2024.05.20 NH-765 Do-Kj PKG-2 HW P&P
2024.05.20 NH-765 Do-Kj PKG-2 HW P&P
CLIENT :
RHS
AUTHORITY :
SCHEMATIC
TO SRISAILAM
DATUM=203.000m
LHS
RHS
SUPER ELEVATION
DESIGN CHAINAGE
DISTANCE FROM PCL
DISTANCE FROM PCL
VERTICAL ALIGNMENT
PROPOSED FRL ALONG
CARRIAGEWAY CENTER
HORIZONTAL SCHEMATIC
TS 243996.946
1
2
R
O
R
START OF THE PROJECT
W
W
244+000
HIP NO.
205
210
215
220
244+000 211.279 212.102 211.356 212.202
(MoRT&H)
244+010 210.994 212.016 210.970 212.125
LHS=2.500
ROW
Chainage
EROW
GOVERNMENT OF INDIA
244371.238
244062.442
EROW
244+030 210.995 211.891 211.348 211.973
ROW
G=-0.763%
SC 244051.946
Easting
296431.61
296411.153
CS 244072.9
34
LHS=5.000
244+070 210.565 211.558 210.512 211.672
RHS=5.000
EROW
EROW
R=-400.000 L=20.987
244+090 210.754 211.157 210.434 211.558 VIP CH:=244091.430
(m)
ROW
VIP LVL:=211.504
244+10
0
Northing
K=96.352
244+100 210.803 211.034 210.125 211.516
L=60.000m
1761364.973
1761672.982
ROW
CL=55.000
244+110 210.900 210.768 210.238 211.485
244+120 211.191 210.636 210.595 211.464
(m)
400
400
ST 244
EROW
EROW
127.934
Radius
244+130 211.144 210.569 210.553 211.450
EPC CONTRACTOR :
KMP
DESIGN CONSULTANT :
244+150 210.916 210.221 210.488 211.422
Left
ROW
Right
244+160 210.823 210.100 210.455 211.408 Direction
(Left/Right)
L=71.147m
G=-0.140%
ER
LHS=2.500
O
W
Email: bhavanicon1991@gmail.com
M/s BHAVANI CONSTRUCTIONS
244+190 210.638 210.524 210.578 211.366 19.4
10.88
Total
SAMARTH INFRAENGG
244+2
00
angle (∆)
Deviation
BRIDGE NO : 245/1
ROW
(m)
EROW
20.988
80.411
Curve,Lc
RHS=2.500
244+240 210.638 210.376 210.810 211.162 VIP CH:=244242.576
VIP LVL:=211.293
244+250 210.604 211.252 210.995 211.086
K=-83.837
L=100.000m
55
55
(m)
Spiral, Ls
Length of
W
ROW
PMC CONSULTANT :
244+280 210.347 209.803 209.264 210.785
DES
ROW
CA SP
IG
BRIDGE
80
80
CA CHA
A
SKEW
244+290
N
DESIGN
(km/h)
Speed
IN
Design
244+30
0
C
PROPOSA
ROW
NO:
H
(M
L=2.190
):
IN ASSOCIATION WITH
AGE:
G=-1.330%
244+310 209.863 209.585 209.116 210.408
ERO
ERO
CL=55.000
W
SPAN (M
W
5.00
5.00
AINAGE:
SC 244330.8
(e) (%)
97
ROW
EROW
HIP-2
struction
dge -3x7
LHS=5.000
RHS=5.000
244+380 209.553 209.871 209.283 209.905
R
O
W
244+400
.70m
.70m
R=400.000 L=80.410
CS 244411
VIP CH:=244397.268
244+400 209.526 209.811 209.084 209.871 VIP LVL:=209.231
K=81.912
L=205.000m
EROW
PROOF CONSULTANT :
SAFETY CONSULTANT :
244+420 209.498 209.909 209.205 209.885
ROW
Consultant LLP
466.30
ST 244
CL=55.000
244+450
Bangalore, Karnataka
209.387 209.969 209.417 209.999
EROW
00
244+480 209.621 209.945 209.784 210.223 244+5
ROW
EROW
PROJECT :
244+510 209.473 209.848 209.485 210.550
PLAN
ROW
ROW
EROW
R
O
W
RHS=2.500
244+560 209.378 209.835 209.215 211.135
244+570 209.303 209.839 209.003 211.252
00
LONGITUDINAL SECTION
244+580 209.759 209.824 209.314 211.366 244+6
SKEW
ROW
CA SPAN (M):
CA CHAINAGE:
REV.
DESIGN SPAN (M):
ROW
DESIGN CHAINAGE:
LHS=2.500
DATE
+650
E
R0 24.04.2024
R1 27.04.2024
245/2
EROW
EROW
244+650
BUSSH
244+7
ROW
EROW
O RN ALA BY
VIP CH:=244700.375
D
244+700
MNB RCC Solid slab -2x7.5m
VIP LVL:=212.777
244+710 210.006 210.461 209.177 212.339
K=-176.883
L=260.000m
ROW
244+720 208.467 210.388 207.720 212.374
R
O
W
ROW
EROW
244+800
R2 20.05.2024 REVISED DUE TO TEMPLE AND AS PER A.E's
R
SC 244806.918
O
W
EROW
O
O
W
W
APPROVED :
EROW
EROW
VERTICAL
RP
KS
DATE : 20/05/2024
BH
244+900
244+890 209.835 210.030 209.401 212.208
LHS=5.000
RHS=5.000
TITLE :
L=316.425m
DRG. NO. :
REVISION :
ROW
LIN
E
244+970 209.524 209.509 209.314 211.968
ROW
244+980
O
+
PLAN & PROFILE
000
-3
ROW
OF MAIN CARRIAGEWAY
O
W
NH-765/DO-KJ/PKG-2/HW/P&P-001
TO VINUKONDA
CLIENT :
RHS
AUTHORITY :
SCHEMATIC
RO
W
TO SRISAILAM
W
O
R
DATUM=201.000m
LHS
RHS
RO
W
SUPER ELEVATION
HIP
DESIGN CHAINAGE
-3
VERTICAL ALIGNMENT
PROPOSED FRL ALONG
CARRIAGEWAY CENTER
HORIZONTAL SCHEMATIC
00
W
O
+0
R
5
24
205
210
215
220
RO
245+000 209.518 209.388 209.310 211.878
(MoRT&H)
INE
W
O
R
RO
HL
245+010 209.612 209.527 209.473 211.848
W
TC
GOVERNMENT OF INDIA
245
245+090 209.490 209.370 209.360 211.608
G=-0.300%
W
L=316.425m
O
R
LHS=5.000
RHS=5.000
245+100 209.420 209.290 209.378 211.578
245+110 209.441 209.325 209.395 211.548
245+120 209.400 209.272 209.352 211.518
ROW
EPC CONTRACTOR :
R
R=-500.000 L=394.590
ROW
245+140
W
DESIGN CONSULTANT :
245+150 209.527 209.451 209.445 211.428
245+160 209.460 209.328 209.337 211.403
245+200
R
Email: bhavanicon1991@gmail.com
M/s BHAVANI CONSTRUCTIONS
W
PROPOSAL
O
R
ROW
SAMARTH INFRAENGG
CA SPAN (M):
CS 245201.508
VIP CH:=245196.800
CA CHAINAGE:
K=166.090
DESIGN SPAN (M):
L=100.000m
DESIGN CHAINAGE:
W
O
R
245+298
CL=95.000
245+260 209.395 209.315 209.177 211.479
ROW
New Construction
PMC CONSULTANT :
245+280 209.371 209.075 209.205 211.539 ST 245296.508
W
O
R
W
O
R
245+300
245+290 209.364 209.191 209.129 211.569
245+300 209.346 209.261 209.089 211.600
IN ASSOCIATION WITH
245+310 209.431 209.271 209.112 211.630
G=0.302%
L=132.325m
W
O
R
245+400
245+390 210.040 209.897 209.705 211.869
ROW
PROOF CONSULTANT :
SAFETY CONSULTANT :
245+420 210.050 209.803 209.862 211.926
245+430 210.085 209.885 209.885 211.937
W
O
R
W
O
R
Consultant LLP
VIP CH:=245449.125
ROW
Bangalore, Karnataka
Engineers Pvt. Ltd.
245+450 209.865 209.816 209.734 211.945
Hyderabad, Telangana
M/s PVR Consulting
VIP LVL:=212.050
ROW
K=-232.526
W
O
R
245+500
245+490 209.792 209.730 209.760 211.909
245+500 209.718 209.683 209.639 211.890
PROJECT :
245+510 209.710 209.779 209.652 211.866
ROW
W
O
R
245+600
REV.
245+620 208.958 208.970 209.015 211.537
245+630 208.899 208.992 208.971 211.507
DATE
W
O
R
W
O
R
R0 24.04.2024
R1 27.04.2024 245+650 209.012 208.858 208.832 211.447
ROW
D=1504.431
245+700
245+690 208.799 208.725 208.729 211.327
245+700 208.818 208.796 208.654 211.297
ROW
(m)
HIP
Chainage
245015.133
245+730
VIDE EMAIL Dt.: 19.05.2024
296296.761
(m)
W
O
R
W
O
R
Northing
245+800
REVISED AS PER PROOF CONSULTANT OBSERVATIONS
245+790
VIDE LETTER NO. PVR/BC/P&P/2024-25/01 Dt: 25.04.2024
500
PROPOSAL
DRAWN
SCALE :
Radius
W
O
R
CA CHAINAGE:
APPROVED :
W
O
R
DESIGN SPAN (M):
ROW
DESIGN CHAINAGE:
Left
VERTICAL
RP
KS
DATE : 20/05/2024
BH
Direction
(Left/Right)
VIP CH:=245853.925
36°
K=-666.667
L=100.000m
245+848
W
O
R
- 1:200
245+880
56.1
angle (∆)
Deviation
245+900
245+890 208.548 208.618 208.612 210.672
New Construction
Box Culvert -1x2.0m
245+900
ROW
TITLE :
394.59
Curve,Lc
DRG. NO. :
REVISION :
RHS=2.500
(m)
100
MATCHLINE
O
R
W
O
R
Super
(e) (%)
NH-765/DO-KJ/PKG-2/HW/P&P-002
(Km: 245+000 TO Km: 246+000)
elevetion,
ROW
LHS
CLIENT :
RHS
AUTHORITY :
SCHEMATIC
TO SRISAILAM
DATUM=201.000m
LHS
RHS
SUPER ELEVATION
DESIGN CHAINAGE
DISTANCE FROM PCL
DISTANCE FROM PCL
ROW
VERTICAL ALIGNMENT
PROPOSED FRL ALONG
CARRIAGEWAY CENTER
HORIZONTAL SCHEMATIC
ROW
W
MATCHLINE
W
R
O
R
205
210
215
220
246+000
246+000 208.022 208.048 208.116 210.178
(MoRT&H)
246+010 208.030 208.064 208.055 210.133
GOVERNMENT OF INDIA
LHS=2.500
RHS=2.500
246+080 207.915 207.847 207.634 209.891
4
W
246+090
O
246+100
HIP NO.
W
O
R
ROW
(m)
HIP
246+120 207.894 207.734 207.612 209.834 VIP LVL:=209.648
Chainage
K=266.645
247015.491
L=200.000m
246+130 207.735 207.759 207.780 209.829
EPC CONTRACTOR :
W
O
W
R
246+140
R
DESIGN CONSULTANT :
246+150 208.004 207.927 207.592 209.831
246+160 (m)
Easting
207.818 208.066 207.691 209.837
CD.NO : 247/1
SKEW
CD NO:
Email: bhavanicon1991@gmail.com
M/s BHAVANI CONSTRUCTIONS
PROPOSAL
W
O
SAMARTH INFRAENGG
246+200
CA SPAN (M):
CA CHAINAGE:
Northing
600
-
Radius
ROW
W
R
246+130
246+128
G=0.300%
L=98.886m
PMC CONSULTANT :
246+280 208.141 208.362 207.983 210.135
W
O
R
W
O
246+290
R
246+300
angle (∆)
Deviation
IN ASSOCIATION WITH
ROW
W
R
246+340
R
W
R
246+390
R
246+400
Design
PROOF CONSULTANT :
SAFETY CONSULTANT :
5.00
(e) (%)
elevetion,
W
O
R
246+440
R
Consultant LLP
Bangalore, Karnataka
Engineers Pvt. Ltd.
