Doors and Windows Qty Unit

Doors
a. D-1 1.60m X 2.10m Double Leaf Swing Door
1 set
Panel Door with Door Jamb at Entrance
b. D-2 0.90m X 2.10m Single Leaf Swing Door
1 set
Panel Door with Door Jamb at Kitchen
c. D-3 0.80m x 2.10m Flush Door Type at
4 set
Bedrooms

d. D-4 0.65m x 2.10m PVC Door Type at T&B 3 set

e. GD-1 2.15m x 2.10m Sliding Glass Door in


2 set
Aluminum Frame at Dining Room/Family Area
f. GD-2 3.00m x 2.10m Sliding Glass Door in
1 set
Aluminum Frame at Master BR Balcony

Windows
a. W-1 1.80m x 3.0m Awning + Fixed Type
1 set
Window at Staircase
b. W-2 3.0m x 2.0m Awning + Fixed Type Window 1 set
at Living Area
c. W-3 1.50m x 1.20m Sliding Type Window at
4 set
Bedrooms, Family Area
d. W-4 1.00m x 1.20m Sliding Type Window at 1 set
Foyer
e. W-5 1.50m x 0.80m Sliding Type Window at 1 set
Kitchen
f. W-6 0.50m x 0.50m Awning Type Window at 2 set
T&B - GF&2F
g. W-7 0.50m x 1.700mAwning Type Window at 3 set
MB T&B

Roofing Works Qty Unit


a. Pre-Painted Roofing Ribtype 0.5mm with
frammings 124.48 sqm

Ceiling Works Qty Unit


a. Gypsum Board Ceiling (8'x4') Board 54 pcs
b. Metal Furring (0.4mm thk) 56 pcs
c. Metal Furring (0.8mm thk) 27 pcs
d. Hanging Rod (3/8" diameter) 60 pcs
e. Blind Rivets 2 boxes

Finishes Qty Unit


Tile Works
a. Toilet and Bath
a.1 Matt Finish Ceramic Tiles (300mmx300mm) 569 pcs
a.2 ABC Grout 7 bags
a.3 Tile Adhesive 6 bags
a.4 Cement 5 bags
b. Flooring
b.1 Ceramic Tiles (600mmx600mm) 227 pcs
b.2 Matt Finish Ceramic Tiles (600mmx600mm) 145 pcs
b.3 Vinyl Tiles (300mmx300mm) 543 pcs
b.4 ABC Grout 22 bags
b.5 Cement 15 bags
b.6 Tile Adhesive 14 bags
b.7 ABC Multibond Vinyl Type Adhesive 8 kgs

Painting Works
a. Concrete Neutralizer 14 gal
b. Flat Latex Paint 10 1/2 gal
c. Acrylic Paint 8 gal
d. Skimcoat 13 bags
e. Paint Thinner 1/2 gal
f. Waterproofing 47.78 m2
g. Enamel Paint 1/2 gal
General Requirements Qty Unit
a. Mobilization & Demobilization 1 lot
b. Temfacil 1 lot

Site Works Qty Unit


Earthworks
a. Excavation 52.67 m3
b. Bedding 41.80 m3
c. Backfill 36.51 m3

Structural Works Qty Unit


Concreting Work
a. Footing
a.1 Concrete 9.66 m3
a.2 Form 29.66 m2
a.3 Rebars 426.86 kgs
b Grade Beams
b.1 Concrete 4.16 m3
b.2 Form 69.25 m2
b.3 Rebars 551 kgs
c. Column from GF to 2nd Floor
c.1 Concrete 5.76 m3
c.2 Form 88.76 m2
c.3 Rebars 5378.02 kgs
d. Ground Floor Slab
d.1 Concrete 10.27 m3
d.2 Rebars 420.17 m2
e. Column from 2nd to Roof
e.1 Concrete 2.69 m3
e.2 Form 42.56 m2
e.3 Rebars 3298.60 kgs
f. Second floor Slab
f.1 Concrete 9.53 m3
f.2 Form 76.20 m2
f.3 Rebars kgs
g. Beams at 2nd Floor
g.1 Concrete 7.48 m3
g.2 Form 113.79 m2
g.3 Rebars kgs
h. Roof Beams
h.1 Concrete 6.44 m3
h.2 Form 89.9 m2
h.3 Rebars kgs
i. Stairs/Landing
i.1 Concrete 1.28 m3
i.2 Form 6.24 m2
i.3 Rebars 182.51 kgs

