LHS

CLIENT :
RHS

AUTHORITY :
SCHEMATIC
TO SRISAILAM

DATUM=203.000m

LHS

RHS

SUPER ELEVATION

DESIGN CHAINAGE
DISTANCE FROM PCL
DISTANCE FROM PCL
VERTICAL ALIGNMENT
PROPOSED FRL ALONG
CARRIAGEWAY CENTER

EXISTING LEVEL ALONG

EXISTING LEVEL AT 15M


EXISTING LEVEL AT 15M
EROW

PROPOSED CENTER LINE


EROW

HORIZONTAL SCHEMATIC
TS 243996.946

1
2
R
O
R
START OF THE PROJECT

W
W
244+000

HIP NO.

205
210
215
220
244+000 211.279 212.102 211.356 212.202

(MoRT&H)
244+010 210.994 212.016 210.970 212.125

New Delhi -110001


(m)
HIP
244+020 210.925 211.957 211.151 212.049

LHS=2.500
ROW

Chainage
EROW

GOVERNMENT OF INDIA
244371.238
244062.442
EROW
244+030 210.995 211.891 211.348 211.973

National Highway Wings, CRF


CL=55.000

MG Road, Vijayawada - 520010.


244+040 210.794 211.812 211.055 211.897

ROW

G=-0.763%
SC 244051.946

ROADS & BUILDINGS DEPARTMENT


244+050 211.848 211.731 210.953 211.820

Transport Bhawan, 1, Parliament Streets


L=61.931m

GOVERNMENT OF ANDHRA PRADESH


(m)
244+060 HIP-1

MINISTRY OF ROAD TRANSPORT & HIGHWAYS


210.891 211.646 210.676 211.744

Easting

296431.61
296411.153
CS 244072.9
34

LHS=5.000
244+070 210.565 211.558 210.512 211.672

RHS=5.000
EROW

EROW

244+080 210.728 211.340 210.633 211.609

R=-400.000 L=20.987
244+090 210.754 211.157 210.434 211.558 VIP CH:=244091.430

(m)
ROW

VIP LVL:=211.504
244+10
0

Northing

K=96.352
244+100 210.803 211.034 210.125 211.516

L=60.000m
1761364.973
1761672.982
ROW

CL=55.000
244+110 210.900 210.768 210.238 211.485
244+120 211.191 210.636 210.595 211.464

(m)

400
400
ST 244
EROW

EROW

127.934

Radius
244+130 211.144 210.569 210.553 211.450

EPC CONTRACTOR :
KMP

244+140 211.036 210.473 210.504 211.436

DESIGN CONSULTANT :
244+150 210.916 210.221 210.488 211.422

Left
ROW

Right
244+160 210.823 210.100 210.455 211.408 Direction

Ph. No. 0861-2321919


RO

(Left/Right)

L=71.147m
G=-0.140%
ER

244+170 210.663 210.313 210.537 211.394


WOW
EROW

244+180 210.639 210.526 210.711 211.380


R

LHS=2.500
O
W

Email: bhavanicon1991@gmail.com
M/s BHAVANI CONSTRUCTIONS
244+190 210.638 210.524 210.578 211.366 19.4
10.88
Total

SAMARTH INFRAENGG
244+2
00
angle (∆)
Deviation

16-6-114, Near Vijaya Mahal, Nellore-524001


244+200 210.711 210.188 210.236 211.349

Technocrats Private Limited


D=147.964
244+210 210.716 209.144 207.578 211.320

BRIDGE NO : 245/1
ROW

244+220 210.692 207.491 208.665 211.279


EROW

(m)
EROW

20.988
80.411
Curve,Lc

244+230 210.669 210.312 210.198 211.227


Length of
ROW

RHS=2.500
244+240 210.638 210.376 210.810 211.162 VIP CH:=244242.576
VIP LVL:=211.293
244+250 210.604 211.252 210.995 211.086

K=-83.837
L=100.000m
55
55
(m)

244+260 210.560 210.518 210.323 210.997


E
ERO

Spiral, Ls
Length of
W

ROW

244+270 210.489 210.148 209.457 210.897


TS 244
275.897

PMC CONSULTANT :
244+280 210.347 209.803 209.264 210.785
DES
ROW

CA SP
IG
BRIDGE

80
80
CA CHA
A

SKEW

244+290
N

210.149 209.838 209.231 210.660


N

DESIGN

(km/h)
Speed
IN

Design

244+30
0
C

PROPOSA
ROW

NO:

H
(M

244+300 209.950 209.669 209.172 210.529

L=2.190
):

IN ASSOCIATION WITH
AGE:

G=-1.330%
244+310 209.863 209.585 209.116 210.408
ERO

ERO

CL=55.000
W

SPAN (M
W

TPF ENGINEERING PVT. LTD.


):

5.00
5.00
AINAGE:

244+320 209.674 209.485 209.317 210.300


Super

SC 244330.8
(e) (%)

97

HBS INFRA ENGINEERS PVT. LTD.


elevetion,

244+330 209.571 209.572 209.023 210.203


-

244+340 209.529 209.692 209.049 210.119


245/1
ROW

244+350 209.320 209.936 209.156 210.047


244+223
Minor Bri
244+218
Minor Bri
New con

244+360 209.721 209.942 209.451 209.987


EROW

ROW
EROW
HIP-2

244+370 209.567 209.940 209.569 209.940


dge -3x7

struction
dge -3x7

LHS=5.000

RHS=5.000
244+380 209.553 209.871 209.283 209.905
R
O
W

244+400
.70m

.70m

244+390 209.539 209.817 209.033 209.881 .308

R=400.000 L=80.410
CS 244411
VIP CH:=244397.268
244+400 209.526 209.811 209.084 209.871 VIP LVL:=209.231
K=81.912
L=205.000m
EROW

244+410 209.512 209.864 209.020 209.872


EROW
ROW

PROOF CONSULTANT :

SAFETY CONSULTANT :
244+420 209.498 209.909 209.205 209.885
ROW

244+430 209.484 209.955 209.028 209.911


244+440

M/s Trisa Infra


209.470 209.989 209.654 209.949 8

Consultant LLP
466.30
ST 244

CL=55.000
244+450

Bangalore, Karnataka
209.387 209.969 209.417 209.999

Engineers Pvt. Ltd.


Hyderabad, Telangana
M/s PVR Consulting
EROW

EROW

244+460 209.473 209.932 209.258 210.061


244+470 209.528 209.930 209.278 210.136
ROW

00
244+480 209.621 209.945 209.784 210.223 244+5
ROW

244+490 209.465 209.919 209.444 210.322


244+500 209.332 209.901 209.397 210.433
EROW

EROW

PROJECT :
244+510 209.473 209.848 209.485 210.550
PLAN

244+520 209.201 209.815 209.638 210.667


BUSSH
E

THE YEAR 2022-23.


244+530 209.108 209.809 209.302 210.784
+550
CH:244 LTER

ROW

244+540 209.164 209.820 209.286 210.901


G=1.170%
L=70.607m

244+550 209.330 209.804 209.141 211.018


EROW

ROW
EROW

R
O
W

RHS=2.500
244+560 209.378 209.835 209.215 211.135
244+570 209.303 209.839 209.003 211.252
00

LONGITUDINAL SECTION
244+580 209.759 209.824 209.314 211.366 244+6
SKEW

WIDENING TO 2-LANE WITH PAVED

JUNCTION FROM DESIGN CHAINAGE


244+590 209.758 209.819 209.180 211.475

KM: 244+000 TO 268+700) SECTION OF


SHOULDERS OF DORNALA TO KUNTA

KM.244+000 TO KM.267+990 (EXISTING

NH-765 (PACKAGE-2) IN THE STATE OF


PROPOSAL

ANDHRA PRADESH ON EPC MODE FOR


D=245.610
EROW

244+600 209.547 209.787 209.336 211.578


EROW
BRIDGE NO:

ROW
CA SPAN (M):
CA CHAINAGE:

244+610 209.398 209.771 209.284 211.675

REV.
DESIGN SPAN (M):

ROW
DESIGN CHAINAGE:

244+620 209.423 209.759 209.054 211.767


244+630 209.282 209.746 208.945 211.853
-

LHS=2.500

DATE
+650
E

244+640 209.253 209.755 208.939 211.934

R0 24.04.2024
R1 27.04.2024
245/2

EROW

EROW

244+650
BUSSH

208.985 209.821 208.974 212.008


CH:244 LTER
244+722
244+721

244+660 209.375 209.929 209.065 212.078


ROW
Reconstruction

244+670 209.530 210.023 208.969 212.141 00


R
O
W

244+7
ROW

244+680 209.566 210.108 209.136 212.199 4+700


8 AR T CH: 24
711.91 T
244+690 209.674 210.214 209.358 212.251 TS 244
S PASS
EROW

EROW

O RN ALA BY
VIP CH:=244700.375
D
244+700
MNB RCC Solid slab -2x7.5m

209.799 210.361 208.975 212.298


MNB RCC Solid slab -2x7.5m

VIP LVL:=212.777
244+710 210.006 210.461 209.177 212.339
K=-176.883
L=260.000m

ROW
244+720 208.467 210.388 207.720 212.374
R
O
W

244+730 208.834 210.426 209.049 212.403


DESCRIPTION
FOR APPROVAL
R
O
W

244+740 209.185 210.365 209.417 212.427


EROW

ROW
EROW

244+750 208.138 210.330 209.945 212.446


R
O
W

244+760 208.473 210.267 209.753 212.458


CL=95.000
BRIDGE NO : 245/2

244+770 208.873 210.178 209.978 212.465


OBSERVATION VIDE EMAIL Dt.: 19.05.2024

244+780 208.998 210.019 210.012 212.466


ROW

244+800
R2 20.05.2024 REVISED DUE TO TEMPLE AND AS PER A.E's
R

SC 244806.918
O
W

EROW

244+790 209.074 209.919 210.057 212.462


EROW

REVISED AS PER PROOF CONSULTANT OBSERVATIONS


VIDE LETTER NO. PVR/BC/P&P/2024-25/01 Dt: 25.04.2024

244+800 209.022 209.873 209.555 212.452


ROW

244+810 209.088 209.794 209.155 212.436


DRAWN

244+820 209.036 209.719 209.240 212.415


SCALE :
R
R

O
O

W
W

244+830 209.083 209.646 209.054 212.388


CHECKED :
DESIGNED :
:

APPROVED :
EROW

EROW

244+840 209.245 209.651 209.172 212.358


ROW

244+850 209.182 209.825 209.130 212.328


RJ

VERTICAL
RP

KS

DATE : 20/05/2024
BH

244+860 209.491 209.874 209.166 212.298


244+870 209.330 209.939 209.248 212.268
ROW
R
O
W

244+880 209.269 210.021 209.233 212.238


- 1:200
HORIZONTAL - 1:2000

244+900
244+890 209.835 210.030 209.401 212.208
LHS=5.000
RHS=5.000

244+900 209.784 209.890 209.267 212.178


244+910 209.826 209.686 209.529 212.148
ROW

TITLE :

244+920 210.012 209.691 209.317 212.118


G=-0.300%
R
O
W

L=316.425m

DRG. NO. :

REVISION :

244+930 210.136 209.441 209.278 212.088


R=-500.000 L=394.590
R
O
W

ROW

244+940 210.001 209.541 209.322 212.058


R2

244+950 209.830 209.571 209.519 212.028


244+960 209.787 209.488 209.355 211.998
MA
TCH
R
O
W

LIN
E
244+970 209.524 209.509 209.314 211.968
ROW

244+980
O

209.626 209.537 209.289 211.938


W

244+990 210.191 209.519 209.302 211.908


245
HIP

+
PLAN & PROFILE

000
-3
ROW

245+000 209.518 209.388 209.310 211.878


R

OF MAIN CARRIAGEWAY
O
W

NH-765/DO-KJ/PKG-2/HW/P&P-001
TO VINUKONDA

(Km: 244+000 TO Km: 245+000)


RO
W
LHS

CLIENT :
RHS

AUTHORITY :
SCHEMATIC
RO
W
TO SRISAILAM

W
O
R

DATUM=201.000m

LHS

RHS
RO
W

SUPER ELEVATION
HIP

DESIGN CHAINAGE
-3

DISTANCE FROM PCL


DISTANCE FROM PCL
W
O
R

VERTICAL ALIGNMENT
PROPOSED FRL ALONG
CARRIAGEWAY CENTER

EXISTING LEVEL ALONG

EXISTING LEVEL AT 15M


EXISTING LEVEL AT 15M

PROPOSED CENTER LINE

HORIZONTAL SCHEMATIC
00

W
O
+0

R
5
24

205
210
215
220
RO
245+000 209.518 209.388 209.310 211.878

(MoRT&H)
INE
W
O
R

RO

HL
245+010 209.612 209.527 209.473 211.848
W

TC

New Delhi -110001


MA
245+020 209.495 209.645 209.688 211.818

GOVERNMENT OF INDIA

National Highway Wings, CRF


245+030 209.483 209.562 209.490 211.788

MG Road, Vijayawada - 520010.


245+040 209.501 209.503 209.512 211.758
W
O
R

ROADS & BUILDINGS DEPARTMENT


Transport Bhawan, 1, Parliament Streets
W
O
R

245+050 209.661 209.469 209.434 211.728

GOVERNMENT OF ANDHRA PRADESH


MINISTRY OF ROAD TRANSPORT & HIGHWAYS
245+060 209.560 209.471 209.375 211.698
ROW

245+070 209.534 209.509 209.397 211.668


ROW

245+080 209.486 209.453 209.436 211.638


100 +
W
O
R

245
245+090 209.490 209.370 209.360 211.608

G=-0.300%
W

L=316.425m
O
R

LHS=5.000
RHS=5.000
245+100 209.420 209.290 209.378 211.578
245+110 209.441 209.325 209.395 211.548
245+120 209.400 209.272 209.352 211.518
ROW

245+130 209.384 209.287 209.345 211.488


W
O

EPC CONTRACTOR :
R

R=-500.000 L=394.590
ROW

245+140
W

209.464 209.360 209.399 211.458


O
R

DESIGN CONSULTANT :
245+150 209.527 209.451 209.445 211.428
245+160 209.460 209.328 209.337 211.403

Ph. No. 0861-2321919


245+170 209.355 209.305 209.329 211.384
SKEW
CD NO:

245+180 209.359 209.278 209.286 211.371


W
O

245+200
R

Email: bhavanicon1991@gmail.com
M/s BHAVANI CONSTRUCTIONS
W
PROPOSAL

O
R

ROW

245+190 209.401 209.263 209.263 211.364

SAMARTH INFRAENGG
CA SPAN (M):

CS 245201.508
VIP CH:=245196.800
CA CHAINAGE:

16-6-114, Near Vijaya Mahal, Nellore-524001


ROW

Technocrats Private Limited


245+200 209.319 209.333 209.273 211.363 VIP LVL:=211.288

K=166.090
DESIGN SPAN (M):

L=100.000m
DESIGN CHAINAGE:

245+210 209.465 209.346 209.280 211.368


245+220 209.380 209.434 209.284 211.379
-

245+230 209.324 209.365 209.262 211.397


246/1

W
O
R

245+240 209.366 209.354 209.273 211.420


245+300

245+298

245+250 209.416 209.357 209.263 211.448


ROW

CL=95.000
245+260 209.395 209.315 209.177 211.479
ROW
New Construction

245+270 209.374 209.244 209.191 211.509


Box Culvert -1x2.0m

Box Culvert -1x2.0m

PMC CONSULTANT :
245+280 209.371 209.075 209.205 211.539 ST 245296.508
W
O
R

W
O
R

245+300
245+290 209.364 209.191 209.129 211.569
245+300 209.346 209.261 209.089 211.600

IN ASSOCIATION WITH
245+310 209.431 209.271 209.112 211.630

TPF ENGINEERING PVT. LTD.


ROW

245+320 209.405 209.342 209.277 211.660

G=0.302%
L=132.325m

HBS INFRA ENGINEERS PVT. LTD.


ROW

245+330 209.500 209.430 209.371 211.690


CD.NO : 246/1
W
O
R

245+340 209.533 209.463 209.374 211.720


245+350 209.689 209.394 209.367 211.751
245+360 209.814 209.569 209.462 211.781
245+370 209.870 209.808 209.612 211.811
245+380 209.969 209.995 209.706 211.841
ROW
W
O
R

W
O
R

245+400
245+390 210.040 209.897 209.705 211.869
ROW

245+400 210.016 209.808 209.704 211.892


245+410 210.043 209.770 209.744 211.911

PROOF CONSULTANT :

SAFETY CONSULTANT :
245+420 210.050 209.803 209.862 211.926
245+430 210.085 209.885 209.885 211.937
W
O
R

W
O
R

M/s Trisa Infra


245+440 210.123 209.912 209.811 211.943

Consultant LLP
VIP CH:=245449.125
ROW

Bangalore, Karnataka
Engineers Pvt. Ltd.
245+450 209.865 209.816 209.734 211.945

Hyderabad, Telangana
M/s PVR Consulting
VIP LVL:=212.050
ROW

K=-232.526

245+460 209.960 209.938 209.684 211.942


L=140.000m

245+470 209.838 209.846 209.748 211.935


245+480 209.783 209.776 209.717 211.924
W
O
R

W
O
R

245+500
245+490 209.792 209.730 209.760 211.909
245+500 209.718 209.683 209.639 211.890

PROJECT :
245+510 209.710 209.779 209.652 211.866
ROW

245+520 209.683 209.642 209.602 211.837


PLAN
ROW

THE YEAR 2022-23.


245+530 209.688 209.587 209.646 211.807
W
O
R

W
O
R

245+540 209.453 209.489 209.576 211.777


245+550 209.364 209.367 209.561 211.747
245+560 209.328 209.281 209.526 211.717
245+570 209.247 209.183 209.332 211.687
ROW

245+580 209.277 209.234 209.364 211.657

WIDENING TO 2-LANE WITH PAVED


LONGITUDINAL SECTION
W
O
R

JUNCTION FROM DESIGN CHAINAGE


ROW

245+600

KM: 244+000 TO 268+700) SECTION OF


SHOULDERS OF DORNALA TO KUNTA

KM.244+000 TO KM.267+990 (EXISTING


245+590 209.125 209.279 209.321 211.627

NH-765 (PACKAGE-2) IN THE STATE OF


ANDHRA PRADESH ON EPC MODE FOR
245+600 209.208 209.023 209.132 211.597
245+610 209.002 209.065 209.025 211.567

REV.
245+620 208.958 208.970 209.015 211.537
245+630 208.899 208.992 208.971 211.507

DATE
W
O
R

W
O
R

245+640 208.922 208.989 208.852 211.477


ROW

R0 24.04.2024
R1 27.04.2024 245+650 209.012 208.858 208.832 211.447
ROW

D=1504.431

245+660 208.942 208.809 208.925 211.417


245+670 208.867 208.781 208.840 211.387
G=-0.300%
L=284.800m
3

245+680 208.811 208.728 208.762 211.357


HIP NO.

245+700
245+690 208.799 208.725 208.729 211.327
245+700 208.818 208.796 208.654 211.297
ROW

(m)
HIP

245+710 208.765 208.816 208.718 211.267


ROW

Chainage

245015.133

245+720 208.776 208.780 208.756 211.237


DESCRIPTION
FOR APPROVAL

245+730
VIDE EMAIL Dt.: 19.05.2024

208.745 208.770 208.764 211.207


W
O
R

245+740 208.831 208.764 208.754 211.177


(m)

245+750 208.908 208.681 208.735 211.147


Easting

296296.761

245+760 208.869 208.658 208.713 211.117


R2 20.05.2024 REVISED AS PER A.E's OBSERVATION

245+770 208.792 208.759 208.684 211.087


ROW

245+780 208.894 208.839 208.680 211.057


ROW

(m)
W
O
R

W
O
R

Northing

245+800
REVISED AS PER PROOF CONSULTANT OBSERVATIONS

245+790
VIDE LETTER NO. PVR/BC/P&P/2024-25/01 Dt: 25.04.2024

208.866 208.756 208.569 211.027


1760735.68

245+800 208.821 208.751 208.742 210.997


SKEW
CD NO:

245+810 208.802 208.750 208.798 210.967


(m)

500
PROPOSAL

DRAWN

SCALE :
Radius

245+820 208.864 208.756 208.878 210.935


CA SPAN (M):

W
O
R
CA CHAINAGE:

245+830 208.924 208.927 208.848 210.902


CHECKED :
DESIGNED :
:

APPROVED :
W
O
R
DESIGN SPAN (M):

ROW
DESIGN CHAINAGE:

245+840 208.913 209.004 208.942 210.868


CD.NO : 246/2
ROW

Left

245+850 208.996 209.311 208.753 210.831


RJ

VERTICAL
RP

KS

DATE : 20/05/2024
BH
Direction
(Left/Right)

VIP CH:=245853.925
36°

245+860 209.254 208.720 208.703 210.794 VIP LVL:=210.836


246/2

K=-666.667
L=100.000m

245+870 208.618 208.690 208.704 210.755


245+850

245+848

W
O
R

- 1:200

245+880
56.1

208.520 208.532 208.627 210.714


HORIZONTAL - 1:2000
Total
W
O
R

angle (∆)
Deviation

245+900
245+890 208.548 208.618 208.612 210.672
New Construction
Box Culvert -1x2.0m

Box Culvert -1x2.0m

245+900
ROW

208.548 208.520 208.588 210.628


ROW

245+910 208.454 208.452 208.577 210.583


(m)

TITLE :
394.59
Curve,Lc

245+920 208.292 208.471 208.503 210.538


Length of

DRG. NO. :

REVISION :

245+930 208.187 208.375 208.501 210.493


LHS=2.500

RHS=2.500

245+940 208.248 208.313 208.355 210.448


R2
95
W
O
R

(m)

245+950 208.311 208.216 208.316 210.403


Spiral, Ls
Length of

245+960 208.204 208.238 208.306 210.358


ROW

245+970 208.125 208.199 208.200 210.313


G=-0.450%
L=113.896m
ROW

100

245+980 208.049 208.043 208.294 210.268


(km/h)
Speed
Design
W

MATCHLINE
O
R

W
O
R

245+990 208.034 208.012 208.233 210.223 246+000


PLAN & PROFILE

246+000 208.022 208.048 208.116 210.178


OF MAIN CARRIAGEWAY
5.00
TO VINUKONDA

Super

(e) (%)

NH-765/DO-KJ/PKG-2/HW/P&P-002
(Km: 245+000 TO Km: 246+000)
elevetion,
ROW
LHS

CLIENT :
RHS

AUTHORITY :
SCHEMATIC
TO SRISAILAM

DATUM=201.000m

LHS

RHS

SUPER ELEVATION

DESIGN CHAINAGE
DISTANCE FROM PCL
DISTANCE FROM PCL
ROW

VERTICAL ALIGNMENT
PROPOSED FRL ALONG
CARRIAGEWAY CENTER

EXISTING LEVEL ALONG

EXISTING LEVEL AT 15M


EXISTING LEVEL AT 15M

PROPOSED CENTER LINE

HORIZONTAL SCHEMATIC
ROW
W
MATCHLINE

W
R

O
R

205
210
215
220
246+000
246+000 208.022 208.048 208.116 210.178

(MoRT&H)
246+010 208.030 208.064 208.055 210.133

New Delhi -110001


246+020 208.230 207.955 207.996 210.088

GOVERNMENT OF INDIA

National Highway Wings, CRF


246+030 207.978 207.936 207.970 210.046

MG Road, Vijayawada - 520010.


ROW
W
O
R
W
O
R

246+040 207.927 208.029 207.979 210.007

ROADS & BUILDINGS DEPARTMENT


ROW

Transport Bhawan, 1, Parliament Streets


G=-0.450%
L=113.896m
246+050 208.013 208.020 207.843 209.973

GOVERNMENT OF ANDHRA PRADESH


MINISTRY OF ROAD TRANSPORT & HIGHWAYS
246+060 207.770 207.660 207.700 209.942
246+070 207.892 207.764 207.662 209.914

LHS=2.500

RHS=2.500
246+080 207.915 207.847 207.634 209.891

4
W

246+090
O

207.911 207.771 207.672 209.871


R

246+100

HIP NO.
W
O
R

ROW

246+100 207.877 207.746 207.793 209.855


ROW

246+110 207.851 207.752 207.754 209.843


VIP CH:=246117.821

(m)
HIP
246+120 207.894 207.734 207.612 209.834 VIP LVL:=209.648

Chainage

K=266.645
247015.491

L=200.000m
246+130 207.735 207.759 207.780 209.829

EPC CONTRACTOR :
W
O

W
R

246+140
R

207.849 207.800 207.685 209.828

DESIGN CONSULTANT :
246+150 208.004 207.927 207.592 209.831
246+160 (m)
Easting
207.818 208.066 207.691 209.837

CD.NO : 247/1

Ph. No. 0861-2321919


ROW

246+170 207.998 207.742 207.845 209.848 297630.646


ROW

SKEW
CD NO:

246+180 208.282 207.966 207.816 209.861


W
O
R

Email: bhavanicon1991@gmail.com
M/s BHAVANI CONSTRUCTIONS
PROPOSAL
W
O

246+190 208.433 208.167 208.020 209.879


(m)
R

SAMARTH INFRAENGG
246+200
CA SPAN (M):
CA CHAINAGE:

Northing

16-6-114, Near Vijaya Mahal, Nellore-524001

Technocrats Private Limited


246+200 208.211 208.261 208.003 209.901
1759217.655
DESIGN SPAN (M):
DESIGN CHAINAGE:

246+210 208.209 208.129 207.997 209.926


246+220 208.150 208.085 208.020 209.955
(m)

600
-

Radius
ROW

246+230 208.048 208.137 208.041 209.985


247/1
ROW
W
O

W
R

246+240 208.200 208.164 208.047 210.015


R

246+130

246+128

246+250 208.242 207.976 208.005 210.045


Left

246+260 208.205 208.077 208.152 210.075


Direction
(Left/Right)
New Construction

246+270 208.158 208.103 208.363 210.105


Pipe Culvert -1x1.2Ø

Pipe Culvert -1x1.2Ø

G=0.300%
L=98.886m

PMC CONSULTANT :
246+280 208.141 208.362 207.983 210.135
W
O
R

W
O

246+290
R

208.269 208.128 207.907 210.165


32.05
Total
ROW

246+300
angle (∆)
Deviation

246+300 208.238 208.108 207.940 210.195

IN ASSOCIATION WITH
ROW

246+310 208.142 208.035 208.025 210.225

TPF ENGINEERING PVT. LTD.


246+320 208.167 208.059 208.085 210.255
(m)

HBS INFRA ENGINEERS PVT. LTD.


245.616
Curve,Lc
Length of

246+330 208.282 208.103 208.122 210.282


W
O

W
R

246+340
R

208.432 208.223 208.164 210.306


246+350 208.535 208.348 208.295 210.328
90
(m)
ROW

246+360 208.442 208.364 208.327 210.346


Spiral, Ls
Length of
ROW

246+370 208.612 208.418 208.362 210.361


246+380 208.644 208.446 208.403 210.374
100
W
O

W
R

246+390
R

208.690 208.495 208.519 210.383


(km/h)
Speed

246+400
Design

246+400 208.680 208.611 208.509 210.389


246+410 208.617 208.616 208.493 210.392

PROOF CONSULTANT :

SAFETY CONSULTANT :
5.00

246+420 208.574 208.519 208.613 210.392


Super
ROW

(e) (%)
elevetion,

246+430 208.516 208.439 208.423 210.389


ROW

M/s Trisa Infra


W
O

W
O
R

246+440
R

208.519 208.522 208.476 210.383

Consultant LLP
Bangalore, Karnataka
Engineers Pvt. Ltd.
246+450 208.445 208.393 208.335 210.374

Hyderabad, Telangana
M/s PVR Consulting
D=1504.431
246+460 208.273 208.119 208.280 210.362
VIP CH:=246466.707
246+470 208.073 208.131 208.182 210.347 VIP LVL:=210.695
K=-328.206
L=300.000m

246+480 208.154 207.983 208.130 210.329


ROW
W
O
R

246+490
O

207.958 208.007 207.900 210.307


R

246+500
ROW

246+500 207.914 207.831 207.768 210.283

PROJECT :
246+510 207.896 207.720 207.771 210.256
246+520 207.607 207.695 207.682 210.225
PLAN

THE YEAR 2022-23.


