No h b w ELV. ELV. ELV. ELV. JARAK LUAS LUAS RATA2 LUAS LUAS RATA2 VOLUME VOLUME
Saluran Ket. TANAH TANGGUL AIR DSR. SAL GALIAN GALIAN TIMBUNAN TIMBUNAN GALIAN TIMBUNAN
(m) (m) (m) (m) (m) (m) (m) (m) (m2) (m2) (m2) (m2) (m3) (m3)
Hulu 0.64 1.00 0.21 11.34 11.29 11.15 10.51 1.15 0.00
I 230.00 1.19 0.00 273.16 0.00
Hilir 0.64 1.00 0.21 11.20 11.10 10.94 10.31 1.22 0.00
Hulu 0.58 1.00 0.19 11.80 11.49 11.27 10.69 1.45 0.00 0.00
11 250.00 1.24 0.00 310.79
Hilir 0.58 1.00 0.19 11.34 11.29 21.09 10.51 1.04 0.00 0.00
Hulu 0.59 1.00 0.20 11.64 11.64 11.43 10.84 0.97 0.00 0.00
III 300.00 1.09 0.00 327.86
Hilir 0.59 1.00 0.20 11.64 11.49 11.28 10.69 1.21 0.00 0.00
Jumlah 911.82 0.00
Sumber : hasil perhitungan
Perhitungan Dimensi Saluran Drainase Desa Sungai Pasir II
No h b w ELV. ELV. ELV. ELV. JARAK LUAS LUAS RATA2 LUAS LUAS RATA2 VOLUME
Saluran Ket. TANAH TANGGUL AIR DSR. SAL GALIAN GALIAN TIMBUNAN TIMBUNAN GALIAN
(m) (m) (m) (m) (m) (m) (m) (m) (m2) (m2) (m2) (m2) (m3)
Hulu 0.38 0.30 0.13 11.38 11.38 11.26 10.88 0.23 0.00
I 400.00 0.26 0.00 102.41
Hilir 0.38 0.30 0.13 11.05 10.98 10.86 10.48 0.29 0.00
Jumlah 102.41
Sumber : hasil perhitungan
VOLUME
TIMBUNAN
(m3)
0.00
0.00
Perhitungan Dimensi Saluran Drainase Desa Sungai Pasir III
No h b w ELV. ELV. ELV. ELV. JARAK LUAS LUAS RATA2 LUAS LUAS RATA2 VOLUME VOLUME
Saluran Ket. TANAH TANGGUL AIR DSR. SAL GALIAN GALIAN TIMBUNAN TIMBUNAN GALIAN TIMBUNAN
(m) (m) (m) (m) (m) (m) (m) (m) (m2) (m2) (m2) (m2) (m3) (m3)
Hulu 0.30 0.30 0.10 10.98 10.52 10.42 10.12 0.57 0.00
I 35.00 0.37 0.00 12.96 0.00
Hilir 0.30 0.30 0.10 10.35 10.35 10.24 9.95 0.17 0.00
Hulu 0.30 0.30 0.10 11.49 11.35 11.14 10.85 0.29 0.00
II 370.00 0.23 0.00 84.85 0.00
Hilir 0.30 0.30 0.10 10.98 10.98 10.77 10.48 0.17 0.00
Jumlah 84.85 0.00
Sumber : hasil perhitungan
Perhitungan Dimensi Saluran Drainase Desa Salino I
gool
Kode Sal Dm A Q Q b/h m n A h b P R S Vhitung w Tinggi saluran
(lt/dtk/ha) (ha) (lt/dtk) (m3/dtk) m m2 m m m m m/dtk m m
1 2 3 4 6 7 8 9 10 11 12 13 14 15 16 17
I 4.83 36.5 176.30 0.1763 1.0448 1.0000 0.0300 0.4683 0.4786 0.5000 1.8536 0.2527 0.0008 0.3768 0.1595 0.6
II 4.83 16 77.28 0.0773 1.6874 1.0000 0.0300 0.2360 0.2963 0.5000 1.3381 0.1763 0.0010 0.3315 0.0988 0.4
III 4.83 20 96.60 0.0966 0.8994 1.0000 0.0300 0.2113 0.3336 0.3000 1.2435 0.1700 0.0020 0.4574 0.1112 0.4
Sumber : hasil perhitungan
PERHITUNGAN GALIAN DAN TIMBUNAN SALURAN DRAINASE DESA SALINO I
No h b w ELV. ELV. ELV. ELV. JARAK LUAS LUAS RATA2 LUAS LUAS RATA2 VOLUME VOLUME