Masonry Work
a. 6" Concrete Hollow Blocks 2324.38 pcs.
b. 4" Concrete Hollow Blocks 933.48 pcs.
c. Reinforcing Steel Bar kgs
d. Sand 12.69 m3
e. Cement 152 bags
f. G.I # 16 6 rolls
g. Plastering
g.1 Cement 751 bags
g.2 Sand 62.55 m3
Electrical Works Qty Unit
Electrical Roughing - ins
a. Panel Board (12 Branches) 1 pcs
b. Circuit Breaker (20amp) 8 pcs
c. Circuit Breaker (30amp) 4 pcs
d. Circuit Breaker (100amp) 1 pcs
e. PVC Orange Pipe (15mm) 200 pcs
f. PVC Orange Pipe Elbow (15mm) 30 pcs
g. 3.5mm2 THHN wire Duraflex 250 m
h. 8.0mm2 THHN wire Duraflex 31 m
i. 22.0mm2 THHN wire Duraflex 31 m
j. Electrical Accessories 1 lot
Lighting Fixtures
a. Pinlights 71 pcs
b. Center Light 11 pcs
c. Wall Lamp 2 pcs
d. Drop Light at Bar Counter 1 pcs
Devices
a. Convenience Outlet 33 pcs
b. Weather Proof Convenience Outlet 7 pcs
c. 1 gang Switch 5 pcs
d. 2 gang Switch 13 pcs
e. 3 gang Switch 3 pcs
f. 3-way Switch 4 pcs
g. ACU Outlet 4 pcs
h. CATV Outlet 6 pcs
Plumbing Works Qty Unit
Fixtures and Accessories
a. Water Closet & Lavatory Set 3 sets
b. Angle Valve 3 pcs
c. Floor Drain 8 pcs
d. PVC P-trap 5 pcs
e. Kitchen Faucet 2 pcs
f. Kitchen Sink 2 pcs
g. Shower Set 3 pcs
h. Hose Bibb 3 pcs
i. Teflon Tape 5 pcs
j. Electrical Accessories pcs
Water Line & Roughing-ins
a. PVC Pipe 1/2"Ø x 3m 20 pcs
b. PVC Tee 1/2"Ø x 1/2"Ø WOT 40 pcs
c. Plumbing Fittings and Accessories 1 lot
Sewer Line & Roughing-ins
a. Septic Tank 1 lot
b. PVC Pipe 4"Ø x 6m. 8 pcs
c. PVC Pipe 2" x 6 m 10 pcs
d. Plumbing Fittings and Accessories 1 lot
Specialty Works Qty Unit
a. Steel Railings at Staircase 1 lot
b. Steel Railings at Balcony (FA) 1 lot
c. Steel Railings at Balcony (MB) 1 lot
Tile Works
Dimensions (m) sqm pcs
FF04 - GF TOTAL PCS 0.05
Tiles 60x60cm DK/LA 4.00 2.15 8.60 23.89 137.66 6.88
Carport 5.00 3.21 16.05 44.58 517.08 25.85
Porch 2.35 2.29 5.38 14.95 541.56 27.08
Lanai 4.50 1.70 7.65 21.25 215.91 10.80
Total pcs FF04 104.67
FF03 - GF
Tiles 30x30cm B1 3.15 3.21 10.11 112.35 *tb(2.85x1.50)=4.28sqm
*wall(2.85x1.72)=4.90 x2 = 9.8sqm
Total pcs FF03 112.35 (1.5x1.72)=2.58 x2=5.16-1.29
FF02 - GF =3.87sqm
Tiles 30x30cm T&B 4.28 13.67 17.95 199.44
Total pcs FF02 199.44
FF01 - GF *LA(5.3x6.59)=34.93sqm - 5.38sqm -
0.26sqm = 29.29
Tiles 60x60cm LA 29.29 24.65 53.94 149.83 *K/DA(8.6+16.05)=24.65sqm
counter 4.02 11.17
Total pcs FF01 161.00
FF04 - 2F
Tiles 60x60cm Balcony 3.10 1.75 5.43 15.07
MB-Balcony 4.30 1.50 6.45 17.92
Total pcs FF04 32.99
FF03 - 2F
Tiles 30x30cm B1 3.65 3.21 11.72 130.18
B2 3.65 3.21 11.72 130.18 *tb (2.15m x 1.7m) = 3.66sqm *mb
MB 4.26 3.05 12.99 144.37 tb (2.65m x 1.25m) = 3.31sqm*wall
(2.15x1.66)=3.57x2=7.14sqm(1.7x1.
Total pcs FF03 404.73 66)=2.82x2=5.64-1.25=4.39sqm
FF02 - 2F *(2.65x1.66)=4.4x2=8.8sqm(1.425x1
Tiles 30x30cm T&B 3.66 11.53 15.19 168.78 .66)=2.37x2=4.74-1.25=3.49sqm
MB-T&B 3.31 12.29 15.60 173.33
Total pcs FF02 342.11
FF01 - 2F *room (3.95m x 3.21m) = 12.68sqm
*hallway (2.31sqm+4.77sqm) = 7.08
Tiles 60x60cm FA 12.68 7.09 19.77 54.91
Total pcs FF01 54.91
ABC Grout
Total sqm ABC Grout 1bag = 8m2
total sqm of T&B = 50.16sqm total bag = 6.27 or 7bags
total sqm of flooring = 169.81sqm total bag = 21.23 or 22bags
Tile Adhesive
Total sqm Tile Adhesive .11 bag per sqm
total sqm of T&B = 50.16sqm total bag = 5.52 or 6bags
total sqm of flooring with counter except vinyl =
126.61sqm total bag = 13.92 or 14bags