246+530 207.560 207.562 207.445 210.192
W
O

W
R

246+540
R

207.538 207.365 207.346 210.155


246+550 207.352 207.292 207.384 210.116
ROW

246+560 207.353 207.418 207.284 210.073


ROW

246+570 207.477 207.285 207.114 210.027


246+580 207.460 207.320 207.185 209.979

WIDENING TO 2-LANE WITH PAVED


LONGITUDINAL SECTION

JUNCTION FROM DESIGN CHAINAGE

KM: 244+000 TO 268+700) SECTION OF


SHOULDERS OF DORNALA TO KUNTA

KM.244+000 TO KM.267+990 (EXISTING


W
O

246+590 207.479 207.375 207.347 209.927


R
W
O
R

NH-765 (PACKAGE-2) IN THE STATE OF


246+600

ANDHRA PRADESH ON EPC MODE FOR


246+600 207.369 207.399 207.243 209.872
246+610 207.223 207.388 207.016 209.814

REV.
ROW

246+620 207.199 207.225 207.043 209.754


ROW

246+630 207.115 207.118 206.954 209.692

DATE
SKEW

W
O

W
R

246+640
R
CD NO:

207.015 207.058 206.916 209.631

R0 24.04.2024
R1 27.04.2024
PROPOSAL

246+650 206.893 206.952 206.876 209.570


CA SPAN (M):
CA CHAINAGE:

246+660 206.772 206.806 206.967 209.508


DESIGN SPAN (M):

246+670 206.813 206.817 206.678 209.447


DESIGN CHAINAGE:

246+680 206.730 206.684 206.540 209.385


ROW
-

W
O
R

W
O

246+690
R

206.676 206.617 206.538 209.324


ROW

246+700
247/2

246+700 206.613 206.585 206.529 209.263


G=-0.614%
L=146.877m
246+800

246+798

246+710 206.568 206.467 206.358 209.201


LHS=2.500

RHS=2.500

246+720 206.560 206.406 206.460 209.140


New Construction

DESCRIPTION
FOR APPROVAL

246+730
VIDE EMAIL Dt.: 19.05.2024

206.553 206.406 206.255 209.078


Pipe Culvert -2x1.2Ø

Pipe Culvert -2x1.2Ø

W
O

W
O
R

246+740
R

206.408 206.442 206.418 209.017


ROW

246+750 206.360 206.485 206.334 208.956


ROW

246+760 206.450 206.357 206.214 208.894


R2 20.05.2024 REVISED AS PER A.E's OBSERVATION

246+770 206.351 206.399 206.085 208.833


246+780 206.243 206.288 206.182 208.772
246+800
W
O

W
R

REVISED AS PER PROOF CONSULTANT OBSERVATIONS

246+790
O

VIDE LETTER NO. PVR/BC/P&P/2024-25/01 Dt: 25.04.2024

206.226 206.200 206.251 208.713


R

CD.NO : 247/2

TS 246800.939
246+800 206.502 206.307 206.290 208.654
ROW

246+810 206.502 206.349 206.257 208.596


DRAWN

SCALE :

246+820 206.538 206.435 206.415 208.539


ROW

VIP CH:=246823.584
VIP LVL:=208.504
246+830 206.588 206.437 206.365 208.483
CHECKED :
DESIGNED :
:

APPROVED :
K=1193.559
L=120.000m

246+840
W
O

206.684 206.529 206.343 208.427


R

246+850 206.850 206.626 206.252 208.373


RJ

VERTICAL
RP

KS

DATE : 20/05/2024
BH
CL=90.000

246+860 206.909 206.503 206.221 208.319


246+870 206.933 206.712 206.287 208.266
ROW

- 1:200

246+880 206.686 206.520 206.338 208.214


HORIZONTAL - 1:2000
ROW
W
O
R

SC 246890.9
39
246+890 206.876 206.764 206.564 208.163
W
O
R

246+900
246+900 206.734 206.867 206.482 208.111
246+910 206.817 206.691 206.559 208.060
TITLE :

246+920 206.728 206.808 206.675 208.009


DRG. NO. :

REVISION :

246+930 206.860 206.828 206.776 207.957


W
O
R

ROW

246+940 206.721 206.562 206.573 207.906


W
O

R2
R
ROW

G=-0.513%

246+950
L=331.848m

206.684 206.676 206.647 207.855


O
F
C
LHS=5.000
RHS=5.000

246+960 206.672 206.533 206.505 207.803


R=-600.000 L=245.616

246+970 206.440 206.404 206.438 207.752 M AT


CHL
246+980
W

206.365 206.344 206.338 207.701


O
R

INE

246+990 206.500 206.320 206.321 207.649


W
O
R

PLAN & PROFILE

247+000 206.637 206.321 206.238 207.598


247
ROW

+00
0
OF MAIN CARRIAGEWAY
TO VINUKONDA

ROW

HIP

NH-765/DO-KJ/PKG-2/HW/P&P-003
(Km: 246+000 TO Km: 247+000)
-4
W
O
R
LHS

CLIENT :
RHS

AUTHORITY :
SCHEMATIC
TO SRISAILAM

DATUM=195.000m

LHS

RHS

SUPER ELEVATION

DESIGN CHAINAGE
RO

DISTANCE FROM PCL


DISTANCE FROM PCL
W

VERTICAL ALIGNMENT
PROPOSED FRL ALONG
CARRIAGEWAY CENTER

EXISTING LEVEL ALONG

EXISTING LEVEL AT 15M


EXISTING LEVEL AT 15M

PROPOSED CENTER LINE

HORIZONTAL SCHEMATIC
0
W
O
R
+00

195
200
205
210
215
247

ROW
E
247+000 206.637 206.321 206.238 207.598 W

(MoRT&H)
HLIN
O
R
ATC M

HIP-

4
247+010 206.676 206.238 206.169 207.547

New Delhi -110001


HIP NO.
247+020 206.746 206.268 206.129 207.495

GOVERNMENT OF INDIA

National Highway Wings, CRF


247+030 206.764 206.305 206.112 207.444
ROW

MG Road, Vijayawada - 520010.


247+040 206.820 206.325 206.069 207.393

(m)
HIP

ROADS & BUILDINGS DEPARTMENT


W
O

Transport Bhawan, 1, Parliament Streets


R
247+050 206.887 206.264 206.098 207.341

GOVERNMENT OF ANDHRA PRADESH


Chainage

247015.491

MINISTRY OF ROAD TRANSPORT & HIGHWAYS


247+060
ROW
206.748 206.348 206.283 207.290
247+070 206.667 206.574 206.063 207.238

(m)
247+080 206.705 206.335 206.027 207.187

LHS=5.000
RHS=5.000
Easting

297630.646
247+090 206.664 206.222 205.952 207.136 247+100
W
O
ROW

247+100 206.306 206.162 205.984 207.084

R=-600.000 L=245.616
247+110 206.106 206.309 206.333 207.033

(m)
247+120 206.281 206.326 205.948 206.982

G=-0.513%
L=331.848m
Northing
ROW

1759217.655
CS 247136.555
247+130 206.349 206.361 205.779 206.930

EPC CONTRACTOR :
W
O
W R
247+140 206.277 206.403 205.691 206.879 R
O

DESIGN CONSULTANT :
(m)

600
247+150 206.054 206.423 205.569 206.828
Radius

247+160
ROW

206.196 206.431 205.553 206.776

Ph. No. 0861-2321919


247+170 206.361 206.421 205.571 206.725 Left

247+180 205.924 206.390 205.633 206.674

Email: bhavanicon1991@gmail.com
M/s BHAVANI CONSTRUCTIONS
Direction

END CH: 247+200

CL=90.000
ROW

247+190 205.896 206.316 205.789 206.622


(Left/Right)

W
O

SAMARTH INFRAENGG
R
247+200 DORNALA BYPASS

16-6-114, Near Vijaya Mahal, Nellore-524001

Technocrats Private Limited


247+200 205.812 206.350 205.869 206.571
247+210 205.827 206.370 205.858 206.520
ROW

32.05
Total
EROW

247+220 205.824 206.327 205.741 206.468


angle (∆)

ST 247226.555
Deviation

247+230 205.756 206.260 205.897 206.417


EROW

247+240 205.817 206.193 205.839 206.366


(m)

247+250 205.739 206.114 205.656 206.315


245.616
ROW

Curve,Lc
Length of
CH:247+240
BUSSHELTER

247+260 205.742 206.088 205.890 206.265


VIP CH:=247265.432
EROW

247+270 206.192 206.037 205.843 206.214 VIP LVL:=206.235


ROW

K=6079.778
L=100.000m

PMC CONSULTANT :
90
EROW

247+280 205.951 205.961 205.656 206.164


(m)
Spiral, Ls
Length of

247+290 205.915 205.921 205.648 206.113 247+300


247+300 205.729 205.892 205.800 206.063

IN ASSOCIATION WITH
247+310 205.505 205.853 205.736 206.014
100

TPF ENGINEERING PVT. LTD.


EROW

(km/h)
Speed
ROW

Design

247+320 205.433 205.821 205.535 205.964

HBS INFRA ENGINEERS PVT. LTD.


EROW
CH:247+340
BUSSHELTER

247+330 205.536 205.778 205.495 205.914


247+340 205.519 205.721 205.444 205.864
ROW

5.00
Super

(e) (%)

247+350 205.461 205.681 205.489 205.815


elevetion,

247+360 205.486 205.646 205.559 205.765


EROW

247+370 205.566 205.641 205.631 205.715


EROW

247+380 205.471 205.610 205.394 205.666

LHS=2.500 RHS=2.500
ROW

247+390 205.373 205.546 205.271 205.616 247+400 O


W
R

247+400 205.292 205.475 205.287 205.566


ROW

247+410 205.201 205.437 205.251 205.516

PROOF CONSULTANT :
EROW

G=-0.497%

SAFETY CONSULTANT :
L=177.708m
247+420 205.230 205.394 205.059 205.467
EROW

247+430 205.171 205.358 204.997 205.417

M/s Trisa Infra


247+440 205.291 205.311 204.896 205.367

Consultant LLP
ROW

Bangalore, Karnataka
Engineers Pvt. Ltd.
247+450 205.150 205.230 204.966 205.318

Hyderabad, Telangana
M/s PVR Consulting
247+460 205.124 205.156 205.007 205.268
EROW
ROW

247+470 205.144 205.077 204.876 205.218


EROW

247+480 205.138 204.998 204.762 205.169


247+490 204.981 204.941 204.566 205.119 247+500
247+500 204.679 204.911 204.089 205.070

PROJECT :
EROW

247+510 204.675 204.863 204.037 205.024


ROW

247+520 204.389 204.829 204.062 204.980 VIP CH:=247523.140


EROW

PLAN

VIP LVL:=204.954

THE YEAR 2022-23.


247+530 204.398 204.820 204.048 204.940
K=346.239
L=60.000m
ROW

247+540 204.443 204.793 204.034 204.902


247+550 204.571 204.746 204.030 204.867
EROW

247+560 204.606 204.710 203.900 204.835


EROW

247+570 204.354 204.693 203.826 204.802


ROW

SKEW

D=1657.418
CD NO:

247+580 204.499 204.681 203.911 204.770

WIDENING TO 2-LANE WITH PAVED


LONGITUDINAL SECTION

JUNCTION FROM DESIGN CHAINAGE


PROPOSAL

KM: 244+000 TO 268+700) SECTION OF


SHOULDERS OF DORNALA TO KUNTA

KM.244+000 TO KM.267+990 (EXISTING


247+590 204.988 204.651 203.698 204.738 O
W

NH-765 (PACKAGE-2) IN THE STATE OF


R

ANDHRA PRADESH ON EPC MODE FOR


CA SPAN (M):

247+600
CA CHAINAGE:
ROW

L=72.649m
G=-0.324%

247+600 204.820 204.588 203.635 204.705


EROW

DESIGN SPAN (M):

247+610 204.663 204.507 203.606 204.673

REV.
DESIGN CHAINAGE:
EROW

247+620 204.658 204.466 203.726 204.641


-

247+630 204.474 204.438 203.600 204.608


CD.NO : 248/1

DATE
248/1

247+640 203.944 204.407 203.467 204.574 W


ROW

O
R

R0 24.04.2024
R1 27.04.2024
247+600

247+598

247+650 203.842 204.405 203.526 204.538


EROW

247+660 203.909 204.346 203.514 204.500


ROW

EROW

New Construction

247+670 203.865 204.289 203.437 204.461


VIP CH:=247675.789
Box Culvert -1x2.0m

Box Culvert -1x2.0m

247+680 203.902 204.245 203.386 204.419 VIP LVL:=204.460


KMP
K=-544.973
L=100.000m

247+690 203.979 204.205 203.385 204.376 247+700


247+700 203.932 204.176 203.457 204.331
EROW

ROW

247+710 203.942 204.120 203.508 204.284


EROW

247+720 204.772 204.045 203.374 204.235


ROW

DESCRIPTION
FOR APPROVAL

247+730
VIDE EMAIL Dt.: 19.05.2024

203.777 203.995 203.348 204.185


247+740 203.797 203.969 203.290 204.134
247+750 203.837 203.902 203.374 204.084
EROW

247+760 203.783 203.842 203.313 204.033


EROW

R2 20.05.2024 REVISED AS PER A.E's OBSERVATION

247+770
ROW

203.578 203.775 203.240 203.982


247+780 203.546 203.713 203.064 203.931
W W
REVISED AS PER PROOF CONSULTANT OBSERVATIONS

247+790
VIDE LETTER NO. PVR/BC/P&P/2024-25/01 Dt: 25.04.2024

203.509 203.682 203.164 203.881 O


R O
R
ROW

247+800
EROW

247+800 203.467 203.661 203.227 203.830


G=-0.507%
L=131.310m

247+810 203.363 203.627 202.999 203.779


EROW

DRAWN

SCALE :

247+820 203.369 203.592 203.030 203.729


247+830 203.487 203.544 202.767 203.678
CHECKED :
DESIGNED :
:

APPROVED :
ROW

247+840 203.518 203.507 202.811 203.627


EROW

247+850 203.203 203.502 202.837 203.576


RJ

VERTICAL
RP

KS

DATE : 20/05/2024
BH
ROW

EROW

247+860 203.094 203.438 202.716 203.526


247+870 203.151 203.382 202.609 203.486
- 1:200

247+880 203.017 203.353 202.683 203.459


HORIZONTAL - 1:2000

VIP CH:=247887.099
247+890 202.983 203.300 202.672 203.445 VIP LVL:=203.388 247+900
K=75.788
EROW

L=60.000m
ROW

247+900 203.068 203.273 202.731 203.444


EROW

247+910 203.220 203.237 202.667 203.457


TITLE :
LHS=2.500 RHS=2.500

247+920 203.245 203.230 202.627 203.482


ROW

DRG. NO. :

REVISION :

247+930 203.190 203.243 202.630 203.510


247+940 203.260 203.312 202.674 203.539
R2
EROW

247+950 203.109 203.391 202.752 203.567


G=0.284%
L=55.700m
EROW

247+960 203.269 203.438 202.686 203.596


ROW

247+970 203.457 203.481 202.532 203.624


247+980 203.465 203.536 202.587 203.651
ROW

MATCHLINE
247+990 203.255 203.567 202.847 203.670 W W
O O
R
EROW

R
PLAN & PROFILE
K=-136.647
L=135.000m

248+000
248+000 203.349 203.554 202.728 203.682
EROW

OF MAIN CARRIAGEWAY
TO VINUKONDA

NH-765/DO-KJ/PKG-2/HW/P&P-004
(Km: 247+000 TO Km: 248+000)
ROW
LHS

CLIENT :
RHS

AUTHORITY :
SCHEMATIC
TO SRISAILAM

DATUM=193.000m

LHS

RHS

SUPER ELEVATION

DESIGN CHAINAGE
DISTANCE FROM PCL
DISTANCE FROM PCL
VERTICAL ALIGNMENT
PROPOSED FRL ALONG
CARRIAGEWAY CENTER

EXISTING LEVEL ALONG

EXISTING LEVEL AT 15M


EXISTING LEVEL AT 15M

PROPOSED CENTER LINE


ROW

HORIZONTAL SCHEMATIC
MATCHLINE
W W
O O

EROW
R R
248+000

195
200
205
210

K=-136.647
EROW

L=135.000m
248+000 203.349 203.554 202.728 203.682

(MoRT&H)
HIP NO.
248+010 203.284 203.571 202.910 203.687

New Delhi -110001


ROW
248+020 203.223 203.593 202.671 203.685

(m)
HIP

GOVERNMENT OF INDIA

National Highway Wings, CRF


248+030 203.259 203.635 202.749 203.675
EROW

MG Road, Vijayawada - 520010.


Chainage

248949.762
248+040 203.276 203.623 202.738 203.658 VIP CH:=248040.299
ROW

EROW
VIP LVL:=203.824

ROADS & BUILDINGS DEPARTMENT


Transport Bhawan, 1, Parliament Streets
248+050 203.243 203.623 202.914 203.634

GOVERNMENT OF ANDHRA PRADESH


MINISTRY OF ROAD TRANSPORT & HIGHWAYS
248+060

K=-136.647
203.171 203.581 202.951 203.602

L=135.000m
(m)
Easting
248+070 203.163 203.510 202.758 203.563
KMP

299486.606
EROW

248+080 203.148 203.445 202.659 203.516 248+100


ROW

248+090 203.042 203.364 202.715 203.463


EROW

(m)
248+100 202.974 203.283 202.749 203.402

Northing
ROW

1758661.864
248+110 202.900 203.198 202.638 203.334
248+120 202.935 203.113 202.465 203.263

LHS=2.500 RHS=2.500
EROW

248+130 202.883 203.054 202.442 203.193

(m)

5000

EPC CONTRACTOR :
Radius
EROW

248+140 202.751 203.006 202.502 203.123

L=45.533m
G=-0.703%

DESIGN CONSULTANT :
ROW

248+150 202.668 202.944 202.443 203.052


248+160 202.644 202.885 202.168 202.983

Ph. No. 0861-2321919


Right
248+170
Direction

202.535 202.824 201.935 202.918


ROW

(Left/Right)
EROW

248+180 202.494 202.741 201.876 202.858 O


W
R
248+200

Email: bhavanicon1991@gmail.com
M/s BHAVANI CONSTRUCTIONS
EROW

248+190 202.435 202.668 201.865 202.802 VIP CH:=248193.332

SAMARTH INFRAENGG
VIP LVL:=202.747
1.51

16-6-114, Near Vijaya Mahal, Nellore-524001


Total

Technocrats Private Limited


248+200 202.473 202.615 201.946 202.751

K=217.807
L=80.000m
angle (∆)
Deviation

248+210 202.446 202.548 201.823 202.704


ROW

248+220 202.579 202.550 201.788 202.662


EROW

(m)

248+230 202.592 202.509 201.741 202.624 O


W
R
131.571
EROW

Curve,Lc
ROW

Length of

248+240 202.463 202.461 201.630 202.591


248+250 202.406 202.422 201.539 202.557
248+260
0

202.365 202.428 201.449 202.523


(m)

248+270 202.450 202.412 201.503 202.490


Spiral, Ls
Length of
EROW

PMC CONSULTANT :
ROW

248+280 202.261 202.401 201.615 202.456 248+300


EROW

248+290 202.079 202.385 201.564 202.422


100
(km/h)
Speed

248+300 202.121 202.349 201.638 202.389


Design
ROW

IN ASSOCIATION WITH
248+310 202.251 202.301 201.582 202.355

TPF ENGINEERING PVT. LTD.


248+320 202.331 202.251 201.709 202.322
EROW

HBS INFRA ENGINEERS PVT. LTD.


Super

G=-0.336%
(e) (%)

248+330 202.327 202.176 201.676 202.288

L=172.074m
EROW

elevetion,

248+340 202.217 202.111 201.528 202.254


ROW

248+350 202.060 202.060 201.758 202.221


248+360 201.765 202.039 201.498 202.187
ROW
EROW

248+370 201.936 201.987 201.652 202.154


248+380 201.912 201.968 201.705 202.120
EROW

W
O
R
248+400
248+390 201.817 201.947 201.742 202.086
248+400 201.754 201.932 201.565 202.053
ROW

248+410 201.766 201.916 201.255 202.019

PROOF CONSULTANT :
SKEW

SAFETY CONSULTANT :
EROW
CD NO:

248+420 201.762 201.884 201.192 201.987


PROPOSAL

EROW

248+430 201.752 201.844 201.206 201.956


ROW
CA SPAN (M):
CA CHAINAGE:

VIP CH:=248445.406

M/s Trisa Infra


248+440 201.764 201.819 201.164 201.926

Consultant LLP
VIP LVL:=201.900
DESIGN SPAN (M):

Bangalore, Karnataka
DESIGN CHAINAGE:

Engineers Pvt. Ltd.


248+450 201.675 201.795 201.090 201.897

Hyderabad, Telangana
M/s PVR Consulting
K=791.434
L=80.000m

248+460 201.728 201.755 200.935 201.870


-

EROW

248+470 201.652 201.710 201.028 201.844


ROW

248+500
249/1

EROW

248+480 201.665 201.664 201.111 201.819


CD.NO : 249/1
248+450

248+448

248+490 201.733 201.616 201.116 201.795


ROW

248+500 201.628 201.611 201.107 201.772

PROJECT :
D=1657.418
New Construction

248+510 200.983 201.627 201.123 201.748


Pipe Culvert -1x1.2Ø

Pipe Culvert -1x1.2Ø

EROW

248+520 200.875 201.618 201.068 201.725


PLAN
EROW

THE YEAR 2022-23.


248+530 200.990 201.586 200.999 201.701
ROW

L=83.502m
G=-0.235%

248+540 200.904 201.566 200.847 201.678


248+550 200.897 201.559 200.992 201.654
ROW

248+560 200.838 201.551 200.906 201.631


EROW

248+570 201.179 201.542 201.165 201.607


EROW

248+580 200.867 201.545 200.869 201.583 W W

WIDENING TO 2-LANE WITH PAVED


LONGITUDINAL SECTION
O O
R R
248+600

JUNCTION FROM DESIGN CHAINAGE

KM: 244+000 TO 268+700) SECTION OF


SHOULDERS OF DORNALA TO KUNTA

KM.244+000 TO KM.267+990 (EXISTING


248+590 200.867 201.532 201.021 201.559

NH-765 (PACKAGE-2) IN THE STATE OF


ANDHRA PRADESH ON EPC MODE FOR
248+600 200.900 201.496 200.969 201.534
ROW

248+610 200.928 201.451 200.938 201.508

REV.
EROW

VIP CH:=248618.908
248+620 200.678 201.442 200.790 201.482 VIP LVL:=201.492
EROW
ROW

248+630 200.866 201.398 200.607 201.455


L=100.000m
K=-1758.752

DATE
248+640 200.949 201.349 200.517 201.428

R0 24.04.2024
R1 27.04.2024 248+650 200.824 201.317 200.626 201.400
ROW
EROW

248+660 200.902 201.299 200.533 201.372


248+670 200.781 201.281 200.671 201.343
EROW
ROW PETROL

248+680 200.709 201.262 201.297 201.314 248+700


248+690 200.747 201.211 201.381 201.285
248+700 200.732 201.205 201.216 201.255
EROW

248+710 200.606 201.187 201.328 201.226


ROW
EROW

248+720 200.562 201.158 200.298 201.197


DESCRIPTION
FOR APPROVAL

248+730
VIDE EMAIL Dt.: 19.05.2024

200.791 201.128 200.279 201.168


ROW

248+740 200.584 201.092 200.265 201.139


248+750 200.673 201.047 200.219 201.109
EROW

248+760 200.642 201.002 200.218 201.080


R2 20.05.2024 REVISED AS PER A.E's OBSERVATION
EROW

248+770 200.626 201.019 200.181 201.051


248+780
ROW

200.320 200.982 200.224 201.022 248+800


W
O
R
REVISED AS PER PROOF CONSULTANT OBSERVATIONS

248+790
VIDE LETTER NO. PVR/BC/P&P/2024-25/01 Dt: 25.04.2024

200.517 200.965 200.484 200.993


248+800 200.310 200.956 200.776 200.963
ROW

EROW

248+810 200.465 200.931 200.831 200.934


EROW

DRAWN

SCALE :

248+820 200.408 200.899 200.635 200.905


248+830 200.300 200.854 200.590 200.876
CHECKED :
DESIGNED :
:

APPROVED :

248+840 200.179 200.812 200.628 200.847


G=-0.292%
L=570.393m
TOLL PLAZA CHAINAGE - CH:248++800

ROW

248+850 200.188 200.779 200.610 200.817


RJ

VERTICAL
RP

KS

DATE : 20/05/2024
BH
EROW

248+860 200.184 200.756 200.429 200.788


EROW
ROW

PC 248883.973
248+870 200.139 200.734 200.527 200.759 KMP
PROPOSED TOLLPLAZA WILL BE SUBMITTED SEPARATELY

- 1:200

248+880 200.280 200.708 200.624 200.730


HORIZONTAL - 1:2000

248+900
248+890 200.172 200.667 200.731 200.701
248+900 200.148 200.606 200.492 200.671
EROW

ROW

248+910 200.424 200.565 200.249 200.642


EROW

TITLE :

248+920 200.199 200.552 200.256 200.613


DRG. NO. :

REVISION :

248+930 200.130 200.552 200.070 200.584


LHS=2.500 RHS=2.500
ROW

248+940 199.893 200.496 199.891 200.555


R2
HIP-5EROW

248+950 199.771 200.423 199.787 200.525


ROW

248+960 199.826 200.395 199.762 200.496


EROW

248+970 199.931 200.370 199.852 200.467


R=5000.000 L=131.571

248+980 199.850 200.339 199.905 200.438 W


MATCHLINE
ROW

O
249+000 R

248+990 199.934 200.286 199.712 200.409


PLAN & PROFILE
EROW

PT 249015.544
249+000 199.791 200.240 199.666 200.379
OF MAIN CARRIAGEWAY
EROW
TO VINUKONDA

NH-765/DO-KJ/PKG-2/HW/P&P-005
(Km: 248+000 TO Km: 249+000)

PC 249037.257
ROW
LHS

CLIENT :
RHS

AUTHORITY :
SCHEMATIC
TO SRISAILAM

DATUM=189.000m

LHS

RHS

SUPER ELEVATION

DESIGN CHAINAGE
DISTANCE FROM PCL
DISTANCE FROM PCL
EROW

VERTICAL ALIGNMENT
PROPOSED FRL ALONG
CARRIAGEWAY CENTER

EXISTING LEVEL ALONG

EXISTING LEVEL AT 15M


EXISTING LEVEL AT 15M

PROPOSED CENTER LINE

HORIZONTAL SCHEMATIC
W
MATCHLINE

ROW
O
R

190
195
200
205
249+000
249+000 199.791 200.240 199.666 200.379

(MoRT&H)
HIP NO.
EROW
PT 249015.544
249+010 199.860 200.223 199.677 200.350

New Delhi -110001


EROW
249+020 200.035 200.166 199.445 200.321

(m)
HIP

GOVERNMENT OF INDIA

National Highway Wings, CRF


PC 249037.257
249+030 199.929 200.053 199.386 200.292

ROW

MG Road, Vijayawada - 520010.


Chainage

D=21.714
249101.268
249+040 199.394 199.958 199.359 200.263

ROADS & BUILDINGS DEPARTMENT


L=131.571
R=5000.000

Transport Bhawan, 1, Parliament Streets


249+050 199.170 199.856 199.195 200.233

GOVERNMENT OF ANDHRA PRADESH


EROW
ROW

MINISTRY OF ROAD TRANSPORT & HIGHWAYS


249+060 199.097 199.790 198.990 200.204

(m)
EROW

Easting
249+070 198.923 199.759 198.210 200.175

299630.837
249+080 198.869 199.748 198.417 200.146
249+090 198.805 199.698 198.391 200.117 249+100
HIP-

(m)
249+100 198.651 199.673 198.332 200.087
ROW6
EROW

Northing

LHS=2.500 RHS=2.500
1758615.456
249+110 198.696 199.633 197.762 200.058
EROW

249+120 198.705 199.586 198.655 200.029

R=-5000.000 L=128.014
CD.NO : 250/1
249+130 198.715 199.514 197.842 200.000

(m)
SKEW

5000

EPC CONTRACTOR :
CD NO:

Radius

G=-0.292%
L=570.393m
249+140 198.819 199.431 197.521 199.971
PROPOSAL

DESIGN CONSULTANT :
249+150
CA SPAN (M):

199.017 199.359 197.533 199.942


EROW
CA CHAINAGE:

PT 249165.271
249+160 198.809 199.270 197.428 199.912
ROW
EROW

Left
DESIGN SPAN (M):

Ph. No. 0861-2321919


DESIGN CHAINAGE:

249+170 198.901 199.126 197.322 199.883


Direction
(Left/Right)

249+180 198.569 199.063 196.987 199.854


-

Email: bhavanicon1991@gmail.com
M/s BHAVANI CONSTRUCTIONS
249+190 198.774 199.070 197.004 199.825

SAMARTH INFRAENGG
249+200
250/1

1.47

16-6-114, Near Vijaya Mahal, Nellore-524001


Total
EROW

Technocrats Private Limited


249+200 198.505 199.024 197.468 199.796
249+094
249+102

angle (∆)
Deviation

249+210 198.625 198.984 197.280 199.766


EROW
Reconstruction

249+220 198.464 198.918 197.324 199.737


ROW
Box Culvert -1x2.0m
Box Culvert -1x2.0m

(m)

249+230 198.454 198.891 197.365 199.708


128.014
Curve,Lc
Length of

249+240 198.436 198.812 197.174 199.679


EROW

249+250 198.321 198.764 197.232 199.646


EROW

249+260
0

198.171 198.689 197.566 199.606


(m)

249+270 198.228 198.595 197.933 199.559


Spiral, Ls
Length of

PMC CONSULTANT :
249+280 198.218 198.522 198.180 199.505
O
F
C

249+290 198.073 198.448 198.732 199.445


ROW

249+300
100
EROW

(km/h)
Speed

249+300 198.009 198.430 199.488 199.377


Design

IN ASSOCIATION WITH
VIP CH:=249304.301
EROW

249+310 VIP LVL:=199.491


197.962 198.326 199.580 199.303

TPF ENGINEERING PVT. LTD.


K=-145.978
L=130.000m
249+320 197.915 198.324 199.728 199.222
-

HBS INFRA ENGINEERS PVT. LTD.


Super

249+330
(e) (%)

197.869 198.263 199.137 199.134


elevetion,

249+340 197.822 198.230 198.305 199.039


EROW

249+350 197.775 198.195 197.657 198.938


ROW
EROW

249+360 197.728 198.122 197.429 198.829


249+370 197.681 198.049 197.216 198.714
249+380

L=2.520m
197.635 198.011 197.307 198.597

G=-1.183%
249+390 197.588 198.004 197.433 198.484 W
O
R
249+400
EROW

249+400 197.541 197.946 197.516 198.375


EROW

249+410 197.494 197.866 197.434 198.270

PROOF CONSULTANT :

SAFETY CONSULTANT :
ROW

249+420 197.448 197.769 197.315 198.169


249+430 197.401 197.678 197.252 198.072

M/s Trisa Infra


249+440 197.361 197.614 197.249 197.979
EROW

Consultant LLP
Bangalore, Karnataka
Engineers Pvt. Ltd.
249+450 197.240 197.546 197.271 197.890

Hyderabad, Telangana
M/s PVR Consulting
EROW

249+460 197.120 197.502 197.231 197.805


249+470 196.999 197.452 197.148 197.723
249+480 196.879 197.445 197.146 197.646
ROW
O
F
C
EROW

249+490 196.759 197.427 197.082 197.573 VIP CH:=249494.321


249+500
249+500 VIP LVL:=197.244
196.638 197.393 196.877 197.504
EROW

K=251.341

PROJECT :
L=245.000m

249+510 196.518 197.327 197.037 197.438


249+520 196.397 197.265 197.153 197.377
PLAN

THE YEAR 2022-23.


