PSS Lifting Plan
PSS Lifting Plan
Date:
6. Riggers will allow carrying out the rigging activities such as sling fixing, removing etc.
7. The lifting process will be continued as per lifting plan.
8. After completion of lifting operation, the crane will be Dis-engaged from site.
- Weight of the LOAD =
- Crane block hook + gears =
---------------------------------------------
MAX. lift weight =
The lifting Load is not to exceed 75% of max crane rated capacity.
o GENERAL
LIFTING PLAN DETAILS
Date:
1. Whole operation is to be suspended in case of adverse weather like heavy rain, extreme wind.
Operation is to be stopped in any other unsafe condition or act as well.
2. Operation to be carried out preferably during the day.
B = 8 mtr
C = 0.2 mt
D = 11 mt
= 11.2*100/18= 62.22%