Saluran Ket. TANAH TANGGUL AIR DSR. SAL GALIAN GALIAN TIMBUNAN TIMBUNAN GALIAN TIMBUNAN
(m) (m) (m) (m) (m) (m) (m) (m) (m2) (m2) (m2) (m2) (m3) (m3)
Hulu 0.48 0.50 0.16 12.15 12.15 12.02 11.55 0.44 0.00
I 250.00 1.37 0.00 343.22 0.00
Hilir 0.48 0.50 0.16 13.64 11.95 11.82 11.35 2.30 0.00
Hulu 0.30 0.50 0.10 13.46 12.55 12.44 12.15 1.25 0.00 0.00
11 400.00 0.75 0.00 299.05
Hilir 0.30 0.50 0.10 12.15 12.15 22.04 11.75 0.24 0.00 0.00
Hulu 0.33 0.30 0.11 14.44 12.57 12.50 12.17 1.88 0.00 0.00
III 220.00 1.04 0.00 227.93
Hilir 0.33 0.30 0.11 12.15 12.15 12.08 11.75 0.19 0.00 0.00
Jumlah 870.20 0.00
Sumber : hasil perhitungan
Perhitungan Dimensi Saluran Drainase Desa Salino II
gool
Kode Sal Dm A Q Q b/h m n A h b P R S Vhitung w Tinggi saluran
(lt/dtk/ha) (ha) (lt/dtk) (m3/dtk) m m2 m m m m m/dtk m m
1 2 3 4 6 7 8 9 10 11 12 13 14 15 16 17
I 4.83 41 198.03 0.1980 2.4867 1.0000 0.0300 0.4715 0.4493 0.6000 1.8709 0.2520 0.0010 0.4206 0.1498 0.6
II 4.83 13 62.79 0.0628 1.1542 1.0000 0.0300 0.2587 0.3466 0.4000 1.3802 0.1875 0.0005 0.2441 0.1155 0.5
III 4.83 27 130.41 0.1304 1.0803 1.0000 0.0300 0.4456 0.4628 0.5000 1.8090 0.2463 0.0005 0.2929 0.1543 0.6
IV 4.83 22 106.26 0.1063 1.1983 1.0000 0.0300 0.3827 0.4172 0.5000 1.6801 0.2278 0.0005 0.2780 0.1391 0.6
Sumber : hasil perhitungan
PERHITUNGAN GALIAN DAN TIMBUNAN SALURAN DRAINASE DESA SALINO II
No h b w ELV. ELV. ELV. ELV. JARAK LUAS LUAS RATA2 LUAS LUAS RATA2 VOLUME VOLUME
Saluran Ket. TANAH TANGGUL AIR DSR. SAL GALIAN GALIAN TIMBUNAN TIMBUNAN GALIAN TIMBUNAN
(m) (m) (m) (m) (m) (m) (m) (m) (m2) (m2) (m2) (m2) (m3) (m3)
Hulu 0.45 0.60 0.15 12.28 12.20 10.45 11.60 0.56 0.00
I 210.00 0.51 0.00 107.55 0.00
Hilir 0.45 0.60 0.15 12.00 12.00 11.84 11.39 0.47 0.00
Hulu 0.35 0.40 0.12 12.90 12.35 12.20 11.85 0.80 0.00 0.00
II 300.00 0.56 0.00 168.27
Hilir 0.35 0.40 0.12 12.28 12.20 22.05 11.70 0.32 0.00 0.00
Hulu 0.46 0.50 0.15 12.30 12.28 12.14 11.68 0.45 0.00 0.00
III 150.00 0.48 0.00 71.58
Hilir 0.46 0.50 0.15 12.28 12.20 12.06 11.60 0.51 0.00 0.00
Hulu 0.42 0.50 0.14 12.38 12.38 12.19 11.78 0.37 0.00 0.00
VI 200.00 0.38 0.00 76.84
Hilir 0.42 0.50 0.14 12.30 12.28 12.09 11.68 0.40 0.00 0.00
Jumlah 424.25 0.00
Sumber : hasil perhitungan
Perhitungan Dimensi Saluran Drainase Desa Salino III
gool
Kode Sal Dm A Q Q b/h m n A h b P R S Vhitung w Tinggi saluran
(lt/dtk/ha) (ha) (lt/dtk) (m3/dtk) m m2 m m m m m/dtk m m
1 2 3 4 6 7 8 9 10 11 12 13 14 15 16 17
1 4.83 14 67.62 0.0676 0.7601 1.0000 0.0300 0.2742 0.3947 0.3000 1.4163 0.1936 0.0005 0.2494 0.1316 0.5