249+530 196.277 197.207 197.125 197.320
EROW

249+540 196.066 197.130 197.322 197.267


EROW

ROW

249+550 196.546 197.105 197.355 197.217


249+560 196.799 197.023 197.217 197.172
D=785.639

249+570 196.924 196.996 197.422 197.130


249+580 196.886 197.009 197.293 197.093

WIDENING TO 2-LANE WITH PAVED


LONGITUDINAL SECTION

JUNCTION FROM DESIGN CHAINAGE


EROW

KM: 244+000 TO 268+700) SECTION OF


SHOULDERS OF DORNALA TO KUNTA

KM.244+000 TO KM.267+990 (EXISTING


249+590 196.758 196.969 197.209 197.060 W W
O O

NH-765 (PACKAGE-2) IN THE STATE OF


R
249+600
R

ANDHRA PRADESH ON EPC MODE FOR


EROW

249+600 196.639 196.927 197.477 197.030


249+610 196.507 196.873 197.462 197.005

REV.
ROW

249+620 196.453 196.858 197.198 196.983


249+630 196.713 196.851 197.239 196.962
EROW

DATE
CH:249+650
BUSSHELTER

249+640 195.724 196.836 197.401 196.941

R0 24.04.2024
R1 27.04.2024
EROW

249+650 195.606 196.886 197.380 196.921


L=52.332m
G=-0.208%
ROW

249+660 195.751 196.843 197.432 196.900


249+670 195.676 196.842 197.537 196.879
ROW

KMP
249+680 195.576 196.836 197.510 196.857
EROW

249+690 195.672 196.784 197.524 196.834 249+700


EROW

VIP CH:=249699.153
249+700 195.590 196.725 197.308 196.809 VIP LVL:=196.818
SKEW

L=60.000m
K=-581.681
CD NO:

249+710 195.807 196.712 197.292 196.782


PROPOSAL

ROW

249+720 195.675 196.666 197.864 196.753


CA SPAN (M):
CA CHAINAGE:

DESCRIPTION
FOR APPROVAL
EROW

249+730
VIDE EMAIL Dt.: 19.05.2024

195.830 196.655 197.211 196.723


DESIGN SPAN (M):

249+740 195.617 196.573 196.848 196.691


O
DESIGN CHAINAGE:

F
C
EROW

ROW

249+750 195.740 196.575 197.157 196.660


-

249+760 196.222 196.484 197.206 196.629


R2 20.05.2024 REVISED AS PER A.E's OBSERVATION
250/2

249+770 196.200 196.466 197.159 196.598


249+762

249+760

EROW

249+780 196.296 196.455 197.054 196.567


ROW

EROW

W W
Reconstruction

REVISED AS PER PROOF CONSULTANT OBSERVATIONS

249+790
VIDE LETTER NO. PVR/BC/P&P/2024-25/01 Dt: 25.04.2024

196.398 196.396 196.926 196.536 249+800 R


O
R
O
G=-0.311%
CD.NO : 250/2

L=108.590m

249+800 196.425 196.394 197.001 196.505


Pipe Culvert -1x1.2Ø

Pipe Culvert -1x1.2Ø

ROW

249+810 196.386 196.407 196.742 196.474


DRAWN

SCALE :

249+820 196.016 196.391 196.782 196.443


EROW

249+830 195.878 196.353 196.779 196.412


CHECKED :
DESIGNED :
:

APPROVED :
EROW

249+840 195.783 196.310 197.070 196.381


ROW

249+850 195.857 196.234 196.925 196.355


RJ

VERTICAL
RP

KS

DATE : 20/05/2024
BH

249+860 195.766 196.203 196.553 196.336


249+870 195.874 196.177 196.444 196.325
ROW
EROW

VIP CH:=249877.742
- 1:200

249+880 196.128 196.236 196.212 196.321 VIP LVL:=196.263


HORIZONTAL - 1:2000
EROW

K=138.268
L=80.000m

249+890 196.318 196.204 196.120 196.324


LHS=2.500 RHS=2.500

249+900
BOX

BOX
ELECTRIC

ELECTRIC
BOX
ELECTRIC

249+900 196.414 196.186 196.165 196.334


249+910 196.499 196.167 196.206 196.352
ROW

TITLE :

249+920 196.264 196.188 196.523 196.376


EROW

DRG. NO. :

REVISION :

249+930 196.315 196.237 196.210 196.403


EROW

ROW

249+940 196.354 196.258 196.060 196.430


R2

TS 249950.910
249+950 195.912 196.250 196.196 196.457
G=0.268%

249+960
L=64.624m

195.251 196.264 196.194 196.483


249+970 195.059 196.290 195.979 196.510
EROW

O
F
C

K=-152.041
ROW

L=100.000m

249+980 195.112 196.330 196.177 196.537


EROW

CL=60.000

MATCHLINE
249+990 195.426 196.378 196.268 196.562 W
O
R
PLAN & PROFILE

250+000
250+000 195.338 196.425 196.523 196.580
ROW

SC 250010.910
OF MAIN CARRIAGEWAY
TO VINUKONDA

NH-765/DO-KJ/PKG-2/HW/P&P-006
(Km: 249+000 TO Km: 250+000)
EROW

EROW
LHS

CLIENT :
RHS

AUTHORITY :
SCHEMATIC
TO SRISAILAM

DATUM=189.000m

LHS

RHS

SUPER ELEVATION

DESIGN CHAINAGE
DISTANCE FROM PCL
DISTANCE FROM PCL
VERTICAL ALIGNMENT
PROPOSED FRL ALONG
CARRIAGEWAY CENTER

EXISTING LEVEL ALONG

EXISTING LEVEL AT 15M


EXISTING LEVEL AT 15M
C
F

PROPOSED CENTER LINE


O
ER

HORIZONTAL SCHEMATIC
ER
R

910 W O
OW OW

W
+
O
0 000 50010.
2
R

190
195
200
205
25 C S
RO
250+000 195.338 196.425 196.523 196.580 W

(MoRT&H)
NE
HLI
250+010 195.425 196.494 196.744 196.592 ATC M

New Delhi -110001


250+020 195.574 196.554 196.606 196.598
ERO
W

GOVERNMENT OF INDIA
ERO

National Highway Wings, CRF


250+030 VIP CH:=250032.366
W

195.601 196.597 197.000 196.596

MG Road, Vijayawada - 520010.


VIP LVL:=196.677
250+040 195.412 196.648 196.839 196.588

CL=60.000
K=-152.041
L=100.000m

ROADS & BUILDINGS DEPARTMENT


Transport Bhawan, 1, Parliament Streets
250+050 194.889 196.655 196.646 196.574
ROW

GOVERNMENT OF ANDHRA PRADESH


MINISTRY OF ROAD TRANSPORT & HIGHWAYS
250+060 194.760 196.527 195.967 196.553
ROW
ER

250+070 194.835 196.260 195.851 196.525


EROW

OW

250+080 194.629 195.685 195.618 196.491 0


KMP
+10
250
250+090 194.656 195.461 195.537 196.452
250+100 194.638 195.221 195.515 196.413
250+110 194.642 195.201 195.645 196.374
E
0+140
ROW
E RO

250+120
W

194.697 195.478 195.506 196.335

L=50.813m
G=-0.390%
EROW

CH:25 LTER
BUSSH
RO W

250+130 194.729 195.518 195.324 196.296

EPC CONTRACTOR :
SKEW
W
DESIG
PROPO

O
DESIG

250+140 R
194.658 195.605 195.462 196.259
CA CH
CA SPA

50

DESIGN CONSULTANT :
CD NO
:

SAL

250+1
HIP-7

250+150 195.447 195.696 195.645 196.227


T CH:
N CHA
N SPAN

STAR NMENT
AINAG
N (M):

250+160 194.675 195.760 195.442 196.203


REALIG
E:

Ph. No. 0861-2321919


CD.NO : 251/1
ERO

LHS=5.000
(M):

RHS=5.000
EROW

INAGE

250+170 194.642 195.812 195.339 196.184


:
ROW

250+180 194.670 195.824 195.301 196.172 VIP CH:=250183.179


-

R=-800.000 L=297.519

Email: bhavanicon1991@gmail.com
M/s BHAVANI CONSTRUCTIONS
0
VIP LVL:=196.089
ROW

250+20
250+190 194.631 195.782 195.251 196.166

SAMARTH INFRAENGG
K=155.590
L=100.000m

16-6-114, Near Vijaya Mahal, Nellore-524001


Recons

Technocrats Private Limited


Box Cu

250+200 194.590 195.607 195.080 196.167


250+1
Box Cu
251/1
250+1

50
52

250+210 194.701 195.540 195.195 196.174


ERO

tructio
W
EROW

n
lvert -1

250+220
lvert -1

195.178 195.157 194.740 196.188


250+230 195.331 193.990 194.429 196.208
x2.0m
x2.0m

250+240 195.278 193.466 193.673 196.233


ROW

250+250 195.291 193.562 193.631 196.258

G=0.253%
L=16.711m
ROW

ERO

250+260 195.141 193.651 193.646 196.281


W
EROW

250+270 194.829 193.796 193.695 196.298

PMC CONSULTANT :
250+280 193.594 193.389 193.533 196.311
250+290 193.267 193.311 193.258 196.319
250+300
CS 250308.429
250+300 193.145 193.241 193.116 196.322

IN ASSOCIATION WITH
ER
O

ROW
W

EROW

250+310 193.183 193.113 193.226 196.320

TPF ENGINEERING PVT. LTD.


ROW

250+320 193.202 192.953 192.967 196.313

HBS INFRA ENGINEERS PVT. LTD.


250+330 192.792 192.883 192.705 196.301
BRIDGE NO : 251/1
SKEW

250+340 192.506 193.373 193.152 196.284 VIP CH:=250339.890

CL=60.000
ER

250+350 VIP LVL:=196.485

K=-201.619
195.651 193.609 193.554 196.262

L=180.000m
EROW
PROPOSAL

OW
BRIDGE NO:

250+360 195.643 193.706 193.642 196.235


DESIGN SPAN
CA SPAN (M):
CA CHAINAGE

ST 250368.429
:

DESIGN CHAINA

250+370
ROW

195.286 194.081 193.740 196.203


(M):
GE:

250+380 193.646 195.350 193.989 196.167


ROW

W
-

250+390 W O
193.688 195.396 194.009 196.125
ER

PC 250398.397
O R
R

D=29.968
250+400
OW
EROW

250+400 194.001 195.181 194.205 196.078


251/1

250+410 194.012 194.806 194.278 196.026


250+333

PROOF CONSULTANT :
250+335

SAFETY CONSULTANT :
250+420 193.964 194.213 194.430 195.970
New constructi
Minor Bridge -3
Minor Bridge -3

on

250+430 193.946 193.981 194.732 195.908


ROW

M/s Trisa Infra


250+440 193.950 194.003 194.749 195.844

Consultant LLP
x10.0m

EROW

L=8.573m
G=0.640%
x10.0m

ROW
EROW

Bangalore, Karnataka
Engineers Pvt. Ltd.
250+450 193.936 194.295 194.693 195.785

Hyderabad, Telangana
M/s PVR Consulting
250+460 193.988 194.735 194.940 195.734
C
F
O

250+470 194.080 194.814 194.673 195.691


250+480 194.070 194.950 194.683 195.655
END CH: 250+500
250+490 194.087 195.039 194.655 195.627
250+500
EROW

REALIGNMENT
OW

VIP CH:=250498.463
ERROW

250+500 194.372 195.155 194.602 195.606 VIP LVL:=195.470

PROJECT :
K=129.451
HIP-8

L=120.000m

250+510 194.217 195.269 194.725 195.594


ROW
SKEW
CD NO:

250+520 194.717 195.366 194.749 195.589


PLAN

R=1850.000 L=208.477

THE YEAR 2022-23.


PROPOSAL

250+530 194.491 195.453 194.946 195.592


CA SPAN (M):
CA CHAINAGE:

EROW

250+540 194.572 195.529 195.004 195.602


EROW
DESIGN SPAN (M):
DESIGN CHAINAGE:

250+550 LHS=2.500 194.567 195.581 195.126 195.621


250+560 194.808 195.614 195.207 195.647
ROW
-

CD.NO : 251/2

250+570 194.795 195.638 195.442 195.675


ROW
251/2

250+580 194.538 195.583 195.182 195.704

WIDENING TO 2-LANE WITH PAVED


LONGITUDINAL SECTION
250+534

JUNCTION FROM DESIGN CHAINAGE


250+536

EROW

KM: 244+000 TO 268+700) SECTION OF


W

SHOULDERS OF DORNALA TO KUNTA

KM.244+000 TO KM.267+990 (EXISTING


250+600
RHS=2.500

250+590 194.591 195.562 195.213 195.733 O

NH-765 (PACKAGE-2) IN THE STATE OF


R
EROW

ANDHRA PRADESH ON EPC MODE FOR


PT 250606.875
Reconstruction

250+600 194.523 195.607 195.204 195.761


250+610 194.667 195.644 195.335 195.790

REV.
SKEW
Box Culvert -1x2.0m
Box Culvert -1x2.0m

CD NO:

250+620 194.600 195.685 195.173 195.819


PROPOSAL
ROW

250+630 194.571 195.711 195.140 195.847


CA SPAN (M):

DATE
CA CHAINAGE:
EROW

DESIGN SPAN (M

250+640 194.542 195.764 194.751 195.876


ROW
EROW

R0 24.04.2024
R1 27.04.2024
):
DESIGN CHAINAGE
:

250+650 194.485 195.812 194.435 195.905


250+660 194.677 195.810 194.125 195.933
-
8
7

9
HIP NO.

250+670 194.607 195.764 194.491 195.962


251/3

250+680 194.663 195.813 195.086 195.991


250+703
250+704
EROW
EROW

250+700
250+690 195.022 195.884 195.259 196.020
G=0.287%
ROW

L=246.896m
(m)
HIP

Reconstruction

250+700 194.733 195.928 195.316 196.048


D=177.195
Chainage

250161.408

250857.011
250502.747

Box Culvert -1x3.0


ROW

Box Culvert -1x3.0

250+710 194.898 195.969 194.959 196.077


m

250+720 195.151 196.004 195.102 196.106


DESCRIPTION
FOR APPROVAL

250+730
VIDE EMAIL Dt.: 19.05.2024

195.339 196.042 195.246 196.134


(m)

EROW
Easting

EROW

CD.NO : 251/3

250+740 195.436 196.093 195.389 196.163


300649.704
300990.962
301344.945

250+750 195.086 196.143 195.533 196.192


ROW

250+760 194.957 196.161 195.348 196.220


R2 20.05.2024 REVISED AS PER A.E's OBSERVATION
(m)

ROW

250+770 195.058 196.109 195.251 196.249 TS 250784.070


Northing

1758390.36
1758371.86
1758322.844

250+780 195.102 196.036 195.342 196.278


EROW
EROW

250+800
REVISED AS PER PROOF CONSULTANT OBSERVATIONS

250+790
VIDE LETTER NO. PVR/BC/P&P/2024-25/01 Dt: 25.04.2024

195.752 196.024 195.339 196.306


(m)

700
800

250+800
1850

195.399 196.079 195.297 196.335


Radius

CH:250+820
BUSSHELTER

250+810 195.147 196.141 195.289 196.365


DRAWN

SCALE :

250+820 195.285 196.166 195.338 196.400


ROW

CL=70.000
EROW

250+830 195.353 196.151 195.927 196.442


CHECKED :
Left
Left

DESIGNED :
:
Right

APPROVED :

VIP CH:=250835.359
EROW

ROW

VIP LVL:=196.437
Direction

250+840 195.452 196.142 196.024 196.491


(Left/Right)

SC 250854.070
K=145.899
L=60.000m

250+850
CS 250859.952
195.799 196.197 196.122 196.547
RJ

VERTICAL
RP

KS

DATE : 20/05/2024
BH
HIP-9

250+860 196.111 196.215 196.219 196.610 KMP


LHS=5.000
RHS=5.000
6.46
6.21

L=5.882m
25.61
Total

R=-700.000

250+870 196.744 196.220 196.325 196.678


angle (∆)
Deviation

EROW

- 1:200

250+880 196.706 196.334 196.277 196.748


HORIZONTAL - 1:2000
EROW
ROW

250+890 196.647 196.511 196.394 196.818


250+900
(m)

ROW
5.882

250+900 196.737 196.732 196.426 196.888


208.478
297.519

CL=70.000
Curve,Lc
Length of

250+910 196.651 196.864 196.458 196.958


TITLE :
G=0.698%
L=77.755m

250+920 196.884 196.898 196.490 197.028 ST 250929.952


DRG. NO. :
EROW

REVISION :
0
70
60

250+930
EROW

196.640 197.016 196.522 197.097


(m)

W W
Spiral, Ls

250+940 196.503 197.076 196.554 197.167 O O


Length of

R R
R2

250+950 196.705 197.154 196.586 197.236


ROW

250+960 196.543 197.201 196.820 197.298


C
F
O

CH:250+950
BUSSHELTER
ROW
100
100
100
(km/h)
Speed
Design

250+970 196.588 197.284 197.081 197.355


EROW
EROW

D=1470.493

250+980 196.752 197.344 197.420 197.406 MATCHLINE


K=-166.195
L=100.000m

250+990 196.585 197.362 197.292 197.450


-

VIP CH:=250993.114
PLAN & PROFILE
5.00
5.00

VIP LVL:=197.538
251+000
Super

(e) (%)

251+000 196.730 197.382 196.339 197.489


elevetion,

OF MAIN CARRIAGEWAY
TO VINUKONDA

ROW

NH-765/DO-KJ/PKG-2/HW/P&P-007
(Km: 250+000 TO Km: 251+000)
EROW
EROW

ROW
LHS

CLIENT :
RHS

AUTHORITY :
SCHEMATIC
TO SRISAILAM

DATUM=189.000m

LHS

RHS

SUPER ELEVATION

DESIGN CHAINAGE
DISTANCE FROM PCL
DISTANCE FROM PCL
VERTICAL ALIGNMENT
PROPOSED FRL ALONG
C
F

CH:250+950
O

BUSSHELTER
ROW

CARRIAGEWAY CENTER

EXISTING LEVEL ALONG

EXISTING LEVEL AT 15M


EXISTING LEVEL AT 15M

PROPOSED CENTER LINE

HORIZONTAL SCHEMATIC
EROW
EROW

190
195
200
205
VIP LVL:=197.538 MATCHLINE
251+000 196.730 197.382 196.339 197.489

(MoRT&H)
251+000
251+010 196.597 197.403 196.615 197.521

New Delhi -110001


251+020 196.618 197.446 197.573 197.548
ROW

GOVERNMENT OF INDIA

National Highway Wings, CRF


251+030 196.795 197.482 197.495 197.568
EROW

MG Road, Vijayawada - 520010.


K=-166.195
L=100.000m
EROW

ROW
251+040 196.638 197.492 197.741 197.583

ROADS & BUILDINGS DEPARTMENT


Transport Bhawan, 1, Parliament Streets
251+050 196.715 197.499 197.313 197.593

GOVERNMENT OF ANDHRA PRADESH


MINISTRY OF ROAD TRANSPORT & HIGHWAYS
SKEW

251+060 196.529 197.496 197.117 197.603


CD NO:

LHS=2.500
251+070 196.657 197.471 196.930 197.612
PROPOSAL

KMP
CA SPAN (M):

EROW

251+080 196.669 197.459 197.024 197.622


CA CHAINAGE:

EROW

251+090
DESIGN SPAN (M):

196.697 197.474 196.976 197.631


ROW
DESIGN CHAINAGE:

G=0.096%
L=91.844m
251+100
251+100
196.947 197.509 197.090 197.641
ROW

RHS=2.500
-

251+110 196.897 197.542 197.205 197.651


251+120 196.576 197.555 197.211 197.660
252/1

EROW
251+109
251+111

251+130 196.702 197.580 197.031 197.670

EPC CONTRACTOR :
EROW

251+140 196.566 197.576 197.203 197.681


Reconstruction

CD.NO : 252/1

DESIGN CONSULTANT :
251+150 196.579 197.566 197.177 197.702
Pipe Culvert 1x1.2Ø
Pipe Culvert 1x1.2Ø

ROW

251+160 196.535 197.568 196.956 197.735 VIP CH:=251164.958

Ph. No. 0861-2321919


ROW

251+170 196.637 197.576 196.951 197.780 VIP LVL:=197.704

K=86.512
L=60.000m
EROW

251+180 196.800 197.570 197.096 197.836


EROW

Email: bhavanicon1991@gmail.com
M/s BHAVANI CONSTRUCTIONS
251+190 196.910 197.575 197.357 197.903

SAMARTH INFRAENGG
16-6-114, Near Vijaya Mahal, Nellore-524001
W W

Technocrats Private Limited


251+200 O O
251+200
196.910 197.588 197.359 197.981 R R

251+210 196.951 197.624 197.352 198.060


251+220 197.085 197.625 197.252 198.139
ROW

EROW

251+230 196.951 197.615 197.372 198.218


EROW

G=0.790%
L=49.556m
ROW
SKEW

251+240 196.964 197.638 197.237 198.297


CD NO:

PROPOSAL

251+250 196.903 197.675 197.222 198.374


CA SPAN (M):
CA CHAINAGE:

251+260 196.904 197.695 197.289 198.446


KMP
DESIGN SPAN (M):

251+270 196.864 197.683 197.297 198.510


DESIGN CHAINAGE:

EROW

PMC CONSULTANT :
EROW

251+280 196.935 197.692 197.286 198.566


ROW
-

251+290 196.907 197.784 197.284 198.616


ROW
252/2

251+300
251+300
196.991 197.885 197.342 198.658

IN ASSOCIATION WITH
CD.NO : 252/2
251+309
251+312

251+310 196.734 197.974 197.466 198.692

TPF ENGINEERING PVT. LTD.


251+320 197.200 198.005 196.752 198.720
Reconstruction

EROW

HBS INFRA ENGINEERS PVT. LTD.


VIP CH:=251327.014
EROW

251+330 197.456 197.975 197.282 198.740 VIP LVL:=198.984


Box Culvert -1x3.0m
Box Culvert -1x3.0m

K=-136.299
L=165.000m
251+340 197.043 197.942 197.349 198.752
ROW

251+350 197.133 197.980 197.417 198.757


251+360 197.138 198.090 197.412 198.755
ROW
EROW

251+370 197.243 198.142 197.588 198.746


EROW

251+380 197.247 198.135 197.514 198.729


251+390 197.435 198.145 197.552 198.705
W W
251+400 O O
251+400
197.560 198.191 197.679 198.674 R R

251+410 197.554 198.234 197.619 198.635

PROOF CONSULTANT :
ROW

SAFETY CONSULTANT :
EROW

251+420 197.514 198.255 197.605 198.593


EROW

L=9.856m
G=0.421%
ROW

251+430 197.598 198.275 197.632 198.554

M/s Trisa Infra


251+440 197.691 198.297 197.658 198.521

Consultant LLP
Bangalore, Karnataka
Engineers Pvt. Ltd.
251+450 197.627 198.305 197.685 198.494

Hyderabad, Telangana
D=1470.493

M/s PVR Consulting


251+460 197.654 198.309 197.649 198.473
EROW

251+470
C
F

197.537 198.305 197.714 198.458


O
EROW
ROW

251+480 197.702 198.310 197.796 198.449


251+490
ROW

197.679 198.348 197.829 198.446


251+500
251+500
197.681 198.382 197.862 198.448

PROJECT :
251+510 197.719 198.412 197.895 198.457
EROW

VIP CH:=251519.370
251+520
EROW

197.661 198.411 197.928 198.471


PLAN

VIP LVL:=198.175

THE YEAR 2022-23.


K=169.374

251+530 197.695 198.412 197.961 198.492


L=200.000m

251+540 197.713 198.425 197.994 198.518


ROW

251+550 197.747 198.446 198.027 198.550


ROW

251+560 197.842 198.484 198.060 198.588


EROW
EROW

251+570 197.864 198.534 197.995 198.632


251+580 197.865 198.567 198.071 198.682

WIDENING TO 2-LANE WITH PAVED


LONGITUDINAL SECTION

JUNCTION FROM DESIGN CHAINAGE

KM: 244+000 TO 268+700) SECTION OF


SHOULDERS OF DORNALA TO KUNTA

KM.244+000 TO KM.267+990 (EXISTING


251+590 197.884 198.555 198.165 198.737

NH-765 (PACKAGE-2) IN THE STATE OF


ANDHRA PRADESH ON EPC MODE FOR
W
O
251+600
251+600
197.744 198.556 198.141 198.799 R
ROW

251+610 197.710 198.575 198.116 198.867

REV.
EROW
EROW

ROW

251+620 197.746 198.625 198.228 198.940


251+630 197.714 198.631 198.320 199.016
L=7.701m
G=0.760%

DATE
251+640 198.086 198.615 198.280 199.086

R0 24.04.2024
R1 27.04.2024 251+650 198.020 198.619 198.227 199.149
EROW

251+660 197.818 198.619 198.229 199.205


EROW

KMP
251+670 197.745 198.625 198.182 199.254
ROW

251+680 197.747 198.625 198.192 199.295


ROW

251+690 197.755 198.634 198.118 199.330


SKEW
CD NO:

251+700
251+700
197.874 198.659 198.102 199.357
PROPOSAL

EROW
CA SPAN (M):

251+710 197.949 198.730 197.928 199.377 VIP CH:=251714.571


CA CHAINAGE:

EROW

251+720 197.616 198.801 197.960 199.390 VIP LVL:=199.659


DESIGN SPAN (M):

K=-139.089
DESIGN CHAINAGE:

L=175.000m

DESCRIPTION
FOR APPROVAL

251+730
VIDE EMAIL Dt.: 19.05.2024

197.418 198.777 197.995 199.395


ROW

251+740
-

197.781 198.712 197.753 199.394


ROW

251+750 197.539 198.704 197.819 199.385


252/3

EROW

251+760
251+735
251+737

197.591 198.685 197.909 199.369


EROW

R2 20.05.2024 REVISED AS PER A.E's OBSERVATION


CD.NO : 252/3

251+770 197.779 198.598 197.885 199.346


Reconstruction

251+780 197.968 198.532 197.957 199.316


Box Culvert -1x2.0m
Box Culvert -1x2.0m

REVISED AS PER PROOF CONSULTANT OBSERVATIONS

251+790
VIDE LETTER NO. PVR/BC/P&P/2024-25/01 Dt: 25.04.2024

198.156 198.535 197.900 199.278


W
251+800 O
251+800
198.345 198.594 198.142 199.233 R
ROW

EROW

251+810
EROW

198.353 198.644 198.294 199.184


ROW

DRAWN

SCALE :

251+820 198.348 198.679 198.099 199.134


L=32.918m
G=-0.498%

251+830 198.342 198.731 198.160 199.084


CHECKED :
DESIGNED :
:

APPROVED :

251+840 198.337 198.781 198.379 199.036


251+850 198.331 198.813 198.277 199.000
RJ

VERTICAL
RP

KS

DATE : 20/05/2024
BH
EROW
EROW

251+860 198.326 198.837 198.314 198.977 VIP CH:=251864.989


ROW

251+870 198.321 198.861 198.382 198.968 VIP LVL:=198.910 KMP


K=74.248
L=60.000m

LHS=2.500
ROW

- 1:200

251+880 198.315 198.878 198.316 198.972


HORIZONTAL - 1:2000

251+890 198.310 198.895 198.283 198.989


251+900
251+900
198.304 198.914 198.328 199.019
EROW
EROW

251+910 198.324 198.952 198.524 199.050


TITLE :
RHS=2.500

251+920 198.576 199.007 198.533 199.081


DRG. NO. :

REVISION :

251+930 198.623 199.052 198.566 199.112


ROW

G=0.310%
L=59.139m

251+940 198.670 199.103 198.688 199.143


R2
ROW
EROW

251+950 198.717 199.130 198.584 199.174


EROW

251+960 198.764 199.135 198.757 199.204


251+970 198.665 199.178 198.775 199.232
251+980 198.842 199.204 198.705 199.258
251+990 198.826 199.198 198.631 199.281
K=-384.777
L=250.000m

PLAN & PROFILE


ROW

MATCHLINE
EROW

W
252+000 198.811 199.156 198.660 199.301 O
R
EROW

252+000
ROW

OF MAIN CARRIAGEWAY
TO VINUKONDA

NH-765/DO-KJ/PKG-2/HW/P&P-008
(Km: 251+000 TO Km: 252+000)
LHS

CLIENT :
RHS

AUTHORITY :
SCHEMATIC
TO SRISAILAM

DATUM=189.000m

LHS

RHS

SUPER ELEVATION

DESIGN CHAINAGE
DISTANCE FROM PCL
DISTANCE FROM PCL
VERTICAL ALIGNMENT
PROPOSED FRL ALONG
CARRIAGEWAY CENTER

EXISTING LEVEL ALONG

EXISTING LEVEL AT 15M


EXISTING LEVEL AT 15M

PROPOSED CENTER LINE

HORIZONTAL SCHEMATIC
10

190
195
200
205
ROW
252+000 198.811 199.156 198.660 199.301

HIP NO.
MATCHLINE

EROW

(MoRT&H)
W
O
R

EROW
252+000
252+010 198.795 199.178 198.680 199.319

ROW

New Delhi -110001


252+020 198.689 199.195 198.705 199.334

(m)
HIP

GOVERNMENT OF INDIA

National Highway Wings, CRF


252+030 198.648 199.199 198.683 199.347

MG Road, Vijayawada - 520010.