Cement
Total sqm Cement .086 bag per sqm
total sqm of T&B = 50.16sqm total bag = 4.31 or 5bags
total sqm of flooring = 169.81sqm total bag = 14.60 or 15bags
ABC Multibond Vinyl Type Adhesive
Total sqm ABC Multibond 4kg per 20-24m2
total sqm of flooring = 46.54sqm total bag = 8kgs
Ceiling Works m m sqm
Gypsum Board Ceiling (8'x4') Board 2.44 1.22 2.97
TOTAL Dimensions (m) sqm pcs
145 CF04 - GF
543 DK/LA 4.00 2.15 8.60 2.89
569 Carport 5.00 3.21 16.05 5.40
227 Porch 2.35 2.29 5.38 1.81
Total pcs FF04 10.10
CF03 - GF
5x1.50)=4.28sqm B1 3.15 3.21 10.11 3.40
72)=4.90 x2 = 9.8sqm
=2.58 x2=5.16-1.29 Total pcs FF03 3.40
=3.87sqm CF02 - GF
T&B 2.85 1.50 4.28 1.44
Total pcs FF02 1.44
=34.93sqm - 5.38sqm - CF01 - GF
sqm = 29.29
+16.05)=24.65sqm LA 29.29 24.65 53.94 18.14
Total pcs FF01 18.14
*Total sqm 98.36 - opening of stairs 4.95 = 93.41sqm
*Total pcs of gypsum board for GF is 31.45 or 32pcs
CF03 - 2F
B1 3.65 3.21 11.72 3.94
B2 3.65 3.21 11.72 3.94
MB 4.26 3.05 12.99 4.37
Total pcs FF03 12.25
1.7m) = 3.66sqm *mb CF02 - 2F
25m) = 3.31sqm*wall T&B 2.15 1.70 3.66 1.23
.57x2=7.14sqm(1.7x1.
=5.64-1.25=4.39sqm MB-T&B 2.65 1.25 3.31 1.11
4.4x2=8.8sqm(1.425x1 Total pcs FF02 2.34
=4.74-1.25=3.49sqm CF01 - 2F
FA 12.68 7.09 19.77 6.65
Total pcs FF01 6.65
m x 3.21m) = 12.68sqm *Total sqm 63.17sqm
1sqm+4.77sqm) = 7.08
*Total pcs of gypsum board for 2F is 21.27 or 22pcs
TOTAL GYPSUM BOARD 54.00
Metal Furring (0.4mm thk)
CF04 - GF L s W
DK/LA 4.00 0.60 6.67 2.15 0.43
Carport 5.00 0.60 8.33 3.21 0.64
Porch 2.29 0.60 3.82 2.29 0.46
CF03 - GF
B1 3.21 0.60 5.35 3.15 0.63
CF01 - GF
LA 5.50 0.60 9.17 4.30 0.86
5.30 0.60 8.83 5.50 1.10
CF03 - 2F
B1 3.65 0.60 6.08 3.21 0.64
B2 3.65 0.60 6.08 3.21 0.64
MB 4.26 0.60 7.10 3.05 0.61
CF02 - 2F
T&B 2.15 0.60 3.58 1.70 0.34
MB-T&B 2.65 0.60 4.42 1.60 0.32
CF01 - 2F
FA 5.05 0.60 8.42 6.21 1.24
Total pcs
Metal Furring (0.8mm thk)
CF04 - GF L s W
DK/LA 4.00 1.20 3.33 2.15 0.43
Carport 5.00 1.20 4.17 3.21 0.64
Porch 2.29 1.20 1.91 2.29 0.46
CF03 - GF
B1 3.21 1.20 2.68 3.15 0.63