246+450 208.445 208.393 208.335 210.374
Hyderabad, Telangana
M/s PVR Consulting
D=1504.431
246+460 208.273 208.119 208.280 210.362
VIP CH:=246466.707
246+470 208.073 208.131 208.182 210.347 VIP LVL:=210.695
K=-328.206
L=300.000m
246+490
O
246+500
ROW
PROJECT :
246+510 207.896 207.720 207.771 210.256
246+520 207.607 207.695 207.682 210.225
PLAN
W
R
246+540
R
REV.
ROW
DATE
SKEW
W
O
W
R
246+640
R
CD NO:
R0 24.04.2024
R1 27.04.2024
PROPOSAL
W
O
R
W
O
246+690
R
246+700
247/2
246+798
RHS=2.500
DESCRIPTION
FOR APPROVAL
246+730
VIDE EMAIL Dt.: 19.05.2024
W
O
W
O
R
246+740
R
W
R
246+790
O
CD.NO : 247/2
TS 246800.939
246+800 206.502 206.307 206.290 208.654
ROW
SCALE :
VIP CH:=246823.584
VIP LVL:=208.504
246+830 206.588 206.437 206.365 208.483
CHECKED :
DESIGNED :
:
APPROVED :
K=1193.559
L=120.000m
246+840
W
O
VERTICAL
RP
KS
DATE : 20/05/2024
BH
CL=90.000
- 1:200
SC 246890.9
39
246+890 206.876 206.764 206.564 208.163
W
O
R
246+900
246+900 206.734 206.867 206.482 208.111
246+910 206.817 206.691 206.559 208.060
TITLE :
REVISION :
ROW
R2
R
ROW
G=-0.513%
246+950
L=331.848m
INE
+00
0
OF MAIN CARRIAGEWAY
TO VINUKONDA
ROW
HIP
NH-765/DO-KJ/PKG-2/HW/P&P-003
(Km: 246+000 TO Km: 247+000)
-4
W
O
R
LHS
CLIENT :
RHS
AUTHORITY :
SCHEMATIC
TO SRISAILAM
DATUM=195.000m
LHS
RHS
SUPER ELEVATION
DESIGN CHAINAGE
RO
VERTICAL ALIGNMENT
PROPOSED FRL ALONG
CARRIAGEWAY CENTER
HORIZONTAL SCHEMATIC
0
W
O
R
+00
195
200
205
210
215
247
ROW
E
247+000 206.637 206.321 206.238 207.598 W
(MoRT&H)
HLIN
O
R
ATC M
HIP-
4
247+010 206.676 206.238 206.169 207.547
GOVERNMENT OF INDIA
(m)
HIP
247015.491
(m)
247+080 206.705 206.335 206.027 207.187
LHS=5.000
RHS=5.000
Easting
297630.646
247+090 206.664 206.222 205.952 207.136 247+100
W
O
ROW
R=-600.000 L=245.616
247+110 206.106 206.309 206.333 207.033
(m)
247+120 206.281 206.326 205.948 206.982
G=-0.513%
L=331.848m
Northing
ROW
1759217.655
CS 247136.555
247+130 206.349 206.361 205.779 206.930
EPC CONTRACTOR :
W
O
W R
247+140 206.277 206.403 205.691 206.879 R
O
DESIGN CONSULTANT :
(m)
600
247+150 206.054 206.423 205.569 206.828
Radius
247+160
ROW
Email: bhavanicon1991@gmail.com
M/s BHAVANI CONSTRUCTIONS
Direction
CL=90.000
ROW
W
O
SAMARTH INFRAENGG
R
247+200 DORNALA BYPASS
32.05
Total
EROW
ST 247226.555
Deviation
Curve,Lc
Length of
CH:247+240
BUSSHELTER
K=6079.778
L=100.000m
PMC CONSULTANT :
90
EROW
IN ASSOCIATION WITH
247+310 205.505 205.853 205.736 206.014
100
(km/h)
Speed
ROW
Design
5.00
Super
(e) (%)
LHS=2.500 RHS=2.500
ROW
PROOF CONSULTANT :
EROW
G=-0.497%
SAFETY CONSULTANT :
L=177.708m
247+420 205.230 205.394 205.059 205.467
EROW
Consultant LLP
ROW
Bangalore, Karnataka
Engineers Pvt. Ltd.
247+450 205.150 205.230 204.966 205.318
Hyderabad, Telangana
M/s PVR Consulting
247+460 205.124 205.156 205.007 205.268
EROW
ROW
PROJECT :
EROW
PLAN
VIP LVL:=204.954
SKEW
D=1657.418
CD NO:
247+600
CA CHAINAGE:
ROW
L=72.649m
G=-0.324%
REV.
DESIGN CHAINAGE:
EROW
DATE
248/1
O
R
R0 24.04.2024
R1 27.04.2024
247+600
247+598
EROW
New Construction
ROW
DESCRIPTION
FOR APPROVAL
247+730
VIDE EMAIL Dt.: 19.05.2024
247+770
ROW
247+790
VIDE LETTER NO. PVR/BC/P&P/2024-25/01 Dt: 25.04.2024
247+800
EROW
DRAWN
SCALE :
APPROVED :
ROW
VERTICAL
RP
KS
DATE : 20/05/2024
BH
ROW
EROW
VIP CH:=247887.099
247+890 202.983 203.300 202.672 203.445 VIP LVL:=203.388 247+900
K=75.788
EROW
L=60.000m
ROW
DRG. NO. :
REVISION :
MATCHLINE
247+990 203.255 203.567 202.847 203.670 W W
O O
R
EROW
R
PLAN & PROFILE
K=-136.647
L=135.000m
248+000
248+000 203.349 203.554 202.728 203.682
EROW
OF MAIN CARRIAGEWAY
TO VINUKONDA
NH-765/DO-KJ/PKG-2/HW/P&P-004
(Km: 247+000 TO Km: 248+000)
ROW
LHS
CLIENT :
RHS
AUTHORITY :
SCHEMATIC
TO SRISAILAM
DATUM=193.000m
LHS
RHS
SUPER ELEVATION
DESIGN CHAINAGE
DISTANCE FROM PCL
DISTANCE FROM PCL
VERTICAL ALIGNMENT
PROPOSED FRL ALONG
CARRIAGEWAY CENTER
HORIZONTAL SCHEMATIC
MATCHLINE
W W
O O
EROW
R R
248+000
195
200
205
210
K=-136.647
EROW
L=135.000m
248+000 203.349 203.554 202.728 203.682
(MoRT&H)
HIP NO.
248+010 203.284 203.571 202.910 203.687
(m)
HIP
GOVERNMENT OF INDIA
248949.762
248+040 203.276 203.623 202.738 203.658 VIP CH:=248040.299
ROW
EROW
VIP LVL:=203.824
K=-136.647
203.171 203.581 202.951 203.602
L=135.000m
(m)
Easting
248+070 203.163 203.510 202.758 203.563
KMP
299486.606
EROW
(m)
248+100 202.974 203.283 202.749 203.402
Northing
ROW
1758661.864
248+110 202.900 203.198 202.638 203.334
248+120 202.935 203.113 202.465 203.263
LHS=2.500 RHS=2.500
EROW
(m)
5000
EPC CONTRACTOR :
Radius
EROW
L=45.533m
G=-0.703%
DESIGN CONSULTANT :
ROW
(Left/Right)
EROW
Email: bhavanicon1991@gmail.com
M/s BHAVANI CONSTRUCTIONS
EROW
SAMARTH INFRAENGG
VIP LVL:=202.747
1.51
K=217.807
L=80.000m
angle (∆)
Deviation
(m)
Curve,Lc
ROW
Length of
PMC CONSULTANT :
ROW
IN ASSOCIATION WITH
248+310 202.251 202.301 201.582 202.355
G=-0.336%
(e) (%)
L=172.074m
EROW
elevetion,
W
O
R
248+400
248+390 201.817 201.947 201.742 202.086
248+400 201.754 201.932 201.565 202.053
ROW
PROOF CONSULTANT :
SKEW
SAFETY CONSULTANT :
EROW
CD NO:
EROW
VIP CH:=248445.406
Consultant LLP
VIP LVL:=201.900
DESIGN SPAN (M):
Bangalore, Karnataka
DESIGN CHAINAGE:
Hyderabad, Telangana
M/s PVR Consulting
K=791.434
L=80.000m
EROW
248+500
249/1
EROW
248+448
PROJECT :
D=1657.418
New Construction
EROW
L=83.502m
G=-0.235%
REV.
EROW
VIP CH:=248618.908
248+620 200.678 201.442 200.790 201.482 VIP LVL:=201.492
EROW
ROW
DATE
248+640 200.949 201.349 200.517 201.428
R0 24.04.2024
R1 27.04.2024 248+650 200.824 201.317 200.626 201.400
ROW
EROW
248+730
VIDE EMAIL Dt.: 19.05.2024
248+790
VIDE LETTER NO. PVR/BC/P&P/2024-25/01 Dt: 25.04.2024
EROW
DRAWN
SCALE :
APPROVED :
ROW
VERTICAL
RP
KS
DATE : 20/05/2024
BH
EROW
PC 248883.973
248+870 200.139 200.734 200.527 200.759 KMP
PROPOSED TOLLPLAZA WILL BE SUBMITTED SEPARATELY
- 1:200
248+900
248+890 200.172 200.667 200.731 200.701
248+900 200.148 200.606 200.492 200.671
EROW
ROW
TITLE :
REVISION :
O
249+000 R
PT 249015.544
249+000 199.791 200.240 199.666 200.379
OF MAIN CARRIAGEWAY
EROW
TO VINUKONDA
NH-765/DO-KJ/PKG-2/HW/P&P-005
(Km: 248+000 TO Km: 249+000)
PC 249037.257
ROW
LHS
CLIENT :
RHS
AUTHORITY :
SCHEMATIC
TO SRISAILAM
DATUM=189.000m
LHS
RHS
SUPER ELEVATION
DESIGN CHAINAGE
DISTANCE FROM PCL
DISTANCE FROM PCL
EROW
VERTICAL ALIGNMENT
PROPOSED FRL ALONG
CARRIAGEWAY CENTER
HORIZONTAL SCHEMATIC
W
MATCHLINE
ROW
O
R
190
195
200
205
249+000
249+000 199.791 200.240 199.666 200.379
(MoRT&H)
HIP NO.
EROW
PT 249015.544
249+010 199.860 200.223 199.677 200.350
(m)
HIP
GOVERNMENT OF INDIA
ROW
D=21.714
249101.268
249+040 199.394 199.958 199.359 200.263
(m)
EROW
Easting
249+070 198.923 199.759 198.210 200.175
299630.837
249+080 198.869 199.748 198.417 200.146
249+090 198.805 199.698 198.391 200.117 249+100
HIP-
(m)
249+100 198.651 199.673 198.332 200.087
ROW6
EROW
Northing
LHS=2.500 RHS=2.500
1758615.456
249+110 198.696 199.633 197.762 200.058
EROW
R=-5000.000 L=128.014
CD.NO : 250/1
249+130 198.715 199.514 197.842 200.000
(m)
SKEW
5000
EPC CONTRACTOR :
CD NO:
Radius
G=-0.292%
L=570.393m
249+140 198.819 199.431 197.521 199.971
PROPOSAL
DESIGN CONSULTANT :
249+150
CA SPAN (M):
PT 249165.271
249+160 198.809 199.270 197.428 199.912
ROW
EROW
Left
DESIGN SPAN (M):
Email: bhavanicon1991@gmail.com
M/s BHAVANI CONSTRUCTIONS
249+190 198.774 199.070 197.004 199.825
SAMARTH INFRAENGG
249+200
250/1
1.47
angle (∆)
Deviation
(m)
249+260
0
PMC CONSULTANT :
249+280 198.218 198.522 198.180 199.505
O
F
C
249+300
100
EROW
(km/h)
Speed
IN ASSOCIATION WITH
VIP CH:=249304.301
EROW
249+330
(e) (%)
L=2.520m
197.635 198.011 197.307 198.597
G=-1.183%
249+390 197.588 198.004 197.433 198.484 W
O
R
249+400
EROW
PROOF CONSULTANT :
SAFETY CONSULTANT :
ROW
Consultant LLP
Bangalore, Karnataka
Engineers Pvt. Ltd.
