PP67-PE-GEN-00-DOR-LS-L-001 - Rev02 - Telecom Equipment List
PP67-PE-GEN-00-DOR-LS-L-001 - Rev02 - Telecom Equipment List
: PP67-PE-GEN-00-DOR-LS-L-001
Peru Block 67 Field
Development Revision: 02 Rev Date : 20-Jul-2011
WARNING: This document as printed may not be the latest version. Please refer to the electronic file in the EDMS
/conversion/tmp/activity_task_scratch/757748754.doc
Doc. Ref.: PP67-PE-GEN-00-DOR-LS-L-001
Peru Block 67 Field
Development Revision: 02 Rev Date : 20-Jul-2011
INDEX
1 GENERAL................................................................................................................................................ 4
1.1 The Project Overview...................................................................................................................... 4
1.2 Purpose........................................................................................................................................... 4
2 REFERENCE DOCUMENTS.................................................................................................................... 4
2.1 Project Documents.......................................................................................................................... 4
2.2 Company Documents...................................................................................................................... 5
2.3 Codes and Standards...................................................................................................................... 5
3 DEFINITIONS........................................................................................................................................... 5
3.1 Parties Involved............................................................................................................................... 5
3.2 Technical Abbreviations................................................................................................................... 5
4 PIRANA LISTING..................................................................................................................................... 7
4.1 Backbone Fibre-Optic Bearer.......................................................................................................... 7
4.2 Back Up Transmission System........................................................................................................ 7
4.3 WAN and LAN Data Network........................................................................................................... 8
4.4 CCTV System.................................................................................................................................. 9
4.5 Telephone & Office Systems......................................................................................................... 10
4.6 General Alarm System................................................................................................................... 10
4.7 Radio Communication Systems..................................................................................................... 11
4.8 Miscellaneous................................................................................................................................ 12
5 WELL PADS........................................................................................................................................... 13
5.1 WAN and LAN Data Network......................................................................................................... 13
5.2 CCTV System................................................................................................................................ 14
5.2.1 Well Pad PPi1.............................................................................................................................................. 14
5.2.2 Well Pad PPi3.............................................................................................................................................. 14
5.3 Telephone System......................................................................................................................... 15
5.4 General Alarm System................................................................................................................... 15
5.4.1 Well Pad PPi1.............................................................................................................................................. 15
5.4.2 Well Pad PPi3.............................................................................................................................................. 15
5.5 Radio Communication Systems..................................................................................................... 16
5.6 Miscellaneous................................................................................................................................ 16
5.6.1 Well Pad PPi1.............................................................................................................................................. 16
5.6.2 Well Pad PPi3.............................................................................................................................................. 16
6 CURARAY TERMINAL SITE.................................................................................................................. 17
6.1 Backbone Fibre-Optic Bearer........................................................................................................ 17
6.2 Back Up VSAT System.................................................................................................................. 17
6.3 WAN and LAN Data Network......................................................................................................... 18
6.4 CCTV System................................................................................................................................ 18
6.5 Telephone System......................................................................................................................... 19
6.6 General Alarm System................................................................................................................... 20
6.7 Radio Communication Systems..................................................................................................... 20
6.8 Microwave Line Of Sight Link........................................................................................................ 21
6.9 Miscellaneous................................................................................................................................ 21
WARNING: This document as printed may not be the latest version. Please refer to the electronic file in the EDMS
/conversion/tmp/activity_task_scratch/757748754.doc
Doc. Ref.: PP67-PE-GEN-00-DOR-LS-L-001
Peru Block 67 Field
Development Revision: 02 Rev Date : 20-Jul-2011
WARNING: This document as printed may not be the latest version. Please refer to the electronic file in the EDMS
/conversion/tmp/activity_task_scratch/757748754.doc
Doc. Ref.: PP67-PE-GEN-00-DOR-LS-L-001
Peru Block 67 Field
Development Revision: 02 Rev Date : 20-Jul-2011
1 GENERAL
Block 67 is an oil field located on the Maranon Basin, in the north east part of Peru and is situated in the
Amazon rainforest between the Andean Cordillera and the Guyana Shield. It covers an area in excess of
200 000 km².
The exploitation of Block 67 will be developed through a limited number of well platforms (or pads) to
minimise the environmental impact. All wells will be deviated to maximise production volumes. Produced
fluids from each field will be gathered and treated in dedicated Central Production Facilities (CPF) prior to
export.
Block 67 initial two project phases consist of two integrated field developments, i.e. Piraña and Dorado, with
a total production capacity of up to 12 000 barrels per day of heavy oil. The field development will initially
focus on Piraña, and then on Dorado as follows:
The first phase, “phase 0”, is dedicated to Piraña field development where the best results have been
obtained in terms of volumes and oil quality.
The second phase, “phase 1”, will extend the development of Piraña and initiate the development of Dorado.
For the Dorado Phase 1 site, there will be some pre-investment infra-structure needed in Phase 0, in order to
provide facilities for the management of a pipeline Section Valve, and to provide access into and out of main
backbone fibres in the fibre-optical cable bundle.
1.2 Purpose
This document presents a listing of all major telecom equipment required to implement Phase 0 of the PP67
Project telecom scope. Neither portable/mobile equipment, battery chargers, test equipment, nor telecom
cables, have been included in the following tables. Equipment required for the Lima office is undecided.