CF01 - GF
LA 5.50 1.20 4.58 4.30 0.86
5.30 1.20 4.42 5.50 1.10
CF03 - 2F
B1 3.65 1.20 3.04 3.21 0.64
B2 3.65 1.20 3.04 3.21 0.64
MB 4.26 1.20 3.55 3.05 0.61
CF01 - 2F
FA 5.05 1.20 4.21 6.21 1.24
Total pcs
Hanging Rod (3/8" diameter)
CF04 - GF L s W Total
DK/LA 4.00 1.20 3.33 2.15
Carport 5.00 1.20 4.17 3.21
Porch 2.29 1.20 1.91 2.29
CF03 - GF
B1 3.21 1.20 2.68 3.15
CF01 - GF
LA 5.50 1.20 4.58 4.30
5.30 1.20 5.50
CF03 - 2F
B1 3.65 1.20 3.04 3.21
B2 3.65 1.20 3.04 3.21
MB 4.26 1.20 3.55
CF01 - 2F
FA 5.05 1.20 4.21 6.21
Total pcs 0.00
Roofing Works
W L elev slope sqm
R1 9.60 11.10 1.05 11.15 93.79
R2 10.30 2.60 0.50 2.65 26.10
R2 1.80 2.50 0.50 2.55 4.59
Total R2 30.69
Total R 124.48
Painting Works
a. Concrete Neutralizer
Total sqm 1.06 gal = 20sqm
total sqm of exterior wall = 185.95sqm total gal = 9.86 or 10gal
total sqm of interior wall = 74.68sqm total gal = 3.95 or 4gal
Total gal 14.00
b. Flat Latex Paint
Total sqm 1.06 gal = 25 - 30sqm
total sqm of ceiling = 161.53sqm total gal = 6.85 or 7gal
total sqm of interior wall = 74.68sqm total gal = 3.17 or 3 1/2 gal
Total gal 10 1/2
c. Acrylic Paint
Total sqm 1.06 gal = 25 - 30sqm
total sqm of exterior wall = 185.95sqm total gal = 7.88 or 8gal
d. Skimcoat
Total sqm 1bag = 20sqm
total sqm of wall = 260.63 total bag = 13bag
e. Paint Thinner
Total sqm
total gal = 0.26 or 1/2gal
f. Waterproofing
Total sqm
total sqm of t&b, balcony, kitchen, lanai, dk/la
39.38

total sqm of wall 8.40


Total sqm 47.78
g. Enamel Paint
Total sqm 1.06 gal = 30 - 35sqm
Total total sqm of D1, D2, D3 = 11.97sqm total gal = 0.42 or 1/2gal
2.87
5.35
1.75

3.37

7.88
9.72
3.91
3.91
4.33

1.22
1.41

10.45
56

Total
1.43
2.68
0.87

1.69

3.94
4.86

1.95
1.95
2.17

5.23
27
Concreting Work
Concrete
a. Footing Dimensions (m) Volume m3 pc/s Total Volume m3
a.1 Concrete
F1 1.30 1.30 0.35 0.59 9 5.32
F2 1.60 1.60 0.35 0.90 2 1.79
F3 1.40 1.40 0.35 0.69 1 0.69
F4 0.80 0.80 0.30 0.19 3 0.58
F5 0.60 0.60 0.25 0.09 1 0.09
CF1 1.30 2.25 0.35 1.02 1 1.02
STF1 0.60 1.15 0.25 0.17 1 0.17
Total Volume m3 9.66