249+450 197.240 197.546 197.271 197.890
Hyderabad, Telangana
M/s PVR Consulting
EROW
K=251.341
PROJECT :
L=245.000m
ROW
REV.
ROW
DATE
CH:249+650
BUSSHELTER
R0 24.04.2024
R1 27.04.2024
EROW
KMP
249+680 195.576 196.836 197.510 196.857
EROW
VIP CH:=249699.153
249+700 195.590 196.725 197.308 196.809 VIP LVL:=196.818
SKEW
L=60.000m
K=-581.681
CD NO:
ROW
DESCRIPTION
FOR APPROVAL
EROW
249+730
VIDE EMAIL Dt.: 19.05.2024
F
C
EROW
ROW
249+760
EROW
EROW
W W
Reconstruction
249+790
VIDE LETTER NO. PVR/BC/P&P/2024-25/01 Dt: 25.04.2024
L=108.590m
ROW
SCALE :
APPROVED :
EROW
VERTICAL
RP
KS
DATE : 20/05/2024
BH
VIP CH:=249877.742
- 1:200
K=138.268
L=80.000m
249+900
BOX
BOX
ELECTRIC
ELECTRIC
BOX
ELECTRIC
TITLE :
DRG. NO. :
REVISION :
ROW
TS 249950.910
249+950 195.912 196.250 196.196 196.457
G=0.268%
249+960
L=64.624m
O
F
C
K=-152.041
ROW
L=100.000m
CL=60.000
MATCHLINE
249+990 195.426 196.378 196.268 196.562 W
O
R
PLAN & PROFILE
250+000
250+000 195.338 196.425 196.523 196.580
ROW
SC 250010.910
OF MAIN CARRIAGEWAY
TO VINUKONDA
NH-765/DO-KJ/PKG-2/HW/P&P-006
(Km: 249+000 TO Km: 250+000)
EROW
EROW
LHS
CLIENT :
RHS
AUTHORITY :
SCHEMATIC
TO SRISAILAM
DATUM=189.000m
LHS
RHS
SUPER ELEVATION
DESIGN CHAINAGE
DISTANCE FROM PCL
DISTANCE FROM PCL
VERTICAL ALIGNMENT
PROPOSED FRL ALONG
CARRIAGEWAY CENTER
HORIZONTAL SCHEMATIC
ER
R
910 W O
OW OW
W
+
O
0 000 50010.
2
R
190
195
200
205
25 C S
RO
250+000 195.338 196.425 196.523 196.580 W
(MoRT&H)
NE
HLI
250+010 195.425 196.494 196.744 196.592 ATC M
GOVERNMENT OF INDIA
ERO
CL=60.000
K=-152.041
L=100.000m
OW
250+120
W
L=50.813m
G=-0.390%
EROW
CH:25 LTER
BUSSH
RO W
EPC CONTRACTOR :
SKEW
W
DESIG
PROPO
O
DESIG
250+140 R
194.658 195.605 195.462 196.259
CA CH
CA SPA
50
DESIGN CONSULTANT :
CD NO
:
SAL
250+1
HIP-7
STAR NMENT
AINAG
N (M):
LHS=5.000
(M):
RHS=5.000
EROW
INAGE
R=-800.000 L=297.519
Email: bhavanicon1991@gmail.com
M/s BHAVANI CONSTRUCTIONS
0
VIP LVL:=196.089
ROW
250+20
250+190 194.631 195.782 195.251 196.166
SAMARTH INFRAENGG
K=155.590
L=100.000m
50
52
tructio
W
EROW
n
lvert -1
250+220
lvert -1
G=0.253%
L=16.711m
ROW
ERO
PMC CONSULTANT :
250+280 193.594 193.389 193.533 196.311
250+290 193.267 193.311 193.258 196.319
250+300
CS 250308.429
250+300 193.145 193.241 193.116 196.322
IN ASSOCIATION WITH
ER
O
ROW
W
EROW
CL=60.000
ER
K=-201.619
195.651 193.609 193.554 196.262
L=180.000m
EROW
PROPOSAL
OW
BRIDGE NO:
ST 250368.429
:
DESIGN CHAINA
250+370
ROW
W
-
250+390 W O
193.688 195.396 194.009 196.125
ER
PC 250398.397
O R
R
D=29.968
250+400
OW
EROW
PROOF CONSULTANT :
250+335
SAFETY CONSULTANT :
250+420 193.964 194.213 194.430 195.970
New constructi
Minor Bridge -3
Minor Bridge -3
on
Consultant LLP
x10.0m
EROW
L=8.573m
G=0.640%
x10.0m
ROW
EROW
Bangalore, Karnataka
Engineers Pvt. Ltd.
250+450 193.936 194.295 194.693 195.785
Hyderabad, Telangana
M/s PVR Consulting
250+460 193.988 194.735 194.940 195.734
C
F
O
REALIGNMENT
OW
VIP CH:=250498.463
ERROW
PROJECT :
K=129.451
HIP-8
L=120.000m
R=1850.000 L=208.477
EROW
CD.NO : 251/2
EROW
REV.
SKEW
Box Culvert -1x2.0m
Box Culvert -1x2.0m
CD NO:
DATE
CA CHAINAGE:
EROW
DESIGN SPAN (M
R0 24.04.2024
R1 27.04.2024
):
DESIGN CHAINAGE
:
9
HIP NO.
250+700
250+690 195.022 195.884 195.259 196.020
G=0.287%
ROW
L=246.896m
(m)
HIP
Reconstruction
250161.408
250857.011
250502.747
250+730
VIDE EMAIL Dt.: 19.05.2024
EROW
Easting
EROW
CD.NO : 251/3
ROW
1758390.36
1758371.86
1758322.844
250+800
REVISED AS PER PROOF CONSULTANT OBSERVATIONS
250+790
VIDE LETTER NO. PVR/BC/P&P/2024-25/01 Dt: 25.04.2024
700
800
250+800
1850
CH:250+820
BUSSHELTER
SCALE :
CL=70.000
EROW
DESIGNED :
:
Right
APPROVED :
VIP CH:=250835.359
EROW
ROW
VIP LVL:=196.437
Direction
SC 250854.070
K=145.899
L=60.000m
250+850
CS 250859.952
195.799 196.197 196.122 196.547
RJ
VERTICAL
RP
KS
DATE : 20/05/2024
BH
HIP-9
L=5.882m
25.61
Total
R=-700.000
EROW
- 1:200
ROW
5.882
CL=70.000
Curve,Lc
Length of
REVISION :
0
70
60
250+930
EROW
W W
Spiral, Ls
R R
R2
CH:250+950
BUSSHELTER
ROW
100
100
100
(km/h)
Speed
Design
D=1470.493
VIP CH:=250993.114
PLAN & PROFILE
5.00
5.00
VIP LVL:=197.538
251+000
Super
(e) (%)
OF MAIN CARRIAGEWAY
TO VINUKONDA
ROW
NH-765/DO-KJ/PKG-2/HW/P&P-007
(Km: 250+000 TO Km: 251+000)
EROW
EROW
ROW
LHS
CLIENT :
RHS
AUTHORITY :
SCHEMATIC
TO SRISAILAM
DATUM=189.000m
LHS
RHS
SUPER ELEVATION
DESIGN CHAINAGE
DISTANCE FROM PCL
DISTANCE FROM PCL
VERTICAL ALIGNMENT
PROPOSED FRL ALONG
C
F
CH:250+950
O
BUSSHELTER
ROW
CARRIAGEWAY CENTER
HORIZONTAL SCHEMATIC
EROW
EROW
190
195
200
205
VIP LVL:=197.538 MATCHLINE
251+000 196.730 197.382 196.339 197.489
(MoRT&H)
251+000
251+010 196.597 197.403 196.615 197.521
GOVERNMENT OF INDIA
ROW
251+040 196.638 197.492 197.741 197.583
LHS=2.500
251+070 196.657 197.471 196.930 197.612
PROPOSAL
KMP
CA SPAN (M):
EROW
EROW
251+090
DESIGN SPAN (M):
G=0.096%
L=91.844m
251+100
251+100
196.947 197.509 197.090 197.641
ROW
RHS=2.500
-
EROW
251+109
251+111
EPC CONTRACTOR :
EROW
CD.NO : 252/1
DESIGN CONSULTANT :
251+150 196.579 197.566 197.177 197.702
Pipe Culvert 1x1.2Ø
Pipe Culvert 1x1.2Ø
ROW
K=86.512
L=60.000m
EROW
Email: bhavanicon1991@gmail.com
M/s BHAVANI CONSTRUCTIONS
251+190 196.910 197.575 197.357 197.903
SAMARTH INFRAENGG
16-6-114, Near Vijaya Mahal, Nellore-524001
W W
EROW
G=0.790%
L=49.556m
ROW
SKEW
PROPOSAL
EROW
PMC CONSULTANT :
EROW
251+300
251+300
196.991 197.885 197.342 198.658
IN ASSOCIATION WITH
CD.NO : 252/2
251+309
251+312
EROW
K=-136.299
L=165.000m
251+340 197.043 197.942 197.349 198.752
ROW
PROOF CONSULTANT :
ROW
SAFETY CONSULTANT :
EROW
L=9.856m
G=0.421%
ROW
Consultant LLP
Bangalore, Karnataka
Engineers Pvt. Ltd.
251+450 197.627 198.305 197.685 198.494
Hyderabad, Telangana
D=1470.493
251+470
C
F
PROJECT :
251+510 197.719 198.412 197.895 198.457
EROW
VIP CH:=251519.370
251+520
EROW
VIP LVL:=198.175
REV.
EROW
EROW
ROW
DATE
251+640 198.086 198.615 198.280 199.086
R0 24.04.2024
R1 27.04.2024 251+650 198.020 198.619 198.227 199.149
EROW
KMP
251+670 197.745 198.625 198.182 199.254
ROW
251+700
251+700
197.874 198.659 198.102 199.357
PROPOSAL
EROW
CA SPAN (M):
EROW
K=-139.089
DESIGN CHAINAGE:
L=175.000m
DESCRIPTION
FOR APPROVAL
251+730
VIDE EMAIL Dt.: 19.05.2024
251+740
-
EROW
251+760
251+735
251+737
251+790
VIDE LETTER NO. PVR/BC/P&P/2024-25/01 Dt: 25.04.2024
EROW
251+810
EROW
DRAWN
SCALE :
APPROVED :
VERTICAL
RP
KS
DATE : 20/05/2024
BH
EROW
EROW
LHS=2.500
ROW
- 1:200
REVISION :
G=0.310%
L=59.139m
MATCHLINE
EROW
W
252+000 198.811 199.156 198.660 199.301 O
R
EROW
252+000
ROW
OF MAIN CARRIAGEWAY
TO VINUKONDA
NH-765/DO-KJ/PKG-2/HW/P&P-008
(Km: 251+000 TO Km: 252+000)
LHS
CLIENT :
RHS
AUTHORITY :
SCHEMATIC
TO SRISAILAM
DATUM=189.000m
LHS
RHS
SUPER ELEVATION
DESIGN CHAINAGE
DISTANCE FROM PCL
DISTANCE FROM PCL
VERTICAL ALIGNMENT
PROPOSED FRL ALONG
CARRIAGEWAY CENTER
HORIZONTAL SCHEMATIC
10
190
195
200
205
ROW
252+000 198.811 199.156 198.660 199.301
HIP NO.
