DocuSign Envelope ID: FC985084-8222-4E86-96ED-4F922EB01EC9

Approval for Villa Modification


Ref. No. 0001-1123-0628
Site Work Duration:
Development Control and Planning Approval From the date of Gate pass issuance (8) Weeks
(DCPA) Development The Palm Jumeirah Co. LLC. BUILT FORM

Issue Date: 03 Nov 2023


Purchaser Hasper LLC FZ,
Expiry Date: 03 May 2024

NOC Consultant/
Contractor
HERMANOS BUILDING CONTRACTING L.L.C
jamilalmulhem@hotm
Property ID: PJPR4V-090
Contact Details T 0558543368 E ail.com

We refer to your application registered on 03 Nov 2023 regarding the abovementioned property PJPR4V-090. Please note that Development
Control and Planning Approval (DCPA) has No Objection to the proposed Modification works subject to the conditions below that must be fulfilled.
This approval permits the following and as per stamped drawing nos.:

1. Villa External Painting with Same as Existing Color.

A copy of CED approval, this NOC, and all We are pleased to inform you that your Villa Modification design submission is considered to be in general compliance with the Development Control
other related permits, is to be maintained in Regulations and is considered acceptable in all other regards, and is therefore approved
a prominent and visible location at the
property and is to be clearly accessible for General Conditions:
staff of Nakheel and other Authorities. 1. This NOC does not approve work that includes any extension or extra built-up area such as enclosure of voids, terraces, balconies, loggias or
All works associated with proposed
construction/modification are to follow porch area, conversion of use, new extensions etc.
Master Community Rules and Nakheel 2. External paint and/or cladding approval for Garden villas will not include any shared walls, unless a written approval from neighbor villa is
Community Management guidelines. submitted to Nakheel to allow painting of the shared wall facing their villa and allowing the access to conduct the work
In carrying out the modification works, all
reasonable and practical measures to 3. Glass which forms all or part of any external wall of a building must not exceed a maximum of 15% for reflection of both heat and light.
minimize releases of contaminants (dust,
odors,..) to the neighbor or built 4. The proposed modifications shall be undertaken for the work described above and in accordance with the drawings and documents identified
environment must be taken. Waste water, and listed above. Should there be any inconsistency between what is shown on the drawing(s) and the conditions of this approval, then these
chemicals, paints, powders, adhesives or conditions will prevail. In case of any new modification, a new application will need to be submitted.
other substances used in the modification
works shall be disposed of offsite and 5. It is a MUST to obtain Trakhees EHS and CED approvals prior to the commencement of modification works at site. This Approval serves Purchaser
mustn’t be released to water ways, Application to Trakhees- CED as long as it is valid.
watercourses, drains or soils. 6. It is a MUST to obtain Nakheel site access NOC and submit security deposit for modification works, prior starting any construction on site. The
Contractors, consultants and their staff are
not permitted to reside within the property same can be applied through Nakheel online services.
during the period of the modification works. 7. This approval is valid for a maximum period of 6 months, which commences from the date highlighted as (Issue Date) and expires on the date
Contractors, consultant’s and supplier’s highlighted as (Expiry Date) unless otherwise extended in writing by the Master Developer. During this time, the Purchaser must apply for
vehicles and/or equipment are not to be
parked upon the footpath or any other area building permit from Trakhees.
except within designated parking spaces 8. Compliance with Villa Design Code (Design Control & modification Submission Procedure), regulations, applicable codes and all laws is
within the street unless otherwise approved
by Nakheel. As well, It should not in any way mandatory. The Purchaser shall undertake that these modifications shall comply with the development community rules and code of behavior
interrupt or hinder the free flow of traffic on essentially for common use facility.
road or be stored/ parked on the beach. 9. This NOC is personal to the above referenced Purchaser(s) of this property. It is not automatically transferable to new property Purchasers on
The Applicant and contractor/ agent shall be
fully responsible, at his/her expense, for the sale of the property or any third party, if it has not been implemented prior to sale. In such event this NOC will be deemed invalid and of no