2 4.83 15 72.45 0.0725 0.8685 1.0000 0.0300 0.2229 0.3454 0.3000 1.2770 0.1746 0.0010 0.3293 0.1151 0.5
3 4.83 44 212.52 0.2125 1.0799 1.0000 0.0300 0.6421 0.5556 0.6000 2.1715 0.2957 0.0005 0.3308 0.1852 0.7
4 4.83 46 222.18 0.2222 1.2595 1.0000 0.0300 0.5128 0.4764 0.6000 1.9475 0.2633 0.0010 0.4330 0.1588 0.6
5 4.83 90 434.70 0.4347 1.9549 1.0000 0.0300 1.1134 0.6138 1.2000 2.9362 0.3792 0.0005 0.3905 0.2046 0.8
6 4.83 45 217.35 0.2174 1.0681 1.0000 0.0300 0.6526 0.5617 0.6000 2.1888 0.2981 0.0005 0.3326 0.1872 0.7
Sumber : hasil perhitungan
PERHITUNGAN GALIAN DAN TIMBUNAN SALURAN DRAINASE DESA SALINO III
No h b w ELV. ELV. ELV. ELV. JARAK LUAS LUAS RATA2 LUAS LUAS RATA2 VOLUME VOLUME
Saluran Ket. TANAH TANGGUL AIR DSR. SAL GALIAN GALIAN TIMBUNAN TIMBUNAN GALIAN TIMBUNAN
(m) (m) (m) (m) (m) (m) (m) (m) (m2) (m2) (m2) (m2) (m3) (m3)
Hulu 0.39 0.30 0.13 10.50 10.50 10.39 10.00 0.24 0.00
IV 200.00 1.10 0.00 220.45 0.00
Hilir 0.39 0.30 0.13 12.31 10.40 10.29 9.90 1.96 0.00
Hulu 0.35 0.30 0.13 12.22 11.95 11.82 11.48 0.45 0.00 0.00
VII 300.00 0.52 0.00 155.62
Hilir 0.35 0.30 0.13 12.31 11.90 11.76 1.42 0.59 0.00 0.00
Hulu 0.56 0.60 0.19 12.31 9.94 9.76 9.20 3.46 0.00 0.00
III 500.00 2.58 0.00 1,291.68
Hilir 0.56 0.60 0.19 10.66 9.74 9.56 9.00 1.71 0.00 0.00
Hulu 0.48 0.60 0.16 11.25 11.04 10.88 10.40 0.76 0.00 0.00
VI 400.00 0.64 0.00 257.41
Hilir 0.48 0.60 0.16 10.66 10.64 10.48 10.00 0.53 0.00 0.00
Hulu 0.61 1.20 0.20 10.66 9.82 9.61 9.00 2.69 0.00 0.00
II 600.00 2.88 0.00 1,726.19
Hilir 0.61 1.20 0.20 10.51 9.47 9.26 8.65 3.06 0.00 0.00
Hulu 0.56 0.60 0.19 10.38 10.05 9.86 9.30 1.02 0.00 0.00
V 600.00 1.28 0.00 765.18
Hilir 0.56 0.60 0.19 10.51 9.75 9.56 9.00 1.53 0.00 0.00
Hulu 0.45 0.00 0.00 2.22 1.89 1.89 1.45 0.25 0.00 0.00
I 300.00 0.29 0.00 87.55
Hilir 0.45 0.00 0.00 2.31 1.87 1.87 1.42 0.33 0.00 0.00
Jumlah 4,504.08 0.00
Sumber : hasil perhitungan
Perhitungan Dimensi Saluran Drainase Desa Pudi Seberang
gool
Kode Sal Dm A Q Q b/h m n A h b P R S Vhitung w Tinggi saluran
(lt/dtk/ha) (ha) (lt/dtk) (m3/dtk) m m2 m m m m m/dtk m m
1 2 3 4 6 7 8 9 10 11 12 13 14 15 16 17
I 4.83 98 473.34 0.4733 1.0607 1.0000 0.0300 1.1722 0.7542 0.8000 2.9332 0.3996 0.0005 0.4044 0.2514 1.0
II 4.83 37.5 181.13 0.1811 0.9959 1.0000 0.0300 0.5031 0.5020 0.5000 1.9200 0.2620 0.0007 0.3611 0.1673 0.7
III 4.83 87 420.21 0.4202 1.8457 1.0000 0.0300 0.8353 0.5418 1.0000 2.5324 0.3299 0.0010 0.5032 0.1806 0.7
IV 4.83 135.5 654.47 0.6545 2.1647 1.0000 0.0300 1.5196 0.6929 1.5000 3.4599 0.4392 0.0005 0.4307 0.2310 0.8