The remote end of the LOS MW link at CT is to be located on the LBC site, and for the purposes of this list,
Tag Numbers have been allocated as “LB”.
2 REFERENCE DOCUMENTS
All Project document numbers commence with PP67, so this has been omitted.
WARNING: This document as printed may not be the latest version. Please refer to the electronic file in the EDMS
/conversion/tmp/activity_task_scratch/757748754.doc
Doc. Ref.: PP67-PE-GEN-00-DOR-LS-L-001
Peru Block 67 Field
Development Revision: 02 Rev Date : 20-Jul-2011
3 DEFINITIONS
CR Control Room
DC Direct Current
GA General Alarm
ICSS Integrated Control and Safety Systems (ESD, Fire & Gas)
WARNING: This document as printed may not be the latest version. Please refer to the electronic file in the EDMS
/conversion/tmp/activity_task_scratch/757748754.doc
Doc. Ref.: PP67-PE-GEN-00-DOR-LS-L-001
Peru Block 67 Field
Development Revision: 02 Rev Date : 20-Jul-2011
W Watts
WARNING: This document as printed may not be the latest version. Please refer to the electronic file in the EDMS
/conversion/tmp/activity_task_scratch/757748754.doc
Doc. Ref.: PP67-PE-GEN-00-DOR-LS-L-001
Peru Block 67 Field Development
Revision: 02 Rev Date : 20-Jul-2011
4 PIRANA LISTING
DESCRIPTION SHELTER OR ZONE LOCATION TAG NUMBER HAZ/ NON HAZ OPERATING LOAD
CERT SUPPLY
VSAT ODU Electronics Control Building Roof PI-L-VS-ODU-01 Non 230V AC UPS 600 watts
VSAT Antenna Pedestal Control Building Roof PI-L-VS-ANT-01 Non 230V AC UPS 50 watts
VSAT IDU Router Control Building TER Cabinet 3 PI-L-VS-IDU-01 Non 230V AC UPS 250 watts
Transmission Control PC Control Building TER Cabinet 3 PI-L-OP-SUP-01 Note 1 Non 230V AC UPS 250 watts
Vendor Composite Cable Interlinking the ODU and IDU PI-L-VS-CAB-01 Non None Zero
TOTAL UPS LOAD 1150
WARNING: This document as printed may not be the latest version. Please refer to the electronic file in the EDMS
/conversion/tmp/activity_task_scratch/757748754.doc
Doc. Ref.: PP67-PE-GEN-00-DOR-LS-L-001
Peru Block 67 Field Development
Revision: 02 Rev Date : 20-Jul-2011
DESCRIPTION SHELTER OR ZONE TAG NUMBER HAZ/ NON HAZ OPERATING LOAD
CERT or NON SUPPLY
Layer 3 Dual LAN Switch Control Building TER Cabinet 2 PI-L-VL-SW3-01A Non 230V AC UPS 360 watts
Layer 3 Dual LAN Switch Control Building TER Cabinet 2 PI-L-VL-SW3-01B Non 230V AC UPS 360 watts
Layer 2 Dual LAN Switch Control Building TER Cabinet 2 PI-L-VL-SW2-01A Non 230V AC UPS 360 watts
Layer 2 Dual LAN Switch Control Building TER Cabinet 2 PI-L-VL-SW2-01B Non 230V AC UPS 360 watts
LAN Server Instrument & Control Building TER PI-L-VL-SRV-01 Non 230V AC UPS 250 watts
Email Server Instrument & Control Building TER PI-L-VL-SRV-02 non 230V AC UPS 250 watts
Layer 2 LAN Switch MCC PI-SW-101 Utilities Area PI-L-VL-SW2-02 Non 230V AC UPS 250 watts
Layer 2 LAN Switch MCC PI-SW-201 Utilities Area PI-L-VL-SW2-03 Non 230V AC UPS 250 watts
Layer 2 LAN Switch MCC PI-SW-202 Utilities Area PI-L-VL-SW2-04 Non 230V AC UPS 250 watts
Layer 2 LAN Switch MCC PI-SW-203 Process Area PI-L-VL-SW2-05 Non 230V AC UPS 250 watts
Fibre-Optic PP 48 port Instrument & Control Building TER PI-L-VL-FOP-01 Non None Zero
Fibre-Optic PP 12 port MCC PI-SW-101 for site LAN PI-L-VL-FOP-02 Non None Zero
Fibre-Optic PP 12 port MCC PI-SW-201 for site LAN PI-L-VL-FOP-03 Non None Zero
Fibre-Optic PP 12 port MCC PI-SW-202 for site LAN PI-L-VL-FOP-04 Non None Zero
Fibre-Optic PP 12 port MCC PI-SW-203 for site LAN PI-L-VL-FOP-05 Non None Zero
Copper Cable PP 96 port Instrument & Control Building TER PI-L-VL-PPS-02 Non None Zero
Copper Cable PP 6 port Security Main Gatehouse LAN PI-L-VL-PPS-03 Non None Zero
Copper Cable PP 12 port Laboratory for LAN termination PI-L-VL-PPS-04 Non None Zero
Copper Cable PP 6 port Workshop for LAN termination PI-L-VL-PPS-05 Non None Zero
Copper Cable PP 12 port MCC PI-SW-101 for copper LAN PI-L-VL-PPS-06 Non None Zero
Copper Cable PP 12 port MCC PI-SW-201 for copper LAN PI-L-VL-PPS-07 Non None Zero
Copper Cable PP 12 port MCC PI-SW-202 for copper LAN PI-L-VL-PPS-08 Non None Zero
Copper Cable PP 12 port MCC PI-SW-203 for copper LAN PI-L-VL-PPS-09 Non None Zero
TOTAL UPS LOAD 3740 W
The above are derived from Ref [7] sheet 3. The complement of Patch Panels covers Data LAN and Telephony LAN requirements.