b Grade Beams Dimensions (m) Volume m3


b.1 Concrete
GB1 69.25 0.20 0.30 4.16
Total Volume m 3
4.16
c. Column from GF to 2nd Floor Dimensions (m) Volume m3 pc/s Total Volume m3
c.1 Concrete
C1 0.40 0.20 4.58 0.37 12 4.39
C2 0.30 0.20 4.58 0.27 5 1.37
Total Volume m3 5.76
d. Ground Floor Slab
d.1 Concrete Dimensions (m) Volume m3
SOG1 5.35 4.30 0.10 2.30
5.35 2.30 0.10 1.23
3.45 4.88 0.10 1.68
2.00 8.00 0.10 1.60
4.80 3.20 0.10 1.54
SOG2 4.00 3.20 0.15 1.92
Total Volume m3 10.27
e. Column from 2nd to Roof
e.1 Concrete Dimensions (m) Volume m3 pc/s Total Volume m3
C1 0.40 0.20 2.80 0.22 10 2.24
PC1 0.20 0.20 2.80 0.11 4 0.45
Total Volume m3 2.69
f. Second floor Slab
f.1 Concrete Dimensions (m) Volume m3
S1 3.10 4.30 0.13 1.67
3.60 2.30 0.13 1.04
3.60 3.20 0.13 1.44
2.25 1.45 0.13 0.41
2.50 3.45 0.13 1.08
2.30 3.45 0.13 0.99
3.20 3.45 0.13 1.38
S2 1.50 4.30 0.13 0.81
1.00 3.20 0.13 0.40
0.80 3.20 0.13 0.32
Total Volume m3 9.53
g. Beams at 2nd Floor
g.1 Concrete Dimensions (m) Volume m3
2B1 53.75 0.20 0.40 4.30
2B2 5.20 0.20 0.40 0.42
2B3 1.40 0.20 0.30 0.08
2B4 13.00 0.20 0.30 0.78
2B5 2.25 0.20 0.30 0.14
2CB1 8.00 0.20 0.40 0.64
2RB1 14.00 0.20 0.40 1.12

h. Roof Beams
h.1 Concrete Dimensions (m) Volume m3
RB1 14.00 0.20 0.40 5.60
LB1 18.60 0.15 0.30 0.84
Total Volume m3 6.44

i. Stairs/Landing
i.1 Concrete Dimensions (m) pcs Volume m3
Steps 0.25 1.05 0.193 16 0.81
Nosing 0.05 1.05 0.05 16 0.04
Landing 1.05 1.05 0.193 2 0.43
Total Volume m3 1.28
Form
Total Volume m 3
a. Footing Dimensions (m) pc/s Total sqm
a.2 Form
5.32 F1 1.30 1.30 0.35 9 16.38
1.79 F2 1.60 1.60 0.35 2 4.48
0.69 F3 1.40 1.40 0.35 1 1.96
0.58 F4 0.80 0.80 0.30 3 2.88
0.09 F5 0.60 0.60 0.25 1 0.60
1.02 CF1 1.30 2.25 0.35 1 2.49
0.17 STF1 0.60 1.15 0.25 1 0.88
9.66 Total sqm 29.66

b Grade Beams Dimensions (m) Total sqm


b.2 Form
GB1 69.25 0.20 0.30 69.25
Total sqm 69.25
Total Volume m3 c. Column from GF to 2nd Floor Dimensions (m) pc/s Total sqm
c.2 Form
4.39 C1 0.40 0.20 4.58 12 65.88
1.37 C2 0.30 0.20 4.58 5 22.88
5.76 Total sqm 88.76
e. Column from 2nd to Roof
e.1 Form Dimensions (m) pc/s Total sqm
C1 0.40 0.20 2.80 10 33.60
PC1 0.20 0.20 2.80 4 8.96
Total sqm 42.56
f. Second floor Slab
f.1 Form Dimensions (m) Total sqm
S1 3.10 4.30 13.33
3.60 2.30 8.28
3.60 3.20 11.52
Total Volume m3 2.25 1.45 3.26
2.24 2.50 3.45 8.63
0.45 2.30 3.45 7.94
2.69 3.20 3.45 11.04
S2 1.50 4.30 6.45
1.00 3.20 3.20
0.80 3.20 2.56
Total sqm 76.20
g. Beams at 2nd Floor
g.1 Form Dimensions (m) Total sqm
2B1 53.75 0.20 0.40 64.50
2B2 5.20 0.20 0.40 6.24
2B3 1.40 0.20 0.30 1.40
2B4 13.00 0.20 0.30 13.00
2B5 2.25 0.20 0.30 2.25
2CB1 8.00 0.20 0.40 9.60
2RB1 14.00 0.20 0.40 16.80
Total sqm 113.79
i. Stairs/Landing
i.1 Form Dimensions (m) Total sqm
Steps 0.25 1.05 0.2625
Nosing 0.05 1.05 0.0525
Landing 1.05 1.05 1.1025
1.71 1.05 1.7955
Slope Form 1.31 1.05 1.3755
1.57 1.05 1.6485
Total sqm 6.24