V 4.83 222.5 1074.68 1.0747 2.3967 1.0000 0.0300 1.7089 0.7093 1.7000 3.7062 0.4611 0.0010 0.6291 0.2364 0.9
No h b w ELV. ELV. ELV. ELV. JARAK LUAS LUAS RATA2 LUAS LUAS RATA2 VOLUME VOLUME
Saluran Ket. TANAH TANGGUL AIR DSR. SAL GALIAN GALIAN TIMBUNANTIMBUNAN GALIAN TIMBUNAN
(m) (m) (m) (m) (m) (m) (m) (m) (m2) (m2) (m2) (m2) (m3) (m3)
Hulu 0.75 0.80 0.25 11.46 11.46 11.21 10.46 1.11 0.00
I 1,100.00 1.51 0.00 1,657.55 0.00
Hilir 0.75 0.80 0.25 11.48 10.91 10.65 9.90 1.91 0.00
Hulu 0.50 0.50 0.17 11.47 11.47 11.28 10.78 0.47 0.00 0.00
450.00 0.64 0.00 287.33
Hilir 0.50 0.50 0.17 11.49 11.18 10.98 10.48 0.81 0.00 0.00
II
Hulu 0.50 0.50 0.17 11.49 11.18 10.98 10.48 0.81 0.00 0.00
450.00 0.64 0.00 287.33
Hilir 0.50 0.50 0.17 10.89 10.89 10.69 10.19 0.47 0.00 0.00
Hulu 0.54 1.00 0.18 11.51 11.45 11.29 10.75 0.98 0.00 0.00
150.00 0.93 0.00 139.64
Hilir 0.54 1.00 0.18 11.30 11.30 11.14 10.60 0.88 0.00 0.00
Hulu 0.54 1.00 0.18 11.30 11.30 11.14 10.60 0.88 0.00 0.00
III 150.00 1.14 0.00 170.84
Hilir 0.54 1.00 0.18 11.47 11.15 11.99 11.45 1.40 0.00 0.00
Hulu 0.54 1.00 0.18 11.47 11.15 11.99 11.45 1.40 0.00 0.00
600.00 1.11 0.00 666.57
Hilir 0.54 1.00 0.18 11.51 11.55 8.70 8.16 0.82 0.00 0.00
Hulu 0.69 1.50 0.23 10.89 10.70 10.59 9.90 2.04 0.00 0.00
150.00 1.84 0.00 276.22
Hilir 0.69 1.50 0.23 10.63 10.63 10.52 9.83 1.64 0.00 0.00
IV
Hulu 0.69 1.50 0.23 10.63 10.63 10.52 9.83 1.64 0.00 0.00
150.00 1.83 0.00 274.65
Hilir 0.69 1.50 0.23 10.73 10.55 9.06 9.75 2.02 0.00 0.00
Hulu 0.71 1.70 0.24 10.73 10.55 10.36 9.65 2.29 0.00
V 200.00 2.16 0.00 432.71 0.00
Hilir 0.71 1.70 0.24 10.52 10.45 10.16 9.45 2.04 0.00
Jumlah 3,760.14 0.00
Sumber : hasil perhitungan
Perhitungan Dimensi Saluran Drainase Desa Sebanti
gool
Kode Sal Dm A Q Q b/h m n A h b P R S Vhitung w Tinggi saluran
(lt/dtk/ha) (ha) (lt/dtk) (m3/dtk) m m2 m m m m m/dtk m m
1 2 3 4 6 7 8 9 10 11 12 13 14 15 16 17
I 4.83 32 154.56 0.1546 0.9922 1.0000 0.0300 0.5059 0.5039 0.5000 1.9253 0.2628 0.0005 0.3058 0.1680 0.7
II 4.83 139 671.37 0.6714 2.1349 1.0000 0.0300 1.5476 0.7026 1.5000 3.4873 0.4438 0.0005 0.4337 0.2342 0.9
Sumber : hasil perhitungan
PERHITUNGAN GALIAN DAN TIMBUNAN SALURAN DRAINASE DESA SEBANTI
No h b w ELV. ELV. ELV. ELV. JARAK LUAS LUAS RATA2 LUAS LUAS RATA2 VOLUME VOLUME
Saluran Ket. TANAH TANGGUL AIR DSR. SAL GALIAN GALIAN TIMBUNAN TIMBUNAN GALIAN TIMBUNAN
(m) (m) (m) (m) (m) (m) (m) (m) (m2) (m2) (m2) (m2) (m3) (m3)
Hulu 0.50 0.50 0.17 12.65 12.65 12.45 11.95 0.47 0.00 0.00
850.00 0.80 0.00 678.83
Hilir 0.50 0.50 0.17 12.82 12.23 12.03 11.53 1.13 0.00 0.00
