Professional Documents
Culture Documents
Item Descriptions Unit Amount (RM)
Item Descriptions Unit Amount (RM)
A Supply, lay and install 150mm diameter MSCL pipe including Sum
excavation, back filling and bedding of approved material, get
out, part return, fill in and ram, deposit and spread in making up
levels where directed within the site and remainder load and cart
away; complete with all necessary lined pipe and fittings to
SYABAS approval; all in accordance in Engineer's approval
(Indicative Quantity : 150m)
B Supply and install sluice valve complete with concrete base slab, Sum
lean concrete, concrete support to hold sluice vavle, aggregate
fill for hole on base slab, s-bend, airvalve, flanged double spigot
socket ductile iron pipe, ductile iron short piece, flange adaptors,
mild steel step iron at staggered, unbreakable steel cover single
steel hinged with steel frame complete with key and locking gear
of heavy pattered type for safe load or mild steel chequered plate
stiffened braced with reflected road line yellow paint and
including all necessary excavation, reinforcements, formwork,
moulds, backfilling, painting, and including all necessary and
associated works; all in accordance in Engineer's approval
HYDRANT
C Double outlet pillar hydrant complete with cap and chain Sum
including sluice valve and precast valve chamber complete with
double flanged extension pipe, ductile iron duckfoot bend,
flanged tee, trust block and concrete slab including all necessary
excavation, backfiiling formwork, painting, fittings and all other
ncessary and associated works
BULK METER
To Collection : -
D2(b)/7/1
PART D2(b) - POST BP WORKS
A Any other items not specifically mentioned above but are shown
on the drawings and/or in the specifications and required for the
completion of Water Recticulation:-
i) ………………………...……………………………………….
ii) ………………………...……………………………………….
iii) ………………………...………………………..…………….
To Collection : -
D2(b)/7/2
PART D2(b) - POST BP WORKS
COLLECTION
D2(b)/7/3
PART D2(b) - POST BP WORKS
Notes:
1. The pricing of this section shall be read in conjunction with
Engineer's Drawing No. 2023/001/MYTOWN/SW/01 to
2023/001/MYTOWN/SW/04
`
Excavate trench to fall for vitrified clay pipes and bed underneath,
commencing from reduced levels through all classes of materials
and including all necessary temporary shoring, part return, fill in
and well ram with compacted selected backfill, spread in making
up levels where directed and remove surplus excavated materials
to Contractor's own dumping ground, premix road to match
existing road; including all necessary and associated works; all
accordance to Engineer's approval
B Supply and lay 225mm diameter virtrified clay pipe complete with Sum
compacted crusher run bed including back filling with selected
excavated materials, well backfill and compacted as approved by
the S.O. (Indicative Quantity : 46.2m)
MANHOLE
To Collection : -
D2(b)/8/1(R1)
PART D2(b) - POST BP WORKS
MANHOLE (CONT'D)
B Allow for testing and inspection fees and inspection by Local Sum
authority based on C.C.T.V method to authority's approval and
allow for liasing with local authorities for the inspection,
documentation and handing over of the completed sewerage
works
C Any other items not specifically mentioned above but are shown on
the drawings and/or in the specifications and required for the
completion of Sewerage:-
i) ………………………...……………………………………….
ii) ………………………...……………………………………….
iii) ………………………...………………………..…………….
To Collection : -
D2(b)/8/2
PART D2(b) - POST BP WORKS
COLLECTION
D2(b)/8/3
PART D2(b) - POST BP WORKS
Notes:
1. The pricing of this section shall be read in conjunction with
Engineer's Drawing No. 2023/001/MYTOWN/R&D/01 to
2023/001/MYTOWN/R&D/04
`
Demolition Of Drain and Sump
To Collection : -
D2(b)/9/1
PART D2(b) - POST BP WORKS
A Any other items not specifically mentioned above but are shown on
the drawings and/or in the specifications and required for the
completion of Sewerage:-
i) ………………………...……………………………………….
ii) ………………………...……………………………………….
iii) ………………………...………………………..…………….
To Collection : -
D2(b)/9/2
PART D2(b) - POST BP WORKS
COLLECTION
D2(b)/9/3
PART D2(b) - POST BP WORKS
Notes:
1. The pricing of this section shall be read in conjunction with
Achitect's Drawing No. 2023/001/MYTOWN/R&D/01 &
2023/001/MYTOWN/R&D/03
B Any other items not specifically mentioned above but are shown on
the drawings and/or in the specifications and required for the
completion of OSD Tank:-
i) ………………………...……………………………………….
ii) ………………………...……………………………………….
iii) ………………………...………………………..…………….
D2(b)/10/1
CADANGAN MEMBINA SEBUAH SEKOLAH SWASTA 4 TINGKAT DI ATAS LOT PT489, JALAN NAKHODA
YUSOF, SEKSYEN 90, BANDAR KUALA LUMPUR, WILAYAH PERSEKUTUAN KUALA LUUMPUR
UNTUK TETUAN BOUSTEAD IKANO SDN. BHD.
3 Project management, co-ordination and supervision which must include a full time 1 lot
competent M&E site engineer/safety officer for the duration of the works
4 Cleaning of MEP services prior to handover and making good of damaged building 1 lot
works.
5 CIDB and other authorities charges, ie liaison with TNB, etc 1 lot
6 To carry out detail M&E Dilapidation Survey and Report during handover of site 1 lot
from landlord to client including testing of all existing M&E services.
