CORRECTIVE ACTION PLAN

Factory Name: Habitus Fashion Ltd.


Section: Sewing

PLANNED COMPLETION
No NON-COMPLIANCES DISCRIPTION RESPONSIBLE PERSON DATE VERIFICATION COMMENTS

1 01 pcs cutter found untied, also without any


identification.

Idle machines should be kept in designated


2 areas. Some idle machines are found in the
sewing floor.

Some mock-up missing in front of the sewing


3 operator.

4 Thread-attaching guidelines need to be posted


in every machine.

Critical process identification should be


5 visualized in every sewing line.

6 The carton is kept closer to the exhaust fan.

Non-conforming goods were found mismatched


7 with the record. Randomly checked one bundle
and found physically 44pcs but the record
showed 45pcs, which is auto-fail issue.

Factory currently practices 90 days preventive


maintenance cycle. The factory needs to analyze
8 the age of the equipment and consider machine
downtime history to reset the preventive
maintenance cycle accordingly.