rectification to any Common Use Facilities further force and effect. Should any new property Purchaser wish to proceed on the basis of the previously approved plans and drawings and
damaged, soiled or defaced (including paint NOC, the new Purchaser will be required to either make a fresh submission if the NOC has expired or apply to transfer the NOC to their name if
spills) by the proposed Modification works.
These rectification works are to be agreed
extant.
and approved by Nakheel. This includes 10. The Approved modifications shall not result by any mean in a change of use as a residence for single family.
removal of any waste materials, associated
with the Modification works, from the 11. No extra utility load will be supplied / approved by Nakheel as a result of these modifications.
external areas of the Property and the 12. Enquiries with DEWA with regards electrical load should be made to ensure that the proposed development will be able to be supplied. No
Common Use Facilities.
NOC issuance from Nakheel does not relieve
approval will be given to disturb the areas external to the plot to upgrade power supply lines, and Nakheel will not be liable for upgrade works
the Purchasers or their representatives from on the basis of this concept design approval.
their obligation to comply with the 13. The Purchaser shall undertake that the modifications, enclosure or conversion of use will not generate extra load on the sewage system and
requirements of all applicable Authorities
and Utilities and of their responsibilities for network of the Development.
any errors or discrepancies in their design, 14. Nakheel has not made any assessment of any proposed Mechanical, Electrical, plumbing (MEP) or structure associated with the proposed
for which the purchasers shall be responsible
for the rectification of such errors at any modifications or the potential impact the proposed modifications might have upon existing MEP or structure.
time they become apparent. 15. The applicant and contractor/agent shall bear full responsibility for assessing the impact the modifications may have (if any) upon existing and
All amounts stated in this Agreement are proposed MEP or structure. Nakheel accepts no liability for any impact upon MEP or structure caused by the proposed modifications.
exclusive of any value added tax (“VAT”),
sales tax or equivalent tax. To the extent 16. Nakheel will accept no claims under the Sale and Purchase Agreement in respect of any defect in the property, whether structural or otherwise
that the VAT at standard rate as prescribed arising as a consequence of modification works and, in carrying out modifications, the Purchaser will be deemed to have indemnified Nakheel,
in the VAT laws and regulations (“VAT
Amount”) is applicable at the time that the
its associated entities, its agents, employees and successors against any claims, damages, injuries, losses (including loss of life) or liabilities as a
amount payable is chargeable, it shall be direct or indirect consequences of villa modification works.
added to the amounts payable. If other 17. Temporary Site Fencing (if required) must be in PVC material and shall be installed and maintained during construction and/or modification works
taxes become applicable to any amounts period exclusively by hoarding contractors that are listed by the Master Developer. PVC hoarding is a must within Palm Jumeirah, Jumeirah
payable, as a result of a change in legislation
applicable in Dubai, this shall be added to Islands, Jumeirah Park, and Nad Al Sheba developments
the amounts payable at the applicable rates.
Signed by: Stamp: For and on behalf of:
Disclaimer: This approval is strictly design-
focused and is limited to the elements of The Palm Jumeirah Co. LLC.
the proposal and as they relate to the
applicable DCR. It is for the purposes of
acknowledging in-principle the compliance
of the submitted proposal and by no means
absolves Developer from any breach to the
controls. Accuracy of measurements and
calculations and all Engineering and
technical solutions are not part of this
Approval. Developer remains subject in full <<<W=140;H=60;N=SIGN1;A=1;>>>

to all contractually binding conditions


stipulated in the Sales and Purchase
Dr. Ahmed Ragab
Agreement of the subject plot. Developer
also indemnifies Master Developer and his
Director of Development Control & Planning Approvals
employees from any damage, risk or loss, or Nakheel Urban Management
legal and financial responsibility that may be
borne at any stage in relation to this
development. Magdy Moshref
Date: 03 Nov 2023

Nakheel PJSC nakheel.com 800 NAKHEEL

You might also like