WARNING: This document as printed may not be the latest version. Please refer to the electronic file in the EDMS
/conversion/tmp/activity_task_scratch/757748754.doc
Doc. Ref.: PP67-PE-GEN-00-DOR-LS-L-001
Peru Block 67 Field Development
Revision: 02 Rev Date : 20-Jul-2011
WARNING: This document as printed may not be the latest version. Please refer to the electronic file in the EDMS
/conversion/tmp/activity_task_scratch/757748754.doc
Doc. Ref.: PP67-PE-GEN-00-DOR-LS-L-001
Peru Block 67 Field Development
Revision: 02 Rev Date : 20-Jul-2011
Washer Tank/pump system Serving TV-CAM-10 PI-L-TV-PMP-10 NON 230V AC UPS 25 watts
Washer Tank/pump system Serving TV-CAM-11 PI-L-TV-PMP-11 NON 230V AC UPS 25 watts
Washer Tank/pump system Serving TV-CAM-12 PI-L-TV-PMP-12 NON 230V AC UPS 25 watts
TOTAL UPS LOAD 3350 W
DESCRIPTION SHELTER OR ZONE LOCATION TAG NUMBER HAZ/ NON HAZ OPERATING LOAD
CERT SUPPLY
Ring Main Contactor A loop Control Building TER Cabinet 5 PI-L-GA-CTR-01 Non From PSU 20 watts
Ring Main Contactor B Loop Control Building TER Cabinet 5 PI-L-GA-CTR-02 Non From PSU 20 watts
WARNING: This document as printed may not be the latest version. Please refer to the electronic file in the EDMS
/conversion/tmp/activity_task_scratch/757748754.doc
Doc. Ref.: PP67-PE-GEN-00-DOR-LS-L-001
Peru Block 67 Field Development
Revision: 02 Rev Date : 20-Jul-2011
Ring Main Contactor C Loop Control Building TER Cabinet 5 PI-L-GA-CTR-03 Non From PSU 20 watts
Contactor AC/DC PSU Control Building TER Cabinet 5 PI-L-GA-PSU-01 Non AC UPS 230V 20 watts
Contactor AC/DC PSU Control Building TER Cabinet 5 PI-L-GA-PSU-02 Non AC UPS 230V 20 watts
Interior Sounder Admin Offices Corridor PI-L-GA-SIR-01-A Non AC UPS 230V 10 watts
Interior Sounder Admin Offices Corridor PI-L-GA-SIR-02-A Non AC UPS 230V 10 watts
Interior Sounder Control Bldg Control Room PI-L-GA-SIR-03-A Non AC UPS 230V 10 watts
Interior Sounder CPF Workshop PI-L-GA-SIR-04-A Non AC UPS 230V 10 watts
Interior Sounder CPF Workshop PI-L-GA-SIR-05-A Non AC UPS 230V 10 watts
Exterior Klaxon Siren Gatehouse Roof PI-L-GA-SIR-01-B Haz Cert Zone 2 AC UPS 230V 250 watts
Exterior Klaxon Siren Workshop roof PI-L-GA-SIR-02-B Haz Cert Zone 2 AC UPS 230V 250 watts
Exterior Klaxon Siren West Fence facing east PI-L-GA-SIR-03-B Haz Cert Zone 2 AC UPS 230V 250 watts
Exterior Klaxon Siren Central facing south PI-L-GA-SIR-04-B Haz Cert Zone 2 AC UPS 230V 250 watts
Exterior Klaxon Siren Central facing north PI-L-GA-SIR-05-B Haz Cert Zone 2 AC UPS 230V 250 watts
Exterior Klaxon Siren South facing east PI-L-GA-SIR-06-B Haz Cert Zone 2 AC UPS 230V 250 watts
Exterior Klaxon Siren Process PI-TP-912 PI-L-GA-SIR-01-C Haz Cert Zone 2 AC UPS 230V 250 watts
Exterior Klaxon Siren Process PI-TF-161B PI-L-GA-SIR-02-C Haz Cert Zone 2 AC UPS 230V 250 watts
Exterior Klaxon Siren Process PI-TF-160A PI-L-GA-SIR-03-C Haz Cert Zone 2 AC UPS 230V 250 watts
Exterior Klaxon Siren See layout PI-L-GA-SIR-04-C Haz Cert Zone 2 AC UPS 230V 250 watts
TOTAL UPS LOAD 2650 W
The above are derived from Ref. [3]
DESCRIPTION SHELTER OR ZONE TAG NUMBER HAZ/ NON HAZ OPERATING LOAD
CERT SUPPLY
Trunked Mobile Base T/R CPF Control Bldg TER Cabinet 4 PI-L-TR-BTR-01 Non From PSU None
Trunk Switch CPF Control Bldg TER Cabinet 4 PI-L-TR-TSW-01 Non 230V AC UPS 400 W
Dedicated AC/DC PSU CPF Control Bldg TER Cabinet 4 PI-L-TR-PSU-01 Non 230V AC UPS 200 W
Base Antenna On Radio Mast PI-L-TR-ANT-01 Non None None
