REF NO AV/QC/QP/02

AV ENGG FINAL INSPECTION QUALITY PLAN REV NO


DATE
00
01.07.2022
SL.N REMARKS/
PROCESS PARAMETERS SPECIFICATION FREQUENCY TO CHECK METHOD OF CHECK RECORDS
O REACTION PLAN

FINAL FINISH AS PER DRAWING 5PC/LOT VERNIER


3 LATHE
FREE FROM RUST, TOOL MARK, IF ANY VARIATION
VISUAL SCRATCH, CRACK
100% VISUAL
IN DIMENSION
FINAL COMPONENTS
CENTRE DRILL AS PER DRAWING VERNIER INSPECTION BEEN REJECTED OR
REPORT IF POSIBLOE
5PC/LOT
DRILLING AS PER DRAWING PER LOT OF 30 PC BORE GUAGE REWORK TO BE
2
DRILLING CARRIED OUT
& TAPPING TAPPING AS PER DRAWING SCREW GUAGE

FREE FROM RUST, TOOL MARK,


VISUAL SCRATCH, CRACK 100% VISUAL

PREPARED BY QC MGR: APPROVED BY MD: