but including


patching and making good remaining blockwork
m2

6 Demolish and remove 200mm solid block wall m2

7 Demolish and remove 200mm solid block wall including patching


and making good remaining blockwork
m2

8 Demolish and remove 300mm solid block wall m2

9 Demolish and remove 400mm solid block wall m2

10 Demolish and remove average 300mm cavity block wall m2

11 Demolish and remove average 400mm cavity block wall m2

1 Demolish and remove average 400mm cavity block wall including


patching and making good remaining blockwork
m2

2 Demolish and remove average 500mm cavity block wall m2

3 Demolish and remove average 600mm cavity block wall m2

4 70mm Chasing into plastered blockwork, only including patching


m

PRELIMINARIES 1/51
.

ITEM NO DESCRIPTION UNIT


5 Cut opening in existing 100mm block wall for a door size 900 x
2100mm high, including patching and making good blockwork
complete
No

6 Cut opening in existing 200mm block wall for a door size 900 x
2100mm high, including patching and making good blockwork
complete
No

7 Cut opening in existing 250mm block wall for a door size 900 x
2100mm high, including patching and making good blockwork
complete
No

8 Cut opening in existing 300mm block wall for a door size 900 x
2100mm high, including patching and making good blockwork
complete
No

9 Cut opening in existing 400mm block wall for a door size 900 x
2100mm high, including patching and making good blockwork
complete
No

10 Remove torch-on waterproofing membrane to concrete m2

11 Removal of 75 x 75mm triangular fillet m

Cut openings in pre-cast concrete elements:

12 Cut opening in existing 100mm pre-cast wall for a door size 900 x
2100mm high, including patching and making good complete
No

13 Cut opening in existing 200mm pre-cast wall or a door size 900 x


2100mm high, including patching and making good complete
No

14 Cut opening in existing 250mm pre-cast wall for a door size 900 x
2100mm high, including patching and making good complete
No

Stitch-core through reinforced concrete elements:

PRELIMINARIES 1/52
.

ITEM NO DESCRIPTION UNIT


15 Opening size 200 x 300mm through 200mm thick element No

16 Opening size 500 x 700mm through 200mm thick element No

17 Opening size 250 x 500mm through 300mm thick element No

1 Opening size 550 x 550mm through 300mm thick element No

2 Opening size 600 x 600mm through 300mm thick element No

3 Opening size 1200 x 1700mm through 400mm thick element No

Steel reinforcement:

4 Mesh 245 m2

5 Mesh 393 m2

6 Extra over designed reinforcing already fixed into place for


additional steel added by the Supervision Consultant
kg

1.5mm Thick galvanised mild steel door frame installed in blockwork


opening including all necessary ties, etc. complete

7 Door frame to suit door size 900 x 2050 x 150mm No

8 Door frame to suit door size 1700 x 2050 x 150mm No

2mm Thick galvanised mild steel door frame installed in blockwork


opening including all necessary ties, etc. complete

9 Door frame to suit door size 900 x 2050 x 150mm No

10 Door frame to suit door size 1700 x 2050 x 150mm No

Undercutting of doors

11 Extra over to undercut single solid leaf door No

PRELIMINARIES 1/53
.

ITEM NO DESCRIPTION UNIT

12 Extra over to undercut double solid leaf door No

WD01 Timber door frames including all necessary sub-frames, oil


finish, etc. installed complete

13 100 x 50mm Rebated door frame. m

DAYWORKS

Provide the following for Dayworks to be expended at the sole


discretion of the Employer in terms of the Conditions of Contract

Labour

1 Unskilled Labourer Hrs

2 Semi-skilled Labourer Hrs

3 Carpenter Hrs

4 Steel Fixer Hrs

5 Mason Hrs

6 Section Leader Hrs

Plant (including operator, fuel,etc.)

7 Back-acting excavator Hrs

8 TLB excavator Hrs

9 CAT loader Hrs

10 10m3 Tipper truck Hrs

11 Plate compactor Hrs

PRELIMINARIES 1/54
.

ITEM NO DESCRIPTION UNIT


12 120 Compressor Hrs

13 Breaker Hrs

14 Jack Hammer Hrs

15 25 Ton mobile crane Hrs

16 JCB Loadall Hrs

MAIN CONTRACTOR's MARK-UP

17 Main Contractor's mark-up on material and labour in respect of new


rates
%

18 Main Contractor's mark-up on Domestic Sub-Contractors %

PRELIMINARIES 1/55
.

ITEM NO DESCRIPTION UNIT

Carried Forward to Section Summary

SECTION 2

BUILDER'S WORK

SECTION SUMMARY - BUILDERS' WORK

1 SITE WORK

2 CONCRETE WORK

3 MASONRY

4 METALWORK

5 WOODWORK

6 THERMAL & MOISTURE PROTECTION

7 INTERNAL DOORS AND WINDOWS

PRELIMINARIES 1/56
.

ITEM NO DESCRIPTION UNIT


8 EXTERNAL DOORS AND WINDOWS

9 SCREEDS AND PLASTER

10 PAINTING

11 TILING AND STONEWORK

12 SUSPENDED CEIILNGS

13 SUNDRY BUILDERS WORK

14 SIGNAGE

15 DAYWORKS

SECTION NO. 3

BILL NO. 1

SANITARY FITTINGS AND BRASSWARE

NOTE: For specifications see General Specification

NOTE: For additional explanations/ clarifications see


"Preambles/Rates and Measurement Clauses"

SANITARYWARES

Supply and install of sanitary ware fixtures as per drawing and


specification.

PRELIMINARIES 1/57
.

ITEM NO DESCRIPTION UNIT


1 SW01 - Wash Basin No

2 SW02 - Wall Hung Water Closet No

3 SW03 - Urinal No

4 SW04 - Wash Basin Handicap Toilet No

5 SW05 - Water Closet Handicap Toilet No

6 SW06 - Grab Bar Folding Type No

7 SW07 - Grab Bar Fixed Type No

8 SW08 - Wash Basin Mixer No

9 SW09 - Shower Mixer No

10 SW10 - Ablution Spray / Shattaf No

11 SW11 - Toilet Roll Holder No

12 SW12 - Linear Shower Drain No

13 SW13 - Floor Drain/ Clean Out No

1 SW14 - Robe Hook Cum Door Stopper No

2 SW15 - Robe Hook No

3 SW16 - Soap Dispenser No

4 SW17 - Paper Dispenser No

5 SW18 - Hand Dryer No

6 SW19 - Baby Changing Stand No

7 SW20 - Towel Rail No

PRELIMINARIES 1/58
.

ITEM NO DESCRIPTION UNIT


8 SW21 - Foldable Shower Seat No

9 SW22 - Shower Shelf No

10 SW23 - Waste Bin 3L No

11 SW24 - Waste Bin 6L No

12 SW25 - Sanitary Bin No

13 SW26 - Baby Diaper Bin - Assumed* No

14 SW27 - Waste Bin- Large No

ADDITIONAL ITEMS

PRELIMINARIES 1/59
.

ITEM NO DESCRIPTION UNIT


The tenderer is to detail below any additional items with quantities
and rates not previously included to complete the build up of the
lump sum tender price for this section of the works. Should the
tenderer fail to insert any items here, it will be deemed that his
lump sum price for the tender includes all items and no subsequent
claim for any additional item will be entertained.

PRELIMINARIES 1/60
.

ITEM NO DESCRIPTION UNIT

Carried Forward to Section Summary

SECTION NO. 3

BILL NO. 2

DISPOSAL INSTALLATION

NOTE: For specifications see General Specification

NOTE: For additional explanations/ clarifications see


"Preambles/Rates and Measurement Clauses"

Drainage Pipes

Pipes and fittings; including all necessary bedding, expansions,


bends, end caps, cleaning eyes, junctions, reducers, accessories,
connections, etc. all as specified and as shown on drawings

Note: The unit rates for pipes shell be deemed to include for pipes
fittings and connections

Drainage Pipes

1 32mm diameter m

2 40mm diameter m

3 82mm diameter m

4 110mm diameter m

uPVC Class E Pipes

5 25mm diameter m

PRELIMINARIES 1/61
.

ITEM NO DESCRIPTION UNIT


Pipe Insulation

Insulation for condensate pipes and fittings as specified

6 25mm diameter m

Valves and accessories as specified and as shown on drawings

Clean Outs

1 32mm diameter CO No

Floor Clean Outs

2 110mm diameter FCO No

Vent Cowls

3 82mm diameter VC No

Floor Drains

4 Floor drain No

5 Shower channel floor drain No

6 Roof water outlet No

Manholes with cover and including all civil works as shown on the
drawings and as per the specifications

7 MH-01; Manhole size: 600 x 600mm with cover 600 x 600mm No

8 FIC for sewerage network connection; Manhole size: 600 x 600mm


with cover 600 x 600mm
No

Gully traps with cover and including all civil work and connections as
specified and as shown on drawings

PRELIMINARIES 1/62
.

ITEM NO DESCRIPTION UNIT


9 Gully trap; Size: 300 x 300mm with cover size: 300 x 300mm
(medium duty recessed type)
No

Connections

10 Allowance for connections from FIC to the existing infrastructure


network
Item

Testing and Commissioning

11 Allow for all testing and commissioning in connection with drainage


installation
Item

ADDITIONAL ITEMS

The tenderer is to detail below any additional items with quantities


and rates not previously included to complete the build up of the
lump sum tender price for this section of the works. Should the
tenderer fail to insert any items here, it will be deemed that his
lump sum price for the tender includes all items and no subsequent
claim for any additional item will be entertained.

PRELIMINARIES 1/63
.

ITEM NO DESCRIPTION UNIT

Carried Forward to Section Summary

SECTION NO. 3

BILL NO. 3

WATER INSTALLATION

NOTE: For specifications see General Specification

NOTE: For additional explanations/ clarifications see


"Preambles/Rates and Measurement Clauses"

Water Supply Pipes

PRELIMINARIES 1/64
.

ITEM NO DESCRIPTION UNIT

Pipe work including expansions, bends, junctions, reducers, tees,


accessories and connections, etc. all as specified and as shown on
drawings

Note: The unit rates for pipes shell be deemed to include for pipes
fittings and connections

PPR Pipes

1 20mm diameter m

2 25mm diameter m

3 32mm diameter m

4 40mm diameter m

5 50mm diameter m

PEX Pipes

6 15mm diameter m

7 20mm diameter m

Insulation and protective coating

Thermal insulation to hot water pipes as per the specification and


shown on the drawings

1 20mm diameter m

2 25mm diameter m

3 32mm diameter m

4 40mm diameter m

5 50mm diameter m

PRELIMINARIES 1/65
.

ITEM NO DESCRIPTION UNIT

Aluminium Cladding

Aluminium sheet covering for exposed domestic water supply pipes


and fittings as specified and shown on the drawings

6 Aluminium cladding Item

Plumbing Valves and Accessories

Isolation Valves

7 20mm diameter IV No

8 40mm diameter IV No

9 50mm diameter IV No

Float Valves

10 50mm diameter FV No

Thermostatic Mixing Valves

11 40mm diameter TMV No

Non Return Valves

12 50mm diameter NRV No

Safety Valves

1 Safety valve No

Strainers

2 50mm diameter ST No

Flexible Pipe Connectors

PRELIMINARIES 1/66
.

ITEM NO DESCRIPTION UNIT

3 50mm diameter FC No

Pressure Gauges

4 Ref. PG No

Bib Taps

5 Hose bib tap No

Drain Valves

6 Drain valve No

7 Temp relief drain valve No

Water Hammer Arresters

8 Water hammer arrester No

Water Meters

Water meter including connecting tail pieces as specified and shown


on the drawings

9 DEWA water meter cabinet (including installation of the water


meter and valves) (Intelligent water meter provided by DEWA)
No

Water pumps including control panel, vessel, connections, anti


vibration mounts, accessories, etc. as specified and as shown on
drawings (valves separately measured)

Domestic Water Booster Pumps

1 DWBP-01 (1D+1S) with VFD; Capacity: 0.95 l/s No

2 Pressure switch and sensor No

PRELIMINARIES 1/67
.

ITEM NO DESCRIPTION UNIT


Thermosyphon Systems

3 Solar water heater with built in storage water tank (Thermosyphon


system); Capacity: 300 L
No

GRP Water Tanks

Supply, delivery, installation and leaving in complete working order


GRP water tanks including ladders, level indicators, drains, air vents,
electrode controls, access manhole, equalizing pipes, all fittings and
accessories as specified and indicated on the drawings

4 GRP insulated water tank Size: 1500 x 1500 x 1500; Capacity: 2.25

No

Connections

5 Allowance for connections to the existing infrastructure network


Item

Testing and Commissioning

6 Allow for all testing and commissioning in connection with water


services
Item

ADDITIONAL ITEMS

The tenderer is to detail below any additional items with quantities


and rates not previously included to complete the build up of the
lump sum tender price for this section of the works. Should the
tenderer fail to insert any items here, it will be deemed that his
lump sum price for the tender includes all items and no subsequent
claim for any additional item will be entertained.

PRELIMINARIES 1/68
.

ITEM NO DESCRIPTION UNIT

Carried Forward to Section Summary

SECTION NO. 3

BILL NO. 4

HVAC INSTALLATION

NOTE: For specifications see General Specification

NOTE: For additional explanations/ clarifications see


"Preambles/Rates and Measurement Clauses"

Refrigerant PIpes

Supply and installation of refrigerant water distribution pipework


including all fittings, expansion connection, hangers, supports;
complete all in accordance with the drawings and specifications

1 Refrigerant pipe m

Pipes Insulation

PRELIMINARIES 1/69
.

ITEM NO DESCRIPTION UNIT


Closed cell rubber foam with a minimum thickness of 19 mm for
supply and return refrigerant pipes and fittings as specified

2 Insulation to refrigerant pipes m

Aluminium cladding for exposed refrigerant piping as specified

3 Aluminium cladding for refrigerant pipes m

Thermostats

Final sub-circuit and auxiliary installation, cable and conduit in


concealed installation including back box, etc. to the following as
specified and as shown on drawings

4 Thermostat No

Supply and installation of thermostats and thermometers; complete


all in accordance with the drawings and specifications

1 Thermostat No

Duct Work

Galvanized steel ductwork, with all necessary fittings, joints, fixings


and accessories, vanes, hangers and supports as specified and as
shown on drawings

2 GI duct m2

Ducts Insulation and Cladding

Fiber glass insulation to ducts and fittings complete with all


accessories as specified

3 Fiber glass insulation m2

PRELIMINARIES 1/70
.

ITEM NO DESCRIPTION UNIT


Acoustic insulation for supply duct work and fittings as specified

4 Acoustic insulation m2

Aluminium cladding for ductwork and fittings in non air-conditioned


spaces and plant rooms as specified

5 Aluminium cladding Item

Flexible ducts

6 150mm flexible duct No

7 200mm flexible duct No

8 250mm flexible duct No

Ducts Accessories

Volume Control Dampers

9 100 x 100mm VCD No

10 200 x 100mm VCD No

1 250 x 150mm VCD No

2 300 x 150mm VCD No

Non Return Dampers

3 200 x 100mm NRD No

4 200 x 150mm NRD No

5 250 x 150mm NRD No

Make Up Units

PRELIMINARIES 1/71
.

ITEM NO DESCRIPTION UNIT


Makeup unit complete with all fittings and accessories; all in
accordance with the drawings and specifications

6 MAU-01; Air flow: 185 L/S No

VRF Condensing Units

7 ODU-01; Capacity: 9.5 KW (serving MAU-01) No

Fan Coil Units

Fan Coil Units

8 FCU-01; Air flow: 213 L/S No

9 FCU-02; Air flow: 326 L/S No

Condensing Units

10 CU-01, 02 No

Air Curtains

11 ACU-01 No

Fans

Supply and installation of fans including control panel, controls, anti


vibration isolator, all connections and accessories, complete all in
accordance with the drawings and specifications

1 EF-01; 50 L/S No

2 EF-02; 175 L/S No

Air Outlets

Supply and Return Ceiling Diffusers

PRELIMINARIES 1/72
.

ITEM NO DESCRIPTION UNIT


3 SCD; Size: 300 x 300mm No

4 RCD; Size: 300 x 300mm No

Supply and Return Linear Slot Diffusers

5 SLD 20mm x 2 slot length: 2m with supply air plenum size: 1100 x
200 x 250mm
No

6 RLD 20mm x 2 slot length: 2m No

DV Exhaust Air Round Diffuser

7 EDV 150mm diameter No

Sandtrap Louvers

8 Fresh air louver with sand trap and bird screen No

Exhaust Air Louvers

9 200 x 200mm exhaust air louver with wire mesh screen No

10 500 x 200mm exhaust air louver with wire mesh screen No

Testing and Commissioning

11 Allow for all testing and commissioning in connection with HVAC


installations
Item

PRELIMINARIES 1/73
.

ITEM NO DESCRIPTION UNIT

ADDITIONAL ITEMS

The tenderer is to detail below any additional items with quantities


and rates not previously included to complete the build up of the
lump sum tender price for this section of the works. Should the
tenderer fail to insert any items here, it will be deemed that his
lump sum price for the tender includes all items and no subsequent
claim for any additional item will be entertained.

PRELIMINARIES 1/74
.

ITEM NO DESCRIPTION UNIT

Carried Forward to Section Summary

SECTION NO. 3

BILL NO. 5

ELECTRICAL INSTALLATION

NOTE: For specifications see General Specification

NOTE: For additional explanations/ clarifications see


"Preambles/Rates and Measurement Clauses"

Meter Cabinets

1 Meter cabinet as per DEWA standards (KHW meter with associated


CT's by DEWA) including surge protection device
No

Distribution Boards

Distribution Boards

2 DB-PH No

Cables

PRELIMINARIES 1/75
.