VHF Aero Radio Base CPF Control Bldg TER Cabinet 4 PI-L-TR-BTR-02 Non See below None
Aero Base Antenna On Radio Mast PI-L-TR-ANT-02 Non None None
AC-DC Power Unit TMR CPF Control Bldg TER PI-L-TR-PSU-01 Non AC UPS 230V 50 watts
AC-DC Power Unit Aero CPF Control Bldg TER PI-L-TR-PSU-02 Non AC UPS 230V 75 watts
TMR radio Security Gatehouse PI-L-TR-TVR-01 Non From PSU None
WARNING: This document as printed may not be the latest version. Please refer to the electronic file in the EDMS
/conversion/tmp/activity_task_scratch/757748754.doc
Doc. Ref.: PP67-PE-GEN-00-DOR-LS-L-001
Peru Block 67 Field Development
Revision: 02 Rev Date : 20-Jul-2011
TMR radio Power Unit Security Gatehouse PI-L-TR-PSU-03 Non AC UPS 230V 25 watts
TMR Radio Antenna Gatehouse roof on TV Camera mast PI-L-TR-ANT-03 Non None None
TMR radio Plant manager’s office PI-L-TR-TVR-02 Non From PSU None
TMR radio Power Unit Plant manager’s office PI-L-TR-PSU-04 Non AC UPS 230V 25 watts
TMR Radio Antenna Roof of Admin Building PI-L-TR-ANT-04 Non None None
TMR radio CPF Control Room console PI-L-TR-TVR-03 Non From PSU None
TMR radio Power Unit Under base radio Control Room PI-L-TR-PSU-05 Non AC UPS 230V 25 watts
TMR Radio Antenna Roof of Control Building PI-L-TR-ANT-05 Non None None
TOTAL UPS LOAD 800 W
The above is derived from Ref. [11].
The above list details the fixed installation elements. The Table above does not list the mobile and portable elements, because these have no fixed position. They
have no Tag Number because the Tag Number is applied to the location and not to the equipment.
4.8 Miscellaneous
WARNING: This document as printed may not be the latest version. Please refer to the electronic file in the EDMS
/conversion/tmp/activity_task_scratch/757748754.doc
Doc. Ref.: PP67-PE-GEN-00-DOR-LS-L-001
Peru Block 67 Field Development
Revision: 02 Rev Date : 20-Jul-2011
Mast for Camera & Siren Supporting TV-CAM-07 & siren PI-L-MT-STR-08 Non None 6 m high hinged at centre
Mast for Camera & Siren Supporting TV-CAM-08 & siren PI-L-MT-STR-09 Non None 6 m high hinged at centre
Mast for Camera & Siren Supporting TV-CAM-09 & siren PI-L-MT-STR-10 Non None 6 m high hinged at centre
Mast for Camera & Siren Supporting TV-CAM-10 & siren PI-L-MT-STR-11 Non None 6 m high hinged at centre
Mast for Camera & Siren Supporting TV-CAM-09 & siren PI-L-MT-STR-10 Non None 6 m high hinged at centre
Mast for Camera & Siren Supporting TV-CAM-10 & siren PI-L-MT-STR-11 Non None 6 m high hinged at centre
Mast for Camera & Siren Supporting TV-CAM-11 & siren PI-L-MT-STR-12 Non None 6 m high hinged at centre
Mast for Camera & Siren Supporting TV-CAM-12 & siren PI-L-MT-STR-13 Non None 6 m high hinged at centre
Radio Op Console Control Bldg TER PI-L-OP-CON-02 Non UPS see above 2400 x 600 x 700 hi
Interface JB Main FOC At Secondary Access Gate PI-L-TX-IJB-01 Non None Zero
Interface JB Well Pad FOC At Secondary Access Gate PI-L-TX-IJB-02 Non None Zero
TOTAL UPS LOAD 600 Watts at night only
The above is derived from Refs [3] and the system Block Diagrams.
Total UPS Telecom .electrical load for the CPF is approximately 13 750 watts.
5 WELL PADS
There are 5 Well Pads, on which the CCTV cameras and GA Siren quantities differ. In those cases, separate tables are given below for those systems.
Well Pads 1 and 3 are to be implemented in Phase 0, with the remaining Pads in Phase 1. Only Phase 0 elements are listed below.
Note: ** means Tag Numbers range therefore from P1 through P5 denoting which Well Pad is relevant.
