Physiographic Parameters
Catchment Area = 14.60 sq.km.
Length of the Longest Stream = 8.35 km.
Eq. Stream Slope = NA m/km
Length of the Longest Stream from
a point opposite to C.G. = NA km
1
Hydrology Report for Bridge at Km 170+186
2. Codes & References
i. IRC: SP-13: 2004- Guidelines for the design of small bridges & culverts.
ii. IRC: 5:2015- Standard specifications and code of practice for road bridges.
Section - I General Features of Design.
iii. IRC: 89: 2019- Guidelines for design and construction of River training and control works for
road bridges.
iv. IRC: SP-84: 2014- Manual of specifications & standards for four laning of highways through public
private partnership.
v. CWC-Flood Estimation Report (FER) for Sub-Zone 2(b)
The hydrological and hydraulic calculation for proposed bridge has been done for 100 year return period.
Detailed hydrological and hydraulic calculations have been done on subsequent pages.
4 Hydrological Calculation
2
Hydrology Report for Bridge at Km 170+186
4.2 Empirical Methods
Rational method
Catchment Area, A = 14.60 Km2 = 1460 Hectares
Length of longest stream = 8.4 Km
Height, H = 8m
(0.87*L3/H)0.385
Time of Concentration by SP-13 formula =
tc = 4.94 Hours
=
100 years Return period rainfall for 24 hours = 320 mm
3
5. Hydraulic Calculation
5.1 Longitudinal Section of River
Dist., Level,
SN
(m) (m)
1 0.0 41.358
2 20.0 41.544
3 36.3 41.392
4 61.2 41.975
5 81.0 41.507
6 116.0 41.600
7 140.0 41.454
8 168.5 41.940
9 187.5 41.229
10 211.1 41.113
11 230.0 41.546
L- S O F RI VE R y = -0.0005x + 41.575
R² = 0.0264
43.000
LEVEL, M
42.000
41.000
0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 160.0 180.0 200.0 220.0 240.0
DISTANCE, M
4
5.2 Discharge Calculation by Slope-Area Method
Manning's Formula
Velocity = (1/n) R2/3S0.5 m/s
where,
n = Rugosity co-efficient
R = Hydraulic mean depth in m, equal to ratio of c/s area (A) to wetted perimeter (P)
S = Bed slope ,measured over a reasonbly long distance
Discharge, Q AV= m3/s
CROSS SECTION AT BRIDGE C/L
LBL = 41.232 m
HFL = 46.550 m
Avg. Diff. in
Offset Bed Level Dist. Height A P n value
height height
(m) (m) (m) (m) (m) (m) (m2) (m)
0.0 45.611 0.00 0.94 0.00 0.00 0.00 0.00
12.6 45.450 12.58 1.10 1.02 0.16 12.83 12.58
18.5 45.200 5.96 1.35 1.22 0.25 7.30 5.96
23.5 43.560 4.93 2.99 2.17 1.64 10.71 5.20
26.9 42.420 3.44 4.13 3.56 1.14 12.24 3.62
31.0 41.975 4.08 4.58 4.35 0.45 17.77 4.11
35.3 41.232 4.28 5.32 4.95 0.74 21.16 4.34
44.1 41.356 8.80 5.19 5.26 0.12 46.25 8.80
53.8 45.956 9.75 0.59 2.89 4.60 28.21 10.78
58.2 45.833 4.34 0.72 0.66 0.12 2.84 4.34
68.1 45.908 9.96 0.64 0.68 0.08 6.77 9.96
Sum 166.1 69.7
R, m 2.38 m (Hyd. Radius)
n 0.040 Weighted Avg.
K 7407.7
S 0.0005 Bed Slope
V 1.00 m/s, Flow Velocity
Series3 Series5
47.0
46.0
45.0
Level, m
44.0
43.0
42.0
41.0
40.0
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70
Distance, m
5
5.3 HFL Calculation
HFL for 100 years flood
Manning's Formula
Velocity = (1/n) R2/3S0.5 m/s
where,
n = Rugosity co-efficient
R = Hydraulic mean depth in m, equal to ratio of c/s area (A) to wetted perimeter (P)
S = Bed slope ,measured over a reasonbly long distance
Discharge, Q AV= m3/s
CROSS SECTION AT BRIDGE C/L
LBL = 41.232 m Q-100 Year = 166 cumecs
HFL = 46.550 m
Avg. Diff. in
Offset Bed Level Dist. Height A P n value
height height
(m) (m) (m) (m) (m) (m) (m2) (m)
0.0 45.611 0.00 0.94 0.00 0.00 0.00 0.00
12.6 45.450 12.58 1.10 1.02 0.16 12.83 12.58
18.5 45.200 5.96 1.35 1.22 0.25 7.30 5.96
23.5 43.560 4.93 2.99 2.17 1.64 10.71 5.20
26.9 42.420 3.44 4.13 3.56 1.14 12.24 3.62
31.0 41.975 4.08 4.58 4.35 0.45 17.77 4.11
35.3 41.232 4.28 5.32 4.95 0.74 21.16 4.34
44.1 41.356 8.80 5.19 5.26 0.12 46.25 8.80
53.8 45.956 9.75 0.59 2.89 4.60 28.21 10.78
58.2 45.833 4.34 0.72 0.66 0.12 2.84 4.34
68.1 45.908 9.96 0.64 0.68 0.08 6.77 9.96
Sum 166.09 69.70
R, m 2.38 m (Hyd. Radius)
W= total width of flow = 68 m n 0.040 Weighted Avg.
K 7408
S 0.0005 Bed Slope
V 1.00 m/s, Flow Velocity
GL HFL
47.0 HFL_100 Year Return Period
46.0
45.0
Level, m
44.0
43.0
42.0
41.0
40.0
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70
Distance, m
6
5.4 Afflux and Velocity Calculation
Afflux by Molesworth Formulae
Afflux, h= ( ( v2 / 17.88 ) + 0.015) ( ( A / A1 )2 - 1 )
Where,
V1 Averge velocity of river prior to obstruction in m/s = 1.00
A Unobstructed sectional area of river in sq. m = 166.09
Bridge opening area, in sq. m. = 138.64
A1 Obstructed sectional area of river in sq. m = 134.64
h Afflux in m = 0.037
V1 Velocity after obstruction (Through bridge) = 1.23 m/sec
7
7.0 Summary
Summary
Discharge Calculation
Catchment Area = 14.60 Sq. Km
Discharge -
Discharge by Rational Formula (Q100) = 63 m3/s
Discharge by Dicken's Formula = 120 m3/s
Discharge by Ryve's Formula = 60 m3/s
Discharge by Slope-Area Method = 166 m3/s
Adopted Discharge
For Clear Waterway = 166 m3/s
For Fixing HFL = 166 m3/s
For Estimation of Scour = 215 m3/s
8