ITEM NO DESCRIPTION UNIT


Supply and fix cables including conduits and necessary fixtures as
specified

3 Allowance for cable from MDB/Feeder pillar to DB (4Cx25mm²


XLPE/SWA/PVC + 1Cx16mm² XLPE/SWA/PVC)
m

Cable Containment

uPVC Ducts

4 uPVC duct m

5 Spare uPVC duct for XLPE cables m

Electrical Manholes

6 Manhole No

Puddle Flanges

1 Sleeve with puddle flange No

Junction Boxes

2 Junction box No

Isolators

Isolators including sub-circuit wiring, containment and terminations


all as specified and as shown on drawings

3 Single phase isolator No

4 Three phase isolator No

Power Outlets

Final sub-circuit and auxiliary installation, cable and conduit in


concealed installation including back box, etc. to the following as
specified and as shown on drawings

PRELIMINARIES 1/76
.

ITEM NO DESCRIPTION UNIT

5 13A single switched socket outlet No

6 13A single switched socket outlet W/P No

7 13A twin switched socket outlet No

8 Switched fused spur outlet with neon indicator No

9 Un-switched fused spur outlet with neon indicator No

10 Flex outlet with power indicator No

Supply and fix the following accessories as specified and as shown


on drawings

11 13A single switched socket outlet No

12 13A single switched socket outlet W/P No

13 13A twin switched socket outlet No

14 Switched fused spur outlet with neon indicator No

1 Un-switched fused spur outlet with neon indicator No

2 Flex outlet with power indicator No

Lighting Switches

Final sub-circuit and auxiliary installation; cable and conduit in


concealed installation including back box, etc. to the following as
specified and shown on drawings

3 1 gang 1 way switch No

4 1 gang 1 way switch W/P No

5 1 gang 2 way switch W/P No

PRELIMINARIES 1/77
.

ITEM NO DESCRIPTION UNIT


6 3 gang 1 way switch No

7 Occupancy sensor No

Supply and fix the following accessories as specified and as shown


on drawings

8 1 gang 1 way switch No

9 1 gang 1 way switch W/P No

10 1 gang 2 way switch W/P No

11 3 gang 1 way switch No

12 Occupancy sensor No

Final sub-circuit and auxiliary installation; all necessary wires,


conduits, junction boxes for the following light fittings as specified
and as shown on drawings

13 LT-01; Mirror light above wash basin No

14 LT-02; General spot light No

15 LT-03; Surface mounted ceiling light No

16 LT-04; External floor recess light No

1 LT-05; Roof light No

2 LT-06; Equipment room light No

Supply and delivery of light fittings as specified and as shown on


drawings

3 LT-01; Mirror light above wash basin No

4 LT-02; General spot light No

PRELIMINARIES 1/78
.

ITEM NO DESCRIPTION UNIT


5 LT-03; Surface mounted ceiling light No

6 LT-04; External floor recess light No

7 LT-05; Roof light No

8 LT-06; Equipment room light No

Take delivery, store, assemble and install the following light fittings
as specified and as shown on drawings

9 LT-01; Mirror light above wash basin No

10 LT-02; General spot light No

11 LT-03; Surface mounted ceiling light No

12 LT-04; External floor recess light No

13 LT-05; Roof light No

14 LT-06; Equipment room light No

Testing and Commissioning

15 Allow for all testing and commissioning in connection with electrical


installation
Item

PRELIMINARIES 1/79
.

ITEM NO DESCRIPTION UNIT

ADDITIONAL ITEMS

The tenderer is to detail below any additional items with quantities


and rates not previously included to complete the build up of the
lump sum tender price for this section of the works. Should the
tenderer fail to insert any items here, it will be deemed that his
lump sum price for the tender includes all items and no subsequent
claim for any additional item will be entertained.

Additional Electrical Works related to Swimming Pool Equipment


* Electrical Power Connection
Item

PRELIMINARIES 1/80
.

ITEM NO DESCRIPTION UNIT

Carried Forward to Section Summary

SECTION NO. 3

BILL NO. 6

FIRE PROTECTION INSTALLATION

NOTE: For specifications see General Specification

NOTE: For additional explanations/ clarifications see


"Preambles/Rates and Measurement Clauses"

FIRE PROTECTION

Fire Hose Cabinets and Fire Extinguishers

Portable Fire Extinguishers

1 Dry chemical powder fire extinguisher (6.0 kg) No

2 Fire cabinet (1.2mm thick stainless steel brush finish) with 5kg CO2
fire extinguisher and 6kg DCP fire extinguisher
No

EARTHING

Earthing

3 Earthing for KWH meter cabinet Item

4 EP-01 No

PRELIMINARIES 1/81
.

ITEM NO DESCRIPTION UNIT


5 EP-02 No

ADDITIONAL ITEMS

The tenderer is to detail below any additional items with quantities


and rates not previously included to complete the build up of the
lump sum tender price for this section of the works. Should the
tenderer fail to insert any items here, it will be deemed that his
lump sum price for the tender includes all items and no subsequent
claim for any additional item will be entertained.

PRELIMINARIES 1/82
.

ITEM NO DESCRIPTION UNIT

Carried Forward to Section Summary

SECTION NO. 3

BILL NO. 7

COMMUNICATION, SECURITY & CONTROL SYSTEMS

NOTE: For specifications see General Specification

NOTE: For additional explanations/ clarifications see


"Preambles/Rates and Measurement Clauses"

FIRE DETECTION AND EVACUATION

Fire Alarm Equipment

1 FACP No

PRELIMINARIES 1/83
.

ITEM NO DESCRIPTION UNIT


2 Hassantuk 24/7 panel No

Fire Alarm Devices

Wiring to fire alarm points including conduits, connections,


termination, fittings etc. as specified and as shown on drawings

3 Addressable smoke detector with build in sounder base and isolator


base
No

4 Addressable heat detector with build in sounder base and isolator


base
No

5 Addressable multi sensor with build in isolator base No

6 Addressable dual action manual pull station No

7 Addressable open area sounder beacon loop powered No

8 Addressable open area sounder beacon loop powered W/P No

9 Isolator module No

1 Addressable monitoring module No

Fire alarm accessories including fixing, fittings termination and


supports as specified and as shown on drawings

2 Addressable smoke detector with build in sounder base and isolator


base
No

3 Addressable heat detector with build in sounder base and isolator


base
No

4 Addressable multi sensor with build in isolator base No

5 Addressable dual action manual pull station No

6 Addressable open area sounder beacon loop powered No

PRELIMINARIES 1/84
.

ITEM NO DESCRIPTION UNIT

7 Addressable open area sounder beacon loop powered W/P No

8 Isolator module No

9 Addressable monitoring module No

Testing and Commissioning

10 Allow for all testing and commissioning in connection with fire alarm
and voice evacuation installation
Item

EMERGENCY LIGHTING INSTALLATION

PRELIMINARIES 1/85
.

ITEM NO DESCRIPTION UNIT


Emergency Lighting Equipment

1 Addressable emergency lighting central monitoring panel No

Emergency Lights

Cable and conduit installation to the following as specified and as


shown on drawings

2 8W recessed mounted emergency light self contained with 3h


battery back up
No

3 8W wall mounted type exit light self contained with 3h battery back
up
No

4 8W wall/hanging type directional exit light self contained with 3h


battery back up
No

Supply, deliver, store, assemble and install emergency light fittings


as specified and as shown on drawings

5 8W recessed mounted emergency light self contained with 3h


battery back up
No

6 8W wall mounted type exit light self contained with 3h battery back
up
No

7 8W wall/hanging type directional exit light self contained with 3h


battery back up
No

Testing and Commissioning

8 Allow for all testing and commissioning in connection with


emergency lighting installation
Item

Disabled system all in accordance with the drawings and


specification

1 PSU - Power supply unit No

PRELIMINARIES 1/86
.

ITEM NO DESCRIPTION UNIT


Final sub-circuit and auxiliary installation; cable and conduit in
concealed installation including back box, etc. to the following as
specified and as shown on drawings

2 Four zone call controller No

3 Ceiling pull unit No

4 Button reset/Emergency call point No

5 Over door light and sounder No

Supply and fix the following accessories including final termination


as specified and as shown on drawings

6 Four zone call controller No

7 Ceiling pull unit No

8 Button reset/Emergency call point No

9 Over door light and sounder No

DDC Panel

DDC Panel as per the specification and as shown on the drawings

1 Stand alone DDC panel No

PRELIMINARIES 1/87
.

ITEM NO DESCRIPTION UNIT

ADDITIONAL ITEMS

The tenderer is to detail below any additional items with quantities


and rates not previously included to complete the build up of the
lump sum tender price for this section of the works. Should the
tenderer fail to insert any items here, it will be deemed that his
lump sum price for the tender includes all items and no subsequent
claim for any additional item will be entertained.

PRELIMINARIES 1/88
.

ITEM NO DESCRIPTION UNIT

Carried Forward to Section Summary

SECTION 3

SERVICES

SECTION SUMMARY - SERVICES

1 SANITARY FITTINGS AND BRASSWARE

2 DISPOSAL INSTALLATION

3 WATER INSTALLATION

4 HVAC INSTALLATION

5 ELECTRICAL INSTALLATION

6 FIRE PROTECTION INSTALLATION

7 COMMUNICATION, SECURITY & CONTROL SYSTEMS

PRELIMINARIES 1/89
.

ITEM NO DESCRIPTION UNIT

PRELIMINARIES 1/90
AMOUNT
ITEM ITEM DESCRIPTION UNIT QUANTITY RATE
UAE Dhs.
BILL NO. 4 - HARD LANDSCAPING (CONT'D)

Fences and Boundary Walls

Boundary wall I Fence Type 1 (F1 }, Swimming Pool


A complex boundary wall, including gates, foundation, m 301 749.00 225,449.00
concrete pilasters, RC upstand, extruded aluminium
post, vertical & intermediate elements, top rail, straight
pattern fence, colour and finish to match townhouse
boundary wall railing and all other items to complete as
per the Drawing, Material Schedule and Specification.

Fence Type 2 (F2), galvanized chain link fence for Play


court, including chainlink fence, gate,
intermediate posts, foundation, colour to match
B m 20
townhouse boundary wall railing and all other items to
complete as per the Drawing, Material Schedule and
Specification

N/A
Fence Type 3 (F3), fence for dog park, including powder As per Tender
C coated galvanized metal welded wire mesh, gate, m 65 Documents
intermediate posts, foundation, colour to match
townhouse boundary wall railing and all other items
to complete as per the Drawing, Material Schedule and
Specification.

Fence Type 4 (F4}, decorative fence along project


D boundary, including aluminium post & frame, cast m 711
aluminium arrow, foundation, solid block work, finishes
and all other items to complete as per the Drawing,
Material Schedule and Specification.

Fence Type 5 (FS), aluminium louver fence including


E aluminium vertical & intermediate elements, doors, m 44 1,018.00 44,792.00
post, foundation, colour and finish to match town house
boundary wall railing and all other items to complete as
per the Drawing, Material Schedule and Specification.

Carried to Bill Summary Dhs. 270,241.00


AMOUNT
ITEM ITEM DESCRIPTION UNIT QUANTITY RATE
UAE Dhs.

BILL NO. 4 - HARD LANDSCAPING {CONT'D)

Additional Items

The Tenderer is to attach with this bill of quantities any


additional items with quantities, enumerated or
itemized and rates which are not previously included to
complete the build up of Item price. Should the
tenderers fail to insert any items here, it will be deemed
that his Item price for the tenders includes all items
either shown on the drawings and described in the
specification or deemed necessary by the Tenderer to
develop the drawings and specification to represent the
entire cost of the Works and no subsequent claim for
any additional item will be entertained.

Carried to Bill Summary Dhs. -


AMOUNT
ITEM ITEM DESCRIPTION UNIT QUANTITY RATE
UAE Dhs.

BILL NO. 5 : SWIMMING POOLS & STRUCTURES


(WALLS & STEPS)

Note: Drawings are indicative only. Contractor


shall design, supply and build following items
and shall submit shop drawings for review and
approval prior to commencement of works.
Tenderer to submit the breakdown of his lump sump
cost.

Swimming Pools for Adults and kids

Swimming Pools including drain/pool edge, pool ladder


with underground pumproom, including all necessary
design and build of civil works and finishes, mechanical
works, electrical works, connection to existing utilities
and all other associated works to complete as per the
drawing typical details and other related documents.

A In PA15 (1 Set) SUM 580,978.00 580,978.00

Shallow Pool

Shallow Pool including level deck channel drain, grating


drain cover, pool edge band, ladder, with underground
pumproom, including all necessary design and build of
civil works and finishes, mechanical works, electrical
works, connection to existing utilities and all other
associated works to complete as per the drawing typical
details and other related documents.

B ln PA15 (1 Nr) SUM 357,369.00 357,369.00

Out door shower

Out door shower (SS2) including all necessary


design and build civil works, finishes, shower/plumbing
and connection of water and drain to the nearest
available pipeline all other associated works to
complete as per the drawing details and other related
documents.
C In PA15 nr 3 32,100.00 96,300.00

Carried to Bill Summary Dhs. 1,034,647.00


. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT


SECTION NO. 1

BILL NO. 1

GENERAL REQUIREMENTS

NOTE: For specifications see General Specification

NOTE: For additional explanations/ clarifications see


"Preambles/Rates and Measurement Clauses"

GENERAL REQUIREMENTS

These General Requirements are applicable to the whole of the


Works. If the Contractor wishes to price any of the items contained
herein then each such item, clause or sub-clause must be
individually priced. The Contractor shall not enter any lump sums
covering more than one or all items, clauses or sub-clauses. Where
any item, clause or sub-clause of the General Requirements has not
been priced, it will be deemed that the value of such item, clause or
sub-clause is included in the rates for measured items elsewhere in
the Bills of Quantities.

Conditions of Contract

1 The Contractor shall describe and list and price herein any
obligations contained in the Conditions of Contract for which he has
not allowed elsewhere and wishes to price separately.

Item Included

Specifications H3

2 The Contractor shall describe and list and price herein any
obligation contained in the Specifications for which he has not
allowed elsewhere and wishes to price separately.
Item Included

Bills of Quantities H3

1 The Contractor shall describe and list and price herein any
obligations contained in the Bills of Quantities for which he has not
allowed elsewhere and wishes to price separately.
Item Included

Performance Bond / Advance Payment H3

2 The Contractor should allow for the provision of the performance


bond and advance payment in accordance with the requirements of
the Contract.
Item 3,950 3,950.00

PRELIMINARIES 1/94
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT

Insurances H3

3 The Contractor should allow for insurances in accordance with the


requirements of the Contract.
Item 7,500 7,500.00

4 Increase of project specific Professional Indemnity Insurance in


accordance with the requirements of the Contract.
Item 3,200 3,200.00

Pricing Generally H3

The Contractor shall satisfy himself as to the meaning of every item


in the Bills of Quantities, and the rates and prices inserted by him
will be deemed to cover all his obligations under the Contract and
all matters and things necessary for the proper construction, and
completion of the Works including, but not by way of limitation, all
temporary work required (including any that may be required by
sub-contractors). The prices shall include for all materials and
labour and for the provision and use of all plant - whether
mechanical or non-mechanical - required for the expeditious
carrying out of the Works in their proper sequence - for shifting,
altering and adapting such temporary work and plant as may be
required during the progress of the Works and removing at
completion and making good any surfaces disturbed; and if not
included in any prices inserted against the Conditions of Contract
Clauses above; for the guarantees, insurances and bonds required;
for the costs of preparing a tender; for the work in connection with
measurements and the final account; for profit; and for all other
establishment charges and on costs of whatever nature. No claim
for additional payment will be allowed for any error or __
misunderstanding by the Contractor in these respects. The selected
Contractor will be required to provide the full and detailed Tender
breakdown upon being awarded the Contract. This Tender
breakdown is to show the actual calculations of the Preliminaries,
the labour, plant and material costs of the Works, the build-up of
measured rates with on-costs and overheads and any other
allowances used to arrive at the Tender Sum.

Quantities in Bills Not Basis for Ordering Materials H3

The Contractor shall not use the Quantities given in the Bills of
Quantities as a basis for ordering materials until he has satisfied
himself from the drawings and site information that the quantities
so given are correct for the work to be executed.

Building Permits and Statutory Approvals H3

PRELIMINARIES 1/95
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT


The Contractor shall be responsible for obtaining all approvals
necessary for the Government Departments, the Police, local
Service Authorities (i.e. Dubai Water & Electricity Authority, Etisalat,
Civil Defence), Dubai Municipality, RTA as required in the
performances of this Contract, and for coordinating approvals and
the like with requirements necessary for the works to proceed.

The Contractor shall be responsible for coordinating the works and


obtain required NOCs from Dubai Municipality, DEWA (water),
DEWA (electricity), RTA and any other necessary authorities or
bodies and ETISALAT.

The Contractor will be responsible for obtaining the approved


demarcation drawings and permits to allow his works to start
(charges for Building Permit will be borne by the Employer).

All charges and deposits towards the temporary service connections


required for construction purposes shall be paid by the Contractor.

2 The Contractor must allow for any liaison necessary for the
successful and timely completion of the works with the
representatives of development of adjoining plots, other plots in the
development, the master plan developer and his representatives
and residential developments in the area.

Item 500 500.00

TEMPORARY FACILITIES H2

Facilities for the Employer's Representative H3

The Contractor to operate and maintain existing site office for the
sole use of the Employer's representative including storage space,
shaded car parking spaces, complete all as per Specification.