DESCRIPTION SHELTER OR ZONE TAG NUMBER HAZ/ NON HAZ OPERATING LOAD
CERT SUPPLY
Layer 3 Dual VLAN Switch Well Pad Control Building Cabinet P**-L-TX-SW3-01 NON 230 V AC UPS 360 watts
Layer 3 Dual VLAN Switch Well Pad Control Building Cabinet P**-L-TX-SW3-02 NON 230 V AC UPS 360 watts
Fibre-Optic cassette Well Pad Control Building Cabinet P**-L-TX-CAS-01 NON None Zero
Fibre-Optic Patch Panel Well Pad Control Building Cabinet P**-L-TX-OPP-01 NON None Zero
Copper CAT6 Patch Panel Well Pad Control Building Cabinet P**-L-VL-PPS-01 NON None Zero
Battery Limits Interface JB Near the Fibre Optic Cable arrival on site P**-L-TX-IJB-01 NON None Zero
TOTAL UPS LOAD 720 watts
WARNING: This document as printed may not be the latest version. Please refer to the electronic file in the EDMS
/conversion/tmp/activity_task_scratch/757748754.doc
Doc. Ref.: PP67-PE-GEN-00-DOR-LS-L-001
Peru Block 67 Field Development
Revision: 02 Rev Date : 20-Jul-2011
DESCRIPTION SHELTER OR ZONE TAG NUMBER HAZ/ NON HAZ OPERATING LOAD
CERT SUPPLY
CCTV VLAN switch Control Shelter Bldg P1-L-TV-SW2-01 NON 230 V AC UPS 360 watts
CCTV Camera See layouts P1-L-TV-CAM-01 NON 230 V AC UPS 50 watts
CCTV Camera See layouts P1-L-TV-CAM-02 NON 230 V AC UPS 50 watts
CCTV Camera See layouts P1-L-TV-CAM-03 NON 230 V AC UPS 50 watts
CCTV Camera See layouts P1-L-TV-CAM-04 NON 230 V AC UPS 50 watts
Washer Tank/pump system Serving TV-CAM-01 P1-L-TV-PMP-01 NON 230 V AC UPS 25 watts
Washer Tank/pump system Serving TV-CAM-02 P1-L-TV-PMP-02 NON 230 V AC UPS 25 watts
Washer Tank/pump system Serving TV-CAM-03 P1-L-TV-PMP-03 NON 230 V AC UPS 25 watts
Washer Tank/pump system Serving TV-CAM-04 P1-L-TV-PMP-04 NON 230 V AC UPS 25 watts
TOTAL UPS LOAD 670 Watts
DESCRIPTION SHELTER OR ZONE TAG NUMBER HAZ/ NON HAZ OPERATING LOAD
CERT SUPPLY
CCTV VLAN switch Control Shelter Bldg P3-L-TV-SW2-01 NON 230 V AC UPS 360 watts
CCTV Camera See layouts P3-L-TV-CAM-01 NON 230 V AC UPS 50 watts
CCTV Camera See layouts P3-L-TV-CAM-02 NON 230 V AC UPS 50 watts
Washer Tank/pump system Serving TV-CAM-01 P3-L-TV-PMP-01 NON 230 V AC UPS 25 watts
Washer Tank/pump system Serving TV-CAM-02 P3-L-TV-PMP-02 NON 230 V AC UPS 25 watts
TOTAL UPS LOAD 510 Watts
WARNING: This document as printed may not be the latest version. Please refer to the electronic file in the EDMS
/conversion/tmp/activity_task_scratch/757748754.doc
Doc. Ref.: PP67-PE-GEN-00-DOR-LS-L-001
Peru Block 67 Field Development
Revision: 02 Rev Date : 20-Jul-2011
DESCRIPTION SHELTER OR ZONE TAG NUMBER HAZ/ NON HAZ OPERATING LOAD
CERT SUPPLY
Telephony Over IP Phone Control Shelter Bldg P**-L-TP-TEL-01 NON From LAN switch POE (none)
DESCRIPTION SHELTER OR ZONE TAG NUMBER HAZ/ NON HAZ OPERATING LOAD
CERT SUPPLY
Ring Main Contactor ring A Control Shelter P3-L-GA-CTR-01 Non From AC/DC PSU Zero
GA AC/DC PSU Control Shelter P3-L-GA-PSU-01 Non AC UPS 230V 50 watts
Interior Sounder Control Shelter P3-L-GA-SIR-03C Non AC UPS 230V 10 watts
Exterior Klaxon Siren See layout drawing for the site P3-L-GA-SIR-01-A Haz Cert Zone 2 AC UPS 230V 250 watts
Exterior Klaxon Siren See layout drawing for the site P3-L-GA-SIR-02-A Haz Cert Zone 2 AC UPS 230V 250 watts
TOTAL UPS LOAD 560 watts
WARNING: This document as printed may not be the latest version. Please refer to the electronic file in the EDMS
/conversion/tmp/activity_task_scratch/757748754.doc
Doc. Ref.: PP67-PE-GEN-00-DOR-LS-L-001
Peru Block 67 Field Development
Revision: 02 Rev Date : 20-Jul-2011
DESCRIPTION SHELTER OR ZONE TAG NUMBER HAZ/ NON HAZ OPERATING LOAD
CERT SUPPLY
Trunked Radio Base VHF Control Shelter one per site P**-L-TR-BTR-01 NON From PSU-01 Zero
AC/DC Power Unit Control Shelter one per site P**-L-TR-PSU-01 NON AC UPS 230V 50 watts
VHF Antenna On pole one per site P**-L-TR-ANT-01 NON None None
The above is derived from Ref [4]
One system as above is required per Well Pad site. UPS load is therefore 50 watts per site.
