Professional Documents
Culture Documents
Risk Assessment-Waterproofing 2
Risk Assessment-Waterproofing 2
Waterproofing Works
Hazard/Risk Groups at Severity Probability Risk Level Existing Controls Risk Level Additional Controls Required Risk Level Actioned by
Risk before with with added
Controls Controls Controls
2) Injury to A,B,C,D S P H 1) Ensure work areas in communal M 1) See working in communal areas L
operative areas are appropriately risk assessment
and others cordoned off and safety signage 3) Specific works hazards to be
is in place covered in site induction where
2) When working in occupied appropriate
properties ensure that tenant
is aware of works being under
taken and any associated risks See contingency plan 3
3) Good communication should be
maintained with other trades
with regards to specific gas
hazard
Severity C = Catastrophic, Cr = Critical, S = Serious, M = Minor, Probability N = Negligible, F = Frequent, P = Probable, O = Occasional, R = Remote, I = Improbable,
Risk T = Tolerable, L = Low, M = Medium, H = High, N = Intolerable
Page 2