2 Maintenance charge (time related cost). Days Included in La Violeta 1&2

3 De-mobilization charges (fixed cost). Item Included in La Violeta 1&2

1 Provide computer equipment (brand new) & software, laptops,


printers and photocopying machine for the exclusive use of the
Employer and their representative.
Item Included in La Violeta 1&2

2 Provide first aid with supplies. Item Included in La Violeta 1&2

3 Provide stationary consumables & other consumable, complete all


as per Specification.
Item Included in La Violeta 1&2

PRELIMINARIES 1/96
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT


Provide telephones, internet access and fax machine for the
exclusive use of the Employer and their representative, complete all
as per Specification.
H3

4 Mobilization charges (fixed cost). Item Included in La Violeta 1&2

5 Maintenance charge (time related cost). Days Included in La Violeta 1&2

6 De-mobilization charges (fixed cost). Item Included in La Violeta 1&2

7 The Contractor shall provide 2 Nos of 4x4 Toyota Fortuner car


including maintenance, fuel, insurances. first aid kit, salik card etc.,
complete. (1 for Employer and 1 for Consultant)

Days Excluded

Attendance of staff H3

8 Provide daily cleaning attendance Days Included in La Violeta 1&2

9 Provide Document Controller Days Included in La Violeta 1&2

Facilities for Supervision Consultants H3

The Contractor shall provide, install and maintain proper office


facilities (temporary site office accommodation with furniture and
equipment) for the sole use of the Engineer's and Engineer's Staff
including storage space, shaded car parking spaces, complete all as
per Specification.

10 Mobilization charges (fixed cost). Item Included in La Violeta 1&2

11 Maintenance charge (time related cost). Days Included in La Violeta 1&2

12 De-mobilization charges (fixed cost). Item Included in La Violeta 1&2

1 Provide computer equipment (brand new) & software, laptops,


printers and photocopying machine, digital camera, complete all as
per Specification.
Item Included in La Violeta 1&2

2 Provide first aid with supplies. Item Included in La Violeta 1&2

3 Provide stationary consumables & other consumable, complete all


as per Specification.
Item Included in La Violeta 1&2

Provide telephones, internet access and fax machine, complete all


as per Specification.

4 Mobilization charges (fixed cost). Item Included in La Violeta 1&2

5 Maintenance charge (time related cost). Days Included in La Violeta 1&2

6 De-mobilization charges (fixed cost). Item Included in La Violeta 1&2

PRELIMINARIES 1/97
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT

Attendance of staff H3

7 Provide daily cleaning attendance Days Included in La Violeta 1&2

Surveying Equipment H3

8 The Contractor shall provide and keep on site an adequate supply of


surveying instruments for the proper execution of the Works. The
instruments shall all be in proper adjustment and always kept in
perfect working order and they shall be immediately available for
use whenever required, together with all necessary assistance.

Item Included in La Violeta 1&2

Facilities for the Contractor H3

The Contractor shall be responsible for the provision, erection,


maintenance offices, with all required furniture and equipment,
messrooms, sanitary accommodation and welfare facilities for his
use and by Contractor's agent and site staff, complete all as per
Specification (no temporary living / accommodation will be
permitted on the site. It is the Contractor's responsibility to make
any necessary arrangements for suitable housing of temporary
workers).

9 Mobilization charges (fixed cost). Item Included in La Violeta 1&2

1 Maintenance charge (time related cost). Days Included in La Violeta 1&2

2 De-mobilization charges (fixed cost). Item Included in La Violeta 1&2

Temporary Roads/ Diversions H3

Contractor shall provide temporary roads/diversions as may be


necessary including hardstanding and crossings, complete all as per
Specification.

3 Mobilization charges (fixed cost). Item Included in La Violeta 1&2

4 Maintenance charge (time related cost). Days Included in La Violeta 1&2

5 De-mobilization charges (fixed cost). Item Included in La Violeta 1&2

CONTRACTOR'S ADMINISTRATIVE ARRANGEMENTS H2

Generally H3

Site Administration and Supervision H4

PRELIMINARIES 1/98
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT


The Contractor shall provide sufficient staff and equipment to
perform the administrative duties involved in executing the
Contract. Such staff shall be properly qualified to perform their
respective duties and shall not be removed from the Site or
replaced without the prior permission.

6 The Contractor shall keep the Employer fully informed of the


sequence of all operations comprised in the Works and he shall not
delegate such responsibility to any Sub-contractor or to any other
agent except with the written permission.

Item Included in La Violeta 1&2

Security, Safety, Accidents and First Aid H4

The Contractor shall be responsible for the protection of the


materials, plant and safety and security of all employee in the site
during the working hours, Contractor to allow for but not limited to:

7 Provision of suitable lights, high visibility clothing and personal


protective equipment for site staff.
Item Included in La Violeta 1&2

1 Safety, security fire extinguishers at site. Item Included in La Violeta 1&2

2 Safety barriers, warning signs on site access roads. Item Included in La Violeta 1&2

3 Adequate protection against any form of damage or deterioration


shall be provided for all sections of the Works. This shall include
protective tapes, casings, guard rails and the like, which shall be
provided if necessary.
Item 5,000 5,000.00

4 First aid facilities and signage for first aid, fire, etc. Item 500 500.00

5 All necessary arrangement to obtain medical help and transport to


hospital, in case of accidents.
Item Included in La Violeta 1&2

6 HSE inspections and H&S performance. Item 2,000 2,000.00

Transportation H4

7 The Contractor shall provide transportation of labour to and from


site and pay all costs in connection therewith.
Days 270 50 13,500.00

Labour Procurement H4

8 The Contractor shall allow for procuring all labour required to


execute the Works and shall pay all charges in connection with the
employment and discharge of such labour.
Item Included in La Violeta 1&2

CONSTRUCTION PLANT H2

Small Plant and Tools H3

PRELIMINARIES 1/99
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT

9 Provide small plant and tools. Item 5,000 5,000.00

Cranes and Lifting Plant H3

The Contractor shall provide all constructional equipment, lifting


equipment, transport facilities, tools and services, required for the
proper execution of the Works, complete all as per Specification. Included

10 Mobilization charges (fixed cost) Item Included in La Violeta 1&2

11 Maintenance charge (time related cost) Days Included in La Violeta 1&2

1 De-mobilization charges (fixed cost) Item Included in La Violeta 1&2

Scaffolding H3

The Contractor shall provide, erect, maintain, dismantle and clear


away at completion proper and adequate internal and external
scaffolding for his own use, and any sub-contractor ("domestic" and
"nominated") and any other directly appointed contractors, artists
and tradesmen. Any holes shall be made good to match the
adjacent surfaces as the scaffolding is dismantled. The Contractor
shall be entirely responsible for all safety precautions in connection
with scaffolding and for its entire sufficiency for the work.

2 Mobilization charges (fixed cost) Item 6,493 6,493.00

3 Maintenance charge (time related cost) Days 270 70 18,900.00

4 De-mobilization charges (fixed cost) Item 500 500.00

TEMPORARY WORKS H2

Temporary Hoardings H3

5 The Contractor is to erect, supply, install and maintain the


temporary fencing and hoardings. The Contractor shall provide all
means, safety signage, etc., necessary for protecting the public or
occupants for the proper execution of the Works and for meeting
the requirements of any service or other authority to the approval.
The Contractor shall handover the temporary fencing gates and
hoardings in good condition( when directed by the Employer on
completion) to the Employer.

Item Included in La Violeta 1&2

Site Sign Boards H3

PRELIMINARIES 1/100
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT


The Contractor shall be responsible for supply, installation,
maintenance, modification, re-alignment, re-location of the existing
site sign boards. Should the Contractor desire to incorporate any
other names, he must gain approval.

No other notice boards or advertisements on or around the Site will


be permitted unless approved in writing.

Upon completion of the Works the Contractor shall remove the sign
boards (at agreed date with the Employer) and handover to the
Employer.

1 Mobilization charges (fixed cost) Item 10,000 10,000.00

2 Maintenance charge (time related cost) Days 270 20 5,400.00

3 De-mobilization charges (fixed cost) Item 100 100.00

TEMPORARY UTILITIES H2

General H3

The Contractor shall provide proper and adequate temporary


utilities for his own use.

Existing Services H4

4 The Contractor is to take particular care to avoid damage to existing


services during the course of the work. The Contractor shall be
responsible for the protection of all existing services within the Site
and shall make good any damage to existing services resulting form
his carrying out of the Works to the satisfaction of the relevant
authority.
Item Included in La Violeta 1&2

Water H4

The Contractor shall supply clean water for the Works, the
Contractor shall pay all charges for the consumption of water used
and arrange for necessary connections and installation of meters,
complete all as per Specification.

5 Mobilization charges (fixed cost) Item Included in La Violeta 1&2

6 Maintenance charge (time related cost) Days Included in La Violeta 1&2

7 De-mobilization charges (fixed cost) Item Included in La Violeta 1&2

Electrical Power and Lighting H4

PRELIMINARIES 1/101
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT


The Contractor shall arrange and provide for an adequate
temporary supply of all necessary electrical power and lighting for
the Works including paying all charges for the consumption of
electricity, complete all as per Specification.

1 Mobilization charges (fixed cost) Item Included in La Violeta 1&2

2 Maintenance charge (time related cost) Days Included in La Violeta 1&2

3 De-mobilization charges (fixed cost) Item Included in La Violeta 1&2

Fire Hazards / Temporary Fire Fighting Services and Precautions


H4

4 Contractor shall be responsible for ensuring that proper precautions


are taken to protect the temporary buildings and its contents where
naked flame is used, complete all as per Specification.

Item Included in La Violeta 1&2

OTHER FACILITIES H2

As-Built Drawings and Operation and Maintenance Instruction


Manual
H3

5 Allow for providing copy of each as-built drawing/ each


Maintenance Instruction Manual in the form and numbers
instructed time to time.
Item 500 500.00

Shop Drawings H3

6 The Contractor shall provide shop drawings, complete all as per


Specification.
Item 500 500.00

QA / QC Procedures H3

7 The Contractor shall allow for QA/QC service and Quality Control
procedures, complete all as per Specification.
Item Included in La Violeta 1&2

Geotechnical Report H3

1 Geotechnical report is part of tender document. However, the


Contractor shall be responsible for carrying out any additional
investigations and any verifications as he considers necessary.

Item Included in La Violeta 1&2

Progress Photographs H3

2 The Contractor shall supply and handover set of progress


photographs as specified.
Item 200 200.00

Records / Progress Reports H3

PRELIMINARIES 1/102
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT

3 The Contractor shall provided records/progress reports as specified.


Item 250 250.00

Project Closeout / Clearing Away Rubbish H3

4 Allow for clearing away rubbish at regular intervals during the


progress of the Work and at completion and for leaving the Site and
perimeter tidy at completion, to the satisfaction.

Days Included in La Violeta 1&2

Topographical Survey H3

5 As soon as the Contract has been signed, the Contractor shall check
and confirm the accuracy of the existing ground levels that are
shown on the drawings.
Item Included in La Violeta 1&2

6 A permanent datum point must be established during this operation


to the approval.
Item Included in La Violeta 1&2

Setting Out of the Works H3

7 The Contractor shall be responsible for the time and proper setting-
out of works in relation to original points and lines and levels of
reference given.
Item Included in La Violeta 1&2

8 The Contractor will be responsible for obtaining the approved


demarcation drawings and permits to allow his works to start.
Item Included in La Violeta 1&2

MISCELLANEOUS H2

Police Regulations H3

1 The Contractor must ascertain and comply with Police Regulations


affecting the execution of the Works.
Item Included in La Violeta 1&2

Traffic Regulations H3

The Contractor is to observe all traffic regulations, including those


regarding the loading or unloading of or waiting by vehicles on the
public highway and the contract sum is deemed to include for strict
compliance therewith. All access roads are to be maintained clean
at all times.

2 Establishment charge (fixed cost) Item Included in La Violeta 1&2

3 Maintenance charge (time related cost) Days Included in La Violeta 1&2

4 Removal charge (fixed cost) Item Included in La Violeta 1&2

Tests H3

PRELIMINARIES 1/103
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT

5 The Contractor shall allow for all tests required by the Specification
to be carried out including providing all necessary materials and
samples.
Item Included in La Violeta 1&2

Samples H3

6 When so required, samples of goods or materials are to be provided


at the Contractor's expense. Complete as specified.
Item Included in La Violeta 1&2

Green Building Regulations H3

7 The Contractor should comply with Green Building Regulations of


Dubai Municipality, this requires that the Contractor to be familiar
with the credit requirements.
Item Included in La Violeta 1&2

PRELIMINARIES 1/104
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT


8 The Contractor is responsible for all documentation required as part
of Dubai Municipality Green Building Certification.
Item Included in La Violeta 1&2

9 Consultant De-Snagging (per Unit) No 2 1,500 3,000.00

10 Customer care De-Snagging (per Unit) No 2 1,500 3,000.00

ADDITIONAL ITEMS H2

The tenderer is to detail below any additional items with quantities


and rates not previously included to complete the build up of the
lump sum tender price for this section of the works. Should the
tenderer fail to insert any items here, it will be deemed that his
lump sum price for the tender includes all items and no subsequent
claim for any additional item will be entertained.

H3

Additional amount for Structural Redesign & Project PI insurance


item 110,000 110,000.00

PRELIMINARIES 1/105
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT

SECTION NO. 2

BILL NO. 1

SITE WORK

NOTE: For specifications see General Specification

NOTE: For additional explanations/ clarifications see


"Preambles/Rates and Measurement Clauses"

SITE EXPLORATION GENERALLY

1 Keeping records of site observations, site tests and laboratory tests


Item Included

2 Samples, site observations, site tests and analyses Item Included

3 Providing reports Item Included

DEWATERING

Allowance for Dewatering the Site

4 Dewatering (in days) Days Excluded

SITE PREPARATION

Sub base preparation

5 Rip up, scarify top 150mm layer and compact to 98% Modified
AASHTO density under raft foundation
m2 267 13 3,471.00

Approved brand of anti termite soil poison applied by a Registered


Pest Control company and guaranteed against termite infestation
for ten years

6 Under floors, etc. including forming and poisoning shallow furrow


against foundation walls etc. filling in furrows and ramming
m2 460 3 1,380.00

EXCAVATION

Excavation in compacted earth to:

1 Footings, pile caps, ground beams and surface bed thickening


m3 2 11 22.00

PRELIMINARIES 1/106
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT


2 Lift pits, tanks, etc. m3 0 Rate Only

DISPOSAL

Disposal of material arising from excavations

3 Extra over all excavations for carting surplus excavated materials to


stockpile on site for later use
m3 2 11 22.00

ADDITIONAL ITEMS

The tenderer is to detail below any additional items with quantities


and rates not previously included to complete the build up of the
lump sum tender price for this section of the works. Should the
tenderer fail to insert any items here, it will be deemed that his
lump sum price for the tender includes all items and no subsequent
claim for any additional item will be entertained.

Backfill with excavated materials m3 451 11 4,961.00

Carried Forward to Section Summary AED 9,856.00

SECTION NO. 2

BILL NO. 2

CONCRETE WORK

NOTE: For specifications see General Specification

PRELIMINARIES 1/107
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT


NOTE: For additional explanations/ clarifications see
"Preambles/Rates and Measurement Clauses"

TESTS

Concrete tests and blocks required and instructed by the


Supervision Consultant

1 Allow for testing as required by the Supervision Consultant Item Included

2 The costs of preliminary tests prior to approval of the Contractor's


materials and mixes shall be done by the Contractor
Item Included

3 The cost of subsequent tests shall be borne by the Employer unless


the test results show the materials or concrete do not conform with
specified requirements
Item Included

4 Should the Supervision Consultant require any load tests to be


carried out because of the Contractor's failure to comply with the
specified requirements, the costs of such load tests shall be borne
by the Contractor
Item Included

PLAIN CONCRETE

20MPa Concrete

5 Surface blinding to take waterproofing (waterproofing elsewhere


measured)
m3 7 447 3,129.00

REINFORCED CONCRETE IN FOUNDATIONS (with GGBS admixture)

40MPa Concrete

1 Footings m3 43 1,199 51,557.00

2 Tie beams m3 2 1,929 3,858.00

REINFORCED CONCRETE IN SUPERSTRUCTURE (with GGBS


admixture)

40Mpa Concrete

3 Slab on grade m3 12 1,074 12,888.00

4 Concrete encasing m3 1 1,584 1,584.00

HOLLOW CORE SLABS

PRELIMINARIES 1/108
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT


Note: Hollow core slabs to be priced as per Preambles, with and
including concrete propping, stoppers, reinforcement, etc. as per
general notes, details and specifications (Structural topping and
mesh elsewhere measured)

Slabs

5 150mm Thick hollow core slabs m2 73 N/A

Structural Toppings

6 60mm Thick structural toppings m2 73 N/A

REINFORCEMENT

NOTE : The Contractor is to provide the Supervision Consultant with


reinforcement details and bending schedules, which are to be
prepared from the Supervision Consultant's Dubai Municipality
submission drawings, for the Supervision Consultant's comment.
These details are to be lodged with the Supervision Consultant 21
days prior to the date on which the reinforcement will be required
on site. Only bending schedules signed and approved by the
Supervision Consultant will be considered for valuation and final
account payment.

