Forms of Technical Inspection Report

INFORMATION

Project Name Diyab Water Pipeline Project

Vendor Name Committee

Tender no Member (1)

Member (2)
Date
Member (3)

Non-compliance with any terms indicated in the technical conditions book

ISO certified - Product test certificate - Health certificates not attached(for Pipes)
Rejection
Supplier has previous contracts non-compliance with terms or CoC with arche noVa

If fails in any of the list below, the offer is considered rejected

Comments:

Conditions for accepting the Offer

CHARACTERISTICS

Material Required Pass Fail comments

Supply and
Implementation period implementation
within 40 Days

The number of original certified Two Contract


contracts in Same Specification or more

Approval ( Pass/ Fail )

Committee Signature