5.6 Miscellaneous
The above is derived from Ref [4]. Note: 1 CCTV camera (CAM-02) is mounted under the roof of a sun shelter and does not require a mast.
WARNING: This document as printed may not be the latest version. Please refer to the electronic file in the EDMS
/conversion/tmp/activity_task_scratch/757748754.doc
Doc. Ref.: PP67-PE-GEN-00-DOR-LS-L-001
Peru Block 67 Field Development
Revision: 02 Rev Date : 20-Jul-2011
WARNING: This document as printed may not be the latest version. Please refer to the electronic file in the EDMS
/conversion/tmp/activity_task_scratch/757748754.doc
Doc. Ref.: PP67-PE-GEN-00-DOR-LS-L-001
Peru Block 67 Field Development
Revision: 02 Rev Date : 20-Jul-2011
DESCRIPTION SHELTER OR ZONE TAG NUMBER HAZ CERT /NON OPERATING LOAD
HAZ SUPPLY
Layer 3 Dual LAN Switch Instrument & Control Building TER CT-L-VL-SW3-01A Non 230V AC UPS 400 watts
Layer 3 Dual LAN Switch Instrument & Control Building TER CT-L-VL-SW3-01B Non 230V AC UPS 400 watts
Fibre-Optic Patch Panel Instrument & Control Building TER CT-L-VL-FOP-01 Non None Zero
LAN Server PC Instrument & Control Building TER CT-L-VL-SRV-01 Non 230V AC UPS 250 watts
Email Server PC Instrument & Control Building TER CT-L-VL-SRV-02 non 230V AC UPS 250 watts
Dual Layer 2 switch Control Bldg TER CT-L-VL-SW2-01A Non 230V AC UPS 250 watts
Dual Layer 2 switch Control Bldg TER CT-L-VL-SW2-01B Non 230V AC UPS 250 watts
Layer 2 switch MCC CT-L-VL-SW2-03 Non 230V AC UPS 250 watts
CAT6 Copper Patch Panel Control Building TER CT-L-VL-PPS-03 Non None Zero
CAT6 Copper Patch Panel Laboratory CT-L-VL-PPS-02 Non None Zero
CAT6 Copper Patch Panel MCC CT-L-VL-PPS-04 Non None Zero
Total UPS Load 3450 W
DESCRIPTION SHELTER OR ZONE TAG NUMBER HAZ CERT /NON OPERATING LOAD
HAZ SUPPLY
CCTV Server PC CPF TER cabinet CT-L-TV-SRV-01 NON 230V AC UPS 350 watts
Cabinet display monitor CPF TER cabinet CT-L-TV-MON-01 NON 230V AC UPS Incl in PC
Control Room Telecom Desk CCR Console CT-L-TV-CON-02 NON None Zero
Control Room Monitor 1 CCR CT-L-TV-MON-02 NON 230V AC UPS 400 watts
Control Room Monitor 2 CCR CT-L-TV-MON-03 NON 230V AC UPS 400 watts
CR Display Server PC CPF CCR CT-L-TV-SRV-01 NON 230V AC UPS 360 watts
Plant Manager’s Monitor CPF Administration Offices CT-L-TV-MON-04 NON 230V AC UPS 150 watts
Security Room Monitor CPF Admin Security Office CT-L-TV-MON-05 NON 230V AC UPS 150 watts
Safety Officer’s Monitor CPF Administration Offices CT-L-TV-MON-06 NON 230V AC UPS 150 watts
Digital Video Recorder CPF TER Cabinet CT-L-TV-STO-01 NON 230V AC UPS 400 watts
Exterior camera See layout Ref [2] CT-L-TV-CAM-01 NON 230V AC UPS 50 watts
Exterior camera - .. - CT-L-TV-CAM-02 NON 230V AC UPS 50 watts
WARNING: This document as printed may not be the latest version. Please refer to the electronic file in the EDMS
/conversion/tmp/activity_task_scratch/757748754.doc
Doc. Ref.: PP67-PE-GEN-00-DOR-LS-L-001
Peru Block 67 Field Development
Revision: 02 Rev Date : 20-Jul-2011
DESCRIPTION SHELTER OR ZONE TAG NUMBER HAZ / NON HAZ OPERATING LOAD
SUPPLY
Slave IPBX TER CT-L-TP-IPX-01 NON AC UPS 230V 600 watts
Telephony Over IP Phone Control Room CT-L-TP-TEL-01 NON From IPBX POE (none)
Telephony Over IP Phone Control Room CT-L-TP-TEL-02 NON From IPBX POE (none)
Telephony Over IP Phone Plant Manager CT-L-TP-TEL-03 NON From IPBX POE (none)
Telephony Over IP Phone Logistics Manager CT-L-TP-TEL-04 NON From IPBX POE (none)
Telephony Over IP Phone Admin Offices CT-L-TP-TEL-05 NON From IPBX POE (none)
Telephony Over IP Phone Admin Offices CT-L-TP-TEL-06 NON From IPBX POE (none)
Telephony Over IP Phone Admin Offices CT-L-TP-TEL-07 NON From IPBX POE (none)
Telephony Over IP Phone Security Office CT-L-TP-TEL-08 NON From IPBX POE (none)
Telephony Over IP Phone Canteen CT-L-TP-TEL-09 NON From IPBX POE (none)