High bond steel reinforcement

1 Bars in various diameters, cut, bent and fixed t 2.44 Included

Fabric Reinforcement

2 Type A193 Mesh reinforcement in surface beds, slabs, etc. m2 116 Included

FORMWORK

Plain Smooth Finished Formwork

Formwork to sides and soffits of

3 Beams in foundations m2 21 Included

4 Formwork to foundations m2 174 Included

5 Formwork to concrete encasing m2 18 Included

PRECAST CONCRETE

Note: All Pre-cast elements to be priced as per Preambles, with and


including dowel bars, back-up rods, sealant, insulation, expansion
joint covers, etc. as per details and specifications

PRELIMINARIES 1/109
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT

Solid Panels

6 PC-H - 100mm Thick Precast Solid Cladding Panel (GSP10/FSP10)


m2 50 N/A

7 PC-K - 150mm Thick Precast Solid Cladding Panel (GSP15/FSP15)


m2 43 N/A

8 PC-L - 200mm Thick Precast Solid Cladding Panel (GSP20/FSP20)


m2 78 N/A

9 PC-N - 300mm Thick Precast Solid Cladding Panel m2 92 N/A

PRELIMINARIES 1/110
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT

Insulated Cladding Panels

10 PC-B - 200mm Thick Precast Insulated Cladding Panel m2 11 N/A

1 PC-E - 250mm Thick Precast Insulated Cladding Panel


(NGIP25/NFIP25 or GIP25/FIP25)
m2 240 N/A

Pre-cast parapet walls

2 250mm Thick pre-cast parapet Wall (GIP25/FIP25) m2 112 N/A

Precast Slabs

3 150mm Thick precast pre-stressed slab (screed measured


elsewhere)
m2 36 N/A

4 310mm Thick precast solid slab m2 175 N/A

Beams

5 RB 01, 470 x 310mm deep m 4 N/A

6 RB 02, 470 x 310mm deep m 6 N/A

7 RCB 01, 360 x 310mm deep m 12 N/A

8 RCB 02, 470 x 310mm deep m 16 N/A

9 RCB 03, 420 x 310mm deep m 5 N/A

10 TRB 01, 410 x 310mm deep m 18 N/A

11 TRCB 01, 470 x 310mm deep m 24 N/A

12 TRCB 02, 420 x 310mm deep m 10 N/A

SUNDRIES

Expansion joints with "Flexcell" or similar approved soft board


between vertical concrete surfaces

13 10mm Joints between slab on grade and concrete substructure


walls
m2 10 50 500.00

PRELIMINARIES 1/111
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT

ADDITIONAL ITEMS

The tenderer is to detail below any additional items with quantities


and rates not previously included to complete the build up of the
lump sum tender price for this section of the works. Should the
tenderer fail to insert any items here, it will be deemed that his
lump sum price for the tender includes all items and no subsequent
claim for any additional item will be entertained.

Columns m3 70 2,166 151,620.00


Walls m3 35 2,390 83,650.00
Beams m3 35 1,920 67,200.00
Slab m3 88 1,602 140,976.00
Parapet & Sections m3 61 1,560 95,160.00

PRELIMINARIES 1/112
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT


Carried Forward to Section Summary AED 612,122.00

SECTION NO. 2

BILL NO. 3

MASONRY

NOTE: For specifications see General Specification

NOTE: For additional explanations/ clarifications see


"Preambles/Rates and Measurement Clauses"

WALLS AND PIERS

Blockwork with OPC cement mortar including galvanised mesh


reinforcement and/ or stainless steel vertical twist type wall ties

1 Normal Blockwork - 100mm Solid block walls m2 2 80 160.00

2 Normal Blockwork - 150mm Solid block walls m2 7 83 581.00

ADDITIONAL ITEMS

The tenderer is to detail below any additional items with quantities


and rates not previously included to complete the build up of the
lump sum tender price for this section of the works. Should the
tenderer fail to insert any items here, it will be deemed that his
lump sum price for the tender includes all items and no subsequent
claim for any additional item will be entertained.

100mm Thick Solid Block Wall m2 70 80 5,600.00


150mm Thick Solid Block Wall m2 32 83 2,656.00
200mm Thick Solid Block Wall m2 121 86 10,406.00
250mm Thick Insulated External Wall m2 427 119 50,813.00

Carried Forward to Section Summary AED 70,216.00

SECTION NO. 2

BILL NO. 4

PRELIMINARIES 1/113
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT


METALWORK

NOTE: For specifications see General Specification

NOTE: For additional explanations/ clarifications see


"Preambles/Rates and Measurement Clauses"

NON-STRUCTURAL METALWORK

50mm IROKO hardwood hanrail fixed to glass balustrade, complete


all

1 To glass balustrade m 8 279 2,232.00

50mm hardwood handrail to match approved sample including


15mm dia grade316 stainless steel bracket support to handrail,
grade 316 stainless steel escutcheon, fastener / wall fixing,
complete all

2 To louver m 11 493 5,423.00

Laminated glass railing 6+a1.14pvb+6mm with aluminium capping


profile powdercoated to match the fins and window frames

3 1200mm High glass balustrade to ramp m 10 1,373 13,730.00

10mm Thick x 65mm powder coated galvanized steel flat bar


(spaced @ 900mm O.C bolted to wall by 16mm dia. stainless steel
expansion bolt including 32mm dia galvanized steel solid bar rung
with powder coat finish spaced @ 300mm O.C, complete all

4 Access Ladder (Ref. A-504) No 2 5,350 10,700.00

ADDITIONAL ITEMS

The tenderer is to detail below any additional items with quantities


and rates not previously included to complete the build up of the
lump sum tender price for this section of the works. Should the
tenderer fail to insert any items here, it will be deemed that his
lump sum price for the tender includes all items and no subsequent
claim for any additional item will be entertained.

PRELIMINARIES 1/114
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT

Carried Forward to Section Summary AED 32,085.00

SECTION NO. 2

BILL NO. 5

WOODWORK

NOTE: For specifications see General Specification

NOTE: For additional explanations/ clarifications see


"Preambles/Rates and Measurement Clauses"

Vanity mirrors

6-8mm Thick clear mirror with straight edge, with and including
framework, backing and adhesive as per bathroom and powder
room drawings, complete all

PRELIMINARIES 1/115
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT

1 1700 x 1200mm High vanity mirror No 2 853 1,706.00

2 1780 x 1200mm High vanity mirror No 2 880 1,760.00

Vanity Cupboards, etc.

Vanity cupboard with and including top, sides, bottom, doors,


division, shelves, skirting, ironmongery, sub frames, stone, etc.
supplied and installed complete

3 1900mm long x 600mm wide x 400mm high vanity No 2 3,344 6,688.00

4 2850mm long x 600mm wide x 400mm high vanity No 2 5,016 10,032.00

5 1900mm long x 600mm wide vanity countertop No 2 3,344 6,688.00

6 2850mm long x 600mm wide vanity countertop No 2 5,016 10,032.00

Utility Cabinets

Wooden upper and lower utility cabinets, including tops, bottoms,


sides, divisions, shelves, skirtings, drawers, doors, ironmongery,
worktops with and including all necessary cut-outs, glazing to doors
etc. (supplied and installed complete)

1 WD-05 1150mm + 1550mm long x 200mm wide x 2200mm high


(Ref. ID_211)
No 2 3,267 6,534.00

WC Back Counter, complete

2 Behind water closet 900mm high + ledge ST-01 190mm wide No 6 495 2,970.00

ADDITIONAL ITEMS

The tenderer is to detail below any additional items with quantities


and rates not previously included to complete the build up of the
lump sum tender price for this section of the works. Should the
tenderer fail to insert any items here, it will be deemed that his
lump sum price for the tender includes all items and no subsequent
claim for any additional item will be entertained.

PRELIMINARIES 1/116
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT

Carried Forward to Section Summary AED 46,410.00

SECTION NO. 2

BILL NO. 6

THERMAL AND MOISTURE PROTECTION

NOTE: For specifications see General Specification

NOTE: For additional explanations/ clarifications see


"Preambles/Rates and Measurement Clauses"

SUBSTRUCTURE WATERPROOFING

1 layer of heavy duty 1000 gauge Polythene /Polyethylene Sheet


below waterproofing, Grade/TieBeams and other Substructures
which requires same in accordance with the Specifications and as
detailed in Drawing and Engineer's Standards.

1 Polythene sheet on blinding m2 265 3 795.00

Two coats modified bituminous waterproof coating

2 On concrete foundations m2 460 16 7,360.00

BUILDING WATERPROOFING

Acrylic resin top coating all as per manufacturer's specifications

PRELIMINARIES 1/117
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT

3 On flat roofs m2 128 32 4,096.00

4 Additional membrane at 100mm diameter outlet No 8 32 256.00

120 GSM Geotextile protection layer, all as per manufacturer's


specifications

5 On roofs m2 128 5 640.00

Polymer modified cement waterproofing layer complete as per


drawings and specifications

6 On bathroom, shower, utility and kitchen floors m2 76 32 2,432.00

1 On bathroom, shower, utility and kitchen walls m2 199 32 6,368.00

"Linings" with 30mm crushed stone evenly spread with larger stones
around outlets

2 To 100mm diameter outlet No 8 115 920.00

COMBO ROOF SYSTEM

Combo-roof system, complete all as per drawing and manufacturers


recommendation

3 On flat roofs (lower roof) m2 47 150 7,050.00

ADDITIONAL ITEMS

The tenderer is to detail below any additional items with quantities


and rates not previously included to complete the build up of the
lump sum tender price for this section of the works. Should the
tenderer fail to insert any items here, it will be deemed that his
lump sum price for the tender includes all items and no subsequent
claim for any additional item will be entertained.

PRELIMINARIES 1/118
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT

Carried Forward to Section Summary AED 29,917.00

SECTION NO. 2

BILL NO. 7

INTERNAL DOORS AND WINDOWS

NOTE: For specifications see General Specification

NOTE: For additional explanations/ clarifications see


"Preambles/Rates and Measurement Clauses"

TIMBER DOORS AND WINDOWS

TIMBER DOORS AND TIMBER FRAMES

Timber door, door frame, architrave and jamb linings including


accessories, sub-frames, installation of ironmongery, etc.installed
complete as per drawings and specifications

1 D-01 SA Single Flush 1, overall size 1300mm x 2850mm high No 2 4,142 8,284.00

2 D-02 SA Single Flush1, overall size 900mm x 2150mm High No 4 2,052 8,208.00

3 D-04 SA Single Flush1, overall size 1000mm x 2150mm high No 2 1,722 3,444.00

4 D-06 DL Double Cabinet, overall size 600mm x 2150mm high No 2 1,722 3,444.00

ALUMINUM DOORS AND WINDOWS

ALUMINUM DOORS

Frosted tempered glass door, door frame, architrave and jamb


linings including accessories, sub-frames, installation of
ironmongery, etc.installed complete as per drawings and
specifications

5 D-05 SM Singe frameless glass, overall size 800mm x 2200mm high


No 10 1,499 14,990.00

1 Extra over for single glass door D-05 No 10 Included in the above

PRELIMINARIES 1/119
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT


ACCESSORIES

Other supply & install

2 Door stopper No 10 17 170.00

ADDITIONAL ITEMS

The tenderer is to detail below any additional items with quantities


and rates not previously included to complete the build up of the
lump sum tender price for this section of the works. Should the
tenderer fail to insert any items here, it will be deemed that his
lump sum price for the tender includes all items and no subsequent
claim for any additional item will be entertained.

Carried Forward to Section Summary AED 38,540.00

SECTION NO. 2

BILL NO. 8

PRELIMINARIES 1/120
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT


EXTERNAL DOORS AND WINDOWS

NOTE: For specifications see General Specification

NOTE: For additional explanations/ clarifications see


"Preambles/Rates and Measurement Clauses"

ALUMINUM DOORS AND WINDOWS

ALUMINUM WINDOWS

Super Durable Powder coating aluminium windows, finishing,


ironmongery, building into block work or concrete wall, etc.

1 CW-01 - 1400 x 2900mm high window No 4 3,593 14,372.00

2 CW-02 - 700 x 2900mm high window No 2 1,801 3,602.00

ALUMINUM LOUVRES AND SCREENS

WPC profile as louvre color as per approved sample, complete all

3 LV-01, 5251 x 3200mm high louvre No 2 9,242 18,484.00

4 LV-02, 5250 x 4400mm high louvre No 2 12,705 25,410.00

5 LV-03, 2600 x 4400mm high louvre No 2 6,292 12,584.00

6 LV-04, 4215 x 4400mm high louvre No 2 10,287 20,574.00

7 D-03 SE-2 Single Louver-V1, overall size 900mm x 2850mm high


No 2 2,187 4,374.00

ALUMINIUM FINS

Aluminum fins, complete all

1 200mm Wide to horizontal m 145 279 40,455.00

2 200mm Wide to vertical m 11 484 5,324.00

ADDITIONAL ITEMS

PRELIMINARIES 1/121
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT


The tenderer is to detail below any additional items with quantities
and rates not previously included to complete the build up of the
lump sum tender price for this section of the works. Should the
tenderer fail to insert any items here, it will be deemed that his
lump sum price for the tender includes all items and no subsequent
claim for any additional item will be entertained.

Carried Forward to Section Summary AED 145,179.00

BILL NO. 9

SCREEDS AND PLASTER

NOTE: For specifications see General Specification

NOTE: For additional explanations/ clarifications see


"Preambles/Rates and Measurement Clauses"

PRELIMINARIES 1/122
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT


BACKGROUNDS

1:4 Cement plaster screeds on concrete floors complete as per


specification

1 Average 60mm thick on floors m2 257 35 8,995.00

2 Average 60mm thick on floors (precast floors) m2 36 35 1,260.00

3 Average 70mm thick on floors to falls (roofs) m2 47 38 1,786.00

INTERNAL FINISHES

Gypsum skim coat including all necessary surface preparation and


accessories complete as per specification

4 On internal precast concrete soffits and beams m2 123 17 2,091.00

One coat cement and sand plaster (1:3.5/4.5) including all necessary
surface preparation and accessories complete as per specification

5 On internal pre-cast walls including returns, reveals, openings and


recesses and concrete columns to receive tiles
m2 182 41 7,462.00

Two coats gypsum render (1:3.5/4.5) with a smooth finish including


all necessary surface preparation and accessories complete as per
specification

6 On internal pre-cast walls including returns, reveals, openings and


recesses and concrete columns to receive paint
m2 182 N/A

INTERNAL FINISHES

Gypsum skim coat including all necessary surface preparation and


accessories complete as per specification

1 To external pre-cast walls, including returns, reveals, openings or


recesses and concrete columns
m2 444 N/A

2 On external precast concrete soffits and beams m2 66 N/A

ADDITIONAL ITEMS

The tenderer is to detail below any additional items with quantities


and rates not previously included to complete the build up of the
lump sum tender price for this section of the works. Should the
tenderer fail to insert any items here, it will be deemed that his
lump sum price for the tender includes all items and no subsequent
claim for any additional item will be entertained.

PRELIMINARIES 1/123
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT

Ceiling Plaster m2 161 38 6,118.00


External Plaster m2 598 45 26,910.00

Carried Forward to Section Summary AED 87,650.00

SECTION NO. 2

BILL NO. 10

PAINTING

NOTE: For specifications see General Specification

NOTE: For additional explanations/ clarifications see


"Preambles/Rates and Measurement Clauses"

ON INTERNAL FLOORS

Prepare and apply Heavy duty epoxy floor coating (EP-01)

1 On concrete floors m2 17 52 884.00

2 S-K02, 80mm high epoxy skirting m 27 16 432.00

ON INTERNAL WALLS AND CONCRETE CEILINGS

Prepare and apply Pure acrylic emulsion paint finish on (PT01)

PRELIMINARIES 1/124
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT


3 Pre-cast concrete walls including returns, reveals of openings or
recesses and columns
m2 149 17 2,533.00

4 Plastered precast soffit of slabs including beams m2 17 17 289.00

ON EXTERNAL WALLS AND CONCRETE CEILINGS

Prepare and apply Pure acrylic emulsion paint finish on (PT12)

5 Pre-cast concrete walls including returns, reveals of openings or


recesses and columns
m2 648 29 18,792.00

Prepare and apply Pure acrylic emulsion exterior paint finish on


(PT11)

6 Plastered precast soffit of slabs including beams m2 181 29 5,249.00

ADDITIONAL ITEMS

The tenderer is to detail below any additional items with quantities


and rates not previously included to complete the build up of the
lump sum tender price for this section of the works. Should the
tenderer fail to insert any items here, it will be deemed that his
lump sum price for the tender includes all items and no subsequent
claim for any additional item will be entertained.

PRELIMINARIES 1/125
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT

Carried Forward to Section Summary AED 30,712.00

SECTION NO. 2

BILL NO. 11

TILING

NOTE: For specifications see General Specification

NOTE: For additional explanations/ clarifications see


"Preambles/Rates and Measurement Clauses"

PORCELAIN FLOOR TILING

600 x 600 x 9mm porcelain floor tiles or similar approved fixed with
adhesive to background (background elsewhere) and butt jointed
with colour epoxy grouting to approval including all movement
beads, sealants etc. (CT01)

1 On floors m2 68 86 5,848.00

2 S-K01 80mm high porcelain skirting m 29 24 696.00

300 x 300 x 9mm anti-slip porcelain floor tiles or similar approved


fixed with adhesive to background (background elsewhere) and butt
jointed with colour epoxy grouting to approval including all
movement beads, sealants etc. (CT02)

3 On floors m2 26 77 2,002.00

PORCELAIN WALL TILING

600 x 300 x 9mm porcelain wall tiles or similar approved fixed with
adhesive to pre-cast/plastered walls and butt jointed with colour
epoxy grouting to approval including all movement beads, sealants
etc. (CT03)

4 On walls m2 149 85 12,665.00

PRELIMINARIES 1/126
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT

300 x 300 x 9mm porcelain wall tiles or similar approved fixed with
adhesive to pre-cast/plastered walls and butt jointed with colour
epoxy grouting to approval including all movement beads, sealants
etc. (CT04)

1 On walls m2 172 79 13,588.00

STONE

Stone laid to approved methods to screed / plaster including ALL


cutting and waste, etc, complete all

2 TH-01, 30mm Thick x 250mm wide threshold m 5 311 1,555.00

3 TH-02, 30mm Thick x 100mm wide threshold m 9 259 2,331.00

4 TH-03, 30mm Thick x 200mm wide threshold m 6 146 876.00

Stone laid to approved methods to screed / plaster including ALL


cutting and waste, etc, complete all

5 Floor Step Riser 150mm H - ST-02, Natural Stone Flooring m2 11 773 8,503.00

6 ST-02, Natural Stone Flooring m2 146 773 112,858.00

7 ST-03, Natural Stone Flooring m2 9 773 6,957.00

ADDITIONAL ITEMS

The tenderer is to detail below any additional items with quantities


and rates not previously included to complete the build up of the
lump sum tender price for this section of the works. Should the
tenderer fail to insert any items here, it will be deemed that his
lump sum price for the tender includes all items and no subsequent
claim for any additional item will be entertained.

