Keban Agung 2x135 MW Power Plant

LAPORAN KONDISI OPERASIONAL


ID :BB22030151
Date :14-03-2022 10:00 Report By :CCR1
Operations Name UNIT #1 UNIT #2 STANDARD SAT
Load Generator 77.40 77.60 MW
Load Exported 68.10 69.10 MW
Self Consumption 12.02 10.95 %
Total Coal Flow 47.00 43.50 t/h
Gross Heat Rate 2,869.79 2,649.24 kCal/Kwh
Nett Heat Rate 3,261.70 2,975.12 kCal/Kwh
Rata2 Nett Heat Rate 3,118.41 kCal/Kwh
Mill in operation ACD ACD
Vacuum Condenser -90.80 -92.90 KPa
Main Steam Flow 217.00 219.70 t/h
Main Steam Temperature 529.70 531.40 Deg.C
Main Steam Pressure 9.11 9.14 MPa
RH Steam Temperature 518.80 528.70 Deg.C
RH Steam Pressure 1.59 1.42 MPa
Make Up Water 0.00 0.00 t/h
Feed Water Flow 220.90 219.40 t/h
Continues Blow Down 1.00 2.00 %
Water & Steam quality Laboratory, Parameter
Steam Drums Boiler
pH 9.50 9.34 9.0-9.7 pH
SC 12.05 8.29 <= 20 us/cm
PO4 2.01 1.30 0.5-3 ppm
Superheated Steam
CC 0.37 0.28 <=0.3 uS/cm
SiO2 3.00 2.00 <=20 ppb
Frequency 49.86 49.89 Hz
BOP
Level Fuel Oil A&B 1.16 0.77 M
Level Demin Water Tank 6.90 6.90 M
Level Raw Water Tank 9.10 M
fuel Status ( litre )
LOCATION BALANCE RECEIPT CONSUMPTION BALANCE
TANK 1 70,552.63 0.00 0.00 70,552.63
TANK 2 46,832.35 0.00 0.00 46,832.35
TOTAL 117,384.98 0.00 0.00 117,384.98
Coal Stock ( Ton )
LOCATION BALANCE
ROM 1 (HOPPER A) 0.00
ROM 1 (HOPPER B) 33,623.65
CANOPY 8,005.05
UNLOADING TRENC 300.00
BUNGKER 1A 1B 1C 1D 2A 2B 2C 2D
TONAGE 166.17 139.00 123.00 14.28 154.48 84.80 111.50 11.11
STATUS ON SB ON ON ON SB ON ON
Note : SB = stand by. [HHV = 4702, LHV = 4351]