Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

CURRICULUM VITAE

Mr.Vedat ÇOBAN

Occupation : Geologoigal Engineer


Place/Date of Birth : Malatya 1970
Permanent Adres : Gümüşpala Mah. Arif Çalış Cad. 51/14
Elmadağ-ANKARA
Telephone : 00 90 536 9239063
Email :vedat_coban@hotmail.com / v.coban2014@gmail.com
Education : Dokuz Eylül Üniversity İzmir /Turkey
WORK EXPERIENCE
 1994 - 1997 ; Kralkızı dam hydro elektric power plant.Responsible for drıllıng and grouting –
water lost grouting work; Temson Drilling and Grouting CO (Site Engineer, Site Manager).
 1997 - 1998 ; Şanlı Urfa irrigantion tunnel.Prosention aktif dywidag anchar; Temson Drilling
and Grouting CO (Site Manager).
 1998 - 1999 ; Umurbey dam responsible for drıllıng and grouting work; Temson Drilling and
Grouting CO (Site Manager).
 1999 - 2000 ; Papuçdere dam responsible for drıllıng and grouting work – water lost grouting
work; Temson Drilling and Grouting CO (Site Manager).
 2000 ; Orta Tokoi dam (Kırgızistan) water lost grouting work; Temson Drilling and Grouting
CO (Site Manager).
 2001 ; Kığı dam hydro elektric power plant responsible for.Slope support and colleps grouting
work; Temson Drilling and Grouting CO (Site Manager).
 2002 ; Dağcı dam (Irrigation dam) responsible for drıllıng and grouting work; Tural Drilling
and Grouting CO (Site Manager).
 2002 ; Hacılar hydro elektric power plant for responsible for drıllıng and grouting work;
Tural Drilling and Grouting CO (Site Manager).
 2003 ; Beşkarış dam responsible for drıllıng and grouting work; Asason CO (Site Manager).
 2004 ; Double hıgh way tunnel responsible for ascauation and supporting work; Yavuz Yiğit
CO (Tunnel Responsible).
 2005 - 2006 ; Mujip dam (Irrigation dam) (Jordan) water lost grouting work; Temson Drilling
and Grouting CO (Site Manager).
 2006 - 2008 ; Al Wehdah dam (Jordan) responsible for drıllıng and grouting work; Temson
Drilling and Grouting CO (Site Manager).
 2008 - 2009 ; Beydağ dam prensiple responsible for drıllıng and grouting work; Temson
Drilling and Grouting CO (Site Manager).
 2009 ; Borcka dam water lost grouting work; Temson Drilling and Grouting CO (Site
Manager).
 2009 ; Erikli – Akocak hydro elektric power plant and tunnel for drıllıng and grouting work;
Temson Drilling and Grouting CO (Site Manager). ; Temson Drilling and Grouting CO (Site
Manager).
 2009 - 2012 ; Gotvand dam (Iran) responsible for drıllıng and grouting work; Temson
Drilling and Grouting CO (Site Manager).
 2012 ; Izmir Metro - Poligon and Göztepe Stations; responsible for drıllıng and grouting
work; Temson Drilling and Grouting CO (Site Manager).
 2012 ; Saracbendi hydro elektric power plant for responsible for drıllıng and grouting work;
Temson Drilling and Grouting CO (Site Manager). ; Temson Drilling and Grouting CO (Site
Manager).
 2013 - 2014 ; Seymareh dam (Iran) responsible for drıllıng and grouting work; Temson
Drilling and Grouting CO (Site Manager).
 2014 - 2015 ; Kufranja dam (Jordan) responsible for drıllıng and grouting work; Temson
Drilling and Grouting CO (Site Manager) ; Temson Drilling and Grouting CO (Site Manager).
 2015 - 2016 ; Banja dam (Albania) responsible for drıllıng and grouting work; Maber Drilling
and Grouting CO (Project Manager).
 2016 ; Ura E Fanit dam (Albania) responsible for drıllıng and grouting work; Temson
Drilling and Grouting CO (Site Manager).
 2017 ; Alparslan 1 dam water lost grouting work .
 2018 ; Ura E Fanit dam (Albania) responsible for drıllıng and grouting work; Kale Group CO
(Project Manager).
 2019 ; Temson Drilling & Grouting CO. (Ankara) – Project Coordinator
 2020 ; Ankara - Sivas High Speed Train Project; Jet Grout, all drıllıng and grouting
work; Çelikler Holding CO (Section Manager).