Carried Forward to Section Summary AED 167,879.00

SECTION NO. 2

PRELIMINARIES 1/127
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT

BILL NO. 12

SUSPENDED CEILINGS

NOTE: For specifications see General Specification

NOTE: For additional explanations/ clarifications see


"Preambles/Rates and Measurement Clauses"

SUSPENDED CEILINGS AND BULKHEADS

12mm Thick suspended gypsum plasterboard ceiling including metal


suspension system fixed in accordance with manufacturer's
instructions including all cut-outs for lighting, sprinklers, etc,
skimmed to a smooth finish ready to receive paint (CT-01)

Ceilings

1 Ceilings suspended not exceeding 1m below concrete soffit m2 21 75 1,575.00

2 Extra over for 250 x 250mm access panel including frame, flush key
and interior release to ceiling
No 4 207 828.00

Ceiling Drop

3 Ceiling drop not exceeding 300mm high m 5 69 345.00

12.5mm Thick moisture resistant suspended gypsum plasterboard


ceiling including metal suspension system fixed in accordance with
manufacturer's instructions including all cut-outs for lighting,
sprinklers, etc skimmed to a smooth finish ready to receive paint
(CL-02)

Ceilings

4 Ceilings suspended not exceeding 1m below concrete soffit m2 72 81 5,832.00

Curtain Cove

1 Horizontal curtain cove not exceeding 300mm high m 6 104 624.00

ADDITIONAL ITEMS

PRELIMINARIES 1/128
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT


The tenderer is to detail below any additional items with quantities
and rates not previously included to complete the build up of the
lump sum tender price for this section of the works. Should the
tenderer fail to insert any items here, it will be deemed that his
lump sum price for the tender includes all items and no subsequent
claim for any additional item will be entertained.

Carried Forward to Section Summary AED 17,784.00

SECTION NO. 2

BILL NO. 13

SUNDRY BUILDER'S WORK

NOTE: For specifications see General Specification

PRELIMINARIES 1/129
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT


NOTE: For additional explanations/ clarifications see
"Preambles/Rates and Measurement Clauses"

MINOR BUILDING WORKS

Sundry Builder's work

1 Builder's Work in Connection with Services Item 2,000 2,000.00

ADDITIONAL ITEMS

The tenderer is to detail below any additional items with quantities


and rates not previously included to complete the build up of the
lump sum tender price for this section of the works. Should the
tenderer fail to insert any items here, it will be deemed that his
lump sum price for the tender includes all items and no subsequent
claim for any additional item will be entertained.

Carried Forward to Section Summary AED 2,000.00

SECTION NO. 2 H1 0

BILL NO. 14

SIGNAGE

NOTE: For specifications see General Specification

NOTE: For additional explanations/ clarifications see


"Preambles/Rates and Measurement Clauses"

SIGNAGE

Internal Signage

1 1 - People of Determination Overall Size: 100mm x 300mm No 2 385 770.00

PRELIMINARIES 1/130
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT


2 2 - Male Toilet/Changing Room Overall Size: 100mm x 300mm
No 2 385 770.00

3 3 - Female Toilet/Changing Room Overall Size: 100mm x 300mm


No 2 385 770.00

4 4 - Electrical Room Overall Size: 100mm x 300mm No 2 385 770.00

5 5 - Equipment Room Overall Size: 100mm x 300mm No 2 385 770.00

6 6 - WC Overall Size: 100mm x 150mm No 6 385 2,310.00

7 7 - (Shower) Overall Size: 100mm x 150mm No 4 385 1,540.00

External Signage

8 Pool House Ref. A-302 No 2 8,250 16,500.00

9 Allow for Profit and attendance %

ADDITIONAL ITEMS

The tenderer is to detail below any additional items with quantities


and rates not previously included to complete the build up of the
lump sum tender price for this section of the works. Should the
tenderer fail to insert any items here, it will be deemed that his
lump sum price for the tender includes all items and no subsequent
claim for any additional item will be entertained.

PRELIMINARIES 1/131
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT

Carried Forward to Section Summary AED 48,400.00

SECTION NO. 2

BILL NO. 15

VARIATIONS & DAYWORKS

NOTE: For specifications see General Specification

NOTE: For additional explanations/ clarifications see


"Preambles/Rates and Measurement Clauses"

VARIATIONS

Provide the following for Variations to be expended at the sole


discretion of the Employer in terms of Clause 22.3 (Valuation of
Variation Orders) of the Conditions of Contract

1 Demolish and remove reinforced concrete not exceeding 1m3


m3 Rate Only

2 Demolish and remove reinforced concrete exceeding 1m3 m3 Rate Only

3 Scrabble surface of concrete to a depth of 30mm m2 Rate Only

4 Demolish and remove 100mm solid block wall m2 Rate Only

5 Demolish and remove 100mm solid block wall but including


patching and making good remaining blockwork
m2 Rate Only

PRELIMINARIES 1/132
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT


6 Demolish and remove 200mm solid block wall m2 Rate Only

7 Demolish and remove 200mm solid block wall including patching


and making good remaining blockwork
m2 Rate Only

8 Demolish and remove 300mm solid block wall m2 Rate Only

9 Demolish and remove 400mm solid block wall m2 Rate Only

10 Demolish and remove average 300mm cavity block wall m2 Rate Only

11 Demolish and remove average 400mm cavity block wall m2 Rate Only

1 Demolish and remove average 400mm cavity block wall including


patching and making good remaining blockwork
m2 Rate Only

2 Demolish and remove average 500mm cavity block wall m2 Rate Only

3 Demolish and remove average 600mm cavity block wall m2 Rate Only

4 70mm Chasing into plastered blockwork, only including patching


m Rate Only

5 Cut opening in existing 100mm block wall for a door size 900 x
2100mm high, including patching and making good blockwork
complete
No Rate Only

6 Cut opening in existing 200mm block wall for a door size 900 x
2100mm high, including patching and making good blockwork
complete
No Rate Only

7 Cut opening in existing 250mm block wall for a door size 900 x
2100mm high, including patching and making good blockwork
complete
No Rate Only

8 Cut opening in existing 300mm block wall for a door size 900 x
2100mm high, including patching and making good blockwork
complete
No Rate Only

9 Cut opening in existing 400mm block wall for a door size 900 x
2100mm high, including patching and making good blockwork
complete
No Rate Only

10 Remove torch-on waterproofing membrane to concrete m2 Rate Only

11 Removal of 75 x 75mm triangular fillet m Rate Only

Cut openings in pre-cast concrete elements:

12 Cut opening in existing 100mm pre-cast wall for a door size 900 x
2100mm high, including patching and making good complete
No Rate Only

PRELIMINARIES 1/133
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT

13 Cut opening in existing 200mm pre-cast wall or a door size 900 x


2100mm high, including patching and making good complete
No Rate Only

14 Cut opening in existing 250mm pre-cast wall for a door size 900 x
2100mm high, including patching and making good complete
No Rate Only

Stitch-core through reinforced concrete elements:

15 Opening size 200 x 300mm through 200mm thick element No Rate Only

16 Opening size 500 x 700mm through 200mm thick element No Rate Only

17 Opening size 250 x 500mm through 300mm thick element No Rate Only

1 Opening size 550 x 550mm through 300mm thick element No Rate Only

2 Opening size 600 x 600mm through 300mm thick element No Rate Only

3 Opening size 1200 x 1700mm through 400mm thick element No Rate Only

Steel reinforcement:

4 Mesh 245 m2 Rate Only

5 Mesh 393 m2 Rate Only

6 Extra over designed reinforcing already fixed into place for


additional steel added by the Supervision Consultant
kg Rate Only

1.5mm Thick galvanised mild steel door frame installed in blockwork


opening including all necessary ties, etc. complete

7 Door frame to suit door size 900 x 2050 x 150mm No Rate Only

8 Door frame to suit door size 1700 x 2050 x 150mm No Rate Only

2mm Thick galvanised mild steel door frame installed in blockwork


opening including all necessary ties, etc. complete

9 Door frame to suit door size 900 x 2050 x 150mm No Rate Only

10 Door frame to suit door size 1700 x 2050 x 150mm No Rate Only

Undercutting of doors

11 Extra over to undercut single solid leaf door No Rate Only

PRELIMINARIES 1/134
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT


12 Extra over to undercut double solid leaf door No Rate Only

WD01 Timber door frames including all necessary sub-frames, oil


finish, etc. installed complete

13 100 x 50mm Rebated door frame. m Rate Only

DAYWORKS

Provide the following for Dayworks to be expended at the sole


discretion of the Employer in terms of the Conditions of Contract

Labour

1 Unskilled Labourer Hrs Rate Only

2 Semi-skilled Labourer Hrs Rate Only

3 Carpenter Hrs Rate Only

4 Steel Fixer Hrs Rate Only

5 Mason Hrs Rate Only

6 Section Leader Hrs Rate Only

Plant (including operator, fuel,etc.)

7 Back-acting excavator Hrs Rate Only

8 TLB excavator Hrs Rate Only

9 CAT loader Hrs Rate Only

10 10m3 Tipper truck Hrs Rate Only

11 Plate compactor Hrs Rate Only

12 120 Compressor Hrs Rate Only

13 Breaker Hrs Rate Only

14 Jack Hammer Hrs Rate Only

15 25 Ton mobile crane Hrs Rate Only

16 JCB Loadall Hrs Rate Only

PRELIMINARIES 1/135
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT

MAIN CONTRACTOR's MARK-UP

17 Main Contractor's mark-up on material and labour in respect of new


rates
% Rate Only

18 Main Contractor's mark-up on Domestic Sub-Contractors % Rate Only

Carried Forward to Section Summary AED -

SECTION 2

BUILDER'S WORK

SECTION SUMMARY - BUILDERS' WORK

PRELIMINARIES 1/136
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT

1 SITE WORK 9,856.00

2 CONCRETE WORK 612,122.00

3 MASONRY 70,216.00

4 METALWORK 32,085.00

5 WOODWORK 46,410.00

6 THERMAL & MOISTURE PROTECTION 29,917.00

7 INTERNAL DOORS AND WINDOWS 38,540.00

8 EXTERNAL DOORS AND WINDOWS 145,179.00

9 SCREEDS AND PLASTER 87,650.00

10 PAINTING 30,712.00

11 TILING AND STONEWORK 167,879.00

12 SUSPENDED CEIILNGS 17,784.00

13 SUNDRY BUILDERS WORK 2,000.00

14 SIGNAGE 48,400.00

15 DAYWORKS -

SECTION NO. 3

BILL NO. 1

SANITARY FITTINGS AND BRASSWARE

NOTE: For specifications see General Specification

NOTE: For additional explanations/ clarifications see


"Preambles/Rates and Measurement Clauses"

SANITARYWARES

PRELIMINARIES 1/137
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT


Supply and install of sanitary ware fixtures as per drawing and
specification.

1 SW01 - Wash Basin No 8 950 7,600.00

2 SW02 - Wall Hung Water Closet No 6 2,020 12,120.00

3 SW03 - Urinal No 2 1,577 3,154.00

4 SW04 - Wash Basin Handicap Toilet No 2 721 1,442.00

5 SW05 - Water Closet Handicap Toilet No 2 1,392 2,784.00

6 SW06 - Grab Bar Folding Type No 2 875 1,750.00

7 SW07 - Grab Bar Fixed Type No 2 284 568.00

8 SW08 - Wash Basin Mixer No 8 1,157 9,256.00

9 SW09 - Shower Mixer No 4 629 2,516.00

10 SW10 - Ablution Spray / Shattaf No 6 135 810.00

11 SW11 - Toilet Roll Holder No 6 109 654.00

12 SW12 - Linear Shower Drain No 4 212 848.00

13 SW13 - Floor Drain/ Clean Out No 20 68 1,360.00

1 SW14 - Robe Hook Cum Door Stopper No 10 193 1,930.00

2 SW15 - Robe Hook No 2 129 258.00

3 SW16 - Soap Dispenser No 8 305 2,440.00

4 SW17 - Paper Dispenser No 6 210 1,260.00

5 SW18 - Hand Dryer No 6 3,468 20,808.00

6 SW19 - Baby Changing Stand No 2 1,896 3,792.00

7 SW20 - Towel Rail No 6 217 1,302.00

8 SW21 - Foldable Shower Seat No 4 745 2,980.00

9 SW22 - Shower Shelf No 4 259 1,036.00

10 SW23 - Waste Bin 3L No 6 149 894.00

11 SW24 - Waste Bin 6L No 4 254 1,016.00

12 SW25 - Sanitary Bin No 4 248 992.00

PRELIMINARIES 1/138
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT

13 SW26 - Baby Diaper Bin - Assumed* No 2 482 964.00

14 SW27 - Waste Bin- Large No 6 1,531 9,186.00

ADDITIONAL ITEMS

The tenderer is to detail below any additional items with quantities


and rates not previously included to complete the build up of the
lump sum tender price for this section of the works. Should the
tenderer fail to insert any items here, it will be deemed that his
lump sum price for the tender includes all items and no subsequent
claim for any additional item will be entertained.

PRELIMINARIES 1/139
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT

Carried Forward to Section Summary AED 187,440.00

SECTION NO. 3

BILL NO. 2

DISPOSAL INSTALLATION

NOTE: For specifications see General Specification

NOTE: For additional explanations/ clarifications see


"Preambles/Rates and Measurement Clauses"

Drainage Pipes

Pipes and fittings; including all necessary bedding, expansions,


bends, end caps, cleaning eyes, junctions, reducers, accessories,
connections, etc. all as specified and as shown on drawings

Note: The unit rates for pipes shell be deemed to include for pipes
fittings and connections

Drainage Pipes

1 32mm diameter m 14 33 462.00

2 40mm diameter m 12 40 480.00

3 82mm diameter m 153 51 7,803.00

PRELIMINARIES 1/140
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT

4 110mm diameter m 78 71 5,538.00

uPVC Class E Pipes

5 25mm diameter m 20 19 380.00

Pipe Insulation

Insulation for condensate pipes and fittings as specified

6 25mm diameter m 20 14 280.00

Valves and accessories as specified and as shown on drawings

Clean Outs

1 32mm diameter CO No 4 47 188.00

Floor Clean Outs

2 110mm diameter FCO No 4 235 940.00

Vent Cowls

3 82mm diameter VC No 10 57 570.00

Floor Drains

4 Floor drain No 22 208 4,576.00

5 Shower channel floor drain No 4 612 2,448.00

6 Roof water outlet No 8 330 2,640.00

Manholes with cover and including all civil works as shown on the
drawings and as per the specifications

7 MH-01; Manhole size: 600 x 600mm with cover 600 x 600mm No 2 800 1,600.00

8 FIC for sewerage network connection; Manhole size: 600 x 600mm


with cover 600 x 600mm
No 2 800 1,600.00

Gully traps with cover and including all civil work and connections as
specified and as shown on drawings

9 Gully trap; Size: 300 x 300mm with cover size: 300 x 300mm
(medium duty recessed type)
No 2 565 1,130.00

Connections

PRELIMINARIES 1/141
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT


10 Allowance for connections from FIC to the existing infrastructure
network
Item 268 268.00

Testing and Commissioning

11 Allow for all testing and commissioning in connection with drainage


installation
Item 428 428.00

ADDITIONAL ITEMS

The tenderer is to detail below any additional items with quantities


and rates not previously included to complete the build up of the
lump sum tender price for this section of the works. Should the
tenderer fail to insert any items here, it will be deemed that his
lump sum price for the tender includes all items and no subsequent
claim for any additional item will be entertained.

PRELIMINARIES 1/142
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT

Carried Forward to Section Summary AED 31,331.00

SECTION NO. 3

BILL NO. 3

WATER INSTALLATION

NOTE: For specifications see General Specification

NOTE: For additional explanations/ clarifications see


"Preambles/Rates and Measurement Clauses"

Water Supply Pipes

Pipe work including expansions, bends, junctions, reducers, tees,


accessories and connections, etc. all as specified and as shown on
drawings

Note: The unit rates for pipes shell be deemed to include for pipes
fittings and connections

PPR Pipes

1 20mm diameter m 27 32 864.00

2 25mm diameter m 38 39 1,482.00

3 32mm diameter m 23 48 1,104.00

4 40mm diameter m 66 64 4,224.00

5 50mm diameter m 47 70 3,290.00

PEX Pipes

6 15mm diameter m 50 19 950.00

7 20mm diameter m 65 20 1,300.00

Insulation and protective coating

PRELIMINARIES 1/143
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT


Thermal insulation to hot water pipes as per the specification and
shown on the drawings

1 20mm diameter m 27 27 729.00

2 25mm diameter m 38 28 1,064.00

3 32mm diameter m 23 30 690.00

4 40mm diameter m 66 37 2,442.00

5 50mm diameter m 47 43 2,021.00

Aluminium Cladding

Aluminium sheet covering for exposed domestic water supply pipes


and fittings as specified and shown on the drawings

6 Aluminium cladding Item 535 535.00

Plumbing Valves and Accessories

Isolation Valves

7 20mm diameter IV No 2 85 170.00

8 40mm diameter IV No 10 108 1,080.00

9 50mm diameter IV No 20 169 3,380.00

Float Valves

10 50mm diameter FV No 2 424 848.00

Thermostatic Mixing Valves

11 40mm diameter TMV No 2 151 302.00

Non Return Valves

12 50mm diameter NRV No 4 182 728.00

Safety Valves

1 Safety valve No 2 214 428.00

Strainers

2 50mm diameter ST No 8 161 1,288.00

Flexible Pipe Connectors

PRELIMINARIES 1/144
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT

3 50mm diameter FC No 8 150 1,200.00

Pressure Gauges

4 Ref. PG No 8 86 688.00

Bib Taps

5 Hose bib tap No 2 61 122.00

Drain Valves

6 Drain valve No 2 66 132.00

7 Temp relief drain valve No 2 141 282.00

Water Hammer Arresters

8 Water hammer arrester No 4 61 244.00

Water Meters

Water meter including connecting tail pieces as specified and shown


on the drawings

9 DEWA water meter cabinet (including installation of the water


meter and valves) (Intelligent water meter provided by DEWA)
No 2 377 754.00

Water pumps including control panel, vessel, connections, anti


vibration mounts, accessories, etc. as specified and as shown on
drawings (valves separately measured)

Domestic Water Booster Pumps

1 DWBP-01 (1D+1S) with VFD; Capacity: 0.95 l/s No 4 3,424 13,696.00

2 Pressure switch and sensor No 2 330 660.00

Thermosyphon Systems

3 Solar water heater with built in storage water tank (Thermosyphon


system); Capacity: 300 L
No 2 4,985 9,970.00

GRP Water Tanks

Supply, delivery, installation and leaving in complete working order


GRP water tanks including ladders, level indicators, drains, air vents,
electrode controls, access manhole, equalizing pipes, all fittings and
accessories as specified and indicated on the drawings

PRELIMINARIES 1/145
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT

4 GRP insulated water tank Size: 1500 x 1500 x 1500; Capacity: 2.25

No 2 25,050 50,100.00

Connections

5 Allowance for connections to the existing infrastructure network


Item 424 424.00

Testing and Commissioning

6 Allow for all testing and commissioning in connection with water


services
Item 2 612 1,224.00

ADDITIONAL ITEMS

The tenderer is to detail below any additional items with quantities


and rates not previously included to complete the build up of the
lump sum tender price for this section of the works. Should the
tenderer fail to insert any items here, it will be deemed that his
lump sum price for the tender includes all items and no subsequent
claim for any additional item will be entertained.