h. Roof Beams
h.1 Form
Dimensions (m) pcs Total sqm
2RB1 14 0.2 0.4 5 5.6
RB1 48.5 0.2 0.4 20 77.6
LB1 18.6 0.15 0.3 8 6.696
Total sqm 89.90
Doors/Windows Dimension m sqm qty
d1 1.6 2.1 3.36 1
d2 0.9 2.1 1.89 1
d3 0.8 2.1 1.68 4
d4 0.65 2.1 1.365 3
gd1 2.15 2.1 4.515 2
gd2 3 2.1 6.3 1
w1 1.8 3 5.4 1
w2 3 2 6 1
w3 1.5 1.2 1.8 4
w4 1 1.2 1.2 1
w5 1.5 0.8 1.2 1
w6 0.5 0.5 0.25 2
w7 0.5 1.7 0.85 3

GF L H sqm opening 1 opening 2 Total


EW1 6.8 2.7 18.36 w3 1.8 w6 0.25 16.31
EW2 4 2.7 10.8 10.8
EW3 2.15 2.7 5.805 d2 1.89 3.915
EW4 4 2.7 10.8 w5 1.2 9.6
EW5 5.5 2.7 14.85 gd1 4.515 10.335
EW7 2.5 2.7 6.75 6.75
EW8 2.2 5.5 12.1 w1 5.4 6.7
EW9 3.1 2.7 8.37 8.37
EW10 4.3 2.7 11.61 w2 6 5.61
EW11 2.35 2.7 6.345 6.345
EW12 2.29 2.7 6.183 d1 3.36 2.823
EW13 1.85 2.7 4.995 w4 1.2 3.795
EW14 3.21 2.7 8.667 8.667

2F L H sqm opening 1 opening 2 opening 3


EW1 7.6 2.4 18.24 w3 1.8 w3 1.8
EW2 8 2.4 19.2 w6 0.25
EW3 3.45 2.4 8.28 w3 1.8
EW4 1.8 2.4 4.32
EW5 2.2 5.5 12.1
EW7 4.6 2.4 11.04
EW8 4.3 2.4 10.32 gd2 6.3
EW9 1.2 2.4 2.88
EW10 5.5 2.4 13.2 w7 0.85 w7 0.85 w7

Mortar area t V Total Volume Cement (40 kg) Sand (cu.m)


177.25 0.012 2.127 9.10
12 1
65.98 0.012 0.791742 3.59
Cell Volume
CHB100 0.003 2.80
CHB150 0.003 6.97

Plastering area t V Cement (40 kg) Sand (cu.m) Total Cement


185.95 0.24 44.63 535.54
12 1
74.68 0.24 17.92 215.08
Total 751
GF L H sqm opening 1 opening 2
IW1 4.65 2.7 12.555 w3 1.8 w6
IW2 3.21 2.7 8.667 w4 1.2 w7

2F L H sqm opening 1 Total


IW1 3.21 2.7 8.667 8.667
IW2 3.65 2.7 9.855 d3 1.68 8.175
IW3 1.6 2.7 4.32 d4 1.365 2.955
IW4 3.65 2.7 9.855 d3 1.68 8.175
IW5 1.795 2.7 4.8465 4.8465
IW6 2.25 2.7 6.075 6.075
IW7 1.05 2.7 2.835 2.835
IW8 4.34 2.7 11.718 d3 1.68 10.038
IW9 2.65 2.7 7.155 d4 1.365 5.79

opening 3 Total
14.64 GF 2F sqm no of chb Total pcs
18.95 CHB 150 100.02 85.93 185.95 12.5 2324.38
6.48 CHB 100 17.122 57.5565 74.68 12.5 933.48
4.32
12.1
11.04
4.02
2.88
0.85 11.5

Sand (cu.m) Total Cement Total Sand


109.20 9.10
1
43.11 3.59
Total 152 12.69

Total Cement Total Sand


535.54 44.63
215.08 17.92
751 62.55
opening 2 Total
0.25 10.505
0.85 6.617
Rebars
a. Footing Conc. Cover Left Hook Clear Span
m m (m) (m) (m)