Total UPS LOad 600 W
Telephones use Power-Over-Ethernet supply, and are supplied from the IPBX. For the system manager see Note 1 above
WARNING: This document as printed may not be the latest version. Please refer to the electronic file in the EDMS
/conversion/tmp/activity_task_scratch/757748754.doc
Doc. Ref.: PP67-PE-GEN-00-DOR-LS-L-001
Peru Block 67 Field Development
Revision: 02 Rev Date : 20-Jul-2011
DESCRIPTION SHELTER OR ZONE TAG NUMBER HAZ/ NON HAZ OPERATING LOAD
SUPPLY
Contactor A Loop Control Building TER CT-L-GA-CTR-01 Non AC UPS 230V From PSU
AC/DC Power Supply Unit Control Building TER CT-L-GA-PSU-01 NON AC UPS 230V 20 watts
Interior Sounder Control Room CT-L-GA-SIR-01-A NON AC UPS 230V 10 watts
Interior Sounder Admin offices CT-L-GA-SIR-02-A NON AC UPS 230V 10 watts
Interior Sounder Laboratory CT-L-GA-SIR-03-A NON AC UPS 230V 10 watts
Interior Sounder Canteen CT-L-GA-SIR-04-A NON AC UPS 230V 10 watts
Exterior Siren Klaxon See layout drawings CT-L-GA-SIR-01-B Cert for Zone 2 AC UPS 230V 250 watts
Exterior Siren Klaxon See layout drawings CT-L-GA-SIR-02-B Cert for Zone 2 AC UPS 230V 250 watts
Exterior Siren Klaxon See layout drawings CT-L-GA-SIR-03-B Cert for Zone 2 AC UPS 230V 250 watts
Total UPS Load 810 W
The above schedule is taken from Ref. [2]
DESCRIPTION SHELTER OR ZONE TAG NUMBER HAZ/ NON HAZ OPERATING LOAD
CERT SUPPLY
Trunked Mobile Base TR Control Building TER CT-L-TR-BTS-01 NON From PSU-01 Zero
Trunked Radio Switch Control Building TER CT-L-TR-TRS-01 NON AC UPS 230V 120 watts
Supervisory PC Control Building TER Cabinet 3 See Note 1 under VSAT See Note 1 See Note 1 See Note 1
Base Antenna Radio Mast CT-L-TR-ANT-01 NON None Zero
VHF Marine Radio Base Control Building TER CT-L-TR-BTS-02 NON From PSU-02 75 watts
Marine radio Antenna Radio Mast CT-L-TR-ANT-02 NON None Zero
AC-DC Power Unit TMR Control Building TER CT-L-TR-PSU-01 NON AC UPS 230V 150 watts
AC-DC Power Unit Marine Control Building TER CT-L-TR-PSU-02 NON AC UPS 230V 50 watts
Local TMR antenna Control Building roof CT-L-TR-ANT-03 NON None Zero
TMR Desk top radio Plant Manager’s office CT-L-TR-TVR-01 NON From PSU-03 25 watts
AC-DC Power Unit TMR Plant Manager’s office CT-L-TR-PSU-03 NON AC UPS 230V 25 watts
TMR Radio Antenna Admin office roof CT-L-TR-ANT-04 NON None Zero
TMR Desk top radio Security office CT-L-TR-TVR-02 NON From PSU zero
AC-DC Power Unit TMR Security office CT-L-TR-PSU-04 NON AC UPS 230V 25 watts
WARNING: This document as printed may not be the latest version. Please refer to the electronic file in the EDMS
/conversion/tmp/activity_task_scratch/757748754.doc
Doc. Ref.: PP67-PE-GEN-00-DOR-LS-L-001
Peru Block 67 Field Development
Revision: 02 Rev Date : 20-Jul-2011
TMR Radio Antenna North of north boundary road CT-L-TR-ANT-05 NON None Zero
Total UPS Load 470 W
Note that the System manager is software loaded on the Supervisory PC mentioned under 6.2 above.
DESCRIPTION SHELTER OR ZONE TAG NUMBER HAZ/ NON HAZ OPERATING LOAD
CERT SUPPLY
MW LOS ODU CT On Radio Mast CT-L-MW-ODU-01 Non From PSU zero
MW LOS Antenna CT On Radio Mast CT-L-MW-ANT-01 Non None Zero
MW LOS IDU Router Control Building TER CT-L-MW-IDU-01 Non 230 V AC UPS 120 watts
MW LOS PSU Control Building TER CT-L-MW-PSU-01 Non 230 V AC UPS 150 watts
Total UPS Load 270 watts
6.9 Miscellaneous
WARNING: This document as printed may not be the latest version. Please refer to the electronic file in the EDMS
/conversion/tmp/activity_task_scratch/757748754.doc
Doc. Ref.: PP67-PE-GEN-00-DOR-LS-L-001
Peru Block 67 Field Development
Revision: 02 Rev Date : 20-Jul-2011
These equipment items are needed to support the Phase 0 operations, in particular the Block Valve, prior to this site that will be developed for production in Phase 1.