Carried Forward to Section Summary AED 108,415.00

SECTION NO. 3

BILL NO. 4

HVAC INSTALLATION

PRELIMINARIES 1/146
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT


NOTE: For specifications see General Specification

NOTE: For additional explanations/ clarifications see


"Preambles/Rates and Measurement Clauses"

Refrigerant PIpes

Supply and installation of refrigerant water distribution pipework


including all fittings, expansion connection, hangers, supports;
complete all in accordance with the drawings and specifications

1 Refrigerant pipe m 115 24 2,760.00

Pipes Insulation

Closed cell rubber foam with a minimum thickness of 19 mm for


supply and return refrigerant pipes and fittings as specified

2 Insulation to refrigerant pipes m 115 10 1,150.00

Aluminium cladding for exposed refrigerant piping as specified

3 Aluminium cladding for refrigerant pipes m 30 20 600.00

Thermostats

Final sub-circuit and auxiliary installation, cable and conduit in


concealed installation including back box, etc. to the following as
specified and as shown on drawings

4 Thermostat No 4 80 320.00

Supply and installation of thermostats and thermometers; complete


all in accordance with the drawings and specifications

1 Thermostat No 4 80 320.00

Duct Work

Galvanized steel ductwork, with all necessary fittings, joints, fixings


and accessories, vanes, hangers and supports as specified and as
shown on drawings

2 GI duct m2 93 126 11,718.00

Ducts Insulation and Cladding

PRELIMINARIES 1/147
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT


Fiber glass insulation to ducts and fittings complete with all
accessories as specified

3 Fiber glass insulation m2 93 61 5,673.00

Acoustic insulation for supply duct work and fittings as specified

4 Acoustic insulation m2 26 51 1,326.00

Aluminium cladding for ductwork and fittings in non air-conditioned


spaces and plant rooms as specified

5 Aluminium cladding Item 482 482.00

Flexible ducts

6 150mm flexible duct No 22 20 440.00

7 200mm flexible duct No 4 24 96.00

8 250mm flexible duct No 4 27 108.00

Ducts Accessories

Volume Control Dampers

9 100 x 100mm VCD No 14 90 1,260.00

10 200 x 100mm VCD No 4 90 360.00

1 250 x 150mm VCD No 4 90 360.00

2 300 x 150mm VCD No 8 90 720.00

Non Return Dampers

3 200 x 100mm NRD No 4 235 940.00

4 200 x 150mm NRD No 2 235 470.00

5 250 x 150mm NRD No 2 235 470.00

Make Up Units

Makeup unit complete with all fittings and accessories; all in


accordance with the drawings and specifications

6 MAU-01; Air flow: 185 L/S No 2 10,358 20,716.00

VRF Condensing Units

PRELIMINARIES 1/148
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT


7 ODU-01; Capacity: 9.5 KW (serving MAU-01) No 2 10,778 21,556.00

Fan Coil Units

Fan Coil Units

8 FCU-01; Air flow: 213 L/S No 2 2,429 4,858.00

9 FCU-02; Air flow: 326 L/S No 2 2,429 4,858.00

Condensing Units

10 CU-01, 02 No 4 2,589 10,356.00

Air Curtains

11 ACU-01 No 2 5,392 10,784.00

Fans

Supply and installation of fans including control panel, controls, anti


vibration isolator, all connections and accessories, complete all in
accordance with the drawings and specifications

1 EF-01; 50 L/S No 2 612 1,224.00

2 EF-02; 175 L/S No 2 1,177 2,354.00

Air Outlets

Supply and Return Ceiling Diffusers

3 SCD; Size: 300 x 300mm No 8 127 1,016.00

4 RCD; Size: 300 x 300mm No 8 104 832.00

Supply and Return Linear Slot Diffusers

5 SLD 20mm x 2 slot length: 2m with supply air plenum size: 1100 x
200 x 250mm
No 4 113 452.00

6 RLD 20mm x 2 slot length: 2m No 4 94 376.00

DV Exhaust Air Round Diffuser

7 EDV 150mm diameter No 14 80 1,120.00

Sandtrap Louvers

8 Fresh air louver with sand trap and bird screen No 2 321 642.00

PRELIMINARIES 1/149
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT


Exhaust Air Louvers

9 200 x 200mm exhaust air louver with wire mesh screen No 2 238 476.00

10 500 x 200mm exhaust air louver with wire mesh screen No 2 245 490.00

Testing and Commissioning

11 Allow for all testing and commissioning in connection with HVAC


installations
Item 2 1,260 2,520.00

ADDITIONAL ITEMS

The tenderer is to detail below any additional items with quantities


and rates not previously included to complete the build up of the
lump sum tender price for this section of the works. Should the
tenderer fail to insert any items here, it will be deemed that his
lump sum price for the tender includes all items and no subsequent
claim for any additional item will be entertained.

PRELIMINARIES 1/150
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT

Carried Forward to Section Summary AED 228,406.00

SECTION NO. 3

BILL NO. 5

ELECTRICAL INSTALLATION

NOTE: For specifications see General Specification

NOTE: For additional explanations/ clarifications see


"Preambles/Rates and Measurement Clauses"

Meter Cabinets

1 Meter cabinet as per DEWA standards (KHW meter with associated


CT's by DEWA) including surge protection device
No 2 4,237 8,474.00

Distribution Boards

Distribution Boards

2 DB-PH No 2 6,120 12,240.00

Cables

Supply and fix cables including conduits and necessary fixtures as


specified

PRELIMINARIES 1/151
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT


3 Allowance for cable from MDB/Feeder pillar to DB (4Cx25mm²
XLPE/SWA/PVC + 1Cx16mm² XLPE/SWA/PVC)
m 40 134 5,360.00

Cable Containment

uPVC Ducts

4 uPVC duct m 63 96 6,048.00

5 Spare uPVC duct for XLPE cables m 63 96 6,048.00

Electrical Manholes

6 Manhole No 2 910 1,820.00

Puddle Flanges

1 Sleeve with puddle flange No 4 696 2,784.00

Junction Boxes

2 Junction box No 2 187 374.00

Isolators

Isolators including sub-circuit wiring, containment and terminations


all as specified and as shown on drawings

3 Single phase isolator No 10 803 8,030.00

4 Three phase isolator No 4 995 3,980.00

Power Outlets

Final sub-circuit and auxiliary installation, cable and conduit in


concealed installation including back box, etc. to the following as
specified and as shown on drawings

5 13A single switched socket outlet No 4 241 964.00

6 13A single switched socket outlet W/P No 8 251 2,008.00

7 13A twin switched socket outlet No 8 241 1,928.00

8 Switched fused spur outlet with neon indicator No 4 353 1,412.00

9 Un-switched fused spur outlet with neon indicator No 10 353 3,530.00

10 Flex outlet with power indicator No 6 353 2,118.00

Supply and fix the following accessories as specified and as shown


on drawings

PRELIMINARIES 1/152
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT

11 13A single switched socket outlet No 4 54 216.00

12 13A single switched socket outlet W/P No 8 123 984.00

13 13A twin switched socket outlet No 8 80 640.00

14 Switched fused spur outlet with neon indicator No 4 134 536.00

1 Un-switched fused spur outlet with neon indicator No 10 102 1,020.00

2 Flex outlet with power indicator No 6 92 552.00

Lighting Switches

Final sub-circuit and auxiliary installation; cable and conduit in


concealed installation including back box, etc. to the following as
specified and shown on drawings

3 1 gang 1 way switch No 10 92 920.00

4 1 gang 1 way switch W/P No 2 92 184.00

5 1 gang 2 way switch W/P No 2 92 184.00

6 3 gang 1 way switch No 4 92 368.00

7 Occupancy sensor No 18 187 3,366.00

Supply and fix the following accessories as specified and as shown


on drawings

8 1 gang 1 way switch No 10 48 480.00

9 1 gang 1 way switch W/P No 2 102 204.00

10 1 gang 2 way switch W/P No 2 112 224.00

11 3 gang 1 way switch No 4 80 320.00

12 Occupancy sensor No 18 305 5,490.00

Final sub-circuit and auxiliary installation; all necessary wires,


conduits, junction boxes for the following light fittings as specified
and as shown on drawings

13 LT-01; Mirror light above wash basin No 10 246 2,460.00

14 LT-02; General spot light No 40 246 9,840.00

15 LT-03; Surface mounted ceiling light No 28 246 6,888.00

PRELIMINARIES 1/153
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT


16 LT-04; External floor recess light No 30 246 7,380.00

1 LT-05; Roof light No 8 246 1,968.00

2 LT-06; Equipment room light No 6 246 1,476.00

Supply and delivery of light fittings as specified and as shown on


drawings

3 LT-01; Mirror light above wash basin No 10 97 970.00

4 LT-02; General spot light No 40 113 4,520.00

5 LT-03; Surface mounted ceiling light No 28 211 5,908.00

6 LT-04; External floor recess light No 30 192 5,760.00

7 LT-05; Roof light No 8 286 2,288.00

8 LT-06; Equipment room light No 6 160 960.00

Take delivery, store, assemble and install the following light fittings
as specified and as shown on drawings

9 LT-01; Mirror light above wash basin No 10 102 1,020.00

10 LT-02; General spot light No 40 102 4,080.00

11 LT-03; Surface mounted ceiling light No 28 102 2,856.00

12 LT-04; External floor recess light No 30 113 3,390.00

13 LT-05; Roof light No 8 102 816.00

14 LT-06; Equipment room light No 6 102 612.00

Testing and Commissioning

15 Allow for all testing and commissioning in connection with electrical


installation
Item 5,350 5,350.00

PRELIMINARIES 1/154
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT

ADDITIONAL ITEMS

The tenderer is to detail below any additional items with quantities


and rates not previously included to complete the build up of the
lump sum tender price for this section of the works. Should the
tenderer fail to insert any items here, it will be deemed that his
lump sum price for the tender includes all items and no subsequent
claim for any additional item will be entertained.

Additional Electrical Works related to Swimming Pool Equipment


* Electrical Power Connection
Item 22,677 22,677.00

Carried Forward to Section Summary AED 325,189.00

SECTION NO. 3

PRELIMINARIES 1/155
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT

BILL NO. 6

FIRE PROTECTION INSTALLATION

NOTE: For specifications see General Specification

NOTE: For additional explanations/ clarifications see


"Preambles/Rates and Measurement Clauses"

FIRE PROTECTION

Fire Hose Cabinets and Fire Extinguishers

Portable Fire Extinguishers

1 Dry chemical powder fire extinguisher (6.0 kg) No 2 235 470.00

2 Fire cabinet (1.2mm thick stainless steel brush finish) with 5kg CO2
fire extinguisher and 6kg DCP fire extinguisher
No 2 539 1,078.00

EARTHING

Earthing

3 Earthing for KWH meter cabinet Item 2,140 2,140.00

4 EP-01 No 2 3,050 6,100.00

5 EP-02 No 2 3,050 6,100.00

ADDITIONAL ITEMS

PRELIMINARIES 1/156
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT


The tenderer is to detail below any additional items with quantities
and rates not previously included to complete the build up of the
lump sum tender price for this section of the works. Should the
tenderer fail to insert any items here, it will be deemed that his
lump sum price for the tender includes all items and no subsequent
claim for any additional item will be entertained.

Carried Forward to Section Summary AED 31,776.00

SECTION NO. 3

BILL NO. 7

COMMUNICATION, SECURITY & CONTROL SYSTEMS

NOTE: For specifications see General Specification

PRELIMINARIES 1/157
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT


NOTE: For additional explanations/ clarifications see
"Preambles/Rates and Measurement Clauses"

FIRE DETECTION AND EVACUATION

Fire Alarm Equipment

1 FACP No 2 3,296 6,592.00

2 Hassantuk 24/7 panel No 2 1,412 2,824.00

Fire Alarm Devices

Wiring to fire alarm points including conduits, connections,


termination, fittings etc. as specified and as shown on drawings

3 Addressable smoke detector with build in sounder base and isolator


base
No 4 330 1,320.00

4 Addressable heat detector with build in sounder base and isolator


base
No 6 377 2,262.00

5 Addressable multi sensor with build in isolator base No 2 377 754.00

6 Addressable dual action manual pull station No 4 424 1,696.00

7 Addressable open area sounder beacon loop powered No 2 424 848.00

8 Addressable open area sounder beacon loop powered W/P No 2 424 848.00

9 Isolator module No 2 235 470.00

1 Addressable monitoring module No 2 330 660.00

Fire alarm accessories including fixing, fittings termination and


supports as specified and as shown on drawings

2 Addressable smoke detector with build in sounder base and isolator


base
No 4 94 376.00

3 Addressable heat detector with build in sounder base and isolator


base
No 6 94 564.00

4 Addressable multi sensor with build in isolator base No 2 94 188.00

5 Addressable dual action manual pull station No 4 94 376.00

6 Addressable open area sounder beacon loop powered No 2 94 188.00

7 Addressable open area sounder beacon loop powered W/P No 2 94 188.00

PRELIMINARIES 1/158
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT


8 Isolator module No 2 94 188.00

9 Addressable monitoring module No 2 94 188.00

Testing and Commissioning

10 Allow for all testing and commissioning in connection with fire alarm
and voice evacuation installation
Item 4,708 4,708.00

EMERGENCY LIGHTING INSTALLATION

Emergency Lighting Equipment

1 Addressable emergency lighting central monitoring panel No 2 4,708 9,416.00

Emergency Lights

Cable and conduit installation to the following as specified and as


shown on drawings

2 8W recessed mounted emergency light self contained with 3h


battery back up
No 10 424 4,240.00

3 8W wall mounted type exit light self contained with 3h battery back
up
No 4 424 1,696.00

PRELIMINARIES 1/159
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT


4 8W wall/hanging type directional exit light self contained with 3h
battery back up
No 4 424 1,696.00

Supply, deliver, store, assemble and install emergency light fittings


as specified and as shown on drawings

5 8W recessed mounted emergency light self contained with 3h


battery back up
No 10 141 1,410.00

6 8W wall mounted type exit light self contained with 3h battery back
up
No 4 141 564.00

7 8W wall/hanging type directional exit light self contained with 3h


battery back up
No 4 141 564.00

Testing and Commissioning

8 Allow for all testing and commissioning in connection with


emergency lighting installation
Item 2 1,412 2,824.00

Disabled system all in accordance with the drawings and


specification

1 PSU - Power supply unit No 2 2,354 4,708.00

Final sub-circuit and auxiliary installation; cable and conduit in


concealed installation including back box, etc. to the following as
specified and as shown on drawings

2 Four zone call controller No 2 330 660.00

3 Ceiling pull unit No 2 330 660.00

4 Button reset/Emergency call point No 2 330 660.00

5 Over door light and sounder No 2 330 660.00

Supply and fix the following accessories including final termination


as specified and as shown on drawings

6 Four zone call controller No 2 141 282.00

7 Ceiling pull unit No 2 141 282.00

8 Button reset/Emergency call point No 2 141 282.00

9 Over door light and sounder No 2 141 282.00

DDC Panel

DDC Panel as per the specification and as shown on the drawings

PRELIMINARIES 1/160
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT

1 Stand alone DDC panel No 2 3,210 6,420.00

ADDITIONAL ITEMS

The tenderer is to detail below any additional items with quantities


and rates not previously included to complete the build up of the
lump sum tender price for this section of the works. Should the
tenderer fail to insert any items here, it will be deemed that his
lump sum price for the tender includes all items and no subsequent
claim for any additional item will be entertained.

PRELIMINARIES 1/161
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT

Carried Forward to Section Summary AED 88,346.00

SECTION 3

SERVICES

SECTION SUMMARY - SERVICES

1 SANITARY FITTINGS AND BRASSWARE 187,440.00

2 DISPOSAL INSTALLATION 31,331.00

3 WATER INSTALLATION 108,415.00

4 HVAC INSTALLATION 228,406.00

5 ELECTRICAL INSTALLATION 325,189.00

6 FIRE PROTECTION INSTALLATION 31,776.00

7 COMMUNICATION, SECURITY & CONTROL SYSTEMS 88,346.00

AMOUNT
ITEM ITEM DESCRIPTION UNIT QUANTITY RATE
UAE Dhs.
BILL NO. 4 - HARD LANDSCAPING (CONT'D)

PRELIMINARIES 1/162
. D0290
VILLANOVE PA 15 LA VIALETTA PHASE 1 & 2 - POOLHOUSE
NORTH DUBAILAND PROJECTS LLC
BILLS OF QUANTITIES

ITEM NO DESCRIPTION UNIT QUANTITY RATE AMOUNT

Fences and Boundary Walls

Boundary wall I Fence Type 1 (F1 }, Swimming Pool complex


A boundary wall, including gates, foundation, concrete pilasters, RC m 301 749.00 225,449.00
upstand, extruded aluminium post, vertical & intermediate
elements, top rail, straight pattern fence, colour and finish to match
townhouse boundary wall railing and all other items to complete as
per the Drawing, Material Schedule and Specification.

