Risk Assessment-Waterproofing 1
Risk Assessment-Waterproofing 1
Risk Assessment-Waterproofing 1
Waterproofing Works
Persons at Risk (Groups) Risk Assessor Appointment Tel. No. Description of Task or Activity
A – One Direct employees Manager Waterproofing works being
B – Contractors/Sub contractors undertaken by the
C – Tenants Contractor
D – Members of the public
Hazard/Risk Groups at Severity Probability Risk Level Existing Controls Risk Level Additional Controls Required Risk Level Actioned by
Risk before with with added
Controls Controls Controls
Severity C = Catastrophic, Cr = Critical, S = Serious, M = Minor, Probability N = Negligible, F = Frequent, P = Probable, O = Occasional, R = Remote, I = Improbable,
Risk T = Tolerable, L = Low, M = Medium, H = High, N = Intolerable