I
Hulu 0.50 0.50 0.17 12.82 12.23 12.03 11.53 1.13 0.00 0.00
100.00 1.40 0.00 140.09
Hilir 0.50 0.50 0.17 13.27 12.18 11.98 11.48 1.68 0.00 0.00
Hulu 0.50 0.50 0.17 12.73 12.63 12.23 11.73 0.59 0.00
II 650.00 0.56 0.00 365.74 0.00
Hilir 0.50 0.50 0.17 12.36 12.30 11.90 11.40 0.54 0.00
Jumlah 818.92 0.00
Sumber : hasil perhitungan
Perhitungan Dimensi Saluran Sumber Sari
gool
Kode Sal Dm A Q Q b/h m n A h b P R S Vhitung w Tinggi saluran
(lt/dtk/ha) (ha) (lt/dtk) (m /dtk)
3
m m 2
m m m m m/dtk m m
1 2 3 4 6 7 8 9 10 11 12 13 14 15 16 17
I 4.83 278 1342.74 1.3427 1.0607 1.0000 0.0300 1.1722 0.7542 0.8000 2.9332 0.3996 0.0005 0.4044 0.2514 1.0
II 4.83 78 376.74 0.3767 1.3786 1.0000 0.0300 0.6132 0.5078 0.7000 2.1362 0.2871 0.0018 0.6154 0.1693 0.7
III 4.83 148 714.84 0.7148 1.3920 1.0000 0.0300 1.2345 0.7184 1.0000 3.0319 0.4072 0.0010 0.5791 0.2395 1.0
Sumber : hasil perhitungan
PERHITUNGAN GALIAN DAN TIMBUNAN DESA SUMBER SARI
No h b w ELV. ELV. ELV. ELV. JARAK LUAS LUAS RATA2 LUAS LUAS RATA2 VOLUME VOLUME
Saluran Ket. TANAH TANGGUL AIR DSR. SAL GALIAN GALIAN TIMBUNAN TIMBUNAN GALIAN TIMBUNAN
(m) (m) (m) (m) (m) (m) (m) (m) (m2) (m2) (m2) (m2) (m3) (m3)
Hulu 0.51 0.70 0.17 13.13 13.127 12.93 12.43 0.61 0.00
200.00 1.28 0.00 255.01 0.00
Hilir 0.51 0.70 0.17 13.80 12.78 12.58 12.08 1.94 0.00
Hulu 0.50 0.50 0.17 13.80 12.78 12.58 12.08 1.59 0.00 0.00
100.00 1.37 0.00 136.84
Hilir 0.50 0.50 0.17 13.22 12.60 12.38 11.88 1.14 0.00 0.00
11
Hulu 0.50 0.50 0.17 13.22 12.60 12.38 11.88 1.14 0.00 0.00
300.00 1.21 0.00 363.48
Hilir 0.50 0.50 0.17 12.81 12.08 11.89 11.38 1.28 0.00 0.00
Hulu 0.50 0.50 0.17 12.81 12.08 11.89 11.38 1.28 0.00 0.00
200.00 0.91 0.00 182.81
Hilir 0.50 0.50 0.17 11.80 11.73 11.53 11.03 0.55 0.00 0.00
Hulu 0.72 1.00 0.24 12.26 12.26 11.53 11.26 1.23 0.00 0.00
III 800.00 2.35 0.00 1,876.08
Hilir 0.72 1.00 0.24 12.85 11.46 11.18 10.46 3.46 0.00 0.00
Jumlah 2,814.22 0.00
Sumber : hasil perhitungan
Perhitungan Dimensi Saluran Sepagar Kampung 1
gool
Kode Sal Dm A Q Q b/h m n A h b P R S Vhitung w Tinggi saluran
(lt/dtk/ha) (ha) (lt/dtk) (m3/dtk) m m2 m m m m m/dtk m m
1 2 3 4 6 7 8 9 10 11 12 13 14 15 16 17
I 4.83 59 284.97 0.2850 1.2488 1.0000 0.0300 0.7066 0.5605 0.7000 2.2855 0.3092 0.0007 0.4032 0.1868 0.7
Sumber : hasil perhitungan
gool
Kode Sal Dm A Q Q b/h m n A h b P R S Vhitung w Tinggi saluran
(lt/dtk/ha) (ha) (lt/dtk) (m3/dtk) m m2 m m m m m/dtk m m
1 2 3 4 6 7 8 9 10 11 12 13 14 15 16 17
I 4.83 79 381.57 0.3816 1.3086 1.0000 0.0300 0.6606 0.5349 0.7000 2.2130 0.2985 0.0015 0.5766 0.1783 0.7