Fence Type 2 (F2), galvanized chain link fence for Play court,
including chainlink fence, gate,
B intermediate posts, foundation, colour to match townhouse m 20
boundary wall railing and all other items to complete as per the
Drawing, Material Schedule and Specification

Fence Type 3 (F3), fence for dog park, including powder coated
galvanized metal welded wire mesh, gate, intermediate posts, N/A
C foundation, colour to match townhouse boundary wall railing and m 65 As per Tender
all other items Documents
to complete as per the Drawing, Material Schedule and
Specification.

D Fence Type 4 (F4}, decorative fence along project boundary, m 711


including aluminium post & frame, cast aluminium arrow,
foundation, solid block work, finishes and all other items to
complete as per the Drawing, Material Schedule and Specification.

Fence Type 5 (FS), aluminium louver fence including aluminium


E vertical & intermediate elements, doors, post, foundation, colour m 44 1,018.00 44,792.00
and finish to match town house boundary wall railing and all other
items to complete as per the Drawing, Material Schedule and
Specification.

PRELIMINARIES 1/163
Activity Name

External Plaster for Facades - Soffits


Activity ID Sub Activity Unit Quantity

PH01-CO-P-FAC-FN-220 M2 300.0
Productivity Rate Total Man Original Manpower/
Days Total Man Crew Desc.
(Unit/Day) Days Duration Day
1 Mason
14.0 21.43 2.00 42.86 8 5.36
1 Helper
MAN-DAYS

2.7 2.7
MAN-Hours

0.000 0.000 0.000


MAN-Hours

0.000 171.429 171.429 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000
Activity
Activity Name Sub Activity
ID

MEP Drainage and EARTHLING Works under Raft of Part 1 CW5.4-CN-STR-RT-101

MEP Drainage and EARTHLING Works under Raft of Part 2 CW5.4-CN-STR-RT-106

MEP Drainage and EARTHLING Works under Raft of Part 3 CW5.4-CN-STR-RT-110


MEP Drainage and EARTHLING Works under Raft of Part 4 CW5.4-CN-STR-RT-116

Scaffolding Installation of RW of Part 1 CW5.4-CN-STR-RW-100

Surface Preparation of RW of Part 1 CW5.4-CN-STR-RW-101

Gunite Works of RW of Part 1 CW5.4-CN-STR-RW-104

Scaffolding Removal of RW of Part 1 CW5.4-CN-STR-RW-107


Scaffolding Installation of RW of Part 2 CW5.4-CN-STR-RW-102

Surface Preparation of RW of Part 2 CW5.4-CN-STR-RW-105


Gunite Works of RW of Part 2 CW5.4-CN-STR-RW-108

Scaffolding Removal of RW of Part 2 CW5.4-CN-STR-RW-112

Rebars
Scaffolding Installation of RW of Part 3 CW5.4-C

Casting

Surface Preparation of RW of Part 3 CW5.4-C

Gunite Works of RW of Part 3 CW5.4-CN-STR-RW-113

Scaffolding Removal of RW of Part 3 CW5.4-CN-STR-RW-119


Scaffolding Installation of RW of Part 4 CW5.4-CN-STR-RW-106
Surface Preparation of RW of Part 4 CW5.4-CN-STR-RW-114
Gunite Works of RW of Part 4 CW5.4-CN-STR-RW-120
Scaffolding Removal of RW of Part 4 CW5.4-CN-STR-RW-124
Concrete Casting for Columns and Core Walls of Basement Part 1 CW5.4-CN-STR-B1-107
Concrete Casting for Columns and Core Walls of Basement Part 2 CW5.4-CN-STR-B1-111
Concrete Casting for Columns and Core Walls of Basement Part 3 CW5.4-CN-STR-B1-123
Concrete Casting for Columns and Core Walls of Basement Part 4 CW5.4-CN-STR-B1-128
Concrete Casting - Ground Slab - Ground Slab Part 1 CW5.4-CN-STR-GF-205
Concrete Casting - - Ground Slab Part 2 CW5.4-CN-STR-GF-207
Formwork of Columns and Walls - Ground Floor Part 1 CW5.4-CN-STR-GF-210
Concrete Casting of Columns and Walls of - Ground Floor Part 1 CW5.4-CN-STR-GF-213
Concrete Casting - Ground Slab Part 3 CW5.4-CN-STR-GF-216
Concrete Casting of Ground Slab - Ground Slab Part 4 CW5.4-CN-STR-GF-218
Formwork of Columns and Walls - Ground Floor Part 2 CW5.4-CN-STR-GF-220
Concrete Casting of Columns and Walls of - Ground Floor Part 2 CW5.4-CN-STR-GF-221
Formwork of Stairs - 1st Floor Part 1 CW5.4-CN-STR-01-100
Concrete Casting of Stairs - 1st Floor Part 1 CW5.4-CN-STR-01-204
Concrete Casting of Slab - 1st Floor Part 1 CW5.4-CN-STR-01-205
Formwork of Columns and Walls - 1st Floor Part 1 CW5.4-CN-STR-01-209
Concrete Casting of Columns and Walls - 1st Floor Part 1 CW5.4-CN-STR-01-210
Formwork of Stairs - 1st Floor Part 2 CW5.4-CN-STR-01-208
Concrete Casting of Stairs - 1st Floor Part 2 CW5.4-CN-STR-01-213
Concrete Casting of Slab - 1st Floor Part 2 CW5.4-CN-STR-01-214
Formwork of Columns and Walls - 1st Floor Part 2 CW5.4-CN-STR-01-216
Concrete Casting of Columns and Walls - 1st Floor Part 2 CW5.4-CN-STR-01-217
Formwork of Stairs - 2nd Floor Part 1 CW5.4-CN-STR-02-100
Concrete Casting of Stairs - 2nd Floor Part 1 CW5.4-CN-STR-02-204
Concrete Casting of Slab - 2nd Floor Part 1 CW5.4-CN-STR-02-205
Formwork of Columns and Walls 2nd Floor Part 1 CW5.4-CN-STR-02-209
Concrete Casting of Columns and Walls - 2nd Floor Part 1 CW5.4-CN-STR-02-211
Formwork of Stairs - 2nd Floor Part 2 CW5.4-CN-STR-02-207
Concrete Casting of Stairs - 2nd Floor Part 2 CW5.4-CN-STR-02-213
Concrete Casting of Slab - 2nd Floor Part 2 CW5.4-CN-STR-02-214
Formwork of Columns and Walls - 2nd Floor Part 2 CW5.4-CN-STR-02-216
Concrete Casting of Columns and Walls - 2nd Floor Part 2 CW5.4-CN-STR-02-217
Formwork of Stairs - 3rd Floor Part 1 CW5.4-CN-STR-03-309
Concrete Casting of Stairs - 3rd Floor Part 1 CW5.4-CN-STR-03-313
Concrete Casting of Slab - 3rd Floor Part 1 CW5.4-CN-STR-03-315
Formwork of Columns and Walls - 3rd Floor Part 1 CW5.4-CN-STR-03-311
Concrete Casting of Columns and Walls - 3rd Floor Part 1 CW5.4-CN-STR-03-317
Formwork of Stairs - 3rd Floor Part 2 CW5.4-CN-STR-03-308
Concrete Casting of Stairs - 3rd Floor Part 2 CW5.4-CN-STR-03-312
Concrete Casting of Slab - 3rd Floor Part 2 CW5.4-CN-STR-03-314
Formwork of Columns and Walls - 3rd Floor Part 2 CW5.4-CN-STR-03-310
Concrete Casting of Columns and Walls - 3rd Floor Part 2 CW5.4-CN-STR-03-316
Formwork of Stairs - 4th Floor Part 1 CW5.4-CN-STR-04-301
Concrete Casting of Stairs - 4th Floor Part 1 CW5.4-CN-STR-04-304
Concrete Casting of Slab - 4th Floor Part 1 CW5.4-CN-STR-04-305
Formwork of Columns and Walls - 4th Floor Part 1 CW5.4-CN-STR-04-310
Concrete Casting of Columns and Walls - 4th Floor Part 1 CW5.4-CN-STR-04-312
Formwork of Stairs - 4th Floor Part 2 CW5.4-CN-STR-04-307
Concrete Casting of Stairs - 4th Floor Part 2 CW5.4-CN-STR-04-313
Concrete Casting of Slab - 4th Floor Part 2 CW5.4-CN-STR-04-314
Formwork of Columns and Walls - 4th Floor Part 2 CW5.4-CN-STR-04-316
Concrete Casting of Columns and Walls - 4th Floor Part 2 CW5.4-CN-STR-04-317
Formwork of Stairs - 5th Floor Part 1 CW5.4-CN-STR-05-301
Concrete Casting of Stairs - 5th Floor Part 1 CW5.4-CN-STR-05-304
Concrete Casting of Slab - 5th Floor Part 1 CW5.4-CN-STR-05-305
Formwork of Columns and Walls - 5th Floor Part 1 CW5.4-CN-STR-05-310
Concrete Casting of Columns and Walls - 5th Floor Part 1 CW5.4-CN-STR-05-312
Formwork of Stairs - 5th Floor Part 2 CW5.4-CN-STR-05-307
Concrete Casting of Stairs - 5th Floor Part 2 CW5.4-CN-STR-05-313
Concrete Casting of Slab - 5th Floor Part 2 CW5.4-CN-STR-05-314
Formwork of Columns and Walls - 5th Floor Part 2 CW5.4-CN-STR-05-316
Concrete Casting of Columns and Walls - 5th Floor Part 2 CW5.4-CN-STR-05-317
Formwork of Stairs - 6th Floor Part 1 CW5.4-CN-STR-06-301
Concrete Casting of Stairs - 6th Floor Part 1 CW5.4-CN-STR-06-304
Concrete Casting of Slab - 6th Floor Part 1 CW5.4-CN-STR-06-305
Formwork of Columns and Walls - 6th Floor Part 1 CW5.4-CN-STR-06-310
Concrete Casting of Columns and Walls - 6th Floor Part 1 CW5.4-CN-STR-06-312
Formwork of Stairs - 6th Floor Part 2 CW5.4-CN-STR-06-307
Concrete Casting of Stairs - 6th Floor Part 2 CW5.4-CN-STR-06-313
Concrete Casting of Slab - 6th Floor Part 2 CW5.4-CN-STR-06-314
Formwork of Columns and Walls - 6th Floor Part 2 CW5.4-CN-STR-06-316
Concrete Casting of Columns and Walls - 6th Floor Part 2 CW5.4-CN-STR-06-317
Formwork of Stairs - 7th Floor Part 1 CW5.4-CN-STR-07-300
Concrete Casting of Stairs - 7th Floor Part 1 CW5.4-CN-STR-07-306
Concrete Casting of Slab - 7th Floor Part 1 CW5.4-CN-STR-07-307
Formwork of Columns and Walls - 7th Floor Part 1 CW5.4-CN-STR-07-311
Concrete Casting of Columns and Walls - 7th Floor Part 1 CW5.4-CN-STR-07-314
Formwork of Stairs - 7th Floor Part 2 CW5.4-CN-STR-07-305
Concrete Casting of Stairs - 7th Floor Part 2 CW5.4-CN-STR-07-312
Concrete Casting of Slab - 7th Floor Part 2 CW5.4-CN-STR-07-313
Formwork of Columns and Walls - 7th Floor Part 2 CW5.4-CN-STR-07-316
Concrete Casting of Columns and Walls - 7th Floor Part 2 CW5.4-CN-STR-07-317
Formwork of Stairs - 8th Floor Attic Slab Part 1 CW5.4-CN-STR-08-301
Concrete Casting of Stairs - 8th Floor Attic Slab Part 1 CW5.4-CN-STR-08-306
Concrete Casting of Slab - 8th Floor Attic Slab Part 1 CW5.4-CN-STR-08-307
Formwork of Columns and Walls - 8th Floor Attic Slab Part 1 CW5.4-CN-STR-08-311
Concrete Casting of Columns and Walls - 8th Floor Attic Slab Part 1 CW5.4-CN-STR-08-314
Formwork of Stairs - 8th Floor Attic Slab Part 2 CW5.4-CN-STR-08-305
Concrete Casting of Stairs - 8th Floor Attic Slab Part 2 CW5.4-CN-STR-08-312
Concrete Casting of Slab - 8th Floor Attic Slab Part 2 CW5.4-CN-STR-08-313
Formwork of Columns and Walls - 8th Floor Attic Slab Part 2 CW5.4-CN-STR-08-317
Concrete Casting of Columns and Walls - 8th Floor Attic Slab Part 2 CW5.4-CN-STR-08-318
Concrete Casting of Slab - 8th Floor Slab Part 1 CW5.4-CN-STR-08-321
Formwork of Columns and Walls - 8th Floor Part 1 CW5.4-CN-STR-08-323
Concrete Casting of Columns and Walls - 8th Floor Part 1 CW5.4-CN-STR-08-325
Concrete Casting of Slab - 8th Floor Slab Part 2 CW5.4-CN-STR-08-326
Formwork of Columns and Walls - 8th Floor Part 2 CW5.4-CN-STR-08-328
Concrete Casting of Columns and Walls - 8th Floor Part 2 CW5.4-CN-STR-08-329
Formwork of Stairs - 9th Floor Part 1 CW5.4-CN-STR-09-301
Concrete Casting of Stairs - 9th Floor Part 1 CW5.4-CN-STR-09-306
Concrete Casting of Slab - 9th Floor Part 1 CW5.4-CN-STR-09-307
Formwork of Columns and Walls - 9th Floor Part 1 CW5.4-CN-STR-09-313
Concrete Casting of Columns and Walls - 9th Floor Part 1 CW5.4-CN-STR-09-314
Formwork of Stairs - 9th Floor Part 2 CW5.4-CN-STR-09-305
Concrete Casting of Stairs - 9th Floor Part 2 CW5.4-CN-STR-09-311
Concrete Casting of Slab - 9th Floor Part 2 CW5.4-CN-STR-09-312
Formwork of Columns and Walls - 9th Floor Part 2 CW5.4-CN-STR-09-316
Concrete Casting of Columns and Walls - 9th Floor Part 2 CW5.4-CN-STR-09-317
Formwork of Stairs - 10th Floor Part 1 CW5.4-CN-STR-10-301
Concrete Casting of Stairs - 10th Floor Part 1 CW5.4-CN-STR-10-306
Concrete Casting of Slab - 10th Floor Part 1 CW5.4-CN-STR-10-307
Formwork of Columns and Walls - 10th Floor Part 1 CW5.4-CN-STR-10-313
Concrete Casting of Columns and Walls - 10th Floor Part 1 CW5.4-CN-STR-10-314
Formwork of Stairs - 10th Floor Part 2 CW5.4-CN-STR-10-304
Concrete Casting of Stairs - 10th Floor Part 2 CW5.4-CN-STR-10-311
Concrete Casting of Slab - 10th Floor Part 2 CW5.4-CN-STR-10-312
Formwork of Columns and Walls - 10th Floor Part 2 CW5.4-CN-STR-10-316
Concrete Casting of Columns and Walls of - 10th Floor Part 2 CW5.4-CN-STR-10-317
Formwork of Stairs - 11th Floor Attic Slab Part 1 CW5.4-CN-STR-11-301
Concrete Casting of Stairs - 11th Floor Attic Slab Part 1 CW5.4-CN-STR-11-306
Concrete Casting of Slab - 11th Floor Attic Slab Part 1 CW5.4-CN-STR-11-307
Formwork of Columns and Walls - 11th Floor Attic Slab Part 1 CW5.4-CN-STR-11-313
Concrete Casting of Columns and Walls - 11th Floor Attic Slab Part 1 CW5.4-CN-STR-11-315
Formwork of Stairs - 11th Floor Attic Slab Part 2 CW5.4-CN-STR-11-304
Concrete Casting of Stairs - 11th Floor Attic Slab Part 2 CW5.4-CN-STR-11-310
Concrete Casting of Slab - 11th Floor Attic Slab Part 2 CW5.4-CN-STR-11-311
Formwork of Columns and Walls - 11th Floor Attic Slab Part 2 CW5.4-CN-STR-11-316
Concrete Casting of Columns and Walls - 11th Floor Attic Slab Part 2 CW5.4-CN-STR-11-317
Concrete Casting of Slab - 11th Floor Slab Part 1 CW5.4-CN-STR-11-322
Formwork of Columns and Walls - 11th Floor Part 1 CW5.4-CN-STR-11-326
Concrete Casting of Columns and Walls - 11th Floor Part 1 CW5.4-CN-STR-11-328
Concrete Casting of Slab - 11th Floor Slab Part 1 CW5.4-CN-STR-11-323
Formwork of Columns and Walls - 11th Floor Part 2 CW5.4-CN-STR-11-327
Concrete Casting of Columns and Walls - 11th Floor Part 2 CW5.4-CN-STR-11-329
Formwork of Stairs - Roof Floor Part 1 CW5.4-CN-STR-RF-301
Concrete Casting of Stairs - Roof Floor Part 1 CW5.4-CN-STR-RF-310
Concrete Casting of Slab - Roof Floor Part 1 CW5.4-CN-STR-RF-311
Parapet Wall - Formwork CW5.4-CN-STR-RF-314
Parapet Wall - Concrete CW5.4-CN-STR-RF-316
Formwork of Stairs - Roof Floor Part 2 CW5.4-CN-STR-RF-303
Concrete Casting of Stairs - Roof Floor Part 2 CW5.4-CN-STR-RF-308
Concrete Casting of Slab - Roof Floor Part 2 CW5.4-CN-STR-RF-309
Parapet Wall - Formwork CW5.4-CN-STR-RF-315
Parapet Wall - Concrete CW5.4-CN-STR-RF-317
Shaft Covers of Roof Floor CW5.4-CN-FIN-RF-1100
Formwork of Columns - Upper Roof Floor CW5.4-CN-STR-RF-101
Concrete Casting of Columns - Upper Roof Floor CW5.4-CN-STR-RF-102
Concrete Casting of Slab - Upper Roof Floor CW5.4-CN-STR-UR-105
Parapet Wall - Formwork - Upper Roof Floor CW5.4-CN-STR-UR-107
Parapet Wall - Concrete - Upper Roof Floor CW5.4-CN-STR-UR-108
Shaft Covers of Upper Roof Floor CW5.4-CN-FIN-RF-1110
Productivity Rate Total Man Original
Unit Quantity Days Total Man Crew Desc.
(Unit/Day) Days Duration
1 Mason
LS 97 17.0 5.68 11.00 62.51 2
10 Helper
1 Mason
LS 97 12.0 8.05 2.00 16.10 8
1 Helper
0.75 Operator
LS 97 252.0 0.38 8.25 6 Driver 3.16 4
1.5 Helper
LS 97
1 Operator 1
m² 47 409.5 0.11 2.00 0.23 2
Helper
0.75 Operator
m² 47 252.0 0.19 8.25 6 Driver 1.53 2
1.5 Helper
1 Mason
m² 466 17.0 27.44 11.00 301.79 4
10 Helper
2 Carpenter
m² 47 12.0 3.92 3.06 1 Helper 11.97 6
.056 Operator
m² 47
4Waterproofer
m² 47 64.0 0.73 6.00 4.37 4
2 Helper
m² 466 #DIV/0! #DIV/0!
1 Mason
m² 47 20.0 2.35 2.00 4.70 2
1 Helper
1 Steel Fixer 1
m² 47 250.0 0.19 2.06 Helper .056 0.38 6
Operator