MATCHLINE
EROW
(MoRT&H)
W
O
R
EROW
252+000
252+010 198.795 199.178 198.680 199.319
ROW
(m)
HIP
GOVERNMENT OF INDIA
252533.962
252+040 198.608 199.192 198.601 199.357
(m)
C
F
O
ROW
Easting
LHS=2.500
252+070 198.419 199.266 198.726 199.371
303001.478
KMP
ROW
VIP CH:=252079.128
252+080 198.366 199.266 198.739 199.371 VIP LVL:=199.574
K=-384.777
252+090 198.293 199.277 198.783 199.368
L=250.000m
(m)
EROW
252+100
Northing
RHS=2.500
1758651.118
252+110 198.320 199.264 198.837 199.354
252+120 198.249 199.246 198.705 199.343
ROW
(m)
252+130 198.354 199.226 198.597 199.330
13700
EPC CONTRACTOR :
Radius
ROW
DESIGN CONSULTANT :
EROW
Email: bhavanicon1991@gmail.com
M/s BHAVANI CONSTRUCTIONS
252+190 197.616 198.690 197.892 199.195
SAMARTH INFRAENGG
ROW
EROW
1.12
Total
O O
Deviation
252+200
R R
ROW
KMP
252+210 197.027 198.602 197.025 199.130
252+220 196.795 198.606 197.404 199.096
D=1470.493
(m)
Curve,Lc
Length of
CD NO:
PROPOSAL
EROW
G=-0.340%
DESIGN CHAINAGE:
L=105.468m
252+270
Spiral, Ls
KMP
PMC CONSULTANT :
252+280 197.454 198.830 198.222 198.892
-
EROW
100
253/1
(km/h)
Speed
Design
IN ASSOCIATION WITH
252+216
252+217
252+300
252+310 197.448 198.602 198.402 198.790
(e) (%)
elevetion,
EROW
252+340
VIP CH:=252339.596
EROW
K=61.906
L=60.000m
252+350 197.357 198.614 198.165 198.786
252+360 197.349 198.675 198.155 198.826
252+370 197.455 198.745 198.274 198.881
252+380 197.682 198.815 198.408 198.944
EROW
EROW
PROOF CONSULTANT :
SAFETY CONSULTANT :
252+420 197.793 199.107 198.364 199.196
C
F
O
Consultant LLP
G=0.630%
Bangalore, Karnataka
L=135.120m
Hyderabad, Telangana
M/s PVR Consulting
252+460 198.526 199.430 198.438 199.448
252+470 198.798 199.426 198.600 199.511
EROW
PROJECT :
252+510 197.820 199.650 198.897 199.762
252+520 197.948 199.699 199.136 199.817
PLAN
REV.
252+620 199.013 199.937 199.343 199.977
EROW
252+630
EROW
DATE
252+640 198.933 199.816 199.350 199.922
R0 24.04.2024
R1 27.04.2024 252+650 198.901 199.743 199.297 199.884
252+660 198.780 199.725 199.273 199.839
252+670 198.720 199.718 199.292 199.787 KMP
PT 252667.470
EROW
EROW
CD.NO : 253/2
EROW
DESCRIPTION
FOR APPROVAL
252+730
VIDE EMAIL Dt.: 19.05.2024
K=87.593
L=60.000m
PROPOSAL
EROW
252+790
VIDE LETTER NO. PVR/BC/P&P/2024-25/01 Dt: 25.04.2024
252+730
EROW
DRAWN
SCALE :
APPROVED :
New Construction
D=1079.162
Box Culvert -1x6.0m
252+850
DATE : 20/05/2024
VERTICAL
RP
KS
BH
- 1:200
252+900
252+910 198.320 199.242 198.615 199.333
TITLE :
EROW
VIP CH:=252916.416
VIP LVL:=199.326
EROW
REVISION :
L=60.000m
R2
253+000
MATCHLINE
198.078 199.001 197.747 199.492 W
O
W
O
R R
OF MAIN CARRIAGEWAY
253+000
EROW
TO VINUKONDA
NH-765/DO-KJ/PKG-2/HW/P&P-009
EROW
CLIENT :
RHS
AUTHORITY :
SCHEMATIC
TO SRISAILAM
DATUM=189.000m
LHS
RHS
SUPER ELEVATION
DESIGN CHAINAGE
DISTANCE FROM PCL
DISTANCE FROM PCL
VERTICAL ALIGNMENT
PROPOSED FRL ALONG
CARRIAGEWAY CENTER
HORIZONTAL SCHEMATIC
C
F
O
190
195
200
205
11
MATCHLINE
253+000 198.078 199.001 197.747 199.492 W W
(MoRT&H)
HIP NO.
O O
253+000 R R
EROW
253+010 198.071 198.942 197.737 199.510
(m)
HIP
GOVERNMENT OF INDIA
253866.471
ROW
253+040 197.801 198.889 197.600 199.527
(m)
ROW
VIP CH:=253071.818
EROW
PROPOSAL
Easting
253+070 197.308 198.780 197.623 199.482 VIP LVL:=199.634
304313.316
CA SPAN (M):
LHS=2.500
CA CHAINAGE:
K=-145.693
L=135.000m
DESIGN SPAN (M):
C
F
O
DESIGN CHAINAGE:
(m)
EROW
253+100
Northing
CD.NO : 254/1
1758884.963
253+110 197.581 198.719 198.042 199.326
RHS=2.500
EROW
254/1
253+072
ROW
(m)
6800
EPC CONTRACTOR :
Radius
Reconstruction
DESIGN CONSULTANT :
EROW
253+170
Direction
L=53.453m
G=-0.728%
253+180 197.644 198.379 197.950 198.846
Email: bhavanicon1991@gmail.com
M/s BHAVANI CONSTRUCTIONS
253+190 197.650 198.363 198.039 198.773
SAMARTH INFRAENGG
ROW
C
F
O
EROW
2.02
VIP LVL:=198.534
(m)
K=106.787
L=60.000m
239.653
Curve,Lc
Length of
253+260
0
KMP
253+270 197.412 198.400 197.651 198.456
Spiral, Ls
Length of
PMC CONSULTANT :
253+280 197.447 198.424 197.561 198.439
253+290 197.399 198.445 197.622 198.422
EROW
100
ROW
(km/h)
Speed
IN ASSOCIATION WITH
253+300
EROW
(e) (%)
EROW
D=1079.162
253+400 197.272 198.172 197.250 198.239 W
O
W
O
EROW
253+400
R R
PROOF CONSULTANT :
SAFETY CONSULTANT :
253+420 197.252 198.008 197.474 198.206
ROW
Consultant LLP
Bangalore, Karnataka
Engineers Pvt. Ltd.
253+450 197.220 197.944 196.943 198.156
Hyderabad, Telangana
EROW
EROW
CD NO:
PROJECT :
PROPOSAL
ROW
CA CHAINAGE:
W
O
EROW
EROW
253+531
CD.NO : 254/2
G=-0.167%
253+600
253+600
196.635 197.677 197.065 197.906
L=672.648m
DRAIN START
253+610 196.632 197.637 197.108 197.890
REV.
PAVER BLOCK &
ROW
DATE
253+640 196.538 197.654 197.268 197.840
R0 24.04.2024
R1 27.04.2024
EROW
ROW
DESCRIPTION
FOR APPROVAL
253+730
VIDE EMAIL Dt.: 19.05.2024
ROW
PC 253746.632
253+750 196.635 197.587 197.350 197.656 W
O
R
EROW
EROW
BUSSHELTER
253+790
VIDE LETTER NO. PVR/BC/P&P/2024-25/01 Dt: 25.04.2024
DRAWN
SCALE :
APPROVED :
EROW
ROW
VERTICAL
RP
KS
BH
- 1:200
HIP-11
LHS=2.500
DRG. NO. :
REVISION :
RHS=2.500
EROW
K=-142.678
L=130.000m
D=262.087
OF MAIN CARRIAGEWAY
TO VINUKONDA
NH-765/DO-KJ/PKG-2/HW/P&P-010
(Km: 253+000 TO Km: 254+000)
EROW
EROW
ROW
BUSSHELTER
CH:254+010
LHS
CLIENT :
RHS
AUTHORITY :
SCHEMATIC
TO SRISAILAM
DATUM=183.000m
LHS
RHS
SUPER ELEVATION
DESIGN CHAINAGE
DISTANCE FROM PCL
DISTANCE FROM PCL
VERTICAL ALIGNMENT
PROPOSED FRL ALONG
EROW
CARRIAGEWAY CENTER
HORIZONTAL SCHEMATIC
PT 253986
.285 MATCHLIN
E
W
12
O
R
W
185
190
195
200
VIP LVL:=197.256 O
R
HIP NO.
ROW
254+000 196.065 196.309 196.128 197.045
(MoRT&H)
254+000
EROW
254+010 195.896 196.267 196.014 196.973
ER
(m)
HIP
GOVERNMENT OF INDIA
BUSSHELT
196.099 196.305 195.789 196.807
Chainage
254428.854
Easting
ROW
304870.13
EROW
LHS=2.500
254+080 195.428 195.628 195.157 196.291
ROW
(m)
254+100 194.680 195.070 194.429 196.075
Northing
DRAIN EN
1758964.09
EROW
RHS=2.500
PAVER BL D
OCK
254+110
&
194.290 194.819 194.348 195.967
EROW
G=-1.078%
L=109.335m
D=262.087
(m)
C
F
O
2000
ROW
Radius
EPC CONTRACTOR :
254+140 193.638 194.146 193.768 195.644
DESIGN CONSULTANT :
254+150 193.254 193.965 193.616 195.536
ROW
EROW
254+160
Right
193.139 193.795 193.394 195.428
Direction
(Left/Right)
Email: bhavanicon1991@gmail.com
M/s BHAVANI CONSTRUCTIONS
W
254+190 192.633 193.309 193.085 195.140 O
W R
SAMARTH INFRAENGG
ROW
O
R
10.31
Total
254+200
254+230
359.989
VIP CH:=254234.754
Length of
K=92.038
L=140.000m
PC 254248
.372
EROW
(m)
EROW
PMC CONSULTANT :
ROW
REALIGNMEN
254+300 T
(km/h)
Speed
Design
EROW
IN ASSOCIATION WITH
EROW
(e) (%)
PROPOSAL
254+330
BRIDGE NO:
G=0.443%
L=32.708m
CA SPAN (M):
CA CHAINAGE:
EROW
DESIGN SPAN (M):
DESIGN CHAINAGE:
254+467
VIP CH:=254387.462
ROW
K=-225.516
L=100.000m
254+400 191.935 192.036 191.825 195.269
OW
New construction
ERROW
PROOF CONSULTANT :
SAFETY CONSULTANT :
Major Bridge -3x20.0m
Consultant LLP
C
F
O
Bangalore, Karnataka
Engineers Pvt. Ltd.
254+450 188.720 189.156 190.528 195.300
Hyderabad, Telangana
ROW
R=2000.000 L=359.989
254+460 189.915 188.992 189.836 195.300
254+470 190.972 189.026 189.613 195.300
ROW
G=0.000%
L=86.267m
254+500
254+500
EROW
PROJECT :
254+510 191.855 191.518 189.825 195.300
ROW
PT 254608.361
RO
REV.