Sumber : hasil perhitungan
gool
Kode Sal Dm A Q Q b/h m n A h b P R S Vhitung w Tinggi saluran
(lt/dtk/ha) (ha) (lt/dtk) (m3/dtk) m m2 m m m m m/dtk m m
1 2 3 4 6 7 8 9 10 11 12 13 14 15 16 17
II 4.83 37 178.71 0.1787 0.9244 1.0000 0.0300 0.5630 0.5409 0.5000 2.0298 0.2774 0.0005 0.3170 0.1803 0.7
IV 4.83 15 72.45 0.0725 1.4615 1.0000 0.0300 0.2881 0.3421 0.5000 1.4676 0.1963 0.0005 0.2518 0.1140 0.5
VI 4.83 18 86.94 0.0869 1.3221 1.0000 0.0300 0.3321 0.3782 0.5000 1.5696 0.2116 0.0005 0.2647 0.1261 0.5
Sumber : hasil perhitungan
No h b w ELV. ELV. ELV. ELV. JARAK LUAS LUAS RATA2 LUAS LUAS RATA2 VOLUME VOLUME
Saluran Ket. TANAH TANGGUL AIR DSR. SAL GALIAN GALIAN TIMBUNAN TIMBUNAN GALIAN TIMBUNAN
(m) (m) (m) (m) (m) (m) (m) (m) (m2) (m2) (m2) (m2) (m3) (m3)
Hulu 0.56 0.70 0.19 12.65 12.407 12.27 11.71 1.00 0.00
I 850.00 1.06 0.00 897.65 0.00
Hilir 0.56 0.70 0.19 12.21 11.88 11.74 11.18 1.11 0.00
Jumlah 897.65 0.00
Sumber : hasil perhitungan
`
No h b w ELV. ELV. ELV. ELV. JARAK LUAS LUAS RATA2 LUAS LUAS RATA2 VOLUME VOLUME
Saluran Ket. TANAH TANGGUL AIR DSR. SAL GALIAN GALIAN TIMBUNAN TIMBUNAN GALIAN TIMBUNAN
(m) (m) (m) (m) (m) (m) (m) (m) (m2) (m2) (m2) (m2) (m3) (m3)
Hulu 0.53 0.70 0.18 12.78 12.705 12.27 12.00 0.75 0.00
I 800.00 0.90 0.00 717.02 0.00
Hilir 0.53 0.70 0.18 11.80 11.50 11.33 10.80 1.04 0.00
Jumlah 717.02 0.00
Sumber : hasil perhitungan
No h b w ELV. ELV. ELV. ELV. JARAK LUAS LUAS RATA2 LUAS LUAS RATA2 VOLUME VOLUME
Saluran Ket. TANAH TANGGUL AIR DSR. SAL GALIAN GALIAN TIMBUNAN TIMBUNAN GALIAN TIMBUNAN
(m) (m) (m) (m) (m) (m) (m) (m) (m2) (m2) (m2) (m2) (m3) (m3)
Hulu 0.54 0.50 0.18 12.23 12.18 12.02 11.48 0.57 0.00
II 400.00 0.55 0.00 221.16 0.00
Hilir 0.54 0.50 0.18 12.00 11.98 11.82 11.28 0.54 0.00
Hulu 0.34 0.50 0.11 12.48 12.48 12.32 11.98 0.29 0.00
IV 200.00 0.35 0.00 69.10 0.00
Hilir 0.34 0.50 0.11 12.33 12.23 12.07 11.73 0.40 0.00
Hulu 0.38 0.50 0.13 12.64 12.47 12.35 11.97 0.51 0.00
100.00 0.42 0.00 42.08 0.00
Hilir 0.38 0.50 0.13 12.42 12.42 12.30 11.92 0.33 0.00
VI
Hulu 0.38 0.50 0.13 12.42 12.42 12.30 11.92 0.33 0.00
200.00 0.54 0.00 107.04 0.00
Hilir 0.38 0.50 0.13 12.69 12.32 12.20 11.82 0.74 0.00
Jumlah 221.16 0.00
Sumber : hasil perhitungan
Perhitungan Dimensi Saluran Drainase Desa Subur Makmur
gool
Kode Sal Dm A Q Q b/h m n A h b P R S Vhitung w Tinggi saluran
(lt/dtk/ha) (ha) (lt/dtk) (m3/dtk) m m2 m m m m m/dtk m m
1 2 3 4 6 7 8 9 10 11 12 13 14 15 16 17
I 4.83 116 560.28 0.5603 2.4867 1.0000 0.0300 1.2112 0.5606 1.6000 3.1855 0.3802 0.0007 0.4629 0.1869 0.7