F-1 1.3 1.3 0.075 0.2 1.15


F-2 1.6 1.6 0.075 0.2 1.45
F-3 1.4 1.4 0.075 0.2 1.25
F-4 0.8 0.8 0.075 0.2 0.65
F-5 0.6 0.6 0.075 0.2 0.45
CF-1 1.3 2.25 0.075 0.2 1.15
STF-1 0.6 1.15 0.075 0.2 0.45
c. Column from GF to 2nd Floor
L No. of bars pcs Rebar L(m) A Volume(cu.m) Unit weight
C1 4.575 8 12 439.2 804.2477193 0.35322559832 7850
C2 4.575 6 5 137.25 804.2477193 0.11038299947 7850
Stirrups
L No. of bars pcs Rebar L(m) A Volume(cu.m) Unit weight
C1 (LT1) 1.28 17 12 261.12 452.3893421 0.11812790501 7850
C1 (LT2) 0.76 17 12 155.04 452.3893421 0.0701384436 7850
C2 1.08 17 4 73.44 452.3893421 0.03322347328 7850
e. Column from 2nd to Roof
L No. of bars pcs Rebar L(m) A Volume(cu.m) Unit weight
C1 3.2 8 10 256 804.2477193 0.20588741614 7850
PC1 3.2 4 4 51.2 804.2477193 0.04117748323 7850
Stirrups
L No. of bars pcs Rebar L(m) A Volume(cu.m) Unit weight
C1 (LT1) 1.28 16 10 204.8 452.3893421 0.09264933726 7850
C1 (LT2) 0.76 16 10 121.6 452.3893421 0.055010544 7850
PC1 0.88 16 4 56.32 452.3893421 0.02547856775 7850
Total kg
GF to 2nd Floor 5378.02
2nd to Roof 3298.60
b Grade Beams
Top bar Bot bar
L M R L M R Diameter
GB1 H1 2 2 2 2 2 2 16
GB1 H2 2 2 2 2 2 2 16
GB1 H3 2 2 2 2 2 2 16
GB1 H4 2 2 2 2 2 2 16
GB1 H5 2 2 2 2 2 2 16
GB1 H6 2 2 2 2 2 2 16
GB1 H7 2 2 2 2 2 2 16
GB1 H8 2 2 2 2 2 2 16
GB1 V1 2 2 2 2 2 2 16
GB1 V2 2 2 2 2 2 2 16
GB1 V3 2 2 2 2 2 2 16
GB1 V4 2 2 2 2 2 2 16
GB1 V5 2 2 2 2 2 2 16
GB1 V6 2 2 2 2 2 2 16
GB1 V7 2 2 2 2 2 2 16

d. Ground Floor Slab


No. of bar
Bx By T Bx By Diameter V
SOG 1A 4.3 5.35 0.1 15 19 10 0.000013
SOG 1B 3.2 4.8 0.1 12 17 10 0.000009
SOG 1C 8 2 0.1 28 7 10 0.000009
SOG 1D.1 4.8 3.45 0.1 17 12 10 0.000009
SOG 1D.2 2.3 5.35 0.1 8 19 10 0.000007
SOG 2 3.2 4 0.15 12 14 10 0.000007
Total kg
Clear Span Right Hook
Total Short Side Long Side
(m) (m)

1.15 0.2 1.55 10 10


1.45 0.2 1.85 12 12
1.25 0.2 1.65 11 11
0.65 0.2 1.05 5 5
0.45 0.2 0.85 4 4
1.15 0.2 1.55 10 6
0.45 0.2 0.85 10 6

Total(kg) i. Stairs/Landing
2772.82 L No. of bar Rebar L A
866.51 1.71 1.05 2.0028 6 12.0168 0.000113097
1.31 1.05 1.67 6 10.02 0.000113097
Total(kg) 1.57 1.05 1.89 6 11.34 0.000113097
927.30 0.95 18 17.1 0.000113097
550.59 0.4 18 7.2 0.000113097
260.80 6 18 108 0.000113097
0.95 42 39.9 0.000113097
Total(kg)
1616.22
323.24