254+620 191.670 192.219 191.759 195.096
254+630 191.179 191.836 191.678 195.052
DATE
EROW
R0 24.04.2024
R1 27.04.2024
ROW
EROW
C
F
O
K=-227.244
L=300.000m
254+700
254+690 191.136 191.430 191.514 194.692
EROW
254+730
VIDE EMAIL Dt.: 19.05.2024
254+750
0
189.860 191.560 191.187 194.173 END CH: 254+76
254+760 190.009 191.574 191.335 194.072 REALIGNMENT
R2 20.05.2024 REVISED AS PER A.E's OBSERVATION
254+790
VIDE LETTER NO. PVR/BC/P&P/2024-25/01 Dt: 25.04.2024
KMP
W W
PROPOSAL
D=2693.284
DRAWN
SCALE :
254+820
SKEW
EROW
CD NO:
CA CHAINAGE:
DESIGNED :
:
DESIGN SPAN (M
APPROVED :
PROPOSAL
):
EROW
ROW
GE:
DESIGN CHAINA
DESIGN SPAN (M
254+850
DATE : 20/05/2024
VERTICAL
RP
KS
BH
-
):
GE:
ROW
EROW
254+882
- 1:200
255/2
Reconstruction
W
O
254+900
254+890 189.465 190.590 189.940 192.445 R W
O
254+960
Box Culvert -1x2
R
254+962
Box Culvert -1x2
C
F
O
ROW
.0m
Reconstruction
Box Culvert -1x2
LHS=2.500
254+910
Box Culvert -1x2
G=-1.320%
L=179.795m
REVISION :
CD.NO : 255/2
NH-765/DO-KJ/PKG-2/HW/P&P-011
(Km: 254+000 TO Km: 255+000)
EROW
EROW
ROW
LHS
CLIENT :
RHS
AUTHORITY :
SCHEMATIC
TO SRISAILAM
DATUM=183.000m
LHS
RHS
SUPER ELEVATION
DESIGN CHAINAGE
DISTANCE FROM PCL
DISTANCE FROM PCL
VERTICAL ALIGNMENT
PROPOSED FRL ALONG
ROW
CARRIAGEWAY CENTER
HORIZONTAL SCHEMATIC
EROW
ROW
MATCHLINE
185
190
195
200
255+000
255+000 188.750 189.990 189.378 190.993
(MoRT&H)
255+010 188.934 190.006 189.979 190.863
EROW
GOVERNMENT OF INDIA
ROW
255+040 189.008 190.133 189.814 190.537
LHS=2.500
255+070 188.791 189.957 189.745 190.310
EROW
RHS=2.500
K=91.669
ROW
L=180.000m
255+110 188.339 189.447 189.604 190.159
SKEW
CD NO:
ROWEROW
EPC CONTRACTOR :
CA CHAINAGE:
DESIGN CONSULTANT :
DESIGN CHAINAGE:
F
O
C
EROW
Email: bhavanicon1991@gmail.com
M/s BHAVANI CONSTRUCTIONS
ROW
SAMARTH INFRAENGG
Reconstruction
255+200
KMP
G=0.643%
L=23.569m
Box Culvert -1x2.0m
Box Culvert -1x2.0m
CD.NO : 256/1
EROW
PMC CONSULTANT :
255+280 189.020 190.451 189.692 190.775
255+290 189.529 190.618 189.999 190.786 VIP CH:=255294.593 W W
O O
255+300
R R
ROW
IN ASSOCIATION WITH
K=-145.263
L=175.000m
255+310 189.779 190.778 190.262 190.786
EROW
PROOF CONSULTANT :
EROW
SAFETY CONSULTANT :
255+420 190.208 190.326 189.984 190.348
EROW
ROW
Consultant LLP
ROW
Bangalore, Karnataka
Engineers Pvt. Ltd.
255+450 189.573 190.249 189.947 190.179
Hyderabad, Telangana
M/s PVR Consulting
255+460 189.212 190.205 189.812 190.123
EROW
G=-0.561%
L=149.221m
EROW
PROJECT :
EROW
255+510
ROW
D=2693.284
255+520 189.024 189.668 189.086 189.787
PLAN
REV.
EROW
ROW
DATE
ROW
R0 24.04.2024
R1 27.04.2024 255+650 189.393 189.558 189.582 189.726
EROW
ROW
W W
O O
255+700
R R
CA SPAN (M):
CD.NO : 256/2
EROW
ROW
EROW
DESIGN CHAINAGE:
DESCRIPTION
FOR APPROVAL
255+730
VIDE EMAIL Dt.: 19.05.2024
255+668
255+670
ROW
255+790
VIDE LETTER NO. PVR/BC/P&P/2024-25/01 Dt: 25.04.2024
L=410.314m
DRAWN
SCALE :
APPROVED :
ROW
255+850
DATE : 20/05/2024
VERTICAL
RP
KS
BH
EROW
- 1:200
R
ROW
LHS=2.500
DRG. NO. :
REVISION :
RHS=2.500
MATCHLINE
PLAN & PROFILE
256+000
256+000 189.393 190.288 190.014 190.403
EROW
ROW
OF MAIN CARRIAGEWAY
TO VINUKONDA
NH-765/DO-KJ/PKG-2/HW/P&P-012
(Km: 255+000 TO Km: 256+000)
ROW
LHS
CLIENT :
RHS
AUTHORITY :
SCHEMATIC
TO SRISAILAM
DATUM=183.000m
LHS
RHS
SUPER ELEVATION
DESIGN CHAINAGE
DISTANCE FROM PCL
DISTANCE FROM PCL
VERTICAL ALIGNMENT
PROPOSED FRL ALONG
CARRIAGEWAY CENTER
HORIZONTAL SCHEMATIC
EROW
MATCHLINE
256+000
EROW
185
190
195
200
256+000
ROW
189.393 190.288 190.014 190.403
(MoRT&H)
256+010 189.577 190.262 190.043 190.420
GOVERNMENT OF INDIA
LHS=2.500
ROW
W W
O O
256+100
R R
EROW
RHS=2.500
256+110 189.207 190.000 189.815 190.203 VIP CH:=256111.628
VIP LVL:=190.619
256+120 188.951 189.988 189.840 190.142
K=-142.058
L=220.000m
ROW
256+130
EROW
EPC CONTRACTOR :
EROW
DESIGN CONSULTANT :
ROW
Email: bhavanicon1991@gmail.com
M/s BHAVANI CONSTRUCTIONS
EROW
256+200
256+190 188.608 189.449 189.238 189.522
SAMARTH INFRAENGG
ROW
L=36.751m
187.839 188.679 188.029 188.744
G=-1.355%
ROW
EROW
PMC CONSULTANT :
ROW
PROPOSAL
VIP CH:=256288.379 W W
CA SPAN (M):
O O
256+300
R R
CA CHAINAGE:
K=51.498
L=60.000m
DESIGN SPAN (M):
IN ASSOCIATION WITH
DESIGN CHAINAGE:
CD.NO : 257/1
L=99.873m
G=-0.190%
EROW
256+400
256+390 187.126 187.867 187.342 188.031
256+400 187.445 187.902 187.500 188.012
ROW
PROOF CONSULTANT :
SAFETY CONSULTANT :
256+420
EROW
Consultant LLP
Bangalore, Karnataka
Engineers Pvt. Ltd.
256+450 186.992 187.848 187.388 187.904
Hyderabad, Telangana
M/s PVR Consulting
ROW
K=-384.751
L=100.000m
PROJECT :
256+510 186.809 187.641 186.964 187.693
F
C
O
EROW
ROW
D=2693.284
EROW
LONGITUDINAL SECTION
REV.
EROW
DATE
256+640 186.196 187.028 186.529 187.109
R0 24.04.2024
R1 27.04.2024
ROW
256+730
VIDE EMAIL Dt.: 19.05.2024
EROW
ROW
KMP
256+800
REVISED AS PER PROOF CONSULTANT OBSERVATIONS
256+790
VIDE LETTER NO. PVR/BC/P&P/2024-25/01 Dt: 25.04.2024
ROW
DESIGN CHAINAGE:
EROW
DRAWN
SCALE :
APPROVED :
256+820
256+822
CD.NO : 257/2
256+850
DATE : 20/05/2024
VERTICAL
RP
KS
BH
EROW
EROW
VIP LVL:=186.119
256+870 184.967 185.932 185.242 186.028
L=175.000m
K=-1031.735
- 1:200
W
O
256+900
R
256+890 184.862 185.888 185.340 185.917
256+900 184.917 185.860 185.394 185.860
EROW
ROW
LHS=2.500
F
O
C
TITLE :
REVISION :
256+970
G=-0.620%
OF MAIN CARRIAGEWAY
TO VINUKONDA
NH-765/DO-KJ/PKG-2/HW/P&P-013
(Km: 256+000 TO Km: 257+000)
ROW
LHS
CLIENT :
RHS
AUTHORITY :
SCHEMATIC
TO SRISAILAM
DATUM=173.000m
LHS
RHS
SUPER ELEVATION
DESIGN CHAINAGE
DISTANCE FROM PCL
DISTANCE FROM PCL
ERO
W
VERTICAL ALIGNMENT
PROPOSED FRL ALONG
R OW
CARRIAGEWAY CENTER
HORIZONTAL SCHEMATIC
13
000
HIP NO.
175
180
185
190
257+
K=299.053
L=235.000m
NE
E RO
ROW
(MoRT&H)
CHLI
W
MAT
257+010 184.384 185.202 184.763 185.215
ERO
GOVERNMENT OF INDIA
257463.917
ROW
LHS=2.500
257+070 184.184 184.961 184.110 184.981
257+080 184.107 184.933 184.278 184.953 100
VIP CH:=257088.903 W
O
257+
R
(m)
W
O
R
ROW
Northing
K=299.053
257+100 183.929 184.886 184.374 184.909
1758855.616
L=235.000m
RHS=2.500
ERO
W
500
ROW
Radius
EPC CONTRACTOR :
ERO
DESIGN CONSULTANT :
257+150 183.855 184.715 183.859 184.856
Left
ERO
W
D=2693.284
257+180 183.507 184.631 183.831 184.864
200
257+
Email: bhavanicon1991@gmail.com
M/s BHAVANI CONSTRUCTIONS
ERO
ROW
KMP
W
26.21
Total
SAMARTH INFRAENGG
angle (∆)
Deviation
G=0.166%
L=37.848m
W
257+250
E OW
C
F
O
300 .645
PMC CONSULTANT :
H
257+280
ERO
257+ TS 257301
R
57+3
W
W
100
00
CH:2 ELTER
ERO
W
IN ASSOCIATION WITH
257+310 182.762 183.814 183.087 184.918
ROW
7+350 S
257+320
Super
VIP LVL:=185.084
SKEW
PROP
A CH:25 TA BYPAS
T
ERO
ST A
DESIG
A K
K=-143.653
DESIG
257+330
CA SP
L=150.000m
CD N
CA CH
MADD
OSAL
O:
W
AN (M
AINA
ROW
):
AINA
CL=95.000
N (M)
:
ROW
257+370
396.645
182.455 183.336 182.893 184.618
-
SC 257
ERO
C
F
O
W
W
0
O
R
257+380 182.448 183.262 182.746 184.543
257+40
New
257+
ERO
Pipe C
443
Const
W
445
R
ulvert
ructio
PROOF CONSULTANT :
ROW
n
-1x1.
SAFETY CONSULTANT :
L=24.125m
G=-0.878%
-1x1.
W
2Ø
C
F
ROW
R
W
Consultant LLP
Bangalore, Karnataka
Engineers Pvt. Ltd.
257+450 182.650 182.078 182.039 183.945
Hyderabad, Telangana
M/s PVR Consulting
HIP-13
LHS=5.000
RHS=5.000
ROW
CD.NO : 258/1
W R
O
R
W
257+500
R=-500.000 L=133.742
257+490 182.590 181.670 181.905 183.634
ROW
PROJECT :
257+510 182.008 181.805 181.767 183.490
ERO
W
0.387
W
R
257+530 181.672 181.645 181.605 183.353
W
W
O
R
VIP CH:=257568.377
257+570 181.400 181.435 181.187 183.104 VIP LVL:=182.896
ERO
K=519.032
W
L=300.000m
600
ERO
REV.