II 4.83 49 236.67 0.2367 1.2582 1.0000 0.0300 0.6990 0.5563 0.7000 2.2736 0.3074 0.0005 0.3395 0.1854 0.7
III 4.83 67 323.61 0.3236 1.5439 1.0000 0.0300 0.6830 0.5182 0.8000 2.2656 0.3015 0.0010 0.4739 0.1727 0.7
Sumber : hasil perhitungan
PERHITUNGAN GALIAN DAN TIMBUNAN SALURAN DRAINASE DESA SUBUR MAKMUR
No h b w ELV. ELV. ELV. ELV. JARAK LUAS LUAS RATA2 LUAS LUAS RATA2 VOLUME VOLUME
Saluran Ket. TANAH TANGGUL AIR DSR. SAL GALIAN GALIAN TIMBUNAN TIMBUNAN GALIAN TIMBUNAN
(m) (m) (m) (m) (m) (m) (m) (m) (m2) (m2) (m2) (m2) (m3) (m3)
Hulu 0.56 1.60 0.19 10.80 10.03 9.89 9.33 3.07 0.00
I 200.00 3.08 0.00 615.90 0.00
Hilir 0.56 1.60 0.19 10.67 9.89 9.75 9.19 3.09 0.00
Hulu 0.56 0.70 0.19 10.75 10.75 10.61 10.05 0.68 0.00 0.00
II 1,450.00 1.19 0.00 1,723.67
Hilir 0.56 0.70 0.19 10.80 10.03 9.88 9.33 1.69 0.00 0.00
Hulu 0.52 0.80 0.17 11.50 11.50 11.32 10.80 0.70 0.00 0.00
III 1,400.00 0.70 0.00 974.30
Hilir 0.52 0.80 0.17 11.30 11.30 11.11 10.60 0.70 0.00 0.00
Jumlah 3,313.86 0.00
Sumber : hasil perhitungan
PERHITUNGAN GALIAN DAN TIMBUNAN SALURAN DRAINASE DESA BANGUN REJO
No h Saluran h Saluran b Saluran b Saluran ELV. ELV. ELV. JARAK LUAS LUAS GALIAN LUAS LUAS GALIAN LUAS LUAS RATA2 VOLUME VOLUME
Saluran Ket. Exist Rencana Exist Rencana TANAH DSR. SAL. Exist DSR. SAL. Rencana Saluran Exist rencana GALIAN rata-rata TIMBUNAN TIMBUNAN GALIAN TIMBUNAN
(m) (m) (m) (m) (m) (m) (m) (m) (m2) (m2) (m2) (m2) (m2) (m2) (m3) (m3)
Sta.1 Hulu 1.30 2.00 3.00 4.00 14.75 13.45 12.75 4.41 9.20 4.79 0.00
300.00 5.35 0.00 1,604.98 0.00
Sta.2 Hilir 1.00 2.00 3.00 4.00 13.30 12.30 11.30 3.29 9.20 5.91 0.00
Sta.2 Hulu 1.00 2.00 3.00 4.00 13.30 12.30 11.30 3.29 9.20 5.91 0.00
300.00 6.08 0.00 1,823.58 0.00
Sta.3 Hilir 0.90 2.00 3.00 4.00 12.21 11.31 10.21 2.96 9.20 6.24 0.00
Sta.3 Hulu 0.90 2.00 3.00 4.00 12.21 11.31 10.21 2.96 9.20 6.24 0.00
I 300.00 5.40 0.00 1,620.62 0.00
Sta.4 Hilir 1.36 2.00 3.00 4.00 11.80 10.44 9.80 4.64 9.20 4.56 0.00
Sta.4 Hulu 1.36 2.00 3.00 4.00 11.80 10.44 9.80 4.64 9.20 4.56 0.00
300.00 6.55 0.00 1,965.37 0.00
Sta.5 Hilir 0.22 2.00 3.00 4.00 9.77 9.56 7.77 0.66 9.20 8.54 0.00
Sta.5 Hulu 0.22 2.00 3.00 4.00 9.77 9.56 7.77 0.66 9.20 8.54 0.00
280.00 8.69 0.00 2,433.18 0.00
Sta.6 Hilir 0.12 2.00 3.00 4.00 9.21 9.09 7.13 0.36 9.20 8.84 0.00
Sta.1 Hulu 0.91 2.00 3.00 4.00 16.01 15.10 14.01 2.97 9.20 6.23 0.00
200.00 5.82 0.00 1,163.36 0.00
Sta.2 Hilir 1.13 2.00 3.00 4.00 15.84 14.71 13.84 3.79 9.20 5.41 0.00
Sta.2 Hulu 1.13 2.00 3.00 4.00 15.84 14.71 13.84 3.79 9.20 5.41 0.00