Chainage

252533.962
252+040 198.608 199.192 198.601 199.357

ROADS & BUILDINGS DEPARTMENT


Transport Bhawan, 1, Parliament Streets
EROW

252+050 198.571 199.213 198.667 199.364

GOVERNMENT OF ANDHRA PRADESH


EROW

MINISTRY OF ROAD TRANSPORT & HIGHWAYS


252+060 198.435 199.242 198.757 199.369

(m)
C
F
O
ROW

Easting

LHS=2.500
252+070 198.419 199.266 198.726 199.371

303001.478
KMP
ROW

VIP CH:=252079.128
252+080 198.366 199.266 198.739 199.371 VIP LVL:=199.574

K=-384.777
252+090 198.293 199.277 198.783 199.368

L=250.000m
(m)
EROW

252+100 198.326 199.274 198.874 199.362


EROW

252+100

Northing

RHS=2.500
1758651.118
252+110 198.320 199.264 198.837 199.354
252+120 198.249 199.246 198.705 199.343
ROW

(m)
252+130 198.354 199.226 198.597 199.330

13700

EPC CONTRACTOR :
Radius
ROW

252+140 198.339 199.215 198.477 199.314

DESIGN CONSULTANT :
EROW

252+150 198.315 199.172 198.376 199.295


EROW

252+160 198.411 199.082 198.488 199.274


Left

Ph. No. 0861-2321919


Direction

252+170 198.361 198.972 198.073 199.250


(Left/Right)

252+180 197.609 198.823 197.942 199.224

Email: bhavanicon1991@gmail.com
M/s BHAVANI CONSTRUCTIONS
252+190 197.616 198.690 197.892 199.195

SAMARTH INFRAENGG
ROW

EROW

1.12
Total

16-6-114, Near Vijaya Mahal, Nellore-524001

Technocrats Private Limited


EROW

252+200 197.156 198.618 197.844 199.163 W W


angle (∆)

O O
Deviation

252+200
R R
ROW

KMP
252+210 197.027 198.602 197.025 199.130
252+220 196.795 198.606 197.404 199.096

D=1470.493
(m)

252+230 196.891 198.638 197.712 199.062


267.025
SKEW
C
F
O

Curve,Lc
Length of
CD NO:

252+240 196.429 198.745 197.863 199.028


EROW

PROPOSAL
EROW

252+250 196.431 198.775 197.995 198.994


CD.NO : 253/1
CA SPAN (M):
CA CHAINAGE:

252+260 197.154 198.803 198.052 198.960


(m)
DESIGN SPAN (M):

G=-0.340%
DESIGN CHAINAGE:

L=105.468m
252+270
Spiral, Ls

197.395 198.831 197.986 198.926


Length of

KMP

PMC CONSULTANT :
252+280 197.454 198.830 198.222 198.892
-
EROW

252+290 197.548 198.784 198.359 198.858


EROW

100
253/1

(km/h)
Speed
Design

252+300 197.563 198.682 198.530 198.824

IN ASSOCIATION WITH
252+216
252+217

252+300
252+310 197.448 198.602 198.402 198.790

TPF ENGINEERING PVT. LTD.


Reconstruction

252+320 197.349 198.575 198.231 198.765


-

HBS INFRA ENGINEERS PVT. LTD.


Super

(e) (%)

252+330 197.294 198.578 198.166 198.756


Box Culvert -1x6.0m
Box Culvert -1x6.0m

elevetion,
EROW

252+340
VIP CH:=252339.596
EROW

197.299 198.584 198.204 198.763 VIP LVL:=198.690

K=61.906
L=60.000m
252+350 197.357 198.614 198.165 198.786
252+360 197.349 198.675 198.155 198.826
252+370 197.455 198.745 198.274 198.881
252+380 197.682 198.815 198.408 198.944
EROW
EROW

252+390 197.759 198.924 198.519 199.007


W
O
252+400 197.919 198.986 198.595 199.070 R
252+400
W
O
R
PC 252400.445
252+410 198.021 199.046 198.524 199.133

PROOF CONSULTANT :

SAFETY CONSULTANT :
252+420 197.793 199.107 198.364 199.196
C
F
O

252+430 197.925 199.187 198.413 199.259


EROW
EROW

M/s Trisa Infra


252+440 198.077 199.270 198.603 199.322

Consultant LLP
G=0.630%

Bangalore, Karnataka
L=135.120m

Engineers Pvt. Ltd.


252+450 198.826 199.354 198.451 199.385

Hyderabad, Telangana
M/s PVR Consulting
252+460 198.526 199.430 198.438 199.448
252+470 198.798 199.426 198.600 199.511
EROW

252+480 198.456 199.458 198.576 199.574


EROW

252+490 197.798 199.505 198.660 199.637


252+500 197.832 199.578 198.714 199.700 252+500

PROJECT :
252+510 197.820 199.650 198.897 199.762
252+520 197.948 199.699 199.136 199.817
PLAN

THE YEAR 2022-23.


EROW

252+530 198.037 199.713 199.170 199.866


EROW

252+540 198.169 199.734 199.142 199.907


HIP-10

252+550 198.338 199.769 199.154 199.941


R=-13700.000 L=267.025

252+560 198.636 199.775 199.246 199.967


252+570 198.745 199.833 199.312 199.987
EROW

252+580 198.813 199.886 199.353 199.999


EROW

WIDENING TO 2-LANE WITH PAVED


LONGITUDINAL SECTION

JUNCTION FROM DESIGN CHAINAGE

KM: 244+000 TO 268+700) SECTION OF


SHOULDERS OF DORNALA TO KUNTA

KM.244+000 TO KM.267+990 (EXISTING


252+590 198.967 199.945 199.468 200.004

NH-765 (PACKAGE-2) IN THE STATE OF


VIP CH:=252594.716

ANDHRA PRADESH ON EPC MODE FOR


252+600 199.122 199.976 199.480 200.002 VIP LVL:=200.296
W W
O O
R
252+600
R
K=-138.894
L=180.000m

252+610 198.969 199.977 199.408 199.993

REV.
252+620 199.013 199.937 199.343 199.977
EROW

252+630
EROW

199.007 199.877 199.204 199.953

DATE
252+640 198.933 199.816 199.350 199.922

R0 24.04.2024
R1 27.04.2024 252+650 198.901 199.743 199.297 199.884
252+660 198.780 199.725 199.273 199.839
252+670 198.720 199.718 199.292 199.787 KMP
PT 252667.470
EROW
EROW

252+680 198.662 199.647 199.155 199.727


252+690 198.584 199.584 199.071 199.661
252+700 198.695 199.480 199.059 199.594 252+700
252+710
L=30.378m

198.637 199.401 199.113 199.528


G=-0.666%

252+720 198.531 199.320 199.126 199.463


EROW

CD.NO : 253/2
EROW

DESCRIPTION
FOR APPROVAL

252+730
VIDE EMAIL Dt.: 19.05.2024

198.597 199.262 199.010 199.407


252+740 198.419 199.206 199.016 199.363 VIP CH:=252745.094
SKEW

252+750 198.540 199.234 199.028 199.331 VIP LVL:=199.294


CD NO:

K=87.593
L=60.000m
PROPOSAL

252+760 198.425 199.205 198.918 199.310


CA SPAN (M):

R2 20.05.2024 REVISED AS PER A.E's OBSERVATION


CA CHAINAGE:

EROW

252+770 198.413 199.198 198.900 199.300


EROW
DESIGN SPAN (M):

252+780 198.500 199.207 198.881 199.301


DESIGN CHAINAGE:

REVISED AS PER PROOF CONSULTANT OBSERVATIONS

252+790
VIDE LETTER NO. PVR/BC/P&P/2024-25/01 Dt: 25.04.2024

198.365 199.219 198.891 199.302


-

252+800 198.458 199.201 198.918 199.304 252+800


253/2

252+810 198.310 199.195 198.829 199.306


252+732

252+730

EROW

DRAWN

SCALE :

252+820 198.307 199.230 198.838 199.308


EROW

252+830 198.257 199.257 198.842 199.310


CHECKED :
DESIGNED :
:

APPROVED :
New Construction

252+840 198.192 199.280 198.775 199.312


G=0.019%
L=111.322m

D=1079.162
Box Culvert -1x6.0m

Box Culvert -1x6.0m

252+850
DATE : 20/05/2024

198.280 199.254 198.800 199.314


RJ

VERTICAL
RP

KS
BH

252+860 198.333 199.218 198.752 199.315


EROW

252+870 198.405 199.215 198.745 199.317 KMP


EROW

- 1:200

252+880 198.218 199.244 198.603 199.319


HORIZONTAL - 1:2000

252+890 198.328 199.276 198.804 199.321


252+900 198.202 199.261 198.615 199.326
LHS=2.500

252+900
252+910 198.320 199.242 198.615 199.333
TITLE :
EROW

VIP CH:=252916.416
VIP LVL:=199.326
EROW

252+920 198.157 199.226 198.483 199.344


DRG. NO. :
K=334.216

REVISION :
L=60.000m

252+930 198.195 199.226 198.377 199.357


252+940 198.268 199.193 198.419 199.373
RHS=2.500

R2

252+950 198.237 199.172 198.178 199.393


252+960 198.175 199.177 197.678 199.412
EROW
EROW

252+970 198.165 199.154 197.460 199.432


252+980 198.144 199.120 197.404 199.452
G=0.198%
L=57.902m

252+990 198.143 199.076 197.610 199.472


C
F
O

PLAN & PROFILE

253+000
MATCHLINE
198.078 199.001 197.747 199.492 W
O
W
O
R R
OF MAIN CARRIAGEWAY

253+000
EROW
TO VINUKONDA

NH-765/DO-KJ/PKG-2/HW/P&P-009
EROW

(Km: 252+000 TO Km: 253+000)


LHS

CLIENT :
RHS

AUTHORITY :
SCHEMATIC
TO SRISAILAM

DATUM=189.000m

LHS

RHS

SUPER ELEVATION

DESIGN CHAINAGE
DISTANCE FROM PCL
DISTANCE FROM PCL
VERTICAL ALIGNMENT
PROPOSED FRL ALONG
CARRIAGEWAY CENTER

EXISTING LEVEL ALONG

EXISTING LEVEL AT 15M


EXISTING LEVEL AT 15M

PROPOSED CENTER LINE

HORIZONTAL SCHEMATIC
C
F
O

190
195
200
205
11
MATCHLINE
253+000 198.078 199.001 197.747 199.492 W W

(MoRT&H)
HIP NO.
O O
253+000 R R

EROW
253+010 198.071 198.942 197.737 199.510

New Delhi -110001


EROW
253+020 198.079 198.917 197.616 199.523

(m)
HIP

GOVERNMENT OF INDIA

National Highway Wings, CRF


253+030 197.989 198.904 197.673 199.528

MG Road, Vijayawada - 520010.


Chainage

253866.471
ROW
253+040 197.801 198.889 197.600 199.527

ROADS & BUILDINGS DEPARTMENT


Transport Bhawan, 1, Parliament Streets
253+050 197.695 198.843 197.600 199.519
EROW

GOVERNMENT OF ANDHRA PRADESH


SKEW
CD NO:

MINISTRY OF ROAD TRANSPORT & HIGHWAYS


253+060 197.445 198.796 197.616 199.504

(m)
ROW

VIP CH:=253071.818
EROW
PROPOSAL

Easting
253+070 197.308 198.780 197.623 199.482 VIP LVL:=199.634

304313.316
CA SPAN (M):

LHS=2.500
CA CHAINAGE:

253+080 197.438 198.764 197.731 199.454

K=-145.693
L=135.000m
DESIGN SPAN (M):

C
F
O
DESIGN CHAINAGE:

253+090 197.514 198.775 197.886 199.418

(m)
EROW

253+100 197.456 198.777 197.967 199.376


ROW
-

253+100

Northing

CD.NO : 254/1
1758884.963
253+110 197.581 198.719 198.042 199.326

RHS=2.500
EROW
254/1

253+120 197.679 198.640 198.185 199.270


253+073

253+072

ROW

253+130 197.596 198.566 198.183 199.207

(m)

6800

EPC CONTRACTOR :
Radius
Reconstruction

253+140 197.671 198.518 198.130 199.137

DESIGN CONSULTANT :
EROW

253+150 197.616 198.457 198.116 199.065


Pipe Culvert -2x1.2Ø

Pipe Culvert -2x1.2Ø

253+160 197.792 198.439 198.127 198.992


EROW

Ph. No. 0861-2321919


Right
ROW

253+170
Direction

197.774 198.426 198.100 198.919


(Left/Right)

L=53.453m
G=-0.728%
253+180 197.644 198.379 197.950 198.846

Email: bhavanicon1991@gmail.com
M/s BHAVANI CONSTRUCTIONS
253+190 197.650 198.363 198.039 198.773

SAMARTH INFRAENGG
ROW
C
F
O

EROW

2.02

16-6-114, Near Vijaya Mahal, Nellore-524001


Total

Technocrats Private Limited


253+200 197.741 198.386 198.132 198.703 253+200 W
O
W
O
R R
angle (∆)
Deviation
EROW

253+210 197.563 198.393 198.052 198.641


253+220 197.510 198.389 197.979 198.589 VIP CH:=253222.771
C
F
O

VIP LVL:=198.534
(m)

253+230 197.607 198.368 197.898 198.547


ROW

K=106.787
L=60.000m
239.653
Curve,Lc
Length of

253+240 197.436 198.357 198.109 198.513


EROW

253+250 197.264 198.386 197.781 198.489


EROW
ROW

253+260
0

197.493 198.393 197.816 198.472


(m)

KMP
253+270 197.412 198.400 197.651 198.456
Spiral, Ls
Length of

PMC CONSULTANT :
253+280 197.447 198.424 197.561 198.439
253+290 197.399 198.445 197.622 198.422
EROW

100
ROW

(km/h)
Speed

253+300 197.345 198.430 197.592 198.406


Design

IN ASSOCIATION WITH
253+300
EROW

253+310 197.435 198.420 197.512 198.389

TPF ENGINEERING PVT. LTD.


253+320 197.466 198.390 197.521 198.373
ROW

HBS INFRA ENGINEERS PVT. LTD.


Super

(e) (%)

253+330 197.664 198.349 197.572 198.356


elevetion,

253+340 197.466 198.301 197.678 198.339


EROW

253+350 197.503 198.266 197.580 198.323


EROW

253+360 197.375 198.234 197.602 198.306


ROW

253+370 197.481 198.212 197.657 198.289


253+380 197.394 198.239 197.312 198.273
ROW

EROW

253+390 197.261 198.244 197.362 198.256

D=1079.162
253+400 197.272 198.172 197.250 198.239 W
O
W
O
EROW

253+400
R R

253+410 197.413 198.082 197.400 198.223

PROOF CONSULTANT :

SAFETY CONSULTANT :
253+420 197.252 198.008 197.474 198.206
ROW

253+430 197.174 197.987 197.500 198.189


EROW

M/s Trisa Infra


253+440 197.348 197.952 197.168 198.173

Consultant LLP
Bangalore, Karnataka
Engineers Pvt. Ltd.
253+450 197.220 197.944 196.943 198.156

Hyderabad, Telangana
EROW

M/s PVR Consulting


ROW

253+460 197.239 197.879 196.954 198.139


253+470 197.023 197.808 196.863 198.123
253+480 196.988 197.766 196.670 198.106
EROW
ROW

253+490 196.825 197.742 196.602 198.089


SKEW

EROW
CD NO:

253+500 196.767 197.764 196.653 198.073 253+500

PROJECT :
PROPOSAL

253+510 196.586 197.767 196.589 198.056


CA SPAN (M):

ROW
CA CHAINAGE:

253+520 196.706 197.790 196.834 198.039


PLAN

THE YEAR 2022-23.


DESIGN SPAN (M):

253+530 196.287 197.735 196.858 198.023


DESIGN CHAINAGE:

W
O
EROW

253+540 196.626 197.706 197.054 198.006


-

EROW

253+550 196.504 197.770 197.376 197.989 W


O
R
ROW
254/2

253+560 196.380 197.845 197.201 197.973


253+533

253+531

CD.NO : 254/2

253+570 196.421 197.838 197.126 197.956


Reconstruction

253+580 196.472 197.787 197.155 197.940


ROW

WIDENING TO 2-LANE WITH PAVED


LONGITUDINAL SECTION
EROW

JUNCTION FROM DESIGN CHAINAGE

KM: 244+000 TO 268+700) SECTION OF


SHOULDERS OF DORNALA TO KUNTA

KM.244+000 TO KM.267+990 (EXISTING


253+590 196.270 197.716 197.309 197.923

NH-765 (PACKAGE-2) IN THE STATE OF


Box Culvert -1x3.0m

Box Culvert -1x3.0m

ANDHRA PRADESH ON EPC MODE FOR


EROW

G=-0.167%

253+600
253+600
196.635 197.677 197.065 197.906
L=672.648m

DRAIN START
253+610 196.632 197.637 197.108 197.890

REV.
PAVER BLOCK &
ROW

253+620 196.655 197.624 197.158 197.873


253+630 196.690 197.654 197.231 197.856
EROW

DATE
253+640 196.538 197.654 197.268 197.840

R0 24.04.2024
R1 27.04.2024
EROW
ROW

253+650 196.665 197.681 197.480 197.823


253+660 196.579 197.659 197.509 197.806
253+670 196.583 197.643 197.576 197.790
EROW

253+680 196.509 197.674 197.316 197.773


ROW

253+690 196.631 197.693 197.344 197.756


EROW

253+700 196.811 197.697 197.263 197.740 253+700


253+710
ROW

197.371 197.682 197.184 197.723


253+720 197.224 197.669 197.441 197.706
EROW

DESCRIPTION
FOR APPROVAL

253+730
VIDE EMAIL Dt.: 19.05.2024

196.903 197.627 197.411 197.690


253+740 196.527 197.607 197.381 197.673
EROW

ROW

PC 253746.632
253+750 196.635 197.587 197.350 197.656 W
O
R

253+760 196.979 197.508 197.222 197.640


R2 20.05.2024 REVISED AS PER A.E's OBSERVATION

253+770 197.006 197.421 197.168 197.623


ROW

EROW

253+780 196.818 197.352 197.099 197.606


CH:253+790

EROW
BUSSHELTER

REVISED AS PER PROOF CONSULTANT OBSERVATIONS

253+790
VIDE LETTER NO. PVR/BC/P&P/2024-25/01 Dt: 25.04.2024

197.034 197.310 197.131 197.590


C
F
O

253+800 197.250 197.275 197.138 197.573 253+800 W


O
R

253+810 197.466 197.232 197.090 197.556


ROW

DRAWN

SCALE :

253+820 197.682 197.207 197.378 197.540


EROW

253+830 197.103 197.225 197.666 197.523


CHECKED :
DESIGNED :
:

APPROVED :
EROW
ROW

253+840 197.391 197.254 197.674 197.507


253+850
DATE : 20/05/2024

197.338 197.295 197.682 197.490


RJ

VERTICAL
RP

KS
BH

253+860 197.810 197.332 197.689 197.473


253+870 197.331 197.365 197.538 197.457
EROW
ROW

- 1:200
HIP-11

253+880 197.053 197.383 197.304 197.440


HORIZONTAL - 1:2000
EROW

253+890 197.035 197.297 197.070 197.423


R=6800.000 L=239.653

LHS=2.500

253+900 197.047 197.174 196.595 197.407 253+900


ROW

253+910 196.993 197.055 196.684 197.390


TITLE :

253+920 196.687 196.936 197.084 197.373


EROW

DRG. NO. :

REVISION :

253+930 196.828 196.806 197.249 197.356


EROW

RHS=2.500

253+940 196.795 196.682 196.506 197.333


R2
ROW

253+950 196.457 196.580 196.187 197.302


253+960 195.967 196.482 196.277 197.265
ROW

EROW

253+970 195.859 196.404 196.212 197.220


C
F
O

K=-142.678
L=130.000m

D=262.087

253+980 196.139 196.370 196.273 197.169


EROW

253+990 196.059 196.338 196.027 197.111 VIP CH:=253990.419 PT 253986.285


VIP LVL:=197.256
PLAN & PROFILE

254+000 196.065 196.309 196.128 197.045 W


O
W
O
MATCHLINE
254+000 R R
ROW

OF MAIN CARRIAGEWAY
TO VINUKONDA

NH-765/DO-KJ/PKG-2/HW/P&P-010
(Km: 253+000 TO Km: 254+000)
EROW
EROW
ROW

BUSSHELTER
CH:254+010
LHS

CLIENT :
RHS

AUTHORITY :
SCHEMATIC
TO SRISAILAM

DATUM=183.000m

LHS

RHS

SUPER ELEVATION

DESIGN CHAINAGE
DISTANCE FROM PCL
DISTANCE FROM PCL
VERTICAL ALIGNMENT
PROPOSED FRL ALONG
EROW

CARRIAGEWAY CENTER

EXISTING LEVEL ALONG

EXISTING LEVEL AT 15M


EXISTING LEVEL AT 15M

PROPOSED CENTER LINE

HORIZONTAL SCHEMATIC
PT 253986
.285 MATCHLIN
E
W

12
O
R
W

185
190
195
200
VIP LVL:=197.256 O
R

HIP NO.
ROW
254+000 196.065 196.309 196.128 197.045

(MoRT&H)
254+000

EROW
254+010 195.896 196.267 196.014 196.973

ER

New Delhi -110001


EROW
254+020 195.884 196.344 195.991 196.893
ROW

(m)
HIP

GOVERNMENT OF INDIA

National Highway Wings, CRF


CH:254+010
254+030

BUSSHELT
196.099 196.305 195.789 196.807

Chainage

254428.854

MG Road, Vijayawada - 520010.


K=-142.678
L=130.000m
254+040 196.100 196.229 195.993 196.713

ROADS & BUILDINGS DEPARTMENT


Transport Bhawan, 1, Parliament Streets
254+050 195.844 196.149 195.812 196.613

GOVERNMENT OF ANDHRA PRADESH


EROW

MINISTRY OF ROAD TRANSPORT & HIGHWAYS


(m)
254+060 195.529 196.096 195.833 196.506

Easting
ROW

304870.13
EROW

254+070 195.315 195.929 195.575 196.398

LHS=2.500
254+080 195.428 195.628 195.157 196.291
ROW

254+090 195.008 195.332 194.604 196.183 254+100

(m)
254+100 194.680 195.070 194.429 196.075

Northing
DRAIN EN

1758964.09
EROW

RHS=2.500
PAVER BL D
OCK
254+110
&
194.290 194.819 194.348 195.967
EROW

254+120 194.085 194.576 194.150 195.860

G=-1.078%
L=109.335m

D=262.087
(m)
C
F
O

2000
ROW

254+130 193.888 194.368 193.899 195.752

Radius

EPC CONTRACTOR :
254+140 193.638 194.146 193.768 195.644

DESIGN CONSULTANT :
254+150 193.254 193.965 193.616 195.536
ROW

EROW

254+160
Right
193.139 193.795 193.394 195.428

Ph. No. 0861-2321919


EROW

Direction
(Left/Right)

254+170 192.975 193.621 193.645 195.322


254+180 192.678 193.457 193.435 195.226

Email: bhavanicon1991@gmail.com
M/s BHAVANI CONSTRUCTIONS
W
254+190 192.633 193.309 193.085 195.140 O
W R

SAMARTH INFRAENGG
ROW

O
R
10.31
Total

254+200

16-6-114, Near Vijaya Mahal, Nellore-524001

Technocrats Private Limited


angle (∆)

254+200 192.441 193.171 192.719 195.065


Deviation
EROW
C
F
C
F
O
O

254+210 192.256 193.031 192.515 195.001


EROW
ROW

254+220 192.087 192.895 192.354 194.948


(m)

254+230
359.989

191.835 192.760 192.307 194.905


Curve,Lc

VIP CH:=254234.754
Length of

254+240 191.487 192.652 192.041 194.874 VIP LVL:=194.623

K=92.038
L=140.000m
PC 254248
.372
EROW

254+250 191.422 192.613 192.016 194.853


0
ROW

(m)
EROW

254+260 191.322 192.565 191.975 194.844


Spiral, Ls
Length of

254+270 191.243 192.520 192.049 194.845

PMC CONSULTANT :
ROW

254+280 191.461 192.525 191.902 194.857 START CH: 25


4+300
254+290 191.501 192.572 191.952 194.880
100

REALIGNMEN
254+300 T
(km/h)
Speed
Design
EROW

254+300 191.397 192.608 191.991 194.913

IN ASSOCIATION WITH
EROW

254+310 191.356 192.612 192.086 194.957

TPF ENGINEERING PVT. LTD.


SKEW

254+320 191.618 192.645 192.186 195.001


ROW

HBS INFRA ENGINEERS PVT. LTD.


Super

(e) (%)
PROPOSAL

254+330
BRIDGE NO:

191.717 192.843 192.037 195.045


elevetion,

G=0.443%
L=32.708m
CA SPAN (M):
CA CHAINAGE:

254+340 191.872 192.665 191.869 195.089


ROW

EROW
DESIGN SPAN (M):
DESIGN CHAINAGE:

254+350 192.557 192.173 192.092 195.130


EROW

254+360 192.821 191.943 192.203 195.167


254+370 191.577 191.879 192.044 195.199
C
F
O
30°
255/1

254+380 191.591 191.867 191.954 195.227


254+480

254+467

VIP CH:=254387.462
ROW

254+390 192.016 191.929 191.883 195.250 VIP LVL:=195.300 W


O
R
254+400
EROW

K=-225.516
L=100.000m
254+400 191.935 192.036 191.825 195.269
OW
New construction

ERROW

254+410 191.899 191.544 191.949 195.283

PROOF CONSULTANT :

SAFETY CONSULTANT :
Major Bridge -3x20.0m

Major Bridge -5x12.0m

254+420 190.991 190.834 191.812 195.293


HIP-12

254+430 188.884 190.138 191.601 195.299

M/s Trisa Infra


254+440 188.393 189.248 191.325 195.300
EROW

Consultant LLP
C
F
O

Bangalore, Karnataka
Engineers Pvt. Ltd.
254+450 188.720 189.156 190.528 195.300

Hyderabad, Telangana
ROW

M/s PVR Consulting


EROW

R=2000.000 L=359.989
254+460 189.915 188.992 189.836 195.300
254+470 190.972 189.026 189.613 195.300
ROW

254+480 191.327 190.412 189.473 195.300


BRIDGE NO : 255/1

254+490 191.667 191.014 189.403 195.300


EROW

G=0.000%
L=86.267m

254+500
254+500
EROW

191.833 191.206 189.653 195.300

PROJECT :
254+510 191.855 191.518 189.825 195.300
ROW

254+520 191.874 192.058 190.204 195.300


PLAN

THE YEAR 2022-23.