W
ST 25
7
257+620
625.3
181.207 181.092 181.050 182.835 7 8
ROW
ERO
W
O
W
DATE
R
R0 24.04.2024
R1 27.04.2024 257+650 180.779 180.792 180.916 182.696
ERO
W
ERO
O
R
257+730
VIDE EMAIL Dt.: 19.05.2024
SKEW
D=181.361
DESIGN
257+740
PROPO
ROW
SAL
SPAN (
257+760
CHAINA
R
LHS=2.500
RHS=2.500
W
257+790
VIDE LETTER NO. PVR/BC/P&P/2024-25/01 Dt: 25.04.2024
Pip
TS 25
ROW
Pipe C
7806.7
257+83
C
u
48
257+800 179.983 179.523 179.350 182.201
257+83
2
u
New Co
0
DRAWN
lvert -2
SCALE :
W
x1.2Ø
R
DESIGNED :
:
x1.2Ø
APPROVED :
CL=60.000
SKEW
257+850
DATE : 20/05/2024
RJ
VERTICAL
RP
PROPO
KS
BH
DESIGN
SC 257
66.748 8
ROW
257+860
SAL
CD.NO : 258/2
SPAN
257+870
(
G=-0.300%
L=634.412m
M
ROW
W
O
):
R
- 1:200
GE:
0
257+890 179.131 179.124 179.064 181.931
-
257+900
Bo
x
Box C
C
u
258+00
TITLE :
New Co
8
lv
DRG. NO. :
REVISION :
W
O
R
257+930 178.836 178.882 178.856 181.811
ert -1x3
nstructi
ert -1x3
o n
ROW
257+940
.0m
LHS=5.000
R2
.0m
OF MAIN CARRIAGEWAY
TO VINUKONDA
CD.NO : 259/1
NH-765/DO-KJ/PKG-2/HW/P&P-014
(Km: 257+000 TO Km: 258+000)
W
O
R W
O
R
LHS
CLIENT :
RHS
AUTHORITY :
SCHEMATIC
TO SRISAILAM
DATUM=173.000m
LHS
RHS
SUPER ELEVATION
DESIGN CHAINAGE
RO
VERTICAL ALIGNMENT
PROPOSED FRL ALONG
CARRIAGEWAY CENTER
RO
HORIZONTAL SCHEMATIC
O
R
MA
CD.NO
TC
175
180
190
HL
IN
258+000 178.581 178.651 178.644 181.601
(MoRT&H)
E
185 : 259/1
RO
W
GOVERNMENT OF INDIA
RO
W
S
O
H
NO:
R
S
P
DES
A
K
I
PRO
P
IGN
14
W
O
RO
S
HIP NO.
CH
(M)
AGE
W
:
:
AL
RO
I
W
DES N SPAN
N
(m)
HIP
W
O
258+110 178.528 178.447 178.483 181.271 R
25
25
Chainage
259
258231.178
8+
2
8
/2
10
5
Box
-
C
Box
ul
New
0
ul
EPC CONTRACTOR :
e
C
8
v
o
W
e
O
RO
(m)
W
DESIGN CONSULTANT :
nstr
RO
Easting
W
258+150
+15 rt -1x3.
308614.667
ucti
+14 rt -1x3.
0m
on
CD.NO : 259/2
G=-0.300%
L=634.412m
Northing
Email: bhavanicon1991@gmail.com
R
W
HIP
O
1759145.845
O
R
258+190 178.427 178.418 178.435 181.031
CD NO:
IG
SAMARTH INFRAENGG
C A C HA
A
SKEW
N
O
CA SP N
DESIGN
-14
AL
258
A
(M):
+20
0
(m)
800
INAGE:
Radius
(M
HAINAG
Right
o
Box
W
x
O
259/3
R
Direction
258+250
C
LHS=5.000
u
RHS=5.000
258+29
0
lv
8
lv
ert -1x3
53.28
PMC CONSULTANT :
Total
ert -1x3
o
angle (∆)
Deviation
.0m
.0m
W
O
258+290 R
R=800.000 L=683.920
178.331 178.319 178.321 180.731
W
O
R
258+300 178.301 178.319 178.313 180.701
258+ 3
IN ASSOCIATION WITH
00
(m)
CD.NO : 259/3
ROW
W
O
R
258+400
258+400 178.743 180.428 178.750 180.354 VIP CH:=258402.788
ROW
5.00
VIP LVL:=180.393
Super
(e) (%)
PROOF CONSULTANT :
K=-233.186
elevetion,
L=100.000m
SAFETY CONSULTANT :
258+420 177.141 177.633 179.036 180.245
258+430 177.004 177.369 177.731 180.184
Consultant LLP
Bangalore, Karnataka
Engineers Pvt. Ltd.
258+450 177.070 177.196 177.636 180.049
Hyderabad, Telangana
M/s PVR Consulting
258+460 177.040 177.274 177.552 179.976
ROW
ROW
W
O
R
258+500 176.969 177.221 177.351 179.685
PROJECT :
258+510 177.024 177.181 177.340 179.612
258+520 177.081 177.208 177.398 179.539
PLAN
ROW
W
O
R
W
258+550 177.302 177.553 177.746 179.320 O
R
8610.6
ST 25
W
O
258+600 177.234 177.357 177.686 178.956 R
REV.
258+620 177.179 177.294 177.467 178.813
258+630 177.254 177.294 177.438 178.750
DATE
258+640 177.189 177.336 177.408 178.695 VIP CH:=258640.495
VIP LVL:=178.661
R0 24.04.2024
R1 27.04.2024 O
W
R
K=141.897
ROW
SAL
700
W
O
R
258+
N SPA
EROW
AINAG
):
E:
DESCRIPTION
FOR APPROVAL
258+730
VIDE EMAIL Dt.: 19.05.2024
258+740
EROW
ulvert
onstru
ction
258+
EROW
258+790
VIDE LETTER NO. PVR/BC/P&P/2024-25/01 Dt: 25.04.2024
SCALE :
APPROVED :
CD.NO : 259/4
EROW
ROW
258+850
DATE : 20/05/2024
VERTICAL
RP
G=-0.306%
KS
BH
L=339.864m
O
EROW
R
258+
EROW
TITLE :
258+920
LHS=2.500
DRG. NO. :
REVISION :
O
R
EROW
CL=40.000
EROW
000
EROW
259+ INE
W
258+990 176.307 176.316 176.393 177.591 O
R
TCHL MA
PLAN & PROFILE
10
259+000 176.237 176.247 176.330 177.560 9025.4
SC 25
OF MAIN CARRIAGEWAY
TO VINUKONDA
NH-765/DO-KJ/PKG-2/HW/P&P-015
(Km: 258+000 TO Km: 259+000)
CL=40.000
EROW
EROW
ROW
LHS
CLIENT :
RHS
AUTHORITY :
SCHEMATIC
TO SRISAILAM
DATUM=167.000m
LHS
RHS
SUPER ELEVATION
DESIGN CHAINAGE
DISTANCE FROM PCL
DISTANCE FROM PCL
R
VERTICAL ALIGNMENT
PROPOSED FRL ALONG
CARRIAGEWAY CENTER
HORIZONTAL SCHEMATIC
8985 5
TS 2
15
170
175
180
185
ROW
ROW
EROW
HIP NO.
0
O
F
C
259+000
EROW
176.237 176.247 176.330 177.560
(MoRT&H)
+00
259
259+010 176.203 176.235 176.226 177.530 0 E IN
W
(m)
HIP
SC 2
CL=40.000
GOVERNMENT OF INDIA
Chainage
176.143 176.196 176.216 177.488
259225.215
EROW
L=60.000m
R OW
(m)
LHS=2.500
Easting
309529.328
259+070 175.976 175.938 176.005 177.526
259+080 176.223 175.902 175.955 177.556
G=0.300%
L=17.277m
259+090 175.879 175.880 175.905 177.586
EROW
(m)
EROW
100
259+100 175.827 175.805 175.836 177.612 259+
Northing
RHS=2.500
1758653.318
259+110 175.877 175.908 175.795 177.633
RO W
(m)
1200
259+130 176.432 175.728 175.725 177.660
Radius
EPC CONTRACTOR :
259+140 176.393 175.730 175.772 177.666
EROW
DESIGN CONSULTANT :
EROW
ROW
Email: bhavanicon1991@gmail.com
M/s BHAVANI CONSTRUCTIONS
EROW
SAMARTH INFRAENGG
EROW
20.82
Total
VIP CH:=259197.636 0
K=-196.429
L=220.000m
259+210 175.477 175.847 175.588 177.565
259+220 175.525 176.157 175.381 177.530
(m)
395.977
LHS=3.700
RHS=3.700
Curve,Lc
Length of
EROW
R=-1200.000 L=395.977
HIPROW
-15
W
259+250 175.274 176.035 175.269 177.395 O
R
SKEW
40
(m)
CD.NO : 260/1
PROPOSAL
Spiral, Ls
DESIGN SP
CA CHAIN
Length of
DESIGN CH
PMC CONSULTANT :
AGE:
EROW
100
(km/h)
Speed
Design
W
KMP
259+300 174.967 176.147 175.199 177.068 O
IN ASSOCIATION WITH
259+300
R W
-
O
R
ROW
(e) (%)
259+230
New Const
elevetion,
Box Culvert
EROW
EROW
259+340
END CH:259+350
174.832 175.866 174.986 176.741
ruction
MADDALAKATTA BYPASS
259+350 174.813 175.819 174.922 176.659
-1x2.0m
W
O
-1x2.0m
EROW
PROOF CONSULTANT :
SAFETY CONSULTANT :
259+420 174.639 175.485 174.570 176.085 CS 259421.387
ROW
EROW
Consultant LLP
Bangalore, Karnataka
Engineers Pvt. Ltd.
259+450 174.344 175.250 174.364 175.839
Hyderabad, Telangana
M/s PVR Consulting
CL=40.000
259+460 174.303 175.158 174.310 175.757
ST 259461.387
259+470 174.268 175.087 174.253 175.675
EROW
PROJECT :
259+500
ROW
EROW
REV.
259+620 173.360 174.343 173.665 174.445
ROW
EROW
EROW
DATE
ROW
R0 24.04.2024
R1 27.04.2024 259+650 172.896 174.031 173.171 174.199
259+660 172.871 173.974 173.278 174.117
259+670 172.719 173.927 173.070 174.035
G=-0.820%
L=706.302m
EROW
EROW
EROW
DESCRIPTION
FOR APPROVAL
259+730
VIDE EMAIL Dt.: 19.05.2024
259+790
VIDE LETTER NO. PVR/BC/P&P/2024-25/01 Dt: 25.04.2024
DRAWN
SCALE :
APPROVED :
VERTICAL
RP
KS
BH
EROW
- 1:200
EROW
REVISION :
RHS=2.500
EROW
MATCHLINE
W
260+000 O
169.579 170.518 169.809 171.329 W R
O
R
OF MAIN CARRIAGEWAY
ROW
260+000
EROW
TO VINUKONDA
EROW
NH-765/DO-KJ/PKG-2/HW/P&P-016
(Km: 259+000 TO Km: 260+000)
ROW
LHS
CLIENT :
RHS
AUTHORITY :
SCHEMATIC
TO SRISAILAM
DATUM=161.000m
LHS
RHS
SUPER ELEVATION
DESIGN CHAINAGE
DISTANCE FROM PCL
DISTANCE FROM PCL
VERTICAL ALIGNMENT
PROPOSED FRL ALONG
CARRIAGEWAY CENTER
HORIZONTAL SCHEMATIC
18
17
16
MATCHLINE
W W
O O
HIP NO.
