Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Supply and installation of 0.

17m thick Gabion mattress made of mechanically woven, double twisted, hexagonal shaped steel wire mesh, Mesh type 6X8 as per IS 16014:2018, Mesh wire dia
2.2 / 3.2 mm (ID/OD ), with double partition with prefabricated X - Ties, Zinc+ High abrasion resistance polymer class A coated, Dark Brown rust not more than 5 % after subjecting to 6000 hours
of neutral salt spray as per ISO 9227 and polymer should be resistant to abrasion after 300 cycles and shall not expose metal wire in accordance with the procedure described in ASTM A 975,
Mechanically edged/selvedged, with partition at 1 m interval , tying with lacing wire of diameter 2.2/3.2 mm (ID/OD), placing at indicated places in dry condition at easily accessible location
as per direction of Engineer including tools, plant, labour etc. complete in all respect (inclusive of supply and filling of stones), carrying the material from nearest approach with all leads & lifts,
manpower & machinery, materials, labor etc. complete as per detailed technical specifications and as directed by Officer Commanding.The abrasion resistance test shall confrm to ASTM A
975.Minimum Tensile strength 37 Kn/m & punch strength 21 Kn as per IRC 116, IS 16014 & Morth specification for road & bridge works, Section 2500.

Code Description Unit Quantity Rate Amount Reference


Details cost of one Gabion box/Crates of Size 2mx1mx0.17m = 0.34 cum & 2
sqm plan area
A LABOUR
PL14 Mate Day 0.10 560.00 56.00 "Rajasthan Urban Infrastructure Development Project SOR 2023, Basic Rates
B-Labour Item No 0231
PL17 Mazdoor/Beldar Skilled Day 0.50 560.00 Basic Labour
280.00 "Rajasthan RateInfrastructure
Urban & Hire chargesDevelopment
Category III Item No SOR
Project 4 2023, Basic Rates
B-Labour Item No 0218
PL15 Mazdoor/Helper Day 1.50 480.00 720.00 Basic Labour
"Rajasthan RateInfrastructure
Urban & Hire chargesDevelopment
Category III Item No 4
Project SOR 2023, Basic Rates
B-Labour Item No 0216
B MATERIAL Basic Labour Rate & Hire charges Category III Item No 4
Crates made of Mesh type 6x8 (D=60 mm) Zn+Polymer coated. Mesh Wire
Diameter 2.20/3.20 mm (ID/OD)
Surface area required = 5.19sqm Sqm 5.19 320.00 1660.80 MOJS SOR item no TTS 701 c

Sqm 5.19 400.00 2076.00 Taking 25% Extra in case of Reno Mattresses Plus Vertical X-ties and
Double diaphragms
PM2206 Stone boulder of size 90-120mm Cum 0.34 0.00 Supply rates of Stone boulder to be considered Seperately
TOTAL RESOURCE COST 3132.00
Add for contractor’s profit including overhead @ 15% 469.80
Labour Cess @1% 36.02
TOTAL cost of 2x1= 2 sqm plan area 3637.82
Cost of 1 sqm plan area 1818.909
say 1819.00

You might also like