254+530 191.724 192.237 190.494 195.299
EROW

254+540 191.658 192.452 192.205 195.294


ROW EROW

254+550 191.610 192.056 192.267 195.285


254+560 191.541 192.581 192.277 195.271
254+570 191.389 192.572 192.296 195.253
ROW

254+580 191.224 192.363 192.292 195.230

WIDENING TO 2-LANE WITH PAVED


LONGITUDINAL SECTION

JUNCTION FROM DESIGN CHAINAGE


EROW

KM: 244+000 TO 268+700) SECTION OF


SHOULDERS OF DORNALA TO KUNTA

KM.244+000 TO KM.267+990 (EXISTING


254+590 191.199 192.302 192.249 195.203
254+600

NH-765 (PACKAGE-2) IN THE STATE OF


ANDHRA PRADESH ON EPC MODE FOR
EROW

PT 254608.361
RO

254+600 191.371 192.190 192.152 195.172


W

254+610 191.662 192.197 191.901 195.136

REV.
254+620 191.670 192.219 191.759 195.096
254+630 191.179 191.836 191.678 195.052

DATE
EROW

254+640 191.270 191.813 191.625 195.003

R0 24.04.2024
R1 27.04.2024
ROW
EROW

C
F
O

254+650 191.118 191.521 191.417 194.949


254+660 191.143 191.573 191.602 194.891
ROW

254+670 190.922 191.660 191.613 194.829 VIP CH:=254673.729


VIP LVL:=195.300
254+680 190.838 191.635 191.521 194.763
EROW

K=-227.244
L=300.000m

254+700
254+690 191.136 191.430 191.514 194.692
EROW

254+700 191.614 191.319 191.557 194.616


ROW

254+710 191.236 191.439 191.288 194.537


254+720 190.592 191.566 191.425 194.452
DESCRIPTION
FOR APPROVAL

254+730
VIDE EMAIL Dt.: 19.05.2024

190.261 191.651 191.618 194.364


EROW
ROWER

254+740 189.819 191.611 191.332 194.271


OW

254+750
0
189.860 191.560 191.187 194.173 END CH: 254+76
254+760 190.009 191.574 191.335 194.072 REALIGNMENT
R2 20.05.2024 REVISED AS PER A.E's OBSERVATION

254+770 190.474 191.557 191.184 193.966


W
ROEROW

254+780 190.572 191.538 190.849 193.855


254+800
REVISED AS PER PROOF CONSULTANT OBSERVATIONS

254+790
VIDE LETTER NO. PVR/BC/P&P/2024-25/01 Dt: 25.04.2024

190.580 191.510 190.848 193.740


ERORO

KMP
W W

254+800 190.604 191.468 190.678 193.621


SKEW

254+810 190.371 191.383 190.723 193.497


CD NO:

PROPOSAL

D=2693.284

DRAWN

SCALE :

254+820
SKEW

190.193 191.296 190.699 193.369


CA SPAN (M):

EROW

CD NO:
CA CHAINAGE:

254+830 190.083 191.191 190.662 193.237


CHECKED :
DESIGN CHAINA

DESIGNED :
:
DESIGN SPAN (M

APPROVED :
PROPOSAL
):

EROW

ROW
GE:

254+840 189.983 191.081 190.545 193.105


CA SPAN (M):
CA CHAINAGE:

DESIGN CHAINA
DESIGN SPAN (M

254+850
DATE : 20/05/2024

189.824 191.002 190.373 192.973


RJ

VERTICAL
RP

KS
BH
-

):
GE:
ROW

254+860 189.661 190.911 190.322 192.841


255/1

254+870 189.580 190.812 190.351 192.709


254+880

EROW
254+882

- 1:200

254+880 189.553 190.709 190.181 192.577


HORIZONTAL - 1:2000
EROW

255/2
Reconstruction

W
O
254+900
254+890 189.465 190.590 189.940 192.445 R W
O
254+960
Box Culvert -1x2

R
254+962
Box Culvert -1x2

C
F
O

254+900 189.390 190.444 190.084 192.313


.0m

ROW
.0m

Reconstruction
Box Culvert -1x2

LHS=2.500

254+910
Box Culvert -1x2

189.259 190.272 190.026 192.181


TITLE :
CD.NO : 255/1
.0m
.0m

254+920 189.024 190.159 189.700 192.049


DRG. NO. :
EROW

G=-1.320%
L=179.795m

REVISION :

254+930 188.685 190.115 189.522 191.917


ROWERO
W

254+940 188.350 190.057 189.483 191.785


R2
RHS=2.500

254+950 188.543 189.996 189.382 191.653


254+960 188.408 189.961 189.636 191.521
ROER

254+970 188.146 189.958 189.448 191.389


WOW

CD.NO : 255/2

254+980 188.136 189.972 189.663 191.257


ERORO
W W

254+990 188.471 189.993 189.572 191.125 255+000 MATCHLINE


PLAN & PROFILE

255+000 188.750 189.990 189.378 190.993


OF MAIN CARRIAGEWAY
TO VINUKONDA

NH-765/DO-KJ/PKG-2/HW/P&P-011
(Km: 254+000 TO Km: 255+000)
EROW
EROW

ROW
LHS

CLIENT :
RHS

AUTHORITY :
SCHEMATIC
TO SRISAILAM

DATUM=183.000m

LHS

RHS

SUPER ELEVATION

DESIGN CHAINAGE
DISTANCE FROM PCL
DISTANCE FROM PCL
VERTICAL ALIGNMENT
PROPOSED FRL ALONG
ROW

CARRIAGEWAY CENTER

EXISTING LEVEL ALONG

EXISTING LEVEL AT 15M


EXISTING LEVEL AT 15M

PROPOSED CENTER LINE


EROW

HORIZONTAL SCHEMATIC
EROW
ROW
MATCHLINE

185
190
195
200
255+000
255+000 188.750 189.990 189.378 190.993

(MoRT&H)
255+010 188.934 190.006 189.979 190.863

New Delhi -110001


255+020 189.138 190.055 189.953 190.743

EROW

GOVERNMENT OF INDIA

National Highway Wings, CRF


255+030 189.145 190.112 189.895 190.635

MG Road, Vijayawada - 520010.


EROW

ROW
255+040 189.008 190.133 189.814 190.537

ROADS & BUILDINGS DEPARTMENT


Transport Bhawan, 1, Parliament Streets
255+050 188.846 190.118 189.705 190.450

GOVERNMENT OF ANDHRA PRADESH


ROW

MINISTRY OF ROAD TRANSPORT & HIGHWAYS


255+060 188.832 190.065 189.755 190.375

LHS=2.500
255+070 188.791 189.957 189.745 190.310
EROW

255+080 188.642 189.820 189.602 190.256


EROW

255+090 188.449 189.703 189.642 190.212 VIP CH:=255093.524 W W


O O
255+100
VIP LVL:=189.758 R R

255+100 188.500 189.567 189.762 190.180

RHS=2.500
K=91.669
ROW

L=180.000m
255+110 188.339 189.447 189.604 190.159
SKEW
CD NO:

255+120 188.101 189.387 189.555 190.148


EROW
PROPOSAL

255+130 187.903 189.433 189.325 190.149


CA SPAN (M):

ROWEROW

EPC CONTRACTOR :
CA CHAINAGE:

255+140 187.771 189.513 189.415 190.160


DESIGN SPAN (M):

DESIGN CONSULTANT :
DESIGN CHAINAGE:

F
O
C

255+150 187.802 189.527 189.107 190.183


255+160 187.809 189.524 189.025 190.216
-

Ph. No. 0861-2321919


ROW

255+170 187.707 189.524 189.067 190.260


EROW
256/1

EROW

255+180 187.868 189.531 189.144 190.315


255+189
255+162

Email: bhavanicon1991@gmail.com
M/s BHAVANI CONSTRUCTIONS
ROW

255+190 187.783 189.534 189.070 190.379

SAMARTH INFRAENGG
Reconstruction

255+200
KMP

16-6-114, Near Vijaya Mahal, Nellore-524001

Technocrats Private Limited


255+200 188.141 189.544 189.052 190.443

G=0.643%
L=23.569m
Box Culvert -1x2.0m
Box Culvert -1x2.0m

255+210 188.410 189.630 189.184 190.507


EROW

255+220 188.418 189.792 189.080 190.566

CD.NO : 256/1
EROW

255+230 188.560 189.948 189.363 190.618


ROW

255+240 188.900 190.065 189.511 190.663


255+250 188.912 190.141 189.676 190.701
ROW

255+260 188.792 190.248 189.679 190.733


EROW

255+270 189.027 190.321 189.517 190.757


EROW

PMC CONSULTANT :
255+280 189.020 190.451 189.692 190.775
255+290 189.529 190.618 189.999 190.786 VIP CH:=255294.593 W W
O O
255+300
R R
ROW

255+300 189.719 190.739 190.061 190.789 VIP LVL:=191.052

IN ASSOCIATION WITH
K=-145.263
L=175.000m
255+310 189.779 190.778 190.262 190.786

TPF ENGINEERING PVT. LTD.


ROW

EROW

255+320 189.583 190.741 190.244 190.776


EROW

HBS INFRA ENGINEERS PVT. LTD.


F
O
C

255+330 189.462 190.712 190.407 190.760


255+340 189.563 190.697 190.384 190.736
255+350 189.649 190.685 190.281 190.705
255+360 189.875 190.638 190.240 190.668
ROW
EROW

255+370 189.625 190.580 189.980 190.623


EROW

255+380 189.575 190.514 189.850 190.572


ROW

255+390 190.192 190.486 189.781 190.516 255+400


255+400 190.293 190.423 189.863 190.460
255+410 190.270 190.371 189.804 190.404

PROOF CONSULTANT :
EROW

SAFETY CONSULTANT :
255+420 190.208 190.326 189.984 190.348
EROW

ROW

255+430 190.253 190.285 190.354 190.292

M/s Trisa Infra


255+440 190.237 190.258 190.332 190.236

Consultant LLP
ROW

Bangalore, Karnataka
Engineers Pvt. Ltd.
255+450 189.573 190.249 189.947 190.179

Hyderabad, Telangana
M/s PVR Consulting
255+460 189.212 190.205 189.812 190.123
EROW

G=-0.561%
L=149.221m
EROW

255+470 189.297 190.127 189.811 190.067


255+480 189.163 190.042 189.591 190.011
255+490
ROW

189.114 189.931 189.291 189.955 255+500


255+500 188.953 189.805 189.230 189.899

PROJECT :
EROW

255+510
ROW

188.682 189.717 189.137 189.843


EROW

D=2693.284
255+520 189.024 189.668 189.086 189.787
PLAN

THE YEAR 2022-23.


255+530 188.986 189.638 189.180 189.730
255+540 188.886 189.602 189.248 189.679
255+550 188.615 189.565 189.097 189.640
ROW
EROW

255+560 188.699 189.545 189.042 189.614 VIP CH:=255561.314


VIP LVL:=189.555
K=79.497

255+570 188.686 189.530 189.080 189.600


L=60.000m
EROWROW

255+580 188.827 189.493 189.014 189.599

WIDENING TO 2-LANE WITH PAVED


LONGITUDINAL SECTION

JUNCTION FROM DESIGN CHAINAGE

KM: 244+000 TO 268+700) SECTION OF


SHOULDERS OF DORNALA TO KUNTA

KM.244+000 TO KM.267+990 (EXISTING


255+590 188.294 189.473 189.050 189.610

NH-765 (PACKAGE-2) IN THE STATE OF


ANDHRA PRADESH ON EPC MODE FOR
255+600
255+600 188.511 189.522 189.001 189.630
EROW

255+610 188.504 189.593 189.187 189.649

REV.
EROW

ROW

255+620 188.568 189.629 189.231 189.668


255+630 189.019 189.623 189.292 189.688

DATE
ROW

255+640 189.568 189.593 189.252 189.707

R0 24.04.2024
R1 27.04.2024 255+650 189.393 189.558 189.582 189.726
EROW

255+660 188.965 189.557 189.664 189.746


EROW

255+670 188.820 189.551 189.578 189.765


F
O
C
SKEW

255+680 188.926 189.562 189.392 189.784


CD NO:

ROW

255+690 188.365 189.608 189.567 189.804


PROPOSAL

W W
O O
255+700
R R
CA SPAN (M):

255+700 188.748 189.682 189.702 189.823


CA CHAINAGE:

CD.NO : 256/2
EROW
ROW

255+710 188.719 189.759 189.618 189.842


DESIGN SPAN (M):

EROW
DESIGN CHAINAGE:

255+720 189.229 189.801 189.745 189.862


-

DESCRIPTION
FOR APPROVAL

255+730
VIDE EMAIL Dt.: 19.05.2024

188.993 189.850 189.728 189.881


255+740 188.622 189.874 189.895 189.900
256/2

255+668
255+670

ROW

255+750 188.799 189.901 189.700 189.920


EROW

255+760 188.967 189.936 189.678 189.939


R2 20.05.2024 REVISED AS PER A.E's OBSERVATION
EROWROW
New Construction

255+770 188.815 189.929 189.806 189.958


Pipe Culvert -2x1.2Ø
Pipe Culvert -2x1.2Ø

255+780 188.738 189.933 189.408 189.978


REVISED AS PER PROOF CONSULTANT OBSERVATIONS

255+790
VIDE LETTER NO. PVR/BC/P&P/2024-25/01 Dt: 25.04.2024

188.855 189.927 189.501 189.997


KMP
255+800
EROW

255+800 188.850 189.904 189.486 190.016


G=0.193%
EROW

L=410.314m

255+810 188.799 189.881 189.426 190.036


ROW

DRAWN

SCALE :

255+820 188.962 189.887 189.461 190.055


255+830 189.254 189.915 189.531 190.074
CHECKED :
DESIGNED :
:

APPROVED :
ROW

255+840 188.920 189.916 189.603 190.094


W
O
R
EROW

255+850
DATE : 20/05/2024

188.898 189.929 189.567 190.113


RJ

VERTICAL
RP

KS
BH
EROW

255+860 188.953 189.970 189.552 190.132


255+870 189.231 190.045 189.857 190.152
ROW

- 1:200

255+880 189.521 190.110 189.706 190.171


HORIZONTAL - 1:2000

255+890 189.591 190.157 190.058 190.191


W
O
255+900
EROW

R
ROW

255+900 189.227 190.155 190.093 190.210


EROW

LHS=2.500

255+910 189.340 190.163 190.087 190.229


TITLE :
F
C
O

255+920 189.419 190.146 189.887 190.249


F
O
C

DRG. NO. :

REVISION :

255+930 189.366 190.151 189.881 190.268


255+940 189.401 190.158 190.062 190.287
R2
ROW
EROW

RHS=2.500

255+950 189.533 190.203 190.120 190.307


255+960 189.524 190.217 190.301 190.326
EROW ROW

255+970 189.399 190.249 190.187 190.345


255+980 189.575 190.293 190.095 190.365
255+990 189.321 190.309 190.257 190.384
EROW

MATCHLINE
PLAN & PROFILE

256+000
256+000 189.393 190.288 190.014 190.403
EROW

ROW

OF MAIN CARRIAGEWAY
TO VINUKONDA

NH-765/DO-KJ/PKG-2/HW/P&P-012
(Km: 255+000 TO Km: 256+000)
ROW
LHS

CLIENT :
RHS

AUTHORITY :
SCHEMATIC
TO SRISAILAM

DATUM=183.000m

LHS

RHS

SUPER ELEVATION

DESIGN CHAINAGE
DISTANCE FROM PCL
DISTANCE FROM PCL
VERTICAL ALIGNMENT
PROPOSED FRL ALONG
CARRIAGEWAY CENTER

EXISTING LEVEL ALONG

EXISTING LEVEL AT 15M


EXISTING LEVEL AT 15M

PROPOSED CENTER LINE

HORIZONTAL SCHEMATIC
EROW
MATCHLINE
256+000

EROW

185
190
195
200
256+000

ROW
189.393 190.288 190.014 190.403

(MoRT&H)
256+010 189.577 190.262 190.043 190.420

New Delhi -110001


256+020 189.432 190.234 190.407 190.430 ROW

GOVERNMENT OF INDIA

National Highway Wings, CRF


256+030 189.615 190.203 190.166 190.433

MG Road, Vijayawada - 520010.


EROW
256+040 189.412 190.190 190.353 190.429
EROW

ROADS & BUILDINGS DEPARTMENT


Transport Bhawan, 1, Parliament Streets
256+050 189.302 190.137 190.157 190.418

GOVERNMENT OF ANDHRA PRADESH


MINISTRY OF ROAD TRANSPORT & HIGHWAYS
256+060 189.376 190.103 190.012 190.399

LHS=2.500
ROW

256+070 189.224 190.051 190.083 190.374


256+080 189.167 190.007 190.045 190.342
EROW
ROW

W W
O O
256+100
R R
EROW

256+090 189.093 189.966 189.841 190.303


256+100 189.129 190.001 189.965 190.256

RHS=2.500
256+110 189.207 190.000 189.815 190.203 VIP CH:=256111.628
VIP LVL:=190.619
256+120 188.951 189.988 189.840 190.142

K=-142.058
L=220.000m
ROW

256+130
EROW

187.949 190.002 189.688 190.075

EPC CONTRACTOR :
EROW

256+140 189.328 189.971 189.827 190.000

DESIGN CONSULTANT :
ROW

256+150 188.957 189.910 189.566 189.919


256+160 188.992 189.772 189.683 189.830

Ph. No. 0861-2321919


256+170 188.772 189.636 189.345 189.734
EROW

256+180 188.755 189.551 189.148 189.632

Email: bhavanicon1991@gmail.com
M/s BHAVANI CONSTRUCTIONS
EROW

256+200
256+190 188.608 189.449 189.238 189.522

SAMARTH INFRAENGG
ROW

16-6-114, Near Vijaya Mahal, Nellore-524001

Technocrats Private Limited


256+200 188.636 189.329 189.223 189.405
256+210 188.613 189.185 188.814 189.281
ROW

256+220 188.335 189.074 188.590 189.151


EROW

256+230 188.291 188.955 188.385 189.015


EROW

256+240 188.108 188.832 188.139 188.880


256+250

L=36.751m
187.839 188.679 188.029 188.744

G=-1.355%
ROW

256+260 187.891 188.512 187.907 188.609


SKEW

256+270 187.672 188.404 187.717 188.486


CD NO:

EROW

PMC CONSULTANT :
ROW
PROPOSAL

256+280 187.440 188.325 187.435 188.383


EROW

VIP CH:=256288.379 W W
CA SPAN (M):

O O
256+300
R R
CA CHAINAGE:

256+290 187.200 188.253 187.323 188.299 VIP LVL:=188.224

K=51.498
L=60.000m
DESIGN SPAN (M):

256+300 187.266 188.190 187.284 188.235

IN ASSOCIATION WITH
DESIGN CHAINAGE:

256+310 187.268 188.135 187.173 188.190

TPF ENGINEERING PVT. LTD.


-

256+320 186.791 188.147 187.260 188.164


ROW
EROW

HBS INFRA ENGINEERS PVT. LTD.


257/1

256+330 186.756 188.122 187.186 188.145


EROW
256+325
256+327

256+340 186.780 188.051 187.279 188.126


ROW

256+350 187.350 187.958 187.530 188.107


Reconstruction

CD.NO : 257/1

256+360 187.245 187.871 187.336 188.088


Pipe Culvert -2x1.2Ø
Pipe Culvert -2x1.2Ø

256+370 187.388 187.858 187.209 188.069


EROW

L=99.873m
G=-0.190%
EROW

256+380 187.281 187.849 187.229 188.050


ROW

256+400
256+390 187.126 187.867 187.342 188.031
256+400 187.445 187.902 187.500 188.012
ROW

256+410 187.515 187.926 187.565 187.993

PROOF CONSULTANT :

SAFETY CONSULTANT :
256+420
EROW

187.186 187.920 187.310 187.974


F
O
C
EROW

256+430 187.193 187.898 187.388 187.953

M/s Trisa Infra


256+440 187.391 187.872 187.311 187.930

Consultant LLP
Bangalore, Karnataka
Engineers Pvt. Ltd.
256+450 186.992 187.848 187.388 187.904

Hyderabad, Telangana
M/s PVR Consulting
ROW

256+460 186.953 187.810 187.328 187.875


VIP CH:=256468.252
EROW

256+470 186.926 187.762 187.217 187.844 VIP LVL:=187.882


ROW
EROW

K=-384.751
L=100.000m

256+480 186.900 187.746 187.134 187.810


W
O
256+500
R
256+490 186.888 187.739 187.068 187.774
256+500 187.072 187.690 186.952 187.735

PROJECT :
256+510 186.809 187.641 186.964 187.693
F
C
O

EROW
ROW

256+520 187.122 187.597 186.806 187.649


PLAN

D=2693.284
EROW

THE YEAR 2022-23.


256+530 186.802 187.549 186.920 187.604
ROW

256+540 186.650 187.494 186.817 187.559


256+550 186.733 187.442 186.628 187.514
256+560 186.580 187.412 186.462 187.469
EROW

256+570 186.497 187.397 186.354 187.424


EROW

256+580 186.618 187.366 186.441 187.379

WIDENING TO 2-LANE WITH PAVED


ROW

LONGITUDINAL SECTION

JUNCTION FROM DESIGN CHAINAGE


KMP
256+600

KM: 244+000 TO 268+700) SECTION OF


SHOULDERS OF DORNALA TO KUNTA

KM.244+000 TO KM.267+990 (EXISTING


256+590 186.634 187.332 186.455 187.334

NH-765 (PACKAGE-2) IN THE STATE OF


ANDHRA PRADESH ON EPC MODE FOR
256+600 186.343 187.249 186.178 187.289
ROW

256+610 186.565 187.184 186.375 187.244

REV.
EROW

256+620 186.284 187.115 186.142 187.199


EROW

256+630 186.179 187.052 185.991 187.154

DATE
256+640 186.196 187.028 186.529 187.109

R0 24.04.2024
R1 27.04.2024
ROW

256+650 186.235 186.987 186.039 187.064


G=-0.450%
L=254.312m

256+660 186.127 186.935 186.197 187.019


EROW
ROW
EROW

256+670 186.133 186.885 186.197 186.974


256+680 186.101 186.845 185.976 186.929
W W
O O
256+700
R R
256+690 186.052 186.810 185.769 186.884
256+700 185.827 186.775 186.169 186.839
EROW

256+710 185.757 186.751 185.798 186.794


ROW
EROW

256+720 185.884 186.726 185.856 186.749


DESCRIPTION
FOR APPROVAL

256+730
VIDE EMAIL Dt.: 19.05.2024

185.826 186.687 185.736 186.704


ROW

256+740 185.858 186.634 185.778 186.659


256+750 185.773 186.573 185.833 186.614
EROW

256+760 185.761 186.510 185.939 186.569


SKEW

EROW

R2 20.05.2024 REVISED AS PER A.E's OBSERVATION


CD NO:

256+770 185.754 186.441 185.739 186.524


PROPOSAL

ROW

256+780 185.721 186.388 185.684 186.479


CA SPAN (M):
CA CHAINAGE:

KMP
256+800
REVISED AS PER PROOF CONSULTANT OBSERVATIONS

256+790
VIDE LETTER NO. PVR/BC/P&P/2024-25/01 Dt: 25.04.2024

185.786 186.343 185.888 186.433


DESIGN SPAN (M):

ROW
DESIGN CHAINAGE:

256+800 185.541 186.295 185.925 186.385


EROW

256+810 185.564 186.237 185.651 186.337


-

EROW

DRAWN

SCALE :

256+820 185.452 186.199 185.495 186.288


257/2

256+830 185.373 186.180 185.627 186.238


CHECKED :
DESIGNED :
:

APPROVED :
256+820
256+822

CD.NO : 257/2

256+840 185.218 186.143 185.785 186.187


ROW
Reconstruction

256+850
DATE : 20/05/2024

185.159 186.080 185.416 186.135


RJ

VERTICAL
RP

KS
BH
EROW

256+860 185.130 186.013 185.437 186.082 VIP CH:=256860.064


ROW
Pipe Culvert -1x1.2Ø
Pipe Culvert -1x1.2Ø

EROW

VIP LVL:=186.119
256+870 184.967 185.932 185.242 186.028
L=175.000m
K=-1031.735

- 1:200

256+880 185.117 185.895 185.240 185.973


HORIZONTAL - 1:2000

W
O
256+900
R
256+890 184.862 185.888 185.340 185.917
256+900 184.917 185.860 185.394 185.860
EROW
ROW

LHS=2.500

256+910 184.873 185.803 185.240 185.803


EROW

F
O
C

TITLE :

256+920 184.758 185.731 185.186 185.744


DRG. NO. :
ROW

REVISION :

256+930 184.737 185.658 185.132 185.684


256+940 184.682 185.585 185.042 185.623
R2
RHS=2.500

256+950 184.635 185.528 184.934 185.562


EROW
EROW

256+960 184.638 185.477 184.678 185.500


L=23.840m
ROW

256+970
G=-0.620%

184.671 185.398 184.709 185.438


256+980 184.600 185.343 184.804 185.377 MATCHLINE
ROW

256+990 184.521 185.314 184.969 185.319 257+000


PLAN & PROFILE
K=299.053
L=235.000m
EROW

257+000 184.333 185.248 184.866 185.265


EROW

OF MAIN CARRIAGEWAY
TO VINUKONDA

NH-765/DO-KJ/PKG-2/HW/P&P-013
(Km: 256+000 TO Km: 257+000)
ROW
LHS

CLIENT :
RHS

AUTHORITY :
SCHEMATIC
TO SRISAILAM

DATUM=173.000m

LHS

RHS

SUPER ELEVATION

DESIGN CHAINAGE
DISTANCE FROM PCL
DISTANCE FROM PCL
ERO
W

VERTICAL ALIGNMENT
PROPOSED FRL ALONG
R OW

CARRIAGEWAY CENTER

EXISTING LEVEL ALONG

EXISTING LEVEL AT 15M


EXISTING LEVEL AT 15M

PROPOSED CENTER LINE

HORIZONTAL SCHEMATIC
13

000
HIP NO.

175
180
185
190
257+

K=299.053
L=235.000m
NE
E RO
ROW

257+000 184.333 185.248 184.866 185.265

(MoRT&H)
CHLI
W
MAT
257+010 184.384 185.202 184.763 185.215
ERO

New Delhi -110001


W
(m)
HIP

257+020 184.497 185.156 184.660 185.167


Chainage

GOVERNMENT OF INDIA
257463.917

National Highway Wings, CRF


257+030 184.239 185.105 184.557 185.123

MG Road, Vijayawada - 520010.


ROW

257+040 184.256 185.058 184.434 185.083

ROADS & BUILDINGS DEPARTMENT


ERO

Transport Bhawan, 1, Parliament Streets


W

257+050 184.510 185.022 184.318 185.045

GOVERNMENT OF ANDHRA PRADESH


(m)

MINISTRY OF ROAD TRANSPORT & HIGHWAYS


Easting

257+060 184.177 184.992 184.017 185.011


REOW
307903.856

ROW

LHS=2.500
257+070 184.184 184.961 184.110 184.981
257+080 184.107 184.933 184.278 184.953 100
VIP CH:=257088.903 W
O
257+
R
(m)

257+090 184.039 184.911 184.447 184.929 VIP LVL:=184.701


ERO

W
O
R
ROW
Northing

K=299.053
257+100 183.929 184.886 184.374 184.909
1758855.616

L=235.000m

RHS=2.500
ERO
W

257+110 183.988 184.877 184.381 184.891


257+120 183.998 184.837 184.313 184.877
(m)

500

ROW
Radius

257+130 183.816 184.827 184.136 184.867

EPC CONTRACTOR :
ERO

257+140 183.823 184.773 183.872 184.859


C
F
O

DESIGN CONSULTANT :
257+150 183.855 184.715 183.859 184.856
Left

ERO
W

257+160 183.714 184.664 183.994 184.855


ROW
Direction

Ph. No. 0861-2321919


(Left/Right)

257+170 183.533 184.662 183.840 184.858

D=2693.284
257+180 183.507 184.631 183.831 184.864
200
257+

Email: bhavanicon1991@gmail.com
M/s BHAVANI CONSTRUCTIONS
ERO
ROW

KMP
W
26.21
Total

257+190 183.581 184.578 183.811 184.873

SAMARTH INFRAENGG
angle (∆)
Deviation

16-6-114, Near Vijaya Mahal, Nellore-524001

Technocrats Private Limited


257+200 183.458 184.495 183.874 184.886
ERO
W

257+210 183.319 184.396 183.720 184.902


(m)

257+220 183.248 184.313 183.308 184.919


ROW
133.742
Curve,Lc
Length of

257+230 183.319 184.269 183.373 184.935


ERO

G=0.166%
L=37.848m
W

257+240 183.368 184.259 183.821 184.952


R

257+250
E OW

183.394 184.228 183.463 184.967


ROW
95
(m)

257+260 183.169 184.173 183.230 184.977


Spiral, Ls
Length of

257+270 183.053 184.102 183.341 184.979


BUSS

C
F
O

300 .645

PMC CONSULTANT :
H

257+280
ERO

183.069 184.004 183.191 184.974 W


O
RO

257+ TS 257301
R
57+3

W
W
100

00
CH:2 ELTER

257+290 182.946 183.922 183.158 184.962


(km/h)
Speed
Design

ERO
W

257+300 182.776 183.865 183.154 184.943

IN ASSOCIATION WITH
257+310 182.762 183.814 183.087 184.918
ROW

TPF ENGINEERING PVT. LTD.


VIP CH:=257319.252
5.00

7+350 S
257+320
Super

182.730 183.759 182.971 184.885


(e) (%)

VIP LVL:=185.084
SKEW
PROP

HBS INFRA ENGINEERS PVT. LTD.


R
elevetion,

A CH:25 TA BYPAS
T
ERO

ST A
DESIG

A K

K=-143.653
DESIG

257+330
CA SP

182.816 183.686 182.939 184.846


AL

L=150.000m
CD N
CA CH

MADD
OSAL
O:

257+340 182.695 183.584 182.926 184.799


ERO
N CH
N SPA

W
AN (M
AINA

ROW
):

257+350 182.537 183.480 182.881 184.746


GE:

AINA

CL=95.000
N (M)
:

257+360 182.498 183.409 182.795 184.685


GE:

ROW

257+370
396.645
182.455 183.336 182.893 184.618
-

SC 257
ERO
C
F
O

W
W

0
O
R
257+380 182.448 183.262 182.746 184.543
257+40
New
257+

ERO
Pipe C

257+390 182.356 183.207 182.577 184.462


W
257+
Pipe C
258/1

443

Const

W
445

257+400 182.413 183.131 182.653 184.375 O


ulvert

R
ulvert

ructio

257+410 182.558 182.936 182.350 184.287

PROOF CONSULTANT :
ROW
n
-1x1.

SAFETY CONSULTANT :
L=24.125m
G=-0.878%
-1x1.

257+420 182.341 182.630 182.376 184.199


ERO

W

C
F
ROW

257+430 182.453 182.414 182.234 184.113 W


O
W
R
O
ERO

R
W

M/s Trisa Infra


257+440 182.653 182.087 182.063 184.028

Consultant LLP
Bangalore, Karnataka
Engineers Pvt. Ltd.
257+450 182.650 182.078 182.039 183.945

Hyderabad, Telangana
M/s PVR Consulting
HIP-13

257+460 182.672 182.125 181.910 183.865


ERO

257+470 182.627 181.909 181.899 183.786


W

LHS=5.000
RHS=5.000
ROW

CD.NO : 258/1

257+480 182.514 181.871 181.951 183.709 W


O
ERO

W R
O
R
W

257+500

R=-500.000 L=133.742
257+490 182.590 181.670 181.905 183.634
ROW

257+500 181.962 181.757 181.796 183.561

PROJECT :
257+510 182.008 181.805 181.767 183.490
ERO
W

257+520 182.008 181.673 181.789 183.421


CS 25753
PLAN

0.387
W

THE YEAR 2022-23.