R R
165
170
175
180
260+000
260+000
ROW
169.579 170.518 169.809 171.329
(MoRT&H)
EROW
EROW
260+010 169.495 170.428 169.886 171.247
ROW
260859.37
Chainage
GOVERNMENT OF INDIA
260597.876
260372.228
G=-0.820%
(m)
311148.66
310666.854
310890.339
LHS=2.500
ROW
VIP CH:=260068.938
260+070 168.739 169.804 169.356 170.848 VIP LVL:=170.764
ROW
K=169.231
260+080 168.710 169.719 169.285 170.802
L=110.000m
(m)
260+090 168.833 169.661 169.114 170.762 260+100
Northing
EROW
1758408.407
1758449.038
1758480.208
RHS=2.500
260+110 168.447 169.572 169.312 170.700
260+120 168.502 169.573 169.064 170.678
(m)
5000
5000
5000
Radius
ROW
EPC CONTRACTOR :
260+140 168.140 169.483 168.851 170.643
ROW
DESIGN CONSULTANT :
EROW
EROW
Email: bhavanicon1991@gmail.com
M/s BHAVANI CONSTRUCTIONS
D=887.448
0.54
0.46
Total
G=-0.170%
O
L=112.743m
SAMARTH INFRAENGG
W
260+200
O R
ROW
R
angle (∆)
EROW
Deviation
EROW
40.372
Curve,Lc
Length of
EROW
PMC CONSULTANT :
260+280 167.491 168.673 168.289 170.384
SKEW
100
100
100
CD NO:
Design
260+300
EROW
PROPOSAL
IN ASSOCIATION WITH
CA SPAN (M):
CA CHAINAGE:
O
F
C
DESIGN CHAINAGE:
260+320
Super
ROW
EROW
VIP CH:=260346.681
O
F
C
261/1
K=-440.042
L=220.000m
260+360 167.316 168.440 167.775 170.097
Reconstruction
ROW
EROW
PT 260395.621
260+390
EROW
R=-5000.000 L=46.786
260+400 167.549 168.541 167.858 169.898
ROW
PROOF CONSULTANT :
SAFETY CONSULTANT :
260+420 167.658 168.523 167.995 169.786
260+430 167.648 168.520 167.811 169.726
EROW
Consultant LLP
Bangalore, Karnataka
Engineers Pvt. Ltd.
260+450 167.629 168.528 167.757 169.599
Hyderabad, Telangana
M/s PVR Consulting
ROW
D=158.675
SKEW
EROW
EROW
CD NO:
O
F
C
PROJECT :
CA CHAINAGE:
ROW
DESIGN CHAINAGE:
EROW
EROW
PC 260554.296
260+550 167.677 168.563 168.075 169.027
260+588
260+590
VIP LVL:=168.781
260+580 167.582 168.635 167.885 168.930
Pipe Culvert -1x1.2Ø
Pipe Culvert -1x1.2Ø
EROW
K=238.170
ROW
L=180.000m
REV.
260+620
R=5000.000 L=87.158
DATE
PT 260641.454
260+640 167.596 168.615 168.064 168.850
R0 24.04.2024
R1 27.04.2024
ROW
260+680
EROW
EROW
DESCRIPTION
FOR APPROVAL
EROW
260+790
VIDE LETTER NO. PVR/BC/P&P/2024-25/01 Dt: 25.04.2024
SCALE :
EROW
PC 260839.184
DESIGNED :
:
G=0.086%
APPROVED :
L=320.674m
260+850
DATE : 20/05/2024
VERTICAL
RP
KS
BH
ROW
PT 260879.556
EROW
- 1:200
KMP
LHS=2.500
DRG. NO. :
REVISION :
EROW
260+990
MATCHLINE
168.297 168.905 168.191 169.138 R
O
W
R
O
W
PLAN & PROFILE
261+000
261+000 168.153 168.938 168.249 169.138
OF MAIN CARRIAGEWAY
TO VINUKONDA
EROW
NH-765/DO-KJ/PKG-2/HW/P&P-017
(Km: 260+000 TO Km: 261+000)
EROW
ROW
LHS
CLIENT :
RHS
AUTHORITY :
SCHEMATIC
TO SRISAILAM
DATUM=161.000m
LHS
RHS
SUPER ELEVATION
DESIGN CHAINAGE
DISTANCE FROM PCL
DISTANCE FROM PCL
VERTICAL ALIGNMENT
PROPOSED FRL ALONG
CARRIAGEWAY CENTER
HORIZONTAL SCHEMATIC
O
F
C
MATCHLINE
W W
O O
R R
261+000
165
170
175
180
261+000 168.153 168.938 168.249 169.138
(MoRT&H)
EROW
261+010 168.090 168.967 168.178 169.130
EROW
GOVERNMENT OF INDIA
ROW
261+060
EROW
K=-137.957
LHS=2.500
L=140.000m
261+070 168.227 169.033 168.484 168.933
261+080 168.123 168.972 168.510 168.875
261+100
261+090 167.982 168.898 168.453 168.810
ROW
RHS=2.500
ROW
EROW
EROW
EPC CONTRACTOR :
261+140 167.515 168.308 167.753 168.384
DESIGN CONSULTANT :
261+150 167.453 168.206 167.689 168.291
L=40.207m
G=-0.929%
EROW
EROW
ROW
Email: bhavanicon1991@gmail.com
M/s BHAVANI CONSTRUCTIONS
R O
R
261+200
261+190 167.017 167.839 167.380 167.933
SAMARTH INFRAENGG
16-6-114, Near Vijaya Mahal, Nellore-524001
EROW
O
F
C
EROW
K=270.233
L=170.000m
261+260 166.815 167.394 166.770 167.443
261+270 166.529 167.304 166.816 167.388
PMC CONSULTANT :
261+280 166.500 167.231 166.762 167.337 KMP
261+300
ROW
SKEW
ROW
EROW
IN ASSOCIATION WITH
EROW
CA SPAN (M):
EROW
ROW
261+348
261+350
W W
O O
Box Culvert -1x2.0m
R
Box Culvert -1x2.0m
261+400
R
EROW
PROOF CONSULTANT :
SAFETY CONSULTANT :
ROW
G=-0.300%
L=169.577m
261+430 165.810 166.758 166.101 166.835
Consultant LLP
EROW
EROW
Bangalore, Karnataka
Engineers Pvt. Ltd.
261+450 165.949 166.653 166.001 166.775
Hyderabad, Telangana
M/s PVR Consulting
261+460 165.750 166.606 166.172 166.745
261+470 165.707 166.611 166.016 166.715
261+480 165.532 166.599 165.814 166.685
O
F
ROW
C
261+500
D=2209.484
261+490 165.606 166.568 165.974 166.655
EROW
ROW
EROW
PROJECT :
261+510 165.731 166.505 165.815 166.595
261+520 165.587 166.469 165.886 166.563
PLAN
L=60.000m
EROW
K=-1117.533
ROW
REV.
261+620 165.100 166.094 165.352 166.218
ROW
DATE
EROW
EROW
R0 24.04.2024
R1 27.04.2024 261+650 164.930 166.003 165.179 166.112
261+660 164.982 165.950 164.553 166.077
G=-0.354%
L=174.604m
261+700
ROW
EROW
261+730
VIDE EMAIL Dt.: 19.05.2024
EROW
ROW
W
EROW
O
261+800
R
REVISED AS PER PROOF CONSULTANT OBSERVATIONS
261+790
VIDE LETTER NO. PVR/BC/P&P/2024-25/01 Dt: 25.04.2024
DRAWN
SCALE :
DESIGNED :
:
APPROVED :
EROW
PROPOSAL
261+850
DATE : 20/05/2024
VERTICAL
RP
KS
BH
DESIGN SPAN (M):
DESIGN CHAINAGE:
- 1:200
EROW
HORIZONTAL - 1:2000
261+900
262/1
LHS=2.500
TITLE :
New Construction
DRG. NO. :
REVISION :
EROW
EROW
W
O
R
RHS=2.500
L=130.000m
EROW
MATCHLINE
261+990 163.717 164.551 163.864 164.687 262+000
PLAN & PROFILE
ROW
NH-765/DO-KJ/PKG-2/HW/P&P-018
(Km: 261+000 TO Km: 262+000)
EROW
EROW
LHS
CLIENT :
RHS
AUTHORITY :
SCHEMATIC
TO SRISAILAM
DATUM=155.000m
LHS
RHS
SUPER ELEVATION
DESIGN CHAINAGE
DISTANCE FROM PCL
DISTANCE FROM PCL
VERTICAL ALIGNMENT
PROPOSED FRL ALONG
CARRIAGEWAY CENTER
HORIZONTAL SCHEMATIC
EROW
O
F
C
MATCHLINE
262+000
155
160
165
170
175
ROW
262+000 163.729 164.534 163.935 164.710
(MoRT&H)
262+010 163.673 164.518 163.773 164.744
ROW
GOVERNMENT OF INDIA
EROW
LHS=2.500
ROW
G=0.575%
L=53.834m
262+070 163.576 164.331 163.758 165.070
EROW
EROW
ROW
RHS=2.500
262+110 163.474 164.249 163.726 165.274
262+120 163.399 164.211 163.584 165.308
EROW
EROW
ROW
EPC CONTRACTOR :
CD NO:
DESIGN CONSULTANT :
CA SPAN (M):
EROW
Email: bhavanicon1991@gmail.com
M/s BHAVANI CONSTRUCTIONS
VIP LVL:=165.751 262+200
R
O
W
SAMARTH INFRAENGG
263/2
ROW
L=210.000m
163.169 164.094 163.134 165.315
262+188
262+190
ROW
EROW
CD.NO : 263/2
O
F
C
Pipe Culvert -1x1.2Ø
Pipe Culvert -1x1.2Ø
EROW
PMC CONSULTANT :
262+280 162.888 163.837 163.070 164.847
262+300
262+290 162.919 163.794 163.121 164.756
262+300 162.892 163.737 163.075 164.658
IN ASSOCIATION WITH
262+310 162.855 163.689 163.086 164.560
EROW
EROW
K=196.532
L=60.000m
W
O
ROW
262+400
R
262+390 162.641 163.481 162.815 163.837
ROW
PROOF CONSULTANT :
EROW
SAFETY CONSULTANT :
262+420 162.566 163.355 162.686 163.631
262+430 162.429 163.331 162.705 163.564
Consultant LLP
Bangalore, Karnataka
Engineers Pvt. Ltd.
262+450 162.137 163.252 162.563 163.429
Hyderabad, Telangana
M/s PVR Consulting
ROW
EROW
262+460
EROW
262+500
262+490 162.068 163.079 162.213 163.159
262+500 162.002 162.994 162.200 163.092
PROJECT :
EROW
EROW
EROW
EROW
REV.
262+620 161.272 162.159 161.337 162.282
262+630 161.242 162.177 161.254 162.214
DATE
262+640 161.201 162.168 161.023 162.147
R0 24.04.2024
R1 27.04.2024
ROW
EROW
ROW
262+700
262+690 160.580 161.490 160.315 161.810
EROW
ROW
DESCRIPTION
FOR APPROVAL
262+730
CA SPAN (M):
O
F
C
DESIGN CHAINAGE:
EROW
262+750
EROW
ROW
W W
O O
ROW
R
262+800
R
REVISED AS PER PROOF CONSULTANT OBSERVATIONS
262+790
VIDE LETTER NO. PVR/BC/P&P/2024-25/01 Dt: 25.04.2024
EROW
SCALE :
APPROVED :
CD.NO : 263/3
ROW
EROW
262+850
DATE : 20/05/2024
VERTICAL
RP
KS
BH
ROW
262+900
262+890 159.118 160.276 158.810 160.460
EROW
EROW
LHS=2.500
REVISION :
R2
EROW
RHS=2.500
MATCHLINE
W W
O O
R R
EROW
263+000
PLAN & PROFILE
NH-765/DO-KJ/PKG-2/HW/P&P-019
(Km: 262+000 TO Km: 263+000)
ROW
LHS
CLIENT :
RHS
AUTHORITY :
SCHEMATIC
TO SRISAILAM
DATUM=143.000m
LHS
RHS
SUPER ELEVATION
DESIGN CHAINAGE
DISTANCE FROM PCL
DISTANCE FROM PCL
VERTICAL ALIGNMENT
PROPOSED FRL ALONG
CARRIAGEWAY CENTER
HORIZONTAL SCHEMATIC
ER
OW
ER
145
150
155
160
OW
(MoRT&H)
263+010 157.833 158.811 157.205 159.651
0
W
RO
263+020
00
157.713 158.413 157.229 159.583
W
3+
W
O
6
GOVERNMENT OF INDIA
R
2
W
W
D=2209.484
LHS=2.500
263+070 157.407 157.950 156.656 159.246
ER
RO
W
RO
OW
1 4
ERW
O
9.0
08
19
63
263+090 157.149 157.549 157.141 159.111
2
TS
HIP NO.
