Daily Pre-Work

Checklist
PTW Reference No.
Date : Location: Contractor:
*For below boxes; use () or (X) as per completion, if not applicable then use (NA).

S YES NO N/A S YES NO N/A


DESCRIPTION DESCRIPTION
N () (X) (NA) N () (X) (NA)

1 PTW with MSRA available at work location 27 Fire watcher available during hot
work
2 Tool Box Talk conducted and recorded 28 All the combustible material removed
from hot work area.
3 PTW Boxes are available at work location 29 Emergency contact details displayed
at work location
4 All workforce inducted and have identification 30 All the marine activities is carrying
stickers out as per site HSE Plan?
5 Workers are fit for duty (to be checked by supervisor) 31 All the approvals and NOC’S
available for marine work and
RAMSAR Area.
Safe access and egress provided. 32 Emergency Evacuation plan in place
6 for marine site.
7 Adequate safety signs displayed for information. 33 Emergency equipment available for
marine works.(life
8 HSE and construction supervision available at work 34 Onsite any reptile, snacks and other
location animal seen on site (not to hit and
kill)
9 Area identified with physical barriers to avoid any 35 Area free from rubbish material
unauthorized access. (housekeeping)
10 Adequate lighting provided during the dark hours 36 All the working platforms are cleared
from obstacles, inspected and safe to
use?
11 Electrical cable managed adequately to avoid 37 Scaffold safe and green tagged
tripping hazards.
12 Power tools are inspected color coded 38 Safety harnesses are available for
use while work above 1.8m.
13 Hand held tools are in good condition, inspected and 39 Access ladder or access way are
color coded safe to use

14 No home-made tools on work location. 40 Underneath area barricaded

15 Mobile equipment/machine are inspected by EPC, 41 No loose material on elevated areas


sticker available
16 Mobile equipment Registration and third party 42 Working party trained on Confined
certificate space entry
17 All stationary equipment/machine inspected and 43 Safe Access and egress are
sticker available provided?
18 All stationary equipment have drip trays such as 44 Trained watcher available at CS
(generator, tower light, storage tanks/containers) entry point
19 All workers have mandatory PPEs in good condition 45 Adequate Lighting & Ventilation
arrangement available prior to enter
Confined Space
20 All workers have task specific PPEs in good 46 Confined space Emergency rescue
condition equipment available
21 Rest area available at work location. 47 Certified and calibrated gas test
equipment available
22 Smoking area available next to work location 48 Lifting accessories 3rd party
certificate
23 Cool Room available near to work location. 49 Lifting Zone identified with signs and
physical barriers
24 Drinking water and electrolyte drink available at work 50 Mean of communication available
location
25 Excavation protected with hard barriers 51 Other (specify)
26 Warning Light displayed at the edges of excavated 52 Other(specify)(
area.