O
ERO

R
257+530 181.672 181.645 181.605 183.353
W

W
O
R

257+540 181.544 181.513 181.528 183.288


ROW

257+550 181.683 181.501 181.430 183.225


ROW

257+560 181.393 181.572 181.435 183.163


ERO
W

VIP CH:=257568.377
257+570 181.400 181.435 181.187 183.104 VIP LVL:=182.896
ERO

K=519.032
W

L=300.000m

257+580 181.317 181.275 181.209 183.046

WIDENING TO 2-LANE WITH PAVED


LONGITUDINAL SECTION
W
O

JUNCTION FROM DESIGN CHAINAGE


R
257+

KM: 244+000 TO 268+700) SECTION OF


SHOULDERS OF DORNALA TO KUNTA

KM.244+000 TO KM.267+990 (EXISTING


257+590 181.243 181.224 181.214 182.990
CL=95.000

600

NH-765 (PACKAGE-2) IN THE STATE OF


ANDHRA PRADESH ON EPC MODE FOR
257+600 181.288 181.241 181.172 182.936
ROW

ERO

257+610 181.232 181.203 181.046 182.885

REV.
W

ST 25
7
257+620
625.3
181.207 181.092 181.050 182.835 7 8
ROW

ERO

W
O
W

257+630 181.155 181.030 180.954 182.787 W


W
O
O

DATE
R

257+640 180.923 180.788 180.764 182.741

R0 24.04.2024
R1 27.04.2024 257+650 180.779 180.792 180.916 182.696
ERO
W

257+660 180.616 180.511 180.627 182.654


ROW

ERO

257+670 180.483 180.594 180.675 182.614 W


W

O
R

257+680 180.629 180.580 180.572 182.576 W


O
R
ROW

257+690 180.366 180.542 180.453 182.539


257+700 180.433 180.518 180.342 182.505
257+
700
257+710 180.379 180.449 180.442 182.472
ERO
W

257+720 180.321 180.338 180.404 182.441


DESCRIPTION
FOR APPROVAL

257+730
VIDE EMAIL Dt.: 19.05.2024

180.205 180.282 180.196 182.411


ROW
CD NO
:
CA CHA
CA SPA

SKEW

D=181.361
DESIGN

257+740
PROPO

180.173 180.204 180.147 182.381


DESIGN

ROW
SAL

257+750 180.141 180.040 180.141 182.351


N (M):
INAGE:

SPAN (

257+760
CHAINA

180.057 179.821 180.266 182.321 W


O
ERO
M

R
LHS=2.500

RHS=2.500
W

R2 20.05.2024 REVISED AS PER A.E's OBSERVATION


):
GE:

257+770 179.827 180.483 180.082 182.291 W


O
R

257+780 180.160 179.775 179.710 182.261 257+


800
-

REVISED AS PER PROOF CONSULTANT OBSERVATIONS

257+790
VIDE LETTER NO. PVR/BC/P&P/2024-25/01 Dt: 25.04.2024
Pip

180.207 179.706 179.438 182.231


258/2

TS 25
ROW
Pipe C

7806.7
257+83

C
u

48
257+800 179.983 179.523 179.350 182.201
257+83
2

u
New Co
0

257+810 179.411 179.449 179.287 182.171


ROW
lvert -2

DRAWN
lvert -2

SCALE :

257+820 179.482 179.389 179.341 182.141


nstructi
on

W
x1.2Ø

257+830 179.729 179.389 179.374 182.111 O


CHECKED :

R
DESIGNED :
:
x1.2Ø

APPROVED :

257+840 179.489 179.283 179.166 182.081


CD NO:
CA CHA
CA SPA

CL=60.000
SKEW

257+850
DATE : 20/05/2024

179.404 179.256 179.257 182.051


DESIGN

RJ

VERTICAL
RP
PROPO

KS
BH
DESIGN

SC 257
66.748 8
ROW

257+860
SAL

179.225 179.280 179.292 182.021


N (M):
INAGE:

CD.NO : 258/2
SPAN

257+870
(

179.211 179.243 179.190 181.991


CHAINA

G=-0.300%
L=634.412m
M
ROW

W
O
):

R
- 1:200
GE:

257+880 179.189 179.225 179.112 181.961


257+90
HORIZONTAL - 1:2000

0
257+890 179.131 179.124 179.064 181.931
-

257+900
Bo

179.110 179.017 179.012 181.901


259/1

x
Box C

C
u
258+00

257+910 179.041 178.970 178.979 181.871


u
257+99
0
lv

TITLE :
New Co
8
lv

257+920 178.933 178.960 178.926 181.841


ROW

DRG. NO. :

REVISION :

W
O
R
257+930 178.836 178.882 178.856 181.811
ert -1x3

nstructi
ert -1x3
o n
ROW

257+940
.0m

LHS=5.000

178.863 178.870 178.785 181.781


RHS=5.000

R2
.0m

257+950 178.865 178.824 178.779 181.751


257+960 178.838 178.773 178.799 181.721
R=800.000 L=683.920

257+970 178.838 178.738 178.735 181.691 MATCHLINE


257+980 178.725 178.697 178.743 181.661
258+000
ROW

257+990 178.633 178.672 178.698 181.631


PLAN & PROFILE

258+000 178.581 178.651 178.644 181.601


ROW

OF MAIN CARRIAGEWAY
TO VINUKONDA

CD.NO : 259/1

NH-765/DO-KJ/PKG-2/HW/P&P-014
(Km: 257+000 TO Km: 258+000)

W
O
R W
O
R
LHS

CLIENT :
RHS

AUTHORITY :
SCHEMATIC
TO SRISAILAM

DATUM=173.000m

LHS

RHS

SUPER ELEVATION

DESIGN CHAINAGE
RO

DISTANCE FROM PCL


DISTANCE FROM PCL
W

VERTICAL ALIGNMENT
PROPOSED FRL ALONG
CARRIAGEWAY CENTER
RO

EXISTING LEVEL ALONG

EXISTING LEVEL AT 15M


EXISTING LEVEL AT 15M
W

PROPOSED CENTER LINE


W

HORIZONTAL SCHEMATIC
O
R
MA

CD.NO
TC

175
180
190
HL
IN
258+000 178.581 178.651 178.644 181.601

(MoRT&H)
E

258+010 178.586 178.556 178.600 181.571

185 : 259/1

New Delhi -110001


258+020 178.563 178.625 178.551 181.541

RO
W

GOVERNMENT OF INDIA
RO

National Highway Wings, CRF


25
258+030 178.568 178.544 178.588 181.511

MG Road, Vijayawada - 520010.


8+
00
0
258+040 178.552 178.522 178.569 181.481 W
O
R

ROADS & BUILDINGS DEPARTMENT


Transport Bhawan, 1, Parliament Streets
258+050 178.540 178.514 178.536 181.451

GOVERNMENT OF ANDHRA PRADESH


CD
CA

MINISTRY OF ROAD TRANSPORT & HIGHWAYS


CA

258+060 178.515 178.571 178.548 181.421


C

W
S

O
H
NO:

R
S
P

DES
A

K
I

PRO

258+070 178.567 178.575 178.585 181.391


E
IG
AN
N

P
IGN

14
W
O

RO
S

258+080 178.559 178.532 178.607 181.361

HIP NO.
CH
(M)
AGE

W
:
:

AL

RO
I

W
DES N SPAN
N

258+090 178.562 178.467 178.517 181.331


(M)
AGE

258+100 178.554 178.500 178.491 181.301


:
:

(m)
HIP
W
O
258+110 178.528 178.447 178.483 181.271 R
25
25

Chainage
259

258231.178
8+
2
8
/2

10
5
Box

258+120 178.504 178.431 178.464 181.241


0
8

-
C

Box
ul

New
0

258+130 178.467 178.412 178.449 181.211


v

ul

EPC CONTRACTOR :
e

C
8
v
o

W
e

O
RO

258+140 178.405 178.380 178.492 181.181 R

(m)
W

DESIGN CONSULTANT :
nstr

RO

Easting
W

258+150
+15 rt -1x3.

178.398 178.413 178.479 181.151

308614.667
ucti
+14 rt -1x3.
0m

on

258+160 178.416 178.470 178.496 181.121


0m

Ph. No. 0861-2321919


258+170 178.378 178.466 178.460 181.091
(m)

258+180 178.435 178.430 178.421 181.061


P

CD.NO : 259/2

G=-0.300%
L=634.412m
Northing

Email: bhavanicon1991@gmail.com
R

M/s BHAVANI CONSTRUCTIONS


DES

W
HIP

O
1759145.845
O

R
258+190 178.427 178.418 178.435 181.031
CD NO:

IG

SAMARTH INFRAENGG
C A C HA
A

SKEW
N

O
CA SP N

DESIGN
-14

16-6-114, Near Vijaya Mahal, Nellore-524001


S

Technocrats Private Limited


258+200
C

178.398 178.433 178.409 181.001 O


R
SP
R OW

AL

258
A
(M):

+20
0
(m)

800
INAGE:

258+210 178.373 178.406 178.397 180.971


ROW

Radius
(M
HAINAG

258+220 178.357 178.435 178.404 180.941


):
E:

258+230 178.369 178.428 178.407 180.911


W
O
R
258+240 178.353 178.396 178.389 180.881
B

Right
o
Box

W
x

O
259/3

R
Direction

258+250
C

178.362 178.362 178.381 180.851


(Left/Right)
C
u
258+30

LHS=5.000
u

RHS=5.000
258+29
0
lv
8
lv

258+260 178.364 178.338 178.349 180.821


New Con
ROW

258+270 178.351 178.360 178.337 180.791


ROW

ert -1x3

53.28

PMC CONSULTANT :
Total
ert -1x3
o

258+280 178.342 178.315 178.323 180.761


structi n

angle (∆)
Deviation
.0m

.0m

W
O
258+290 R

R=800.000 L=683.920
178.331 178.319 178.321 180.731
W
O
R
258+300 178.301 178.319 178.313 180.701
258+ 3

IN ASSOCIATION WITH
00
(m)

258+310 178.349 178.350 178.330 180.671


683.92

TPF ENGINEERING PVT. LTD.


Curve,Lc
Length of

258+320 178.319 178.315 178.292 180.641

HBS INFRA ENGINEERS PVT. LTD.


258+330 178.395 178.181 178.297 180.611
ROW

CD.NO : 259/3
ROW

258+340 178.322 178.275 178.278 180.581


60
(m)

W
O
R

258+350 178.317 178.278 178.250 180.551


Spiral, Ls
Length of

258+360 178.305 178.204 178.227 180.520


258+370 178.513 178.218 178.169 180.485
100
(km/h)
Speed
Design

258+380 179.616 178.222 178.198 180.446


258+390 180.685 178.417 178.182 180.402 W O
W
O R
R
ROW

258+400
258+400 178.743 180.428 178.750 180.354 VIP CH:=258402.788
ROW

5.00

VIP LVL:=180.393
Super

(e) (%)

258+410 177.429 179.281 180.255 180.301

PROOF CONSULTANT :
K=-233.186
elevetion,

L=100.000m

SAFETY CONSULTANT :
258+420 177.141 177.633 179.036 180.245
258+430 177.004 177.369 177.731 180.184

M/s Trisa Infra


258+440 177.015 177.281 177.514 180.118

Consultant LLP
Bangalore, Karnataka
Engineers Pvt. Ltd.
258+450 177.070 177.196 177.636 180.049

Hyderabad, Telangana
M/s PVR Consulting
258+460 177.040 177.274 177.552 179.976
ROW

ROW

258+470 177.020 177.269 177.374 179.903


258+480 177.071 177.283 177.378 179.830
258+490 177.042 177.237 177.373 179.757 258+500 O
W
R

W
O
R
258+500 176.969 177.221 177.351 179.685

PROJECT :
258+510 177.024 177.181 177.340 179.612
258+520 177.081 177.208 177.398 179.539
PLAN
ROW

THE YEAR 2022-23.


258+530
ROW

177.141 177.364 177.485 179.466


550.668
CS 258
258+540 177.233 177.460 177.672 179.393
G=-0.729%
L=157.706m

W
O
R
W
258+550 177.302 177.553 177.746 179.320 O
R

258+560 177.313 177.599 177.795 179.247


258+570 177.378 177.613 177.787 179.174
258+580 177.355 177.487 177.690 179.101

WIDENING TO 2-LANE WITH PAVED


LONGITUDINAL SECTION

JUNCTION FROM DESIGN CHAINAGE


600
W
ROW

KM: 244+000 TO 268+700) SECTION OF


SHOULDERS OF DORNALA TO KUNTA
CL=60.000

KM.244+000 TO KM.267+990 (EXISTING


258+
258+590 177.268 177.404 177.668 179.029 68 R

NH-765 (PACKAGE-2) IN THE STATE OF


ANDHRA PRADESH ON EPC MODE FOR
ROW

8610.6
ST 25
W
O
258+600 177.234 177.357 177.686 178.956 R

258+610 177.017 177.323 177.528 178.883

REV.
258+620 177.179 177.294 177.467 178.813
258+630 177.254 177.294 177.438 178.750

DATE
258+640 177.189 177.336 177.408 178.695 VIP CH:=258640.495
VIP LVL:=178.661

R0 24.04.2024
R1 27.04.2024 O
W
R
K=141.897

258+650 177.187 177.328 177.347 178.646


L=60.000m
ROW

ROW

258+660 177.162 177.360 177.435 178.605


SKEW

258+670 177.190 177.325 177.419 178.570


DESIG
PROPO
DESIG
CA SP
CA CH

258+680 177.211 177.316 177.406 178.540


CD NO
:

SAL

700
W
O
R
258+
N SPA

258+690 177.207 177.292 177.343 178.509


AN (M
N CHA

EROW
AINAG
):
E:

258+700 177.193 177.264 177.342 178.478


N (M):
INAGE
:

258+710 177.135 177.262 177.289 178.448


ROW

258+720 177.058 177.229 177.283 178.417


ROW

DESCRIPTION
FOR APPROVAL

258+730
VIDE EMAIL Dt.: 19.05.2024

176.994 177.052 177.376 178.387


New C
Pipe C
258+7
Pipe C
259/4
258+8

258+740
EROW

176.947 177.020 177.451 178.356


98
00

ulvert
onstru

258+750 177.059 177.126 177.189 178.325


ulvert

ction

258+760 176.966 176.986 177.159 178.295


-1x1.2

R2 20.05.2024 REVISED AS PER A.E's OBSERVATION


-1x1.2

258+770 176.909 176.943 177.119 178.264


Ø
ROW

258+780 176.837 176.905 177.092 178.234 800


ROW

258+
EROW

REVISED AS PER PROOF CONSULTANT OBSERVATIONS

258+790
VIDE LETTER NO. PVR/BC/P&P/2024-25/01 Dt: 25.04.2024

176.799 176.811 177.063 178.203 W


O
R

258+800 176.789 176.815 177.118 178.172


D=374.742

258+810 176.760 176.970 177.110 178.142


DRAWN

SCALE :

258+820 176.783 176.900 177.034 178.111


258+830 176.740 176.861 176.904 178.081
CHECKED :
DESIGNED :
:

APPROVED :
CD.NO : 259/4
EROW

258+840 176.807 176.829 176.857 178.050


EROW
ROW

ROW

258+850
DATE : 20/05/2024

176.721 176.721 176.769 178.019


RJ

VERTICAL
RP
G=-0.306%

KS
BH
L=339.864m

258+860 176.788 176.813 176.818 177.989


258+870 176.646 176.741 176.709 177.958
- 1:200

258+880 176.566 176.590 176.602 177.928


900
W
HORIZONTAL - 1:2000

O
EROW

R
258+
EROW

258+890 176.549 176.642 176.744 177.897


258+900 176.628 176.658 176.660 177.866
ROW

258+910 176.525 176.620 176.801 177.836


ROW

TITLE :

258+920
LHS=2.500

176.525 176.609 176.657 177.805


RHS=2.500

DRG. NO. :

REVISION :

258+930 176.450 176.570 176.634 177.775 W


EROW

O
R
EROW

258+940 176.465 176.522 176.644 177.744 W


O
R
R2

258+950 176.454 176.476 176.582 177.713


10
258+960 176.330 176.417 176.487 177.683 8985.4
TS 25
ROW

258+970 176.279 176.367 176.475 177.652


ROW

CL=40.000
EROW

258+980 176.307 176.356 176.435 177.622


O
F
C

000
EROW

259+ INE
W
258+990 176.307 176.316 176.393 177.591 O
R
TCHL MA
PLAN & PROFILE

10
259+000 176.237 176.247 176.330 177.560 9025.4
SC 25
OF MAIN CARRIAGEWAY
TO VINUKONDA

NH-765/DO-KJ/PKG-2/HW/P&P-015
(Km: 258+000 TO Km: 259+000)
CL=40.000
EROW

EROW
ROW
LHS

CLIENT :
RHS

AUTHORITY :
SCHEMATIC
TO SRISAILAM

DATUM=167.000m

LHS

RHS

SUPER ELEVATION

DESIGN CHAINAGE
DISTANCE FROM PCL
DISTANCE FROM PCL
R

VERTICAL ALIGNMENT
PROPOSED FRL ALONG
CARRIAGEWAY CENTER

EXISTING LEVEL ALONG

EXISTING LEVEL AT 15M


EXISTING LEVEL AT 15M
.410

PROPOSED CENTER LINE

HORIZONTAL SCHEMATIC
8985 5
TS 2

15

170
175
180
185
ROW

ROW

EROW

HIP NO.
0

O
F
C
259+000

EROW
176.237 176.247 176.330 177.560

(MoRT&H)
+00
259
259+010 176.203 176.235 176.226 177.530 0 E IN
W

New Delhi -110001


O
5.41
R
5902 CHL
259+020 176.135 176.234 176.302 177.504 MAT

(m)
HIP
SC 2

CL=40.000

GOVERNMENT OF INDIA

National Highway Wings, CRF


259+030

Chainage
176.143 176.196 176.216 177.488

259225.215

MG Road, Vijayawada - 520010.


259+040 176.102 176.112 176.131 177.482 VIP CH:=259040.359
VIP LVL:=177.437

ROADS & BUILDINGS DEPARTMENT


EROW

EROW

Transport Bhawan, 1, Parliament Streets


K=99.010
259+050 175.997 176.018 176.052 177.487

L=60.000m

GOVERNMENT OF ANDHRA PRADESH


W
O
R
ROW

R OW

(m)

MINISTRY OF ROAD TRANSPORT & HIGHWAYS


259+060 175.966 175.965 176.034 177.501

LHS=2.500
Easting

309529.328
259+070 175.976 175.938 176.005 177.526
259+080 176.223 175.902 175.955 177.556

G=0.300%
L=17.277m
259+090 175.879 175.880 175.905 177.586
EROW

(m)
EROW

100
259+100 175.827 175.805 175.836 177.612 259+

Northing

RHS=2.500
1758653.318
259+110 175.877 175.908 175.795 177.633
RO W

259+120 176.382 175.724 175.705 177.649


ROW

(m)

1200
259+130 176.432 175.728 175.725 177.660
Radius

EPC CONTRACTOR :
259+140 176.393 175.730 175.772 177.666
EROW

DESIGN CONSULTANT :
EROW

259+150 176.334 175.671 175.718 177.667


259+160 176.262 175.638 175.687 177.663 Left

Ph. No. 0861-2321919


Direction
(Left/Right)

259+170 176.180 175.690 175.656 177.653


259+180 176.139 175.301 175.603 177.639
ROW

ROW

Email: bhavanicon1991@gmail.com
M/s BHAVANI CONSTRUCTIONS
EROW

259+190 176.098 175.395 175.585 177.619

SAMARTH INFRAENGG
EROW

20.82
Total

VIP CH:=259197.636 0

16-6-114, Near Vijaya Mahal, Nellore-524001


angle (∆)

Technocrats Private Limited


Deviation

259+200 175.486 176.039 176.026 177.595 VIP LVL:=177.909


259+20
W
O
R

K=-196.429
L=220.000m
259+210 175.477 175.847 175.588 177.565
259+220 175.525 176.157 175.381 177.530
(m)
395.977

259+230 175.434 176.131 175.296 177.490

LHS=3.700
RHS=3.700
Curve,Lc
Length of
EROW

259+240 175.357 176.072 175.304 177.445


EROW
ROW

R=-1200.000 L=395.977
HIPROW
-15

W
259+250 175.274 176.035 175.269 177.395 O
R
SKEW

40
(m)

259+260 175.190 176.051 175.157 177.340


CD NO:

CD.NO : 260/1
PROPOSAL

Spiral, Ls
DESIGN SP
CA CHAIN

Length of
DESIGN CH

259+270 175.201 176.066 175.170 177.279


CA SPAN (M
):

PMC CONSULTANT :
AGE:

259+280 174.988 176.106 175.069 177.214


EROW
AN (M):

EROW

259+290 175.056 176.136 175.176 177.144


AINAGE:

100
(km/h)
Speed
Design

W
KMP
259+300 174.967 176.147 175.199 177.068 O

IN ASSOCIATION WITH
259+300
R W
-

O
R

259+310 174.924 176.070 175.106 176.987


ROW

ROW

TPF ENGINEERING PVT. LTD.


260/1

259+320 174.823 175.989 175.021 176.905


3.70

HBS INFRA ENGINEERS PVT. LTD.


Super
259+228

(e) (%)
259+230

New Const

elevetion,
Box Culvert

259+330 174.867 175.941 174.948 176.823


Box Culvert

EROW

EROW

259+340
END CH:259+350
174.832 175.866 174.986 176.741
ruction

MADDALAKATTA BYPASS
259+350 174.813 175.819 174.922 176.659
-1x2.0m

W
O
-1x2.0m

259+360 174.741 175.780 174.779 176.577


ROW

259+370 174.620 175.735 174.745 176.495


CH:259+350
BUSSHELTER
ROW

259+380 174.640 175.675 174.700 176.413


EROW

EROW

259+390 174.735 175.617 174.734 176.331


259+400 174.590 175.571 174.726 176.249 O
W
R
259+400
259+410 174.619 175.548 174.843 176.167

PROOF CONSULTANT :

SAFETY CONSULTANT :
259+420 174.639 175.485 174.570 176.085 CS 259421.387
ROW

259+430 174.422 175.416 174.585 176.003


EROW

EROW

M/s Trisa Infra


259+440 174.393 175.335 174.462 175.921
ROW

Consultant LLP
Bangalore, Karnataka
Engineers Pvt. Ltd.
259+450 174.344 175.250 174.364 175.839

Hyderabad, Telangana
M/s PVR Consulting
CL=40.000
259+460 174.303 175.158 174.310 175.757
ST 259461.387
259+470 174.268 175.087 174.253 175.675
EROW

259+480 174.220 175.033 174.321 175.593


EROW

259+490 174.032 174.979 174.288 175.511


ROW

259+500 173.838 174.955 174.092 175.429

PROJECT :
259+500
ROW

259+510 173.803 174.930 174.143 175.347


259+520 173.742 174.890 174.224 175.265
PLAN

THE YEAR 2022-23.


EROW

259+530 173.748 174.832 174.164 175.183


EROW

259+540 173.574 174.777 174.097 175.101


259+550 173.560 174.759 174.030 175.019
ROW

259+560 173.405 174.741 174.155 174.937


259+570 173.419 174.694 173.910 174.855
ROW
EROW

EROW

259+580 173.415 174.610 173.810 174.773

WIDENING TO 2-LANE WITH PAVED


LONGITUDINAL SECTION

JUNCTION FROM DESIGN CHAINAGE

KM: 244+000 TO 268+700) SECTION OF


SHOULDERS OF DORNALA TO KUNTA

KM.244+000 TO KM.267+990 (EXISTING


259+590 173.382 174.537 173.744 174.691

NH-765 (PACKAGE-2) IN THE STATE OF


ANDHRA PRADESH ON EPC MODE FOR
W
259+600 173.395 174.481 173.670 174.609 O
W R
O
R
259+600
259+610 173.366 174.405 173.673 174.527

REV.
259+620 173.360 174.343 173.665 174.445
ROW
EROW

EROW

259+630 173.247 174.205 173.479 174.363

DATE
ROW

259+640 172.941 174.115 173.314 174.281

R0 24.04.2024
R1 27.04.2024 259+650 172.896 174.031 173.171 174.199
259+660 172.871 173.974 173.278 174.117
259+670 172.719 173.927 173.070 174.035
G=-0.820%
L=706.302m
EROW

EROW

259+680 172.705 173.847 173.093 173.953


ROW

259+690 172.598 173.751 172.861 173.871


ROW

259+700 172.854 173.652 172.822 173.789 259+700


259+710 172.687 173.546 172.681 173.707
259+720 172.627 173.441 172.766 173.625
EROW

EROW

DESCRIPTION
FOR APPROVAL

259+730
VIDE EMAIL Dt.: 19.05.2024

172.544 173.335 172.618 173.543


D=887.448

259+740 172.516 173.231 172.475 173.461


O
F
C
ROW

259+750 172.182 173.169 172.337 173.379


259+760 172.165 173.065 172.262 173.297
ROW

R2 20.05.2024 REVISED AS PER A.E's OBSERVATION


EROW

259+770 172.042 172.989 172.202 173.215


EROW

259+780 171.953 172.919 172.198 173.133


REVISED AS PER PROOF CONSULTANT OBSERVATIONS

259+790
VIDE LETTER NO. PVR/BC/P&P/2024-25/01 Dt: 25.04.2024

171.905 172.839 172.122 173.051


W
259+800 171.684 172.748 171.987 172.969 O
R
259+800
259+810 171.490 172.660 172.033 172.887
ROW
EROW

DRAWN

SCALE :

259+820 171.492 172.556 171.875 172.805


EROW
ROW

259+830 171.395 172.451 171.801 172.723


CHECKED :
DESIGNED :
:

APPROVED :

259+840 171.297 172.317 171.587 172.641


259+850
DATE : 20/05/2024

171.199 172.230 171.837 172.559


RJ

VERTICAL
RP

KS
BH

259+860 171.101 172.119 171.301 172.477


EROW

EROW

259+870 171.003 172.013 171.145 172.395


ROW

- 1:200

259+880 170.905 171.892 170.924 172.313


HORIZONTAL - 1:2000

259+890 170.808 171.766 170.689 172.231


ROW

259+900 170.710 171.655 170.481 172.149 259+900


LHS=2.500

259+910 170.645 171.532 170.526 172.067


TITLE :
EROW

EROW

259+920 170.487 171.420 170.418 171.985


DRG. NO. :

REVISION :

259+930 170.227 171.318 170.438 171.903


259+940 170.121 171.199 170.356 171.821
R2
ROW

RHS=2.500

259+950 169.991 171.052 170.166 171.739


ROW

259+960 169.915 170.914 170.046 171.657


EROW

EROW

259+970 169.801 170.797 170.018 171.575


259+980 169.743 170.700 169.791 171.493
259+990 169.610 170.609 169.747 171.411
PLAN & PROFILE

MATCHLINE
W
260+000 O
169.579 170.518 169.809 171.329 W R
O
R
OF MAIN CARRIAGEWAY
ROW

260+000
EROW
TO VINUKONDA

EROW

NH-765/DO-KJ/PKG-2/HW/P&P-016
(Km: 259+000 TO Km: 260+000)
ROW
LHS

CLIENT :
RHS

AUTHORITY :
SCHEMATIC
TO SRISAILAM

DATUM=161.000m

LHS

RHS

SUPER ELEVATION

DESIGN CHAINAGE
DISTANCE FROM PCL
DISTANCE FROM PCL
VERTICAL ALIGNMENT
PROPOSED FRL ALONG
CARRIAGEWAY CENTER

EXISTING LEVEL ALONG

EXISTING LEVEL AT 15M


EXISTING LEVEL AT 15M

PROPOSED CENTER LINE

HORIZONTAL SCHEMATIC
18
17
16
MATCHLINE
W W
O O

HIP NO.
R R

165
170
175
180
260+000
260+000

ROW
169.579 170.518 169.809 171.329

(MoRT&H)
EROW

EROW
260+010 169.495 170.428 169.886 171.247

ROW

New Delhi -110001


(m)
HIP
260+020 169.404 170.332 169.945 171.167

260859.37
Chainage

GOVERNMENT OF INDIA
260597.876
260372.228

National Highway Wings, CRF


260+030 169.235 170.215 169.573 171.091

MG Road, Vijayawada - 520010.


260+040 169.292 170.100 169.661 171.022

G=-0.820%

ROADS & BUILDINGS DEPARTMENT


L=706.302m

Transport Bhawan, 1, Parliament Streets


260+050
EROW

169.266 170.002 169.758 170.958

GOVERNMENT OF ANDHRA PRADESH


EROW

(m)

MINISTRY OF ROAD TRANSPORT & HIGHWAYS


Easting
260+060 169.005 169.891 169.550 170.900

311148.66
310666.854
310890.339

LHS=2.500
ROW

VIP CH:=260068.938
260+070 168.739 169.804 169.356 170.848 VIP LVL:=170.764
ROW

K=169.231
260+080 168.710 169.719 169.285 170.802

L=110.000m
(m)
260+090 168.833 169.661 169.114 170.762 260+100

Northing
EROW

260+100 168.676 169.597 169.084 170.728


EROW

1758408.407
1758449.038
1758480.208

RHS=2.500
260+110 168.447 169.572 169.312 170.700
260+120 168.502 169.573 169.064 170.678
(m)

5000
5000
5000
Radius
ROW

260+130 168.502 169.548 168.908 170.660

EPC CONTRACTOR :
260+140 168.140 169.483 168.851 170.643
ROW

DESIGN CONSULTANT :
EROW

EROW

260+150 168.184 169.398 168.702 170.626


Left
Left
Right
260+160 168.201 169.309 168.751 170.609
Direction

Ph. No. 0861-2321919


(Left/Right)

260+170 168.103 169.241 168.682 170.592


260+180 167.833 169.204 168.550 170.575
1

Email: bhavanicon1991@gmail.com
M/s BHAVANI CONSTRUCTIONS
D=887.448
0.54

0.46
Total

260+190 167.924 169.156 168.417 170.558 W

G=-0.170%
O

L=112.743m

SAMARTH INFRAENGG
W
260+200
O R
ROW

R
angle (∆)
EROW

Deviation
EROW

16-6-114, Near Vijaya Mahal, Nellore-524001

Technocrats Private Limited


260+200 168.058 169.122 168.813 170.541
ROW

260+210 167.653 169.096 168.487 170.524


(m)

260+220 167.806 169.065 168.243 170.507


87.158
46.786

40.372
Curve,Lc
Length of

260+230 167.775 169.019 168.393 170.490


260+240 167.657 168.968 168.244 170.473
EROW

EROW

260+250 167.651 168.923 168.133 170.454


0
0
0
(m)
ROW

260+260 167.500 168.869 168.134 170.433


Spiral, Ls
Length of

260+270 167.441 168.793 168.183 170.410


ROW

PMC CONSULTANT :
260+280 167.491 168.673 168.289 170.384
SKEW

100
100
100
CD NO:

260+290 167.374 168.595 168.501 170.356


(km/h)
Speed
EROW

Design

260+300
EROW
PROPOSAL

260+300 167.433 168.536 168.148 170.326

IN ASSOCIATION WITH
CA SPAN (M):
CA CHAINAGE:

260+310 167.257 168.477 167.980 170.293


-
-
-

TPF ENGINEERING PVT. LTD.