0
263+100 157.008 157.322 157.163 159.043
RHS=2.500
10 +
263+110
63
156.992 157.102 157.040 158.976 2
ER
W O
263+120
ER
OW
RO
Chainage
W
RO
EPC CONTRACTOR :
W
DESIGN CONSULTANT :
263+150 157.121 157.368 157.263 158.706
CL=115.000
(m)
ER
OW
Email: bhavanicon1991@gmail.com
M/s BHAVANI CONSTRUCTIONS
RO
1
263+190
RO
SAMARTH INFRAENGG
(m)
4.04
W
0 20
W
O
1758067.939
263 SC
O
R
W
ER
W
O
R
400
C
F
O
Radius
SKEW
CD NO:
PMC CONSULTANT :
CA SPAN (M
LHS=5.000
RHS=5.000
EROW
AINAGE:
angle (∆)
Deviation
NALA
IN ASSOCIATION WITH
EROW
0
-19
263+30
-
R=-400.000 L=164.032
263+310 155.488 157.583 157.143 157.626
ENT
263+313
Length of
263+302
Reconstruct
Box Culvert
Box Culvert
EROW
CD.NO : 264/1
EROW
-1x2.0m
-1x2.0m
G=-0.675%
ROW
L=1288.859m
100
EROW
PROOF CONSULTANT :
263+400
SAFETY CONSULTANT :
263+420 155.731 156.908 155.976 156.884
5.00
Super
(e) (%)
elevetion,
CL=115.000
Consultant LLP
ROW
EROW
ROW
Bangalore, Karnataka
Engineers Pvt. Ltd.
263+450 156.058 156.611 155.747 156.682
Hyderabad, Telangana
M/s PVR Consulting
263+460 155.628 156.508 155.715 156.614
263+470 155.533 156.397 155.787 156.547
263+480 154.994 156.343 155.588 156.479
EROW
ST 26
263+500 155.117 156.213 155.468 156.345
3483.0
73
PROJECT :
ROW
263+
PLAN
500
263+520 154.859 156.054 155.229 156.210
REV.
600
DATE
ROW
EROW
ROW
R0 24.04.2024
R1 27.04.2024 263+650 153.899 155.238 154.571 155.332
W
O
R
263+
263+710
700
153.029 154.855 153.910 154.920
263+720 152.923 154.668 153.775 154.842
EROW
DESCRIPTION
FOR APPROVAL
263+730
VIDE EMAIL Dt.: 19.05.2024
L=120.000m
ROW
263+790
VIDE LETTER NO. PVR/BC/P&P/2024-25/01 Dt: 25.04.2024
SCALE :
263+820
EROW
ROW
BRIDG
CA CH
ROW
DESIG
O
CA SPA
DESIGNED :
:
DESIG
APPROVED :
SKEW
PROPO
S
A
AINAG
L
)
N CHA
N (M :
E:
263+850
DATE : 20/05/2024
RJ
VERTICAL
RP
KS
BH
( M
R
EROW
L=102.482m
- 1:200
MNB
KMP
c
263+9
ROW
o
ROW
263+9
MNB R
n
C
88
C
88
263+
S
900
o
structi
LHS=2.500
TITLE :
d
on
EROW
Solid S
263+920
EROW
REVISION :
Slab -2
RHS=2.500
x10.0m
K=235.761
L=165.000m
VIP LVL:=151.841
PLAN & PROFILE
264+PC 263999
OF MAIN CARRIAGEWAY
000 .314
EROW
TO VINUKONDA
W
O
R
EROW
ROW
NH-765/DO-KJ/PKG-2/HW/P&P-020
(Km: 263+000 TO Km: 264+000)
ROW
LHS
CLIENT :
RHS
AUTHORITY :
SCHEMATIC
TO SRISAILAM
DATUM=143.000m
LHS
RHS
SUPER ELEVATION
DESIGN CHAINAGE
DISTANCE FROM PCL
DISTANCE FROM PCL
VERTICAL ALIGNMENT
PROPOSED FRL ALONG
EROW
CARRIAGEWAY CENTER
HORIZONTAL SCHEMATIC
MATC
H
145
150
155
160
LINE
CC
FF
O
O
264+000 147.701 151.138 148.362 151.946
(MoRT&H)
C
F
O
264+010 148.169 150.924 148.123 151.870
264+PC 263999
000 .314
ER OW
EROW
264+020 148.441 150.632 148.186 151.798
ROW
ROW
GOVERNMENT OF INDIA
LHS=2.500
IG
CA CHA
CA SPA
EROW
SKEW
N
PROPO
DESIGN
ROW
ROW
CHAINA
RHS=2.500
264+1
00
CD.NO : 265/1
EROW
EROW
-
ip e
C
264+ 07
Pipe C
u
264+07
4
264+130
u
EPC CONTRACTOR :
truc
DESIGN CONSULTANT :
lvert -2
o
lvert -2
RO W
n
DES
EROW
CA SP
x1.2Ø
CD NO:
IG
SKEW
x1.2Ø
EROW
C
DESIGN S
PROPOSA
C
264+170
F
G=-0.450%
H
L
(M
L=167.422m
A
):
AGE:
HIP-20
Email: bhavanicon1991@gmail.com
M/s BHAVANI CONSTRUCTIONS
264+190 148.660 150.245 148.773 150.963
PAN (M):
SAMARTH INFRAENGG
INAGE:
R=2500.000 L=374.549
EROW
-
ROW
CD.NO : 265/2
ROW
265/2
264+180
264+230
DESIGN
Reconstru
Box Culver
C
F
O
PROPOSAL
SP
AN
CA CHAINAGE:
EROW
t -1x2.0m
DESIGN CHAINAG
t -1x2.0m
):
EROW
E:
ROW
PMC CONSULTANT :
26
ROW
4+
CD.NO : 265/3
IN ASSOCIATION WITH
264+300
EROW
SKEW
CD NO:
EROW
Reconstruction
VIP CH:=264319.895
Box Culvert -1x2.0
CA SPAN (M):
m
VIP LVL:=150.379
CA CHAINAGE:
L=150.000m
DESIGN SPAN (M):
DESIGN CHAINAGE:
EROW
264+340
CD.NO : 265/4
PT 264373.863
264+380 148.790 150.387 149.094 150.507
Reconstruction
O
R
Box Culvert -1x2.0m
264+400
264+400 148.992 150.464 149.096 150.543
Box Culvert -1x2.0m
EROW
ROW
ROW
PROOF CONSULTANT :
SAFETY CONSULTANT :
264+420 148.852 150.519 149.099 150.585
264+430 148.891 150.512 149.100 150.605
Consultant LLP
EROW
Bangalore, Karnataka
Engineers Pvt. Ltd.
264+450 149.143 150.373 149.103 150.646
Hyderabad, Telangana
M/s PVR Consulting
EROW
264+500
EROW
PROJECT :
264+510 148.355 150.322 149.315 150.769
264+520 148.329 150.231 149.545 150.790
PLAN
G=0.205%
SKEW
EROW
DESIGN CH
CA CHAINA
CA SPAN (M
O:
264+570
):
W
-
O
R
264+600
ROW
REV.
265/1
HIP NO.
MNB RCC
264+646
Reconstruct
DATE
EROW
R0 24.04.2024
R1 27.04.2024
Solid Slab
EROW
Solid Slab
264186.94
Chainage
-2x4.5m
ROW
-2x4.5m
TS 264679.343
264+680 149.261 150.440 149.093 151.120
Easting
314947.744
314328.835
EROW
BRIDGE NO : 265/1
264+700
264+700 149.581 150.749 149.180 151.171
264+710 149.679 150.851 149.224 151.200
(m)
264+720
Northing
ROW
DESCRIPTION
FOR APPROVAL
264+730
VIDE EMAIL Dt.: 19.05.2024
CL=95.000
EROW
C
F
O
500
2500
Radius
EROW
264+790
VIDE LETTER NO. PVR/BC/P&P/2024-25/01 Dt: 25.04.2024
264+800
ROW
W
O
264+800 150.103 151.434 150.368 151.543 R
DRAWN
angle (∆)
SCALE :
Deviation
APPROVED :
EROW
C
F
O
158.215
374.549
264+850
DATE : 20/05/2024
VERTICAL
Curve,Lc
RP
KS
BH
Length of
ROW
21
HIP-ROW
RHS=5.000
ERO
R=500.000 L=158.215
95
(m)
- 1:200
HORIZONTAL - 1:2000
0
W
Spiral, Ls
+90
Length of
264+890
264
150.581 151.403 151.026 152.027
264+900 150.450 151.402 150.962 152.083 558
32. 9
264+910
100
100
CS
(km/h)
Speed
RO
Design
ER
OW
ER
DRG. NO. :
REVISION :
OW
R2
Super
(e) (%)
elevetion,
0
RO
+0
RO
5
264+980 151.025 151.987 151.890 152.531 W
O
W
R
558 26
27.
CL=95.000
0
264+990 151.217 152.067 152.080 152.587 265
PLAN & PROFILE
ST INE L
265+000 151.348 152.148 152.273 152.643 AT
CH
ER
M
OF MAIN CARRIAGEWAY
OW
ER
TO VINUKONDA
OW
NH-765/DO-KJ/PKG-2/HW/P&P-021
(Km: 264+000 TO Km: 265+000)
CL=95.000
050 R
RO
5+
W
:26 LTE
BU
CH SSHE
LHS
CLIENT :
RHS
AUTHORITY :
SCHEMATIC
TO SRISAILAM
DATUM=143.000m
LHS
RHS
SUPER ELEVATION
DESIGN CHAINAGE
DISTANCE FROM PCL
DISTANCE FROM PCL
VERTICAL ALIGNMENT
PROPOSED FRL ALONG
ROW
CARRIAGEWAY CENTER
HORIZONTAL SCHEMATIC
MATCHLINE
ROW
W
O
265+000 R
145
150
155
160
265+000 151.348 152.148 152.273 152.643
(MoRT&H)
265+010 151.664 152.209 152.370 152.699 ST 265027.558
EROW
CL=95.000
GOVERNMENT OF INDIA
EROW
EROW
ROW
EPC CONTRACTOR :
VIP CH:=265138.704
265+140 152.565 152.931 152.273 153.088 VIP LVL:=153.420
DESIGN CONSULTANT :
K=-136.651
265+150
L=190.000m
152.037 152.882 152.219 153.070
EROW
Email: bhavanicon1991@gmail.com
O
SAMARTH INFRAENGG
16-6-114, Near Vijaya Mahal, Nellore-524001
EROW
265+230
ROW
EROW
PMC CONSULTANT :
265+280 150.757 152.032 151.373 152.247 265+300
265+290 150.701 151.957 151.178 152.164
ROW
SKEW
IN ASSOCIATION WITH
CD NO:
EROW
EROW
ROW
EROW
ROW
265+360
266/1
EROW
PROOF CONSULTANT :
SAFETY CONSULTANT :
G=-0.830%
L=348.453m
265+420 149.546 150.772 150.272 151.084
ROW
Consultant LLP
Bangalore, Karnataka
EROW
Hyderabad, Telangana
M/s PVR Consulting
265+460 149.114 150.525 149.673 150.752
265+470 149.077 150.417 149.462 150.669
265+480 148.372 150.337 149.058 150.586 265+500
ROW
EROW
265+500
ROW
PROJECT :
265+510 148.441 150.010 149.127 150.337
265+520 148.154 149.874 149.063 150.254
PLAN
EROW
EROW
REV.
ROW
ROW
D=1185.562
265+630
CD NO:
DATE
PROPOSAL
EROW
R0 24.04.2024
R1 27.04.2024
CA SPAN (M):
CA CHAINAGE:
265+700
266/2
EROW
ROW
265+686
265+688
DESCRIPTION
FOR APPROVAL
265+730
VIDE EMAIL Dt.: 19.05.2024
265+740
EROW
O W
R
O
R
265+800
EROW
EROW
265+790
VIDE LETTER NO. PVR/BC/P&P/2024-25/01 Dt: 25.04.2024