II 200.00 5.45 0.00 1,089.79 0.00
Sta.3 Hilir 1.11 2.00 3.00 4.00 15.59 14.47 13.59 3.71 9.20 5.49 0.00
Sta.3 Hulu 1.11 2.00 3.00 4.00 15.59 14.47 13.59 3.71 9.20 5.49 0.00
290.00 5.14 0.00 1,489.85 0.00
Sta.4 Hilir 1.30 2.00 3.00 4.00 14.75 13.45 12.75 4.41 9.20 4.79 0.00
Sta.1 Hulu 1.06 1.50 2.00 2.50 17.08 16.02 15.58 2.46 4.43 1.97 0.00
220.00 2.48 0.00 546.28 0.00
Sta.2 Hilir 0.65 1.50 2.00 2.50 16.55 15.90 15.05 1.43 4.43 3.00 0.00
Sta.2 Hulu 0.65 1.50 2.00 2.50 16.55 15.90 15.05 1.43 4.43 3.00 0.00
220.00 2.48 0.00 545.41 0.00
Sta.3 Hilir 1.06 1.50 2.00 2.50 16.48 15.41 14.98 2.46 4.43 1.96 0.00
Sta.3 Hulu 1.06 1.50 2.00 2.50 16.48 15.41 14.98 2.46 4.43 1.96 0.00
III 220.00 2.02 0.00 444.19 0.00
Sta.4 Hilir 1.02 1.50 2.00 2.50 16.40 15.38 14.90 2.35 4.43 2.08 0.00
Sta.4 Hulu 1.02 1.50 2.00 2.50 16.40 15.38 14.90 2.35 4.43 2.08 0.00
220.00 1.83 0.00 401.73 0.00
Sta.5 Hilir 1.21 1.50 2.00 2.50 16.30 15.09 14.80 2.85 4.43 1.57 0.00
Sta.5 Hulu 1.21 1.50 2.00 2.50 16.30 15.09 14.80 2.85 4.43 1.57 0.00
220.00 1.98 0.00 435.43 0.00
Sta.6 Hilir 0.90 1.50 2.00 2.50 16.00 15.10 14.50 2.04 4.43 2.38 0.00
Sta.1 Hulu 0.40 1.50 2.00 2.50 17.32 16.92 15.82 0.85 4.43 3.58 0.00
300.00 2.82 0.00 847.09 0.00
Sta.2 Hilir 1.02 1.50 2.00 2.50 16.72 15.70 15.22 2.35 4.43 2.07 0.00
Sta.2 Hulu 1.02 1.50 2.00 2.50 16.72 15.70 15.22 2.35 4.43 2.07 0.00
300.00 1.96 0.00 587.84 0.00
Sta.3 Hilir 1.11 1.50 2.00 2.50 16.36 15.25 14.86 2.58 4.43 1.85 0.00
Sta.3 Hulu 1.11 1.50 2.00 2.50 16.36 15.25 14.86 2.58 4.43 1.85 0.00
IV 300.00 1.86 0.00 557.00 0.00
Sta.4 Hilir 1.10 1.50 2.00 2.50 16.29 15.19 14.79 2.56 4.43 1.86 0.00
Sta.4 Hulu 1.10 1.50 2.00 2.50 16.29 15.19 14.79 2.56 4.43 1.86 0.00
300.00 2.02 0.00 607.01 0.00
Sta.5 Hilir 0.98 1.50 2.00 2.50 16.09 15.11 14.59 2.24 4.43 2.18 0.00
Sta.5 Hulu 0.98 1.50 2.00 2.50 16.09 15.11 14.59 2.24 4.43 2.18 0.00
359.60 2.28 0.00 821.07 0.00
Sta.6 Hilir 0.90 1.50 2.00 2.50 16.00 15.10 14.50 2.04 4.43 2.38 0.00
Jumlah 18,983.79
Sumber : hasil perhitungan
Total Volume Galian
Desa Volume
1 Salino I = 870.20 m3
2 Salino II = 424.25 m3
3 Salino III = 4,504.08 m3
4 Sungai Pasir I = 911.82 m3
5 Sungai Pasir II = 102.41 m3
6 Sungai Pasir III = 84.85 m3
7 Sepagar Kampung
a. Sepagar Kampung 1 = 897.65 m3
b. Sepagar Kampung 2 = 717.02 m3
c. Sepagar Kampung Barat = 221.16 m3
d. Sepagar Kampung Selatan = 182.45 m3
8 Pudi Seberang = 3,760.14 m3
9 Sumber Sari = 2,814.22 m3
10 Sebanti = 818.92 m3
11 Subur Makmur = 3,313.86 m3
12 Bangun Rejo = 18,983.79 m3
13 Sei Bahim = 3,600.00 m3