DESIGN SPAN (M):

O
F
C
DESIGN CHAINAGE:

260+320
Super

167.172 168.422 167.936 170.258


(e) (%)
ROW

HBS INFRA ENGINEERS PVT. LTD.


elevetion,

260+330 167.011 168.371 167.885 170.221


CD.NO : 261/1
-

ROW
EROW

260+340 167.049 168.368 167.821 170.182 PC 260348.835


EROW

VIP CH:=260346.681
O
F
C
261/1

260+350 167.267 168.418 167.798 170.140 VIP LVL:=170.292


260+336
260+338

K=-440.042
L=220.000m
260+360 167.316 168.440 167.775 170.097
Reconstruction

260+370 167.364 168.503 167.752 170.050


HIP-16

260+380 167.303 168.547 167.866 170.002


Pipe Culvert -2x1.2Ø
Pipe Culvert -2x1.2Ø

ROW
EROW

PT 260395.621
260+390
EROW

167.495 168.557 167.861 169.951 260+400

R=-5000.000 L=46.786
260+400 167.549 168.541 167.858 169.898
ROW

260+410 167.659 168.529 167.939 169.843

PROOF CONSULTANT :

SAFETY CONSULTANT :
260+420 167.658 168.523 167.995 169.786
260+430 167.648 168.520 167.811 169.726
EROW

M/s Trisa Infra


EROW

260+440 167.639 168.520 167.778 169.664

Consultant LLP
Bangalore, Karnataka
Engineers Pvt. Ltd.
260+450 167.629 168.528 167.757 169.599

Hyderabad, Telangana
M/s PVR Consulting
ROW

260+460 167.479 168.483 167.672 169.533


ROW

260+470 167.304 168.464 167.836 169.466


L=25.464m
G=-0.670%

260+480 167.324 168.467 167.779 169.399

D=158.675
SKEW

EROW

EROW
CD NO:

O
F
C

260+490 167.425 168.474 167.869 169.333 260+500


PROPOSAL

260+500 167.570 168.462 168.009 169.272


CA SPAN (M):

PROJECT :
CA CHAINAGE:

260+510 167.620 168.454 167.960 169.214


DESIGN SPAN (M):

ROW
DESIGN CHAINAGE:

260+520 167.669 168.474 167.811 169.161


PLAN

THE YEAR 2022-23.


ROW

260+530 167.755 168.513 167.797 169.112


-

EROW

EROW

260+540 167.718 168.555 167.947 169.067


261/2

PC 260554.296
260+550 167.677 168.563 168.075 169.027
260+588
260+590

260+560 167.507 168.576 167.931 168.990


260+570 167.723 168.605 167.813 168.958 VIP CH:=260572.145
New Construction

VIP LVL:=168.781
260+580 167.582 168.635 167.885 168.930
Pipe Culvert -1x1.2Ø
Pipe Culvert -1x1.2Ø

EROW

K=238.170
ROW

WIDENING TO 2-LANE WITH PAVED


LONGITUDINAL SECTION
EROW

L=180.000m

JUNCTION FROM DESIGN CHAINAGE

KM: 244+000 TO 268+700) SECTION OF


SHOULDERS OF DORNALA TO KUNTA

KM.244+000 TO KM.267+990 (EXISTING


260+590 168.102 168.666 167.843 168.906 O
W

NH-765 (PACKAGE-2) IN THE STATE OF


R
260+600

ANDHRA PRADESH ON EPC MODE FOR


ROW

260+600 167.853 168.673 167.987 168.886


HIP-17

260+610 167.894 168.607 168.132 168.871

REV.
260+620
R=5000.000 L=87.158

168.201 168.577 168.276 168.860


CD.NO : 261/2
EROW

260+630 167.975 168.584 168.164 168.853


EROW

DATE
PT 260641.454
260+640 167.596 168.615 168.064 168.850

R0 24.04.2024
R1 27.04.2024
ROW

260+650 167.712 168.711 167.994 168.851


ROW

260+660 167.802 168.747 168.084 168.857


260+670 167.873 168.758 168.108 168.865
EROW

260+680
EROW

167.968 168.797 168.171 168.874


260+690 167.876 168.803 168.011 168.883 260+700
260+700 167.904 168.805 167.986 168.891
260+710 167.858 168.810 168.020 168.900
ROW

260+720 167.819 168.821 168.076 168.908


ROW
EROW

EROW

DESCRIPTION
FOR APPROVAL

260+730 167.891 168.829 168.158 168.917


O
F
C

260+740 167.973 168.805 168.169 168.926


D=197.730

260+750 167.851 168.813 168.266 168.934


260+760 167.936 168.836 168.348 168.943
260+770 167.962 168.854 168.166 168.951
EROW

OBSERVATION VIDE EMAIL Dt.: 19.05.2024


ROW

EROW

260+780 167.954 168.863 168.151 168.960


O
F
C

R2 20.05.2024 REVISED DUE TO TEMPLE AND AS PER A.E's


ROW

REVISED AS PER PROOF CONSULTANT OBSERVATIONS

260+790
VIDE LETTER NO. PVR/BC/P&P/2024-25/01 Dt: 25.04.2024

167.914 168.839 168.185 168.968 260+800


R
O
W
R
O
W

260+800 168.055 168.794 168.165 168.977


260+810 167.955 168.807 168.136 168.986
DRAWN

SCALE :

260+820 167.928 168.855 168.093 168.994


EROW

EROW

260+830 168.105 168.893 168.129 169.003


CHECKED :

PC 260839.184
DESIGNED :
:
G=0.086%

APPROVED :
L=320.674m

260+840 168.178 168.952 168.375 169.011


ROW

260+850
DATE : 20/05/2024

168.183 169.052 168.521 169.020


RJ

VERTICAL
RP

KS
BH
ROW

260+860 168.281 169.130 168.544 169.029


260+870 168.199 169.160 168.610 169.037
HIP-18 EROW

PT 260879.556
EROW

- 1:200

260+880 168.225 169.167 168.786 169.046


HORIZONTAL - 1:2000
R=-5000.000 L=40.372

KMP

260+890 168.279 169.145 168.733 169.054 260+900


260+900 168.193 169.076 168.476 169.063
ROW

LHS=2.500

260+910 167.974 169.017 168.303 169.071


TITLE :
ROW
EROW

260+920 167.947 168.941 168.365 169.080


EROW

DRG. NO. :

REVISION :

260+930 167.969 168.861 168.314 169.089


260+940 167.983 168.821 168.225 169.097
R2
RHS=2.500

260+950 168.082 168.831 168.147 169.106


D=2209.484

260+960 167.953 168.844 168.057 169.114


EROW
ROW

EROW

260+970 168.070 168.851 168.072 169.123


K=-137.957
L=140.000m

260+980 168.236 168.873 168.142 169.131


ROW
O
F
C

260+990
MATCHLINE
168.297 168.905 168.191 169.138 R
O
W
R
O
W
PLAN & PROFILE

261+000
261+000 168.153 168.938 168.249 169.138
OF MAIN CARRIAGEWAY
TO VINUKONDA

EROW

NH-765/DO-KJ/PKG-2/HW/P&P-017
(Km: 260+000 TO Km: 261+000)
EROW
ROW
LHS

CLIENT :
RHS

AUTHORITY :
SCHEMATIC
TO SRISAILAM

DATUM=161.000m

LHS

RHS

SUPER ELEVATION

DESIGN CHAINAGE
DISTANCE FROM PCL
DISTANCE FROM PCL
VERTICAL ALIGNMENT
PROPOSED FRL ALONG
CARRIAGEWAY CENTER

EXISTING LEVEL ALONG


ROW

EXISTING LEVEL AT 15M


EXISTING LEVEL AT 15M

PROPOSED CENTER LINE

HORIZONTAL SCHEMATIC
O
F
C
MATCHLINE
W W
O O
R R
261+000

165
170
175
180
261+000 168.153 168.938 168.249 169.138

(MoRT&H)
EROW
261+010 168.090 168.967 168.178 169.130

EROW

New Delhi -110001


261+020 168.059 168.958 168.276 169.116

GOVERNMENT OF INDIA
ROW

National Highway Wings, CRF


261+030 168.079 168.950 168.313 169.094

MG Road, Vijayawada - 520010.


261+040 168.244 168.972 168.300 169.064
ROW

ROADS & BUILDINGS DEPARTMENT


Transport Bhawan, 1, Parliament Streets
261+050 168.374 169.023 168.318 169.028 VIP CH:=261052.819

GOVERNMENT OF ANDHRA PRADESH


VIP LVL:=169.194

MINISTRY OF ROAD TRANSPORT & HIGHWAYS


EROW

261+060
EROW

168.295 169.080 168.355 168.984

K=-137.957

LHS=2.500
L=140.000m
261+070 168.227 169.033 168.484 168.933
261+080 168.123 168.972 168.510 168.875
261+100
261+090 167.982 168.898 168.453 168.810
ROW

261+100 167.834 168.753 168.490 168.737 KMP

RHS=2.500
ROW
EROW

EROW

261+110 167.860 168.642 168.249 168.657


261+120 167.846 168.522 168.121 168.570
261+130 167.633 168.408 167.886 168.477

EPC CONTRACTOR :
261+140 167.515 168.308 167.753 168.384

DESIGN CONSULTANT :
261+150 167.453 168.206 167.689 168.291

L=40.207m
G=-0.929%
EROW

EROW
ROW

261+160 167.350 168.090 167.739 168.198

Ph. No. 0861-2321919


ROW

261+170 167.282 168.017 167.638 168.106


261+180 167.141 167.933 167.379 168.018
W
O W

Email: bhavanicon1991@gmail.com
M/s BHAVANI CONSTRUCTIONS
R O
R
261+200
261+190 167.017 167.839 167.380 167.933

SAMARTH INFRAENGG
16-6-114, Near Vijaya Mahal, Nellore-524001

Technocrats Private Limited


261+200 166.899 167.746 167.354 167.852
EROW

EROW
O
F
C

261+210 166.828 167.670 167.260 167.775


261+220 166.786 167.606 167.137 167.701
ROW

261+230 166.754 167.548 167.086 167.631


ROW

261+240 166.857 167.498 167.016 167.565


VIP CH:=261248.026
261+250 166.823 167.450 166.931 167.502 VIP LVL:=167.380
EROW

EROW

K=270.233
L=170.000m
261+260 166.815 167.394 166.770 167.443
261+270 166.529 167.304 166.816 167.388

PMC CONSULTANT :
261+280 166.500 167.231 166.762 167.337 KMP
261+300
ROW
SKEW

261+290 166.353 167.198 166.522 167.289


CD NO:

ROW
EROW

261+300 166.331 167.159 166.430 167.245


PROPOSAL

IN ASSOCIATION WITH
EROW
CA SPAN (M):

261+310 166.265 167.129 166.399 167.204


CA CHAINAGE:

TPF ENGINEERING PVT. LTD.


261+320 166.162 167.104 166.306 167.168
DESIGN SPAN (M):
DESIGN CHAINAGE:

HBS INFRA ENGINEERS PVT. LTD.


261+330 166.184 167.052 166.238 167.135
-

261+340 166.029 166.988 166.298 167.105


EROW

EROW

261+350 165.993 166.907 166.209 167.075


262/1

ROW
261+348
261+350

261+360 165.785 166.895 166.130 167.045


ROW

261+370 166.086 166.831 166.240 167.015


New Construction

261+380 166.016 166.832 166.329 166.985


CD.NO : 262/1

W W
O O
Box Culvert -1x2.0m

R
Box Culvert -1x2.0m

261+400
R

261+390 165.914 166.842 166.269 166.955


EROW

EROW

261+400 166.058 166.850 166.097 166.925


261+410 166.086 166.822 166.163 166.895

PROOF CONSULTANT :

SAFETY CONSULTANT :
ROW

261+420 165.899 166.779 166.136 166.865


ROW

G=-0.300%
L=169.577m
261+430 165.810 166.758 166.101 166.835

M/s Trisa Infra


261+440 165.767 166.728 165.916 166.805

Consultant LLP
EROW

EROW

Bangalore, Karnataka
Engineers Pvt. Ltd.
261+450 165.949 166.653 166.001 166.775

Hyderabad, Telangana
M/s PVR Consulting
261+460 165.750 166.606 166.172 166.745
261+470 165.707 166.611 166.016 166.715
261+480 165.532 166.599 165.814 166.685
O
F
ROW
C

261+500

D=2209.484
261+490 165.606 166.568 165.974 166.655
EROW

ROW
EROW

261+500 165.627 166.534 165.786 166.625

PROJECT :
261+510 165.731 166.505 165.815 166.595
261+520 165.587 166.469 165.886 166.563
PLAN

THE YEAR 2022-23.


261+530 165.549 166.439 165.720 166.531 VIP CH:=261532.603
VIP LVL:=166.527
261+540 165.596 166.462 165.687 166.499
EROW

L=60.000m
EROW

K=-1117.533
ROW

261+550 165.566 166.464 165.669 166.465


ROW

261+560 165.431 166.416 165.695 166.430


261+570 165.433 166.377 165.712 166.395
261+580 165.432 166.340 165.680 166.359

WIDENING TO 2-LANE WITH PAVED


LONGITUDINAL SECTION
W
W O

JUNCTION FROM DESIGN CHAINAGE


261+600
O R
R

KM: 244+000 TO 268+700) SECTION OF


SHOULDERS OF DORNALA TO KUNTA
EROW

KM.244+000 TO KM.267+990 (EXISTING


261+590 165.278 166.282 165.675 166.324
EROW

NH-765 (PACKAGE-2) IN THE STATE OF


ANDHRA PRADESH ON EPC MODE FOR
261+600 165.176 166.209 165.538 166.289
ROW

261+610 165.236 166.144 165.447 166.253

REV.
261+620 165.100 166.094 165.352 166.218
ROW

261+630 165.055 166.046 165.377 166.183

DATE
EROW

EROW

261+640 164.830 166.027 165.227 166.147

R0 24.04.2024
R1 27.04.2024 261+650 164.930 166.003 165.179 166.112
261+660 164.982 165.950 164.553 166.077
G=-0.354%
L=174.604m

261+670 164.977 165.884 164.213 166.041


ROW

261+680 164.891 165.830 165.286 166.006 KMP


EROW

261+700
ROW
EROW

261+690 164.975 165.809 165.269 165.970


261+700 164.826 165.842 165.094 165.935
261+710 164.872 165.841 164.987 165.900
261+720 164.704 165.828 165.007 165.864
DESCRIPTION
FOR APPROVAL

261+730
VIDE EMAIL Dt.: 19.05.2024

164.755 165.795 164.790 165.829


O
F
C
EROW

EROW
ROW

261+740 164.743 165.749 164.883 165.794


261+750 164.749 165.697 164.986 165.756
ROW

261+760 164.759 165.631 165.024 165.717


R2 20.05.2024 REVISED AS PER A.E's OBSERVATION

261+770 164.601 165.560 164.855 165.675


261+780 164.591 165.446 164.946 165.631
EROW

W
EROW

O
261+800
R
REVISED AS PER PROOF CONSULTANT OBSERVATIONS

261+790
VIDE LETTER NO. PVR/BC/P&P/2024-25/01 Dt: 25.04.2024

164.455 165.361 164.740 165.584


261+800 164.449 165.325 164.637 165.535
ROW

261+810 164.485 165.297 164.500 165.484 VIP CH:=261812.207


VIP LVL:=165.538
ROW

DRAWN

SCALE :

261+820 164.445 165.270 164.394 165.431


K=-427.181
L=150.000m
SKEW
CD NO:

261+830 164.406 165.254 164.418 165.375


CHECKED :
EROW

DESIGNED :
:

APPROVED :
EROW
PROPOSAL

261+840 164.309 165.232 164.490 165.316


CA SPAN (M):
CA CHAINAGE:

261+850
DATE : 20/05/2024

164.072 165.185 164.445 165.256


RJ

VERTICAL
RP

KS
BH
DESIGN SPAN (M):
DESIGN CHAINAGE:

261+860 164.043 165.126 164.350 165.193


ROW

261+870 163.999 165.025 164.369 165.128


-

- 1:200
EROW

261+880 164.172 164.968 164.220 165.060


ROW
EROW

HORIZONTAL - 1:2000

261+900
262/1

261+890 163.954 164.898 164.239 164.990


261+898
261+900

261+900 164.424 164.826 164.083 164.920


L=12.447m
G=-0.705%

LHS=2.500

261+910 163.842 164.753 164.109 164.854


CD.NO : 262/1

TITLE :
New Construction

261+920 163.953 164.683 164.210 164.799


Box Culvert -1x2.0m
Box Culvert -1x2.0m

DRG. NO. :

REVISION :
EROW

EROW

261+930 163.792 164.626 164.132 164.754


ROW

W
O
R

261+940 163.914 164.595 164.121 164.718


R2
ROW

RHS=2.500

261+950 163.990 164.575 164.217 164.692


261+960 163.802 164.583 164.065 164.676 VIP CH:=261964.654
261+970 163.767 164.586 163.946 164.670 VIP LVL:=164.464
K=101.583
EROW

L=130.000m
EROW

261+980 163.687 164.561 163.926 164.674


O
F
C

MATCHLINE
261+990 163.717 164.551 163.864 164.687 262+000
PLAN & PROFILE
ROW

262+000 163.729 164.534 163.935 164.710


OF MAIN CARRIAGEWAY
ROW
TO VINUKONDA

NH-765/DO-KJ/PKG-2/HW/P&P-018
(Km: 261+000 TO Km: 262+000)
EROW

EROW
LHS

CLIENT :
RHS

AUTHORITY :
SCHEMATIC
TO SRISAILAM

DATUM=155.000m

LHS

RHS

SUPER ELEVATION

DESIGN CHAINAGE
DISTANCE FROM PCL
DISTANCE FROM PCL
VERTICAL ALIGNMENT
PROPOSED FRL ALONG
CARRIAGEWAY CENTER

EXISTING LEVEL ALONG

EXISTING LEVEL AT 15M


EXISTING LEVEL AT 15M

PROPOSED CENTER LINE


EROW

HORIZONTAL SCHEMATIC
EROW
O
F
C
MATCHLINE
262+000

155
160
165
170
175
ROW
262+000 163.729 164.534 163.935 164.710

(MoRT&H)
262+010 163.673 164.518 163.773 164.744

ROW

New Delhi -110001


262+020 163.595 164.482 163.741 164.787
EROW

GOVERNMENT OF INDIA
EROW

National Highway Wings, CRF


262+030 163.483 164.451 163.618 164.840

MG Road, Vijayawada - 520010.


262+040 163.635 164.427 163.729 164.897

ROADS & BUILDINGS DEPARTMENT


Transport Bhawan, 1, Parliament Streets
262+050 163.634 164.386 163.749 164.955

GOVERNMENT OF ANDHRA PRADESH


MINISTRY OF ROAD TRANSPORT & HIGHWAYS
262+060 163.618 164.360 163.624 165.012

LHS=2.500
ROW

G=0.575%
L=53.834m
262+070 163.576 164.331 163.758 165.070
EROW

EROW
ROW

262+080 163.590 164.252 163.688 165.127


KMP
262+100
262+090 163.582 164.220 163.545 165.183
262+100 163.567 164.236 163.646 165.232

RHS=2.500
262+110 163.474 164.249 163.726 165.274
262+120 163.399 164.211 163.584 165.308
EROW

EROW
ROW

262+130 163.415 164.164 163.633 165.335


SKEW

EPC CONTRACTOR :
CD NO:

262+140 163.419 164.138 163.622 165.354


ROW
PROPOSAL

DESIGN CONSULTANT :
CA SPAN (M):

262+150 163.348 164.126 163.604 165.366


CA CHAINAGE:

262+160 163.214 164.135 163.559 165.370


DESIGN SPAN (M):

Ph. No. 0861-2321919


DESIGN CHAINAGE:

262+170 163.182 164.120 163.352 165.368


EROW

EROW

262+180 163.209 164.099 163.275 165.357 VIP CH:=262188.488


-

Email: bhavanicon1991@gmail.com
M/s BHAVANI CONSTRUCTIONS
VIP LVL:=165.751 262+200
R
O
W

262+190 163.209 164.089 163.278 165.340

SAMARTH INFRAENGG
263/2

ROW

16-6-114, Near Vijaya Mahal, Nellore-524001


K=-135.048

Technocrats Private Limited


262+200

L=210.000m
163.169 164.094 163.134 165.315
262+188
262+190

ROW

262+210 163.178 164.077 163.096 165.282


KMP
EROW

262+220 163.183 164.033 163.167 165.242


New Construction

EROW

CD.NO : 263/2
O
F
C
Pipe Culvert -1x1.2Ø
Pipe Culvert -1x1.2Ø

262+230 163.177 163.992 163.056 165.195


262+240 163.098 163.950 163.056 165.140
262+250 163.060 163.920 163.131 165.078
ROW

262+260 162.991 163.909 163.101 165.009


EROW

EROW

262+270 162.931 163.875 163.029 164.932


ROW

PMC CONSULTANT :
262+280 162.888 163.837 163.070 164.847
262+300
262+290 162.919 163.794 163.121 164.756
262+300 162.892 163.737 163.075 164.658

IN ASSOCIATION WITH
262+310 162.855 163.689 163.086 164.560

TPF ENGINEERING PVT. LTD.


EROW

EROW

262+320 162.809 163.641 162.930 164.462


ROW

HBS INFRA ENGINEERS PVT. LTD.


L=47.643m
G=-0.980%
262+330 162.800 163.586 163.119 164.364
ROW

262+340 162.820 163.534 162.821 164.266


262+350 162.805 163.510 162.718 164.170
262+360 162.869 163.516 162.711 164.079
EROW

EROW

262+370 162.695 163.523 162.716 163.993 VIP CH:=262371.131


VIP LVL:=163.961
262+380 162.731 163.500 162.731 163.913

K=196.532
L=60.000m
W
O
ROW

262+400
R
262+390 162.641 163.481 162.815 163.837
ROW

262+400 162.531 163.445 162.720 163.766


EROW

262+410 162.601 163.398 162.688 163.699

PROOF CONSULTANT :
EROW

SAFETY CONSULTANT :
262+420 162.566 163.355 162.686 163.631
262+430 162.429 163.331 162.705 163.564

M/s Trisa Infra


262+440 162.268 163.284 162.626 163.496

Consultant LLP
Bangalore, Karnataka
Engineers Pvt. Ltd.
262+450 162.137 163.252 162.563 163.429

Hyderabad, Telangana
M/s PVR Consulting
ROW
EROW

262+460
EROW

162.071 163.216 162.669 163.361


ROW

262+470 162.112 163.183 162.682 163.294


262+480 162.108 163.139 162.441 163.227
PLAN

262+500
262+490 162.068 163.079 162.213 163.159
262+500 162.002 162.994 162.200 163.092

PROJECT :
EROW

EROW

262+510 162.045 162.904 162.169 163.024


ROW

262+520 162.082 162.849 162.221 162.957

THE YEAR 2022-23.


ROW

262+530 161.957 162.816 162.247 162.889


D=2209.484

262+540 161.961 162.757 162.288 162.822


262+550 161.862 162.695 162.173 162.754
EROW

EROW

262+560 161.927 162.623 162.145 162.687


262+570 161.765 162.578 162.143 162.619
262+580 161.740 162.490 161.887 162.552
ROW

WIDENING TO 2-LANE WITH PAVED


LONGITUDINAL SECTION

JUNCTION FROM DESIGN CHAINAGE


W W
O O
262+600
R R

KM: 244+000 TO 268+700) SECTION OF


SHOULDERS OF DORNALA TO KUNTA

KM.244+000 TO KM.267+990 (EXISTING


262+590 161.601 162.361 161.592 162.484

NH-765 (PACKAGE-2) IN THE STATE OF


ROW

ANDHRA PRADESH ON EPC MODE FOR


262+600 161.455 162.224 161.440 162.417
EROW

EROW

262+610 161.338 162.157 161.496 162.349

REV.
262+620 161.272 162.159 161.337 162.282
262+630 161.242 162.177 161.254 162.214

DATE
262+640 161.201 162.168 161.023 162.147

R0 24.04.2024
R1 27.04.2024
ROW

262+650 161.054 162.080 160.950 162.080


EROW

EROW

ROW

262+660 161.045 161.965 160.665 162.012


262+670 160.786 161.837 160.491 161.945
G=-0.675%

262+680 160.676 161.657 160.319 161.877


L=1288.859m

262+700
262+690 160.580 161.490 160.315 161.810
EROW

262+700 160.441 161.392 160.127 161.742


EROW

262+710 160.307 161.288 159.990 161.675


ROW
SKEW
CD NO:

262+720 160.066 161.192 159.932 161.607


PROPOSAL

ROW

DESCRIPTION
FOR APPROVAL

262+730
CA SPAN (M):

VIDE EMAIL Dt.: 19.05.2024

160.222 161.063 160.081 161.540


O
F
C
CA CHAINAGE:

262+740 159.954 160.927 159.877 161.472


DESIGN SPAN (M):

O
F
C
DESIGN CHAINAGE:

EROW

262+750
EROW

160.304 160.793 159.507 161.405


262+760 159.881 160.674 159.272 161.337
-

R2 20.05.2024 REVISED AS PER A.E's OBSERVATION

262+770 159.844 160.555 159.294 161.270


263/3

ROW

262+780 159.724 160.467 159.168 161.202


262+798
262+800

W W
O O
ROW

R
262+800
R
REVISED AS PER PROOF CONSULTANT OBSERVATIONS

262+790
VIDE LETTER NO. PVR/BC/P&P/2024-25/01 Dt: 25.04.2024

159.658 160.414 159.041 161.135


EROW

EROW

262+800 159.626 160.383 159.015 161.067


New Construction
Pipe Culvert -1x1.2Ø
Pipe Culvert -1x1.2Ø

262+810 159.547 160.367 158.951 161.000


DRAWN

SCALE :

262+820 159.371 160.390 158.816 160.933


262+830 159.298 160.450 158.896 160.865
CHECKED :
DESIGNED :
:

APPROVED :
CD.NO : 263/3
ROW

262+840 159.408 160.536 158.768 160.798


EROW

EROW

262+850
DATE : 20/05/2024

159.320 160.523 158.855 160.730


RJ

VERTICAL
RP

KS
BH
ROW

262+860 159.240 160.478 158.847 160.663


262+870 159.228 160.425 158.639 160.595
- 1:200

262+880 159.234 160.390 158.708 160.528


HORIZONTAL - 1:2000

262+900
262+890 159.118 160.276 158.810 160.460
EROW

EROW

262+900 158.903 160.170 158.461 160.393


ROW

LHS=2.500

262+910 158.770 160.048 158.502 160.325


TITLE :
ROW

262+920 158.769 159.925 158.244 160.258


DRG. NO. :

REVISION :

262+930 158.654 159.808 158.518 160.190


262+940 158.615 159.685 158.238 160.123
EROW

R2
EROW

RHS=2.500

262+950 158.538 159.579 158.166 160.055


262+960 158.559 159.434 158.278 159.988
ROW

262+970 158.284 159.300 157.938 159.920


262+980 158.135 159.279 157.678 159.853
ROW

MATCHLINE
W W
O O
R R
EROW

262+990 157.984 159.206 157.616 159.786


EROW

263+000
PLAN & PROFILE

263+000 157.901 159.230 157.559 159.718


OF MAIN CARRIAGEWAY
TO VINUKONDA

NH-765/DO-KJ/PKG-2/HW/P&P-019
(Km: 262+000 TO Km: 263+000)
ROW
LHS

CLIENT :
RHS

AUTHORITY :
SCHEMATIC
TO SRISAILAM

DATUM=143.000m

LHS

RHS

SUPER ELEVATION

DESIGN CHAINAGE
DISTANCE FROM PCL
DISTANCE FROM PCL
VERTICAL ALIGNMENT
PROPOSED FRL ALONG
CARRIAGEWAY CENTER

EXISTING LEVEL ALONG

EXISTING LEVEL AT 15M


EXISTING LEVEL AT 15M

PROPOSED CENTER LINE

HORIZONTAL SCHEMATIC
ER
OW
ER

145
150
155
160
OW

263+000 157.901 159.230 157.559 159.718

(MoRT&H)
263+010 157.833 158.811 157.205 159.651

New Delhi -110001


RO

0
W
RO

263+020
00
157.713 158.413 157.229 159.583
W

3+
W
O
6

GOVERNMENT OF INDIA
R
2

National Highway Wings, CRF


ER

263+030 157.654 158.290 157.618 159.516


O

MG Road, Vijayawada - 520010.


W
ER
O

W
W

263+040 157.639 158.356 157.244 159.448 O


E
R

ROADS & BUILDINGS DEPARTMENT


LIN

Transport Bhawan, 1, Parliament Streets


CH
263+050 157.550 158.228 156.632 159.381 T

GOVERNMENT OF ANDHRA PRADESH


MA

D=2209.484

MINISTRY OF ROAD TRANSPORT & HIGHWAYS


263+060 157.473 158.043 156.663 159.313

LHS=2.500
263+070 157.407 157.950 156.656 159.246
ER

RO
W
RO

OW

1 4
ERW
O

263+080 157.304 157.782 156.962 159.178


W

9.0
08
19

63
263+090 157.149 157.549 157.141 159.111
2
TS
HIP NO.