DESCRIPTION SHELTER OR ZONE TAG NUMBER HAZ/ NON HAZ OPERATING SUPPLY LOAD
CERT
Main Backbone layer 3 switch Tie-In Shelter DO-L-TX-BRT-01A Non 230V AC UPS 400 watts
Main Backbone layer 3 switch Tie-In Shelter DO-L-TX-BRT-01B Non 230V AC UPS 400 watts
Fibre-Optic Cassette Unit Tie-In Shelter DO-L-TX-CAS-01 Non None Zero
Fibre-Optic Patch Panel Tie-In Shelter DO-L-TX-FOP-01 Non None Zero
Total UPS Load 800 W
DESCRIPTION SHELTER OR ZONE TAG NUMBER HAZ/ NON HAZ OPERATING SUPPLY LOAD
CERT
VLAN Layer 3 switch Communications cabin DOR-L-VL-SW3-01 Non 230V AC UPS 360 watts
VLAN Layer 3 switch Communications cabin DOR-L-VL-SW3-02 Non 230V AC UPS 360 watts
CAT6 Copper Patch Panel Communications cabin DO-L-VL-PPS-01 Non None Zero
Fibre-Optic Patch Panel Communications cabin DO-L-VL-OPP-01 Non None Zero
Total UPS Load 720 W
WARNING: This document as printed may not be the latest version. Please refer to the electronic file in the EDMS
/conversion/tmp/activity_task_scratch/757748754.doc
Doc. Ref.: PP67-PE-GEN-00-DOR-LS-L-001
Peru Block 67 Field Development
Revision: 02 Rev Date : 20-Jul-2011
7.3 Miscellaneous
DESCRIPTION SHELTER OR ZONE TAG NUMBER HAZ /NON HAZ OPERATING SUPPLY NOTES
CERT
Cabinet 19” Communications DO-L-TX-RAK-01 Non 230V AC UPS test gear 800 x 800 x 2000
The total UPS power consumption for telecom equipment is 1520 Watts.
The main backbone fibre-optic cable passes through this site, not far from the Pirana CPF, in order that fibre pairs dedicated to the 2 Block Valve Stations (Dorado
and Arabela) can receive control signals and report valve status.
DESCRIPTION SHELTER OR ZONE TAG NUMBER HAZ/ NON HAZ OPERATING SUPPLY LOAD
CERT
Main Backbone layer 3 switch Tie-In Shelter AR-L-TX-BRT-01A Non 230V AC UPS 400 watts
Main Backbone layer 3 switch Tie-In Shelter AR-L-TX-BRT-01B Non 230V AC UPS 400 watts
Fibre-Optic Cassette Unit Tie-In Shelter AR-L-TX-CAS-01 Non None Zero
Fibre-Optic Patch Panel Tie-In Shelter AR-L-TX-FOP-01 Non None Zero
DESCRIPTION SHELTER OR ZONE TAG NUMBER HAZ/ NON HAZ OPERATING SUPPLY LOAD
CERT
VLAN Layer 3 switch Communications cabin AR-L-VL-SW3-01 Non 230V AC UPS 360 watts
VLAN Layer 3 switch Communications cabin AR-L-VL-SW3-02 Non 230V AC UPS 360 watts
CAT6 Copper Patch Panel Communications cabin AR-L-VL-PPS-01 Non None Zero
Fibre-Optic Patch Panel Communications cabin AR-L-VL-OPP-01 Non None Zero
WARNING: This document as printed may not be the latest version. Please refer to the electronic file in the EDMS
/conversion/tmp/activity_task_scratch/757748754.doc
Doc. Ref.: PP67-PE-GEN-00-DOR-LS-L-001
Peru Block 67 Field Development
Revision: 02 Rev Date : 20-Jul-2011
8.3 Miscellaneous
DESCRIPTION SHELTER OR ZONE TAG NUMBER HAZ /NON HAZ OPERATING SUPPLY NOTES
CERT
Cabinet 19” Communications cabin AR-L-TX-RAK-01 Non 230V AC UPS test gear 800 x 800 x 2000
As for Dorado, the total UPS power consumption for telecom equipment is 1520 Watts.
DESCRIPTION SHELTER OR ZONE TAG NUMBER HAZ/ NON HAZ OPERATING SUPPLY LOAD
CERT
MW LOS ODU CT On Radio Mast LB-L-MW-ODU-01 Non From PSU in IDU From IDU PSU
MW LOS Antenna CT On Radio Mast LB-L-MW-ANT-01 Non None None
MW LOS IDU Router Control Building TER LB-L-MW-IDU-01 Non 230V AC UPS 120 watts
MW LOS PSU Control Building TER LB-L-MW-PSU-01 Non 230V AC UPS 150 watts
Equipment cabinet 19” Control Building TER LB-L-MW-RAK-01 non 230V AC UPS Occasional services
10 LIMA OFFICE
To Be Advised by Company.
11 PARIS OFFICE