1 Carpenter
18 Helper
m² 47 180.0 0.26 26.00 6.74 1
6 Mason
1 Steel Fixer

4Waterproofer
m² 466 64.0 7.29 6.00 43.73 12
2 Helper
1 Alum. Tech 1
m² 47 6.0 7.83 2.06 Helper .056 16.11 12
Operator
m² 47 #DIV/0! #DIV/0!
m² 47 #DIV/0! #DIV/0!
m² 466 #DIV/0! #DIV/0!
m² 47 #DIV/0! #DIV/0!
m³ 290 #DIV/0! #DIV/0!
m³ 290 #DIV/0! #DIV/0!
m³ 290 #DIV/0! #DIV/0!
m³ 290 #DIV/0! #DIV/0!
m³ 1,008 #DIV/0! #DIV/0!
m³ 1,008 #DIV/0! #DIV/0!
m² 716 #DIV/0! #DIV/0!
m³ 145 #DIV/0! #DIV/0!
m³ 1,008 #DIV/0! #DIV/0!
m³ 1,008 #DIV/0! #DIV/0!
m² 716 #DIV/0! #DIV/0!
m³ 145 #DIV/0! #DIV/0!
m² 44 #DIV/0! #DIV/0!
m³ 14 #DIV/0! #DIV/0!
m³ 291 #DIV/0! #DIV/0!
m² 716 #DIV/0! #DIV/0!
m³ 123 #DIV/0! #DIV/0!
m² 44 #DIV/0! #DIV/0!
m³ 14 #DIV/0! #DIV/0!
m³ 291 #DIV/0! #DIV/0!
m² 716 #DIV/0! #DIV/0!
m³ 123 #DIV/0! #DIV/0!
m² 44 #DIV/0! #DIV/0!
m³ 14 #DIV/0! #DIV/0!
m³ 291 #DIV/0! #DIV/0!
m² 716 #DIV/0! #DIV/0!
m³ 123 #DIV/0! #DIV/0!
m² 44 #DIV/0! #DIV/0!
m³ 14 #DIV/0! #DIV/0!
m³ 291 #DIV/0! #DIV/0!
m² 716 #DIV/0! #DIV/0!
m³ 123 #DIV/0! #DIV/0!
m² 44 #DIV/0! #DIV/0!
m³ 14 #DIV/0! #DIV/0!
m³ 291 #DIV/0! #DIV/0!
m² 716 #DIV/0! #DIV/0!
m³ 123 #DIV/0! #DIV/0!
m² 44 #DIV/0! #DIV/0!
m³ 14 #DIV/0! #DIV/0!
m³ 291 #DIV/0! #DIV/0!
m² 716 #DIV/0! #DIV/0!
m³ 123 #DIV/0! #DIV/0!
m² 44 #DIV/0! #DIV/0!
m³ 14 #DIV/0! #DIV/0!
m³ 291 #DIV/0! #DIV/0!
m² 716 #DIV/0! #DIV/0!
m³ 123 #DIV/0! #DIV/0!
m² 44 #DIV/0! #DIV/0!
m³ 14 #DIV/0! #DIV/0!
m³ 291 #DIV/0! #DIV/0!
m² 716 #DIV/0! #DIV/0!
m³ 123 #DIV/0! #DIV/0!
m² 37 #DIV/0! #DIV/0!
m³ 14 #DIV/0! #DIV/0!
m³ 232 #DIV/0! #DIV/0!
m² 716 #DIV/0! #DIV/0!
m³ 123 #DIV/0! #DIV/0!
m² 37 #DIV/0! #DIV/0!
m³ 14 #DIV/0! #DIV/0!
m³ 232 #DIV/0! #DIV/0!
m² 716 #DIV/0! #DIV/0!
m³ 123 #DIV/0! #DIV/0!
m² 37 #DIV/0! #DIV/0!
m³ 14 #DIV/0! #DIV/0!
m³ 232 #DIV/0! #DIV/0!
m² 716 #DIV/0! #DIV/0!
m³ 123 #DIV/0! #DIV/0!
m² 37 #DIV/0! #DIV/0!
m³ 14 #DIV/0! #DIV/0!
m³ 232 #DIV/0! #DIV/0!
m² 716 #DIV/0! #DIV/0!
m³ 123 #DIV/0! #DIV/0!
m² 34 #DIV/0! #DIV/0!
m³ 11 #DIV/0! #DIV/0!
m³ 232 #DIV/0! #DIV/0!
m² 716 #DIV/0! #DIV/0!
m³ 123 #DIV/0! #DIV/0!
m² 34 #DIV/0! #DIV/0!
m³ 11 #DIV/0! #DIV/0!
m³ 232 #DIV/0! #DIV/0!
m² 716 #DIV/0! #DIV/0!
m³ 123 #DIV/0! #DIV/0!
m² 34 #DIV/0! #DIV/0!
m³ 11 #DIV/0! #DIV/0!
m³ 232 #DIV/0! #DIV/0!
m² 716 #DIV/0! #DIV/0!
m³ 123 #DIV/0! #DIV/0!
m² 34 #DIV/0! #DIV/0!
m³ 11 #DIV/0! #DIV/0!
m³ 232 #DIV/0! #DIV/0!
m² 716 #DIV/0! #DIV/0!
m³ 123 #DIV/0! #DIV/0!
m³ 173 #DIV/0! #DIV/0!
m² 716 #DIV/0! #DIV/0!
m³ 123 #DIV/0! #DIV/0!
m³ 173 #DIV/0! #DIV/0!
m² 716 #DIV/0! #DIV/0!
m³ 123 #DIV/0! #DIV/0!
m² 34 #DIV/0! #DIV/0!
m³ 11 #DIV/0! #DIV/0!
m³ 127 #DIV/0! #DIV/0!
m² 716 #DIV/0! #DIV/0!
m³ 123 #DIV/0! #DIV/0!
m² 34 #DIV/0! #DIV/0!
m³ 11 #DIV/0! #DIV/0!
m³ 175 #DIV/0! #DIV/0!
m² 716 #DIV/0! #DIV/0!
m³ 123 #DIV/0! #DIV/0!
m² 31 #DIV/0! #DIV/0!
m³ 9 #DIV/0! #DIV/0!
m³ 175 #DIV/0! #DIV/0!
m² 716 #DIV/0! #DIV/0!
m³ 123 #DIV/0! #DIV/0!
m² 31 #DIV/0! #DIV/0!
m³ 9 #DIV/0! #DIV/0!
m³ 175 #DIV/0! #DIV/0!
m² 716 #DIV/0! #DIV/0!
m³ 123 #DIV/0! #DIV/0!
m² 31 #DIV/0! #DIV/0!
m³ 9 #DIV/0! #DIV/0!
m³ 175 #DIV/0! #DIV/0!
m² 537 #DIV/0! #DIV/0!
m³ 92 #DIV/0! #DIV/0!
m² 31 #DIV/0! #DIV/0!
m³ 9 #DIV/0! #DIV/0!
m³ 175 #DIV/0! #DIV/0!
m² 537 #DIV/0! #DIV/0!
m³ 92 #DIV/0! #DIV/0!
m³ 115 #DIV/0! #DIV/0!
m² 358 #DIV/0! #DIV/0!
m³ 61 #DIV/0! #DIV/0!
m³ 115 #DIV/0! #DIV/0!
m² 358 #DIV/0! #DIV/0!
m³ 61 #DIV/0! #DIV/0!
m² 21 #DIV/0! #DIV/0!
m³ 6 #DIV/0! #DIV/0!
m³ 279 #DIV/0! #DIV/0!
m² 370 #DIV/0! #DIV/0!
m³ 37 #DIV/0! #DIV/0!
m² 26 #DIV/0! #DIV/0!
m³ 6 #DIV/0! #DIV/0!
m³ 11 #DIV/0! #DIV/0!
m² 324 #DIV/0! #DIV/0!
m³ 32 #DIV/0! #DIV/0!
m² 27 #DIV/0! #DIV/0!
m² 358 #DIV/0! #DIV/0!
m³ 61 #DIV/0! #DIV/0!
m³ 239 #DIV/0! #DIV/0!
m² 231 #DIV/0! #DIV/0!
m³ 23 #DIV/0! #DIV/0!
FIN-RF-1110 15 #DIV/0! #DIV/0!
2,286 #DIV/0! #DIV/0!
2,286 #DIV/0! #DIV/0!
5,407 #DIV/0! #DIV/0!
1 #DIV/0! #DIV/0!
16 #DIV/0! #DIV/0!
64 #DIV/0! #DIV/0!
943 #DIV/0! #DIV/0!
96 #DIV/0! #DIV/0!
357 #DIV/0! #DIV/0!
1 #DIV/0! #DIV/0!
2 #DIV/0! #DIV/0!
137 #DIV/0! #DIV/0!
324 #DIV/0! #DIV/0!
1,224 #DIV/0! #DIV/0!
9 #DIV/0! #DIV/0!
37 #DIV/0! #DIV/0!
47 #DIV/0! #DIV/0!
97 #DIV/0! #DIV/0!
47 #DIV/0! #DIV/0!
47 #DIV/0! #DIV/0!
97 #DIV/0! #DIV/0!
47 #DIV/0! #DIV/0!
58 #DIV/0! #DIV/0!
9 #DIV/0! #DIV/0!
37 #DIV/0! #DIV/0!
47 #DIV/0! #DIV/0!
97 #DIV/0! #DIV/0!
47 #DIV/0! #DIV/0!
47 #DIV/0! #DIV/0!
97 #DIV/0! #DIV/0!
47 #DIV/0! #DIV/0!
58 #DIV/0! #DIV/0!
47 #DIV/0! #DIV/0!
47 #DIV/0! #DIV/0!
97 #DIV/0! #DIV/0!
47 #DIV/0! #DIV/0!
15 #DIV/0! #DIV/0!
47 #DIV/0! #DIV/0!
437 #DIV/0! #DIV/0!
47 #DIV/0! #DIV/0!
108 #DIV/0! #DIV/0!
47 #DIV/0! #DIV/0!
47 #DIV/0! #DIV/0!
943 #DIV/0! #DIV/0!
47 #DIV/0! #DIV/0!
974 #DIV/0! #DIV/0!
47 #DIV/0! #DIV/0!
47 #DIV/0! #DIV/0!
47 #DIV/0! #DIV/0!
108 #DIV/0! #DIV/0!
96 #DIV/0! #DIV/0!
47 #DIV/0! #DIV/0!
943 #DIV/0! #DIV/0!
47 #DIV/0! #DIV/0!
6 #DIV/0! #DIV/0!
437 #DIV/0! #DIV/0!
47 #DIV/0! #DIV/0!
108 #DIV/0! #DIV/0!
47 #DIV/0! #DIV/0!
96 #DIV/0! #DIV/0!
472 #DIV/0! #DIV/0!
96 #DIV/0! #DIV/0!
1,311 #DIV/0! #DIV/0!
96 #DIV/0! #DIV/0!
328 #DIV/0! #DIV/0!
96 #DIV/0! #DIV/0!
96 #DIV/0! #DIV/0!
446 #DIV/0! #DIV/0!
99 #DIV/0! #DIV/0!
64 #DIV/0! #DIV/0!
96 #DIV/0! #DIV/0!
97 #DIV/0! #DIV/0!
96 #DIV/0! #DIV/0!
342 #DIV/0! #DIV/0!
44 #DIV/0! #DIV/0!
10 #DIV/0! #DIV/0!
96 #DIV/0! #DIV/0!
96 #DIV/0! #DIV/0!
96 #DIV/0! #DIV/0!
437 #DIV/0! #DIV/0!
108 #DIV/0! #DIV/0!
96 #DIV/0! #DIV/0!
96 #DIV/0! #DIV/0!
472 #DIV/0! #DIV/0!
96 #DIV/0! #DIV/0!
96 #DIV/0! #DIV/0!
96 #DIV/0! #DIV/0!
9 #DIV/0! #DIV/0!
41 #DIV/0! #DIV/0!
10 #DIV/0! #DIV/0!
96 #DIV/0! #DIV/0!
96 #DIV/0! #DIV/0!
437 #DIV/0! #DIV/0!
96 #DIV/0! #DIV/0!
108 #DIV/0! #DIV/0!
96 #DIV/0! #DIV/0!
96 #DIV/0! #DIV/0!
96 #DIV/0! #DIV/0!
96 #DIV/0! #DIV/0!
96 #DIV/0! #DIV/0!
9 #DIV/0! #DIV/0!
96 #DIV/0! #DIV/0!
41 #DIV/0! #DIV/0!
90 #DIV/0! #DIV/0!
96 #DIV/0! #DIV/0!
366 #DIV/0! #DIV/0!
233 #DIV/0! #DIV/0!
106 #DIV/0! #DIV/0!
96 #DIV/0! #DIV/0!
96 #DIV/0! #DIV/0!
55 #DIV/0! #DIV/0!
22 #DIV/0! #DIV/0!
110 #DIV/0! #DIV/0!
5 #DIV/0! #DIV/0!
2 #DIV/0! #DIV/0!
3 #DIV/0! #DIV/0!
96 #DIV/0! #DIV/0!
437 #DIV/0! #DIV/0!
96 #DIV/0! #DIV/0!
96 #DIV/0! #DIV/0!
96 #DIV/0! #DIV/0!
472 #DIV/0! #DIV/0!
96 #DIV/0! #DIV/0!
437 #DIV/0! #DIV/0!
96 #DIV/0! #DIV/0!
96 #DIV/0! #DIV/0!
96 #DIV/0! #DIV/0!
472 #DIV/0! #DIV/0!
96 #DIV/0! #DIV/0!
161 #DIV/0! #DIV/0!
437 #DIV/0! #DIV/0!
96 #DIV/0! #DIV/0!
108 #DIV/0! #DIV/0!
96 #DIV/0! #DIV/0!
472 #DIV/0! #DIV/0!
96 #DIV/0! #DIV/0!
57 #DIV/0! #DIV/0!
232 #DIV/0! #DIV/0!
437 #DIV/0! #DIV/0!
96 #DIV/0! #DIV/0!
108 #DIV/0! #DIV/0!
Manpower/ MAN-DAYS
Day
31.25 28.4 2.8

2.01 1.0 1.0

0.79 0.1 0.6 0.1

0.11 0.1 0.1

0.76 0.1 0.6 0.1

75.45 68.6 6.9

1.99 0.0 1.3 0.7

1.09 0.4 0.7

#DIV/0! #DIV/0! #DIV/0!

2.35 1.2 1.2

0.06 0.0 0.0 0.0

6.74 0.2 3.3 3.3

3.64 1.2 2.4

1.34 0.0 0.7

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
MAN-H

0.000 0.000

0.000 0.000

5.350 42.801

0.000 0.000

3.622 0.000

3.095 24.762

0.000 0.000

1.613 0.000

0.000 0.000

0.000 0.000

0.000 0.000

0.000 0.000

7.585 0.000

1.099 0.000

0.000 0.000

0.7 6.347 0.000


MAN-Hours

0.000 0.000 88.346 8.835 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 306.000 306.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 10.700 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 3.622 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 6.190 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 33.279 3.328 0.000 0.000 0.000 0.000 0.000 0.000

57.599 0.000 28.799 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 43.250 0.000 86.500 0.000 0.000 0.000 0.000 0.000

0.000 0.000 80.000 80.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 60.000 60.000 0.000 0.000 0.000 0.000 0.000 0.000

270.908 0.000 135.454 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 19.633 19.633 0.000 0.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 75.000 0.000 150.000 0.000 0.000 0.000 0.000 0.000

0.000 0.000 113.333 0.000 0.000 0.000 0.000 0.000 113.333 0.000
0.000 0.000 0.000

0.000 0.000 0.000

0.000 0.000 0.000

0.000 0.000 0.000

0.000 0.000 0.000

0.000 0.000 0.000

0.000 0.000 0.000

0.000 0.000 0.000

0.000 0.000 0.000

0.000 0.000 0.000

0.000 0.000 0.000

0.000 0.000 0.000

0.000 0.000 0.000

0.000 0.000 0.000

0.000 0.000 0.000

0.000 0.000 0.000