0
263+100 157.008 157.322 157.163 159.043

RHS=2.500
10 +
263+110
63
156.992 157.102 157.040 158.976 2
ER
W O

263+120
ER

157.014 157.064 157.363 158.908


(m)
HIP

OW

RO
Chainage

263+130 157.006 157.129 157.407 158.841


263287.226

W
RO

EPC CONTRACTOR :
W

263+140 157.165 157.311 157.399 158.773

DESIGN CONSULTANT :
263+150 157.121 157.368 157.263 158.706

CL=115.000
(m)

ER

263+160 156.993 157.198 157.170 158.639


Easting

Ph. No. 0861-2321919


OW
ER
313551.481

OW

263+170 156.995 157.348 156.881 158.571


263+180 157.083 157.703 156.631 158.504

Email: bhavanicon1991@gmail.com
M/s BHAVANI CONSTRUCTIONS
RO

1
263+190
RO

157.094 157.953 156.513 158.436


W

SAMARTH INFRAENGG
(m)

4.04
W

0 20

16-6-114, Near Vijaya Mahal, Nellore-524001


+20 263

Technocrats Private Limited


Northing

263+200 157.066 158.064 156.197 158.369


ER

W
O
1758067.939

263 SC
O
R
W
ER

263+210 157.008 158.321 156.032 158.301


OW

W
O
R

263+220 156.863 158.384 156.094 158.234


(m)

400

C
F
O
Radius

263+230 156.707 158.351 155.620 158.166


263+240 156.464 158.242 155.383 158.099
ER
W O
ER

263+250 156.414 158.092 155.800 158.031


ROW
ROW
OW
Left

SKEW

263+260 156.373 157.915 156.113 157.964


Direction
(Left/Right)

CD NO:

263+270 157.027 157.772 156.405 157.896


PROPOSAL
DESIGN SP
DESIGN CH
CA CHAINA

PMC CONSULTANT :
CA SPAN (M

263+280 157.692 157.623 156.127 157.829


):
GE:

263+290 157.580 157.662 156.429 157.761


HIP
AN (M):
39.97
Total

LHS=5.000
RHS=5.000
EROW
AINAGE:
angle (∆)
Deviation

NALA

263+300 157.304 157.633 156.642 157.694


REALIGNM

IN ASSOCIATION WITH
EROW

0
-19

263+30
-

R=-400.000 L=164.032
263+310 155.488 157.583 157.143 157.626
ENT

TPF ENGINEERING PVT. LTD.


ROW
ROW

263+320 155.622 157.496 157.272 157.559


(m)

HBS INFRA ENGINEERS PVT. LTD.


264/1
164.032

263+330 155.839 157.376 156.591 157.492


Curve,Lc

263+313
Length of

263+302

Reconstruct
Box Culvert
Box Culvert

263+340 155.600 157.254 156.152 157.424


ion

EROW

CD.NO : 264/1
EROW

263+350 155.674 157.149 156.008 157.357


(m)
115

-1x2.0m
-1x2.0m

263+360 155.616 156.941 155.933 157.289


Spiral, Ls
Length of

263+370 155.509 156.881 155.883 157.222


CS 263368.073
263+380 155.457 156.851 155.896 157.154
ROW

G=-0.675%
ROW

L=1288.859m
100

263+390 155.364 156.892 155.995 157.087


EROW
(km/h)
Speed
Design

EROW

263+400 155.739 156.953 156.046 157.019


W
O
R

263+410 155.659 156.973 156.123 156.952

PROOF CONSULTANT :
263+400

SAFETY CONSULTANT :
263+420 155.731 156.908 155.976 156.884
5.00
Super

(e) (%)
elevetion,

263+430 156.026 156.843 155.904 156.817

CL=115.000

M/s Trisa Infra


263+440 155.439 156.733 155.754 156.749
EROW

Consultant LLP
ROW
EROW
ROW

Bangalore, Karnataka
Engineers Pvt. Ltd.
263+450 156.058 156.611 155.747 156.682

Hyderabad, Telangana
M/s PVR Consulting
263+460 155.628 156.508 155.715 156.614
263+470 155.533 156.397 155.787 156.547
263+480 154.994 156.343 155.588 156.479
EROW

263+490 155.359 156.287 155.513 156.412


EROW

ST 26
263+500 155.117 156.213 155.468 156.345
3483.0
73

PROJECT :
ROW

263+510 154.896 156.145 155.477 156.277


ROW

263+
PLAN

500
263+520 154.859 156.054 155.229 156.210

THE YEAR 2022-23.


263+530 154.896 155.960 155.198 156.142
EROW

263+540 154.242 155.892 155.079 156.075


EROW

263+550 154.383 155.832 155.144 156.007


263+560 154.780 155.756 154.949 155.940
263+570 154.453 155.700 154.887 155.872
ROW
ROW

263+580 154.520 155.638 154.785 155.805

WIDENING TO 2-LANE WITH PAVED


LONGITUDINAL SECTION
EROW

JUNCTION FROM DESIGN CHAINAGE


EROW

KM: 244+000 TO 268+700) SECTION OF


SHOULDERS OF DORNALA TO KUNTA

KM.244+000 TO KM.267+990 (EXISTING


263+590 154.483 155.578 154.718 155.737

NH-765 (PACKAGE-2) IN THE STATE OF


ANDHRA PRADESH ON EPC MODE FOR
263+600 154.577 155.491 154.740 155.670 W
O
263+ R

263+610 154.198 155.426 154.650 155.602

REV.
600

263+620 154.087 155.355 154.543 155.535


263+630 154.053 155.289 154.585 155.467
EROW

DATE
ROW
EROW
ROW

263+640 153.989 155.255 154.364 155.400

R0 24.04.2024
R1 27.04.2024 263+650 153.899 155.238 154.571 155.332
W
O
R

263+660 153.839 155.229 154.636 155.265


263+670 153.619 155.239 154.576 155.198
EROW

263+680 153.213 155.198 154.452 155.130


EROW

263+690 153.232 155.100 154.179 155.063


KMP
ROW

263+700 153.201 154.997 154.046 154.993


ROW

263+
263+710
700
153.029 154.855 153.910 154.920
263+720 152.923 154.668 153.775 154.842
EROW

DESCRIPTION
FOR APPROVAL

263+730
VIDE EMAIL Dt.: 19.05.2024

153.184 154.480 153.518 154.761


EROW
C
F
O

263+740 153.630 154.317 153.340 154.676


VIP CH:=263749.991
D=516.241

263+750 153.321 154.180 153.214 154.586


VIP LVL:=154.658
263+760 152.736 153.978 153.022 154.493
K=-252.574
ROW

L=120.000m
ROW

R2 20.05.2024 REVISED AS PER A.E's OBSERVATION

263+770 152.531 153.781 152.503 154.396


EROW
EROW

263+780 152.456 153.553 152.011 154.295


REVISED AS PER PROOF CONSULTANT OBSERVATIONS

263+790
VIDE LETTER NO. PVR/BC/P&P/2024-25/01 Dt: 25.04.2024

152.381 153.367 151.633 154.190


263+800 152.148 153.210 151.519 154.081 263+
800
263+810 152.218 153.140 151.507 153.968
W
O
R
DRAWN

SCALE :

263+820
EROW

151.928 152.918 152.502 153.853


EROW

ROW

BRIDG
CA CH
ROW

263+830 151.560 152.744 151.975 153.738


CHECKED :
C
F

DESIG
O

CA SPA

DESIGNED :
:
DESIG

APPROVED :
SKEW
PROPO
S

263+840 151.192 152.620 151.823 153.623


E NO:

A
AINAG

L
)
N CHA
N (M :
E:

263+850
DATE : 20/05/2024

151.057 152.453 151.531 153.508


N SPAN

RJ

VERTICAL
RP

KS
BH
( M

263+860 151.286 152.278 151.205 153.393


)
INAGE
:
:
EROW

263+870 150.922 152.097 150.887 153.278 W


O
G=-1.150%

R
EROW

L=102.482m

- 1:200

263+880 150.652 151.979 150.490 153.163


HORIZONTAL - 1:2000
R
-
e
264/1

MNB

KMP
c
263+9
ROW

263+890 150.356 151.805 150.303 153.048


R

o
ROW

263+9
MNB R
n
C
88
C
88

263+900 150.665 151.593 150.120 152.933


CC

263+
S

900
o
structi

LHS=2.500

263+910 150.465 151.415 149.579 152.818


li

TITLE :
d
on
EROW

Solid S

263+920
EROW

149.499 151.280 148.824 152.704


DRG. NO. :

REVISION :

263+930 150.000 151.187 148.749 152.595


lab -2x

Slab -2

263+940 149.407 151.100 148.402 152.489


R2
10.0m

RHS=2.500
x10.0m

263+950 148.822 151.101 148.274 152.388


ROW
ROW

263+960 148.675 151.131 148.225 152.291


EROW
EROW

263+970 148.164 151.202 148.223 152.198


BRIDGE NO : 264/1

K=235.761
L=165.000m

263+980 147.426 151.123 148.111 152.110 MATC


VIP CH:=263994.973 INE HL
263+990
CC

147.162 150.112 148.182 152.026


FF
OO

VIP LVL:=151.841
PLAN & PROFILE

264+000 147.701 151.138 148.362 151.946


C
F
O

264+PC 263999
OF MAIN CARRIAGEWAY

000 .314
EROW
TO VINUKONDA

W
O
R
EROW

ROW

NH-765/DO-KJ/PKG-2/HW/P&P-020
(Km: 263+000 TO Km: 264+000)
ROW
LHS

CLIENT :
RHS

AUTHORITY :
SCHEMATIC
TO SRISAILAM

DATUM=143.000m

LHS

RHS

SUPER ELEVATION

DESIGN CHAINAGE
DISTANCE FROM PCL
DISTANCE FROM PCL
VERTICAL ALIGNMENT
PROPOSED FRL ALONG
EROW

CARRIAGEWAY CENTER

EXISTING LEVEL ALONG

EXISTING LEVEL AT 15M


EXISTING LEVEL AT 15M

PROPOSED CENTER LINE

HORIZONTAL SCHEMATIC
MATC
H

145
150
155
160
LINE

CC
FF
O
O
264+000 147.701 151.138 148.362 151.946

(MoRT&H)
C
F
O
264+010 148.169 150.924 148.123 151.870
264+PC 263999
000 .314

ER OW

New Delhi -110001


W
O
R

EROW
264+020 148.441 150.632 148.186 151.798

ROW
ROW

GOVERNMENT OF INDIA

National Highway Wings, CRF


264+030 148.000 150.387 147.959 151.731

MG Road, Vijayawada - 520010.


264+040 148.137 150.197 148.224 151.668

ROADS & BUILDINGS DEPARTMENT


K=235.761

Transport Bhawan, 1, Parliament Streets


L=165.000m
264+050 148.101 150.041 148.862 151.609

GOVERNMENT OF ANDHRA PRADESH


MINISTRY OF ROAD TRANSPORT & HIGHWAYS
DES

264+060 147.944 149.983 149.070 151.555 EROW


CD NO:

LHS=2.500
IG
CA CHA
CA SPA

EROW
SKEW
N

PROPO
DESIGN

264+070 147.553 149.989 149.278 151.505


SAL

264+080 147.785 149.943 149.211 151.458


N (M):
INAGE:

ROW
ROW
CHAINA

264+090 147.810 149.901 149.155 151.413


SPAN (M
):
GE:

264+100 147.851 149.870 149.246 151.368

RHS=2.500
264+1
00

CD.NO : 265/1
EROW

264+110 147.947 149.897 149.357 151.323


P

EROW
-
ip e

264+120 147.986 149.974 149.622 151.278


265/1

C
264+ 07

Pipe C
u
264+07
4

264+130
u

148.109 150.025 149.576 151.233


Recons
2

EPC CONTRACTOR :
truc

264+140 148.276 150.042 149.443 151.188


ti

DESIGN CONSULTANT :
lvert -2

o
lvert -2

RO W
n

264+150 148.095 150.076 149.444 151.143


RO W

DES
EROW

CA SP
x1.2Ø

CD NO:

IG

264+160 148.269 150.109 149.454 151.098


A

SKEW
x1.2Ø

EROW

Ph. No. 0861-2321919


N
N
CA CHAIN

C
DESIGN S
PROPOSA
C

264+170
F

148.424 150.185 149.403 151.053


O

G=-0.450%
H

L
(M

L=167.422m
A
):
AGE:
HIP-20

264+180 148.567 150.217 148.973 151.008

Email: bhavanicon1991@gmail.com
M/s BHAVANI CONSTRUCTIONS
264+190 148.660 150.245 148.773 150.963
PAN (M):

SAMARTH INFRAENGG
INAGE:

16-6-114, Near Vijaya Mahal, Nellore-524001


W

Technocrats Private Limited


264+200 148.655 150.287 149.164 150.918 O
R
264+200
EROW

264+210 148.852 150.341 149.448 150.873

R=2500.000 L=374.549
EROW

-
ROW

CD.NO : 265/2
ROW

265/2

264+220 149.062 150.420 149.207 150.828


264+182
SKEW
CD NO:

264+180

264+230
DESIGN

149.129 150.485 149.157 150.783


Box Culver

Reconstru
Box Culver
C
F
O
PROPOSAL
SP

264+240 149.240 150.537 149.244 150.738


ction
CA SPAN (M):

AN
CA CHAINAGE:

264+250 149.285 150.578 149.308 150.694


(M

EROW

t -1x2.0m
DESIGN CHAINAG

t -1x2.0m
):

EROW
E:

264+260 149.215 150.588 149.287 150.653


264+270 149.309 150.570 149.107 150.617
-

ROW

PMC CONSULTANT :
26

ROW

264+280 149.310 150.541 149.094 150.585


265/3

4+

264+290 149.001 150.496 149.533 150.558


30
264+302

CD.NO : 265/3

264+300 149.044 150.446 149.084 150.535

IN ASSOCIATION WITH
264+300
EROW

SKEW
CD NO:
EROW
Reconstruction

264+310 148.655 150.391 149.085 150.516

TPF ENGINEERING PVT. LTD.


PROPOSAL
Box Culvert -1x2.0

VIP CH:=264319.895
Box Culvert -1x2.0

264+320 148.419 150.325 149.086 150.502


m

CA SPAN (M):
m

VIP LVL:=150.379
CA CHAINAGE:

HBS INFRA ENGINEERS PVT. LTD.


K=228.919
264+330 148.593 150.349 149.087 150.492

L=150.000m
DESIGN SPAN (M):
DESIGN CHAINAGE:

264+340 148.745 150.337 149.089 150.486


ROW
ROW

EROW

264+350 148.777 150.323 149.090 150.485


-
EROW

264+360 148.815 150.285 149.091 150.488


265/4

264+370 148.834 150.315 149.093 150.495


264+342

264+340

CD.NO : 265/4

PT 264373.863
264+380 148.790 150.387 149.094 150.507
Reconstruction

264+390 148.979 150.442 149.095 150.523


W
EROW

O
R
Box Culvert -1x2.0m

264+400
264+400 148.992 150.464 149.096 150.543
Box Culvert -1x2.0m
EROW

ROW
ROW

264+410 148.849 150.501 149.098 150.564

PROOF CONSULTANT :

SAFETY CONSULTANT :
264+420 148.852 150.519 149.099 150.585
264+430 148.891 150.512 149.100 150.605

M/s Trisa Infra


264+440 149.122 150.444 149.101 150.626

Consultant LLP
EROW

Bangalore, Karnataka
Engineers Pvt. Ltd.
264+450 149.143 150.373 149.103 150.646

Hyderabad, Telangana
M/s PVR Consulting
EROW

264+460 148.883 150.369 149.104 150.667


264+470 148.917 150.327 149.105 150.687
ROW
ROW

264+480 148.825 150.264 149.106 150.708


C
F
O

264+490 148.710 150.244 149.108 150.728


EROW

264+500
EROW

264+500 148.551 150.285 149.109 150.749

PROJECT :
264+510 148.355 150.322 149.315 150.769
264+520 148.329 150.231 149.545 150.790
PLAN

THE YEAR 2022-23.


264+530 148.641 150.224 149.572 150.810
D=305.480
ROW
ROW

G=0.205%

264+540 148.448 150.277 149.656 150.831


L=270.414m
EROW

SKEW
EROW

264+550 148.510 150.234 149.741 150.851


264+560 148.377 150.280 149.351 150.872
PROPOSAL
DESIGN SP
BRIDGE N

DESIGN CH
CA CHAINA
CA SPAN (M
O:

264+570
):

148.475 150.298 148.930 150.892


GE:

264+580 148.569 150.417 149.001 150.913


AN (M):

WIDENING TO 2-LANE WITH PAVED


LONGITUDINAL SECTION
AINAGE:

JUNCTION FROM DESIGN CHAINAGE

KM: 244+000 TO 268+700) SECTION OF


SHOULDERS OF DORNALA TO KUNTA

KM.244+000 TO KM.267+990 (EXISTING


264+590 149.107 150.418 149.005 150.934
EROW

NH-765 (PACKAGE-2) IN THE STATE OF


ANDHRA PRADESH ON EPC MODE FOR
EROW

W
-

O
R
264+600
ROW

264+600 148.754 150.452 149.162 150.954


ROW
20
21

264+610 148.838 150.418 148.964 150.975

REV.
265/1
HIP NO.

MNB RCC
264+646

264+620 148.807 150.350 149.033 150.995


MNB RCC
264+645

Reconstruct

264+630 148.661 150.271 148.987 151.016


ion

DATE
EROW

264+640 148.632 150.028 149.143 151.036


(m)
HIP

R0 24.04.2024
R1 27.04.2024
Solid Slab
EROW

Solid Slab
264186.94
Chainage

264+650 148.752 150.002 148.764 151.057


264854.117

264+660 149.141 150.240 148.887 151.077


ROW

-2x4.5m
ROW

-2x4.5m

264+670 149.266 150.311 149.049 151.098


(m)

TS 264679.343
264+680 149.261 150.440 149.093 151.120
Easting

314947.744
314328.835

EROW

264+690 149.246 150.631 149.137 151.145 KMP


EROW

BRIDGE NO : 265/1

264+700
264+700 149.581 150.749 149.180 151.171
264+710 149.679 150.851 149.224 151.200
(m)

264+720
Northing

149.381 150.919 149.268 151.230


1758773.796
1758523.732

ROW

DESCRIPTION
FOR APPROVAL

264+730
VIDE EMAIL Dt.: 19.05.2024

149.497 151.010 149.332 151.262


ROW

CL=95.000
EROW
C
F
O

264+740 149.523 151.080 149.789 151.296


EROW
CH:264+750
BUSSHELTER
(m)

500
2500
Radius

264+750 149.547 151.191 149.985 151.333 VIP CH:=264755.309


264+760 149.650 151.313 149.978 151.371 VIP LVL:=151.273
K=507.470

R2 20.05.2024 REVISED AS PER A.E's OBSERVATION


L=180.000m

264+770 149.740 151.383 149.899 151.411


SC 264774.343
Right
Right

264+780 149.957 151.430 150.030 151.453


EROW
Direction
(Left/Right)

EROW

REVISED AS PER PROOF CONSULTANT OBSERVATIONS

264+790
VIDE LETTER NO. PVR/BC/P&P/2024-25/01 Dt: 25.04.2024

150.112 151.439 150.182 151.497


ROW

264+800
ROW

W
O
264+800 150.103 151.434 150.368 151.543 R

264+810 150.113 151.382 150.801 151.591


8.58
29.02
Total

DRAWN
angle (∆)

SCALE :
Deviation

264+820 150.346 151.483 151.171 151.641


264+830 150.490 151.178 151.344 151.693
CHECKED :
DESIGNED :
:
EROW

APPROVED :
EROW

264+840 150.553 151.135 151.290 151.747


(m)

C
F
O
158.215
374.549

264+850
DATE : 20/05/2024

150.615 151.219 151.089 151.803


RJ

VERTICAL
Curve,Lc

RP

KS
BH
Length of

ROW
21
HIP-ROW

264+860 150.678 151.288 150.994 151.859


LHS=5.000

RHS=5.000

264+870 150.740 151.346 151.001 151.915


0

ERO

R=500.000 L=158.215
95
(m)

- 1:200

264+880 150.802 151.420 151.032 151.971


ERO

HORIZONTAL - 1:2000

0
W
Spiral, Ls

+90
Length of

264+890
264
150.581 151.403 151.026 152.027
264+900 150.450 151.402 150.962 152.083 558
32. 9
264+910
100
100

150.227 151.419 150.958 152.139 264


TITLE :

CS
(km/h)
Speed

RO
Design

ER

264+920 150.135 151.482 151.176 152.195


ROW

OW
ER

DRG. NO. :

REVISION :
OW

264+930 150.612 151.546 151.220 152.251


-

264+940 151.752 151.606 151.310 152.307


5.00

R2
Super

(e) (%)
elevetion,

264+950 151.621 151.691 151.511 152.363


G=0.560%
L=198.395m

264+960 151.347 151.796 151.959 152.419


ER
OW
ER

264+970 151.050 151.894 151.795 152.475 0


OW

0
RO

+0
RO

5
264+980 151.025 151.987 151.890 152.531 W
O
W

R
558 26
27.
CL=95.000

0
264+990 151.217 152.067 152.080 152.587 265
PLAN & PROFILE

ST INE L
265+000 151.348 152.148 152.273 152.643 AT
CH
ER

M
OF MAIN CARRIAGEWAY
OW
ER
TO VINUKONDA

OW

NH-765/DO-KJ/PKG-2/HW/P&P-021
(Km: 264+000 TO Km: 265+000)
CL=95.000
050 R
RO

5+
W

:26 LTE
BU
CH SSHE
LHS

CLIENT :
RHS

AUTHORITY :
SCHEMATIC
TO SRISAILAM

DATUM=143.000m

LHS

RHS

SUPER ELEVATION

DESIGN CHAINAGE
DISTANCE FROM PCL
DISTANCE FROM PCL
VERTICAL ALIGNMENT
PROPOSED FRL ALONG
ROW

CARRIAGEWAY CENTER

EXISTING LEVEL ALONG

EXISTING LEVEL AT 15M


EXISTING LEVEL AT 15M

PROPOSED CENTER LINE

HORIZONTAL SCHEMATIC
MATCHLINE

ROW
W
O
265+000 R

145
150
155
160
265+000 151.348 152.148 152.273 152.643

(MoRT&H)
265+010 151.664 152.209 152.370 152.699 ST 265027.558

EROW

New Delhi -110001


EROW
265+020 151.455 152.260 152.216 152.755

CL=95.000

GOVERNMENT OF INDIA

National Highway Wings, CRF


265+030 151.377 152.313 152.161 152.811

MG Road, Vijayawada - 520010.


G=0.560%
L=198.395m
ROW

265+040 151.491 152.417 151.970 152.867

ROADS & BUILDINGS DEPARTMENT


ROW

Transport Bhawan, 1, Parliament Streets


265+050 151.734 152.531 151.879 152.922

GOVERNMENT OF ANDHRA PRADESH


MINISTRY OF ROAD TRANSPORT & HIGHWAYS
CH:265+050
BUSSHELTER
265+060 151.939 152.622 151.882 152.969
EROW

EROW

265+070 151.935 152.693 151.870 153.010


KMP

265+080 151.860 152.802 151.849 153.043 265+100


265+090 152.333 152.850 151.971 153.069
265+100 152.925 152.929 152.005 153.087
ROW

265+110 152.944 152.981 152.002 153.098


EROW

EROW

ROW

265+120 152.531 152.990 152.152 153.102


265+130 152.540 152.966 152.259 153.099

EPC CONTRACTOR :
VIP CH:=265138.704
265+140 152.565 152.931 152.273 153.088 VIP LVL:=153.420

DESIGN CONSULTANT :
K=-136.651
265+150

L=190.000m
152.037 152.882 152.219 153.070
EROW

265+160 151.570 152.797 152.016 153.044


EROW

Ph. No. 0861-2321919


ROW

265+170 151.434 152.693 152.033 153.012


ROW

265+180 151.527 152.636 151.979 152.971


W W
O

Email: bhavanicon1991@gmail.com
O

M/s BHAVANI CONSTRUCTIONS


R
265+200
R

265+190 151.330 152.568 151.831 152.924

SAMARTH INFRAENGG
16-6-114, Near Vijaya Mahal, Nellore-524001

Technocrats Private Limited


265+200 151.184 152.501 151.802 152.869
EROW

EROW

265+210 151.207 152.439 151.785 152.807


265+220 151.047 152.384 151.727 152.738
F
O
C

265+230
ROW

150.870 152.334 151.773 152.661


265+240 151.037 152.322 151.689 152.579
ROW

265+250 151.125 152.265 151.531 152.496


EROW

EROW

265+260 151.147 152.204 151.436 152.413


265+270 150.707 152.115 151.449 152.330

PMC CONSULTANT :
265+280 150.757 152.032 151.373 152.247 265+300
265+290 150.701 151.957 151.178 152.164
ROW
SKEW

265+300 151.001 151.884 150.971 152.081

IN ASSOCIATION WITH
CD NO:

EROW

EROW

ROW

265+310 150.836 151.803 151.580 151.997


PROPOSAL

TPF ENGINEERING PVT. LTD.


CA SPAN (M):

265+320 150.687 151.692 150.774 151.914


CA CHAINAGE:

HBS INFRA ENGINEERS PVT. LTD.


265+330
DESIGN SPAN (M):

150.581 151.587 150.421 151.831


DESIGN CHAINAGE:

265+340 150.544 151.470 150.429 151.748


-

265+350 150.431 151.342 150.483 151.665


EROW

EROW
ROW

265+360
266/1

150.189 151.246 149.725 151.582


265+358
265+360

265+370 149.940 151.171 149.535 151.499


ROW

265+380 149.731 151.089 150.202 151.416 265+400


New Construction

265+390 149.631 150.991 149.867 151.333


CD.NO : 266/1
Pipe Culvert -1x1.2Ø
Pipe Culvert -1x1.2Ø

265+400 149.778 150.897 149.723 151.250


EROW

EROW

265+410 150.205 150.830 150.105 151.167

PROOF CONSULTANT :

SAFETY CONSULTANT :
G=-0.830%
L=348.453m
265+420 149.546 150.772 150.272 151.084
ROW

265+430 149.625 150.724 149.802 151.001


ROW

M/s Trisa Infra


265+440 149.386 150.687 149.681 150.918

Consultant LLP
Bangalore, Karnataka
EROW

Engineers Pvt. Ltd.


265+450
EROW

149.328 150.624 149.990 150.835

Hyderabad, Telangana
M/s PVR Consulting
265+460 149.114 150.525 149.673 150.752
265+470 149.077 150.417 149.462 150.669
265+480 148.372 150.337 149.058 150.586 265+500
ROW

265+490 148.483 150.242 149.328 150.503


EROW

EROW

265+500
ROW

148.573 150.143 149.061 150.420

PROJECT :
265+510 148.441 150.010 149.127 150.337
265+520 148.154 149.874 149.063 150.254
PLAN

THE YEAR 2022-23.


265+530 148.098 149.769 148.971 150.171
265+540 148.081 149.668 148.870 150.088
EROW

EROW

265+550 147.911 149.547 148.411 150.005


ROW

265+560 147.941 149.444 148.578 149.921


ROW

265+570 147.632 149.317 148.237 149.838


265+580 147.590 149.207 147.913 149.755

WIDENING TO 2-LANE WITH PAVED


LONGITUDINAL SECTION
W
O

JUNCTION FROM DESIGN CHAINAGE


265+600
R W
O
R

KM: 244+000 TO 268+700) SECTION OF


SHOULDERS OF DORNALA TO KUNTA

KM.244+000 TO KM.267+990 (EXISTING


265+590 147.472 149.106 148.020 149.674

NH-765 (PACKAGE-2) IN THE STATE OF


ANDHRA PRADESH ON EPC MODE FOR
EROW

EROW

265+600 147.362 149.006 147.867 149.598


265+610 147.293 148.922 147.716 149.526

REV.
ROW

265+620 146.921 148.883 147.825 149.461


SKEW

ROW

D=1185.562

265+630
CD NO:

147.008 148.888 147.941 149.400

DATE
PROPOSAL

265+640 147.031 148.906 147.738 149.344


EROW

EROW

R0 24.04.2024
R1 27.04.2024
CA SPAN (M):
CA CHAINAGE:

265+650 146.984 148.912 147.811 149.294


DESIGN SPAN (M):

265+660 147.229 148.982 147.851 149.249


DESIGN CHAINAGE:

265+670 147.046 149.062 147.703 149.209


KMP
-

265+680 146.685 149.144 147.702 149.175


ROW

265+700
266/2

265+690 146.878 149.145 147.817 149.145


EROW

EROW

ROW
265+686
265+688

265+700 147.313 149.070 147.118 149.121


Reconstruction

265+710 147.968 149.019 147.194 149.102


265+720 148.162 148.984 147.428 149.088
CD.NO : 266/2
O
F
C
Box Culvert -1x4.0m
Box Culvert -1x4.0m

DESCRIPTION
FOR APPROVAL

265+730
VIDE EMAIL Dt.: 19.05.2024

148.355 149.013 148.056 149.080


SKEW
CD NO:
EROW

265+740
EROW

148.549 149.099 147.995 149.076


PROPOSAL
ROW

265+750 148.819 149.193 148.334 149.078


CA SPAN (M):
CA CHAINAGE:
ROW

265+760 148.490 149.310 148.515 149.085


DESIGN SPAN (M):
DESIGN CHAINAGE:

R2 20.05.2024 REVISED AS PER A.E's OBSERVATION

265+770 148.581 149.414 148.554 149.097


265+780 148.691 149.475 148.614 149.115 W
-

O W
R
O
R
265+800
EROW

EROW

REVISED AS PER PROOF CONSULTANT OBSERVATIONS

265+790
VIDE LETTER NO. PVR/BC/P&P/2024-25/01 Dt: 25.04.2024