Referanslar

- Muhsin SEZEN (Temson Drilling and Grouting CO / Director – 0 312 4687860 (pbx)
- Şükrü FIRAT (Çelikler Holding CO / Project Coordinator – 0 532 5012177
- Cemal GÜLNAR (Kale Group CO / Director – 0 533 7764683
ÖZGEÇMİŞ
Vedat ÇOBAN

Mesleği : Jeoloji Mühendisi


Doğum yeri / Tarihi : Malatya 1970
Adres : Gümüşpala Mah. Arif Çalış Cad. 51/14
Elmadağ-ANKARA
Telefon : 00 90 536 9239063
Email : vedat_coban@hotmail.com / v.coban2014@gmail.com
Üniversite : Dokuz Eylül Üniversitesi İzmir /Türkiye
ÇALIŞTIĞIM İŞLER

 1994 - 1997 ; Kralkızı Barajı ve HES; sondaj – enjeksiyon işleri; Temson Sondajcılık
(Saha Mühendisi + Şantiye Şefi).
 1997 - 1998 ; Şanlıurfa tüneli ve Şanlıurfa HES; çift krozyon tüplü öngerilmeli aktif
ankraj işi; Temson Sondajcılık (Şantiye Şefi).
 1998 - 1999 ; Umurbey Barajı; sondaj – enjeksiyon işleri; Temson Sondajcılık
(Şantiye Şefi).
 1999 - 2000 ; Papuçdere Barajı; sondaj – enjeksiyon işleri; Temson Sondajcılık
(Şantiye Şefi).
 2000 ; Orta Tokoi Barajı (Kırgızistan) su kaçağı enjeksiyonu; Temson Sondajcılık
(Şantiye Şefi).
 2001 ; Kığı Barajı ve HES; sondaj – enjeksiyon işleri; Temson Sondajcılık (Şantiye
Şefi).
 2002 ; Dağcı Göleti; sondaj – enjeksiyon işleri; Tural Sondajcılık (Şantiye Şefi)
 2002 ; Hacılar HES; sondaj – enjeksiyon işleri; Tural Sondajcılık (Şantiye Şefi)
 2003 ; Beşkarış Barajı; sondaj – enjeksiyon işleri; Asason Sondaj (Şantiye Şefi)
 2004 ; Kocatepe duble yol tüneli; Tünel açımı ve tahkimatı; Yavuz Yiğit İnşaat (Tünel
Sorumlusu)
 2005 - 2006 ; Mujip Barajı (Ürdün) su kaçağı enjeksiyonu; Temson Sondajcılık
(Şantiye Şefi).
 2006 - 2008 ; Al Wehdah Barajı (Ürdün); sondaj – enjeksiyon işleri; Temson
Sondajcılık (Şantiye Şefi).
 2008 - 2009 ; Beydağ Barajı; sondaj – enjeksiyon işleri; Temson Sondajcılık (Şantiye
Şefi).
 2009 ; Borçka Barajı su kaçağı enjeksiyonu; Temson Sondajcılık (Şantiye Şefi).
 2009 ; Erikli – Akocak HES ve tüneli; enjeksiyon işleri; Temson Sondajcılık (Şantiye
Şefi).
 2009 - 2012 ; Gotvand Barajı (İran); sondaj – enjeksiyon işleri; Temson Sondajcılık
(Proje Müdürü).
 2012 ; İzmir Metrosu Poligon ve Göztepe İstasyonları; sondaj – enjeksiyon işleri;
Temson Sondajcılık (Şantiye Şefi).
 2012 ; Saraçbendi HES; sondaj – enjeksiyon işleri; Temson Sondajcılık (Şantiye Şefi).
 2013 - 2014 ; Seymereh Barajı (Iran); sondaj – enjeksiyon işleri; Temson Sondajcılık
(Proje Müdürü).
 2014 - 2015 ; Kufranja Barajı (Ürdün); sondaj – enjeksiyon işleri; Temson Sondajcılık
(Şantiye Şefi).
 2015 - 2016 ; Banja Barajı (Arnavutluk); sondaj – enjeksiyon işleri; Maber (Proje
Müdürü).
 2016 ; Ura E Fanit Barajı (Arnavutluk); sondaj – enjeksiyon işleri; Maber (Proje
Müdürü).
 2017 ; Alparslan 1 Barajı; su kaçağı enjeksiyonu; Berge İnşaat (Şantiye Şefi)
 2018 ; Ura E Fanit Barajı (Arnavutluk); sondaj – enjeksiyon işleri; Kale Grup Makine
(Proje Müdürü).
 2019 ; Temson Sondajcılık Ankara Merkez – Proje Koordinatörlüğü
 2020 ; Ankara - Sivas Hızlı Tren Projesi; Zemin İyileştirme (Jet Grout, enjeksiyon
işleri); Çelikler Holding (YSE Yapı); Kısım Şefi.

Referanslar

- Muhsin SEZEN (Temson Sondajcılık / Genel Müdür – 0 312 4687860 (pbx)


- Şükrü FIRAT (Çelikler Holding / Proje Koordinatörü – 0 532 5012177
- Cemal GÜLNAR (Kale Grup / Genel Müdür – 0 533 7764683

You might also like