Total(kg)
727.30
431.83
200.01

Length
Length M R V(t) V(b) Total(kg)
1195 2973.33 1195 0.002157 0.002157 33.86
895 2173.33 895 0.001594 0.001594 25.02
1020 2506.67 1020 0.001828 0.001828 28.70
1195 2973.33 1195 0.002157 0.002157 33.86
1020 2506.67 1020 0.001828 0.001828 28.70
1395 3506.67 1395 0.002532 0.002532 39.75
920 2240 920 0.001641 0.001641 25.76
2095 5373.33 2095 0.003846 0.003846 60.38
970 2373.33 970 0.001734 0.001734 27.23
832.5 2006.67 832.5 0.001476 0.001476 23.18
1457.5 3673.33 1457.5 0.002649 0.002649 41.59
2270 5840 2270 0.004174 0.004174 65.53
1220 3040 1220 0.002204 0.002204 34.60
1532.5 3873.33 1532.5 0.00279 0.002790 43.80
1370 3440 1370 0.002485 0.002485 39.02
Total kg 551.00

Total(kg)
99.8482576
69.0522065
69.0522065
71.6724911
53.3304988
57.2146854
420.17
Total Total Rebar Length Rebar Diameter Volume of Rebar Unit Weight of
Required Rebar
20 31 0.012 0.003506017401406 7850
24 44.4 0.012 0.005021521697498 7850
22 36.3 0.012 0.004105433279711 7850
10 10.5 0.012 0.001187522023057 7850
8 6.8 0.012 0.000769061881599 7850
16 24.8 0.012 0.002804813921125 7850
16 13.6 0.012 0.001538123763198 7850

Volume(cu.m) Unit weight Total(kg)


0.0013590640296 7850 10.67
0.00113323194 7850 8.90
0.00128251998 7850 10.07
0.0019339587 7850 15.18
0.0008142984 7850 6.39
0.012214476 7850 95.88
0.0045125703 7850 35.42
Total kg 182.51
Weight of Rebar pcs Total
Required
27.52 9 247.70
39.42 2 78.84
32.23 1 32.23
9.32 3 27.97
6.04 1 6.04
22.02 1 22.02
12.07 1 12.07
Earthworks
a. Excavation Dimensions (m) Volume m3 pc/s Total Volume m3
F1 1.30 1.30 1.50 2.54 9 22.82
F2 1.60 1.60 1.50 3.84 2 7.68
F3 1.40 1.40 1.50 2.94 1 2.94
F4 0.80 0.80 1.50 0.96 3 2.88
F5 0.60 0.60 1.50 0.54 1 0.54
CF1 1.30 2.25 1.50 4.39 1 4.39
STF1 0.60 1.15 1.50 1.04 1 1.04
WF 69.25 0.25 0.60 10.39 1 10.39
Total Volume m3 52.67
b. Bedding Dimensions (m) Volume m3 pc/s Total Volume m3
F1 1.30 1.30 0.75 1.27 9 11.41
F2 1.60 1.60 0.75 1.92 2 3.84
F3 1.40 1.40 0.75 1.47 1 1.47
F4 0.80 0.80 0.75 0.48 3 1.44
F5 0.60 0.60 0.75 0.27 1 0.27
CF1 1.30 2.25 0.75 2.19 1 2.19
STF1 0.60 1.15 0.75 0.52 1 0.52
WF 69.25 0.25 0.60 10.39 1 10.39
SOG1 5.35 4.30 0.10 2.30 1 2.30
5.35 2.30 0.10 1.23 1 1.23
3.45 4.88 0.10 1.68 1 1.68
2.00 8.00 0.10 1.60 1 1.60
4.80 3.20 0.10 1.54 1 1.54
SOG2 4.00 3.20 0.15 1.92 1 1.92
Total Volume m3 41.80
c. Backfill Dimensions (m) Volume m3
pc/s Total Volume m3
F1 1.30 1.30 1.50 2.54 9 22.82
F2 1.60 1.60 1.50 3.84 2 7.68
F3 1.40 1.40 1.50 2.94 1 2.94
F4 0.80 0.80 1.50 0.96 3 2.88
F5 0.60 0.60 1.50 0.54 1 0.54
CF1 1.30 2.25 1.50 4.39 1 4.39
STF1 0.60 1.15 1.50 1.04 1 1.04
Total Volume m3 42.28
C1 0.40 0.20 4.58 0.37 12 4.39
C2 0.30 0.20 4.58 0.27 5 1.37
Total Volume m3 5.76
Total Volume m3 36.51