7 To survey, disconnect and dismantle all unwanted and unused MEP (ex: demolish 1 lot
(TA 01) existing Air-conditioning unit and outdoor unit c/w piping etc. and IT items prior to
start work
9 Site coordination with other trades (Architectural, C&S & etc.) and servces. 1 lot
10 To provide temporary electricity and water supply during construction period. 1 lot
11 Any other item not listed above but deemed necessary for the satisfactory
completion of the enitre electrical services installation:-
(Plese specify,if none write NIL)
a. ________________________________________________
b. ________________________________________________
c. ________________________________________________
________________________________________
Date:______________ BQ.F2 Signature and Official Stamp of Tenderer
CADANGAN MEMBINA SEBUAH SEKOLAH SWASTA 4 TINGKAT DI ATAS LOT PT489, JALAN NAKHODA
YUSOF, SEKSYEN 90, BANDAR KUALA LUMPUR, WILAYAH PERSEKUTUAN KUALA LUUMPUR
UNTUK TETUAN BOUSTEAD IKANO SDN. BHD.
Supply and install HDPE incoming water piping work from Syabus run in
1 underground c/w water meter, gate valves and necessary accessories 1 lot
(TA 01) connecting to new Suction Tank and Hose Reel Tank and accessories, etc. as
per shown in the drawing
Supply and install PPR cold water piping work c/w necessary accessories
2 connecting new basin, toilet bowl, tap and accessories, etc. from the nearest inlet 1 lot
to suit ID layout as per shown in the drawing.
Supply and install UPVC waste and vent pipe connecting sanitary fittings to the
3 1 lot
existing mainhole to suit ID layout as per shown in the drawing.
Supply & install new 6.0m(W) x 3.0m (D) x 3.0m(H) FRP Suction tank c/w
4 internal compartment (EFF Capacity : 45,000 litres) at Ground Floor c/w plinth, 1 lot
(TA 01) expansion joint, balancing valve, get valves, check valves, overflow pipe, ball
valves and all other necessary accessories to make system complete
Supply & installation of suction pump (1 duty & 1 standby) to deliver water from
5 new suction tank to serve kitchen tap and existing Roof water tank c/w support, 1 lot
(TA 01) gate valves, check valves, balancing valve, control panel and neessary
accessories to make system complete
6 Supply and install new gully trap connecting to existing mainhole c/w necessary
1 lot
accessories as per shown in the drawing.
7 Any other item not listed above but deemed necessary for the satisfactory
completion of the enitre plumbing and sanitary services installation:-
(Plese specify,if none write NIL)
a.
b.
c.
Supply and install PPR cold water piping work c/w necessary accessories
1 connecting new basin, toilet bowl, tap and accessories, etc. from the nearest inlet 1 lot
to suit ID layout as per shown in the drawing.
Supply and install UPVC waste and vent pipe connecting sanitary fittings to the
2 1 lot
existing mainhole to suit ID layout as per shown in the drawing.
3 Any other item not listed above but deemed necessary for the satisfactory
completion of the enitre plumbing and sanitary services installation:-
(Plese specify,if none write NIL)
a.
b.
c.
________________________________________
Date:______________ BQ.F12 Signature and Official Stamp of Tenderer
CADANGAN MEMBINA SEBUAH SEKOLAH SWASTA 4 TINGKAT DI ATAS LOT PT489, JALAN NAKHODA
YUSOF, SEKSYEN 90, BANDAR KUALA LUMPUR, WILAYAH PERSEKUTUAN KUALA LUUMPUR
UNTUK TETUAN BOUSTEAD IKANO SDN. BHD.
Supply and install PPR cold water piping work c/w necessary accessories
1 connecting new basin, toilet bowl, tap and accessories, etc. from the nearest inlet 1 lot
to suit ID layout as per shown in the drawing.
Supply and install UPVC waste and vent pipe connecting sanitary fittings to the
2 existing mainhole to suit ID layout as per shown in the drawing. 1 lot
3 Any other item not listed above but deemed necessary for the satisfactory
completion of the enitre plumbing and sanitary services installation:-
(Plese specify,if none write NIL)
a.
b.
c.
1 Supply and install PPR cold water piping work c/w necessary accessories FROM
1 lot
(TA 01) existing cold water tank to serve floor below c/w gate valves, check valves,
header etc.as per shown in the drawing.
2 Supply and install vent pipe through roof & terminated at 900mm high above roof
1 lot
(TA 01) level c/w vent cowl as per shown in the drawing.
Supply & install new booster pump (1 duty & 1 standby) to deliver water from
3 existing roof tank to serve floor below toilets c/w control panel (weather proof 1 lot
(TA 01) type) support, gate valves, check valves, balancing valve for existing tank, and
all neccessary accessories as per shown in the drawing
Coring on floors and walls for openings as required and making good of any
5 1 lot
openings for entire project where applicable.
6 Testing and commissioning inclusive of pressure testing for the entire project. 1 lot
Demolish existing unused piping and accessories and make good for entire
7 1 lot
project
9 Any other item not listed above but deemed necessary for the satisfactory
completion of the enitre plumbing and sanitary services installation:-
(Plese specify,if none write NIL)
a.
b.
c.
________________________________________
Date:______________ BQ.F13 Signature and Official Stamp of Tenderer