Doc. Ref.

: PP67-PE-GEN-00-DOR-LS-L-001
Peru Block 67 Field
Development Revision: 02 Rev Date : 20-Jul-2011

Status: IFD Class: 1


Telecom Equipment List
Page 1 of 24

TELECOM EQUIPMENT LIST

02 IFD Issued For Design 20-Jul-11 T.Haydu-Jones V.Fort X.Grandiaud

01 IFC Issued for Comments 01-Jul-11 T.Haydu-Jones V.Fort X.Grandiaud

Rev Status Revision Memo Date Written By Checked By Approved By

WARNING: This document as printed may not be the latest version. Please refer to the electronic file in the EDMS
/conversion/tmp/activity_task_scratch/757748754.doc
Doc. Ref.: PP67-PE-GEN-00-DOR-LS-L-001
Peru Block 67 Field
Development Revision: 02 Rev Date : 20-Jul-2011

Status: IFD Class: 1


Telecom Equipment List
Page 2 of 24

INDEX

1 GENERAL................................................................................................................................................ 4
1.1 The Project Overview...................................................................................................................... 4
1.2 Purpose........................................................................................................................................... 4
2 REFERENCE DOCUMENTS.................................................................................................................... 4
2.1 Project Documents.......................................................................................................................... 4
2.2 Company Documents...................................................................................................................... 5
2.3 Codes and Standards...................................................................................................................... 5
3 DEFINITIONS........................................................................................................................................... 5
3.1 Parties Involved............................................................................................................................... 5
3.2 Technical Abbreviations................................................................................................................... 5
4 PIRANA LISTING..................................................................................................................................... 7
4.1 Backbone Fibre-Optic Bearer.......................................................................................................... 7
4.2 Back Up Transmission System........................................................................................................ 7
4.3 WAN and LAN Data Network........................................................................................................... 8
4.4 CCTV System.................................................................................................................................. 9
4.5 Telephone & Office Systems......................................................................................................... 10
4.6 General Alarm System................................................................................................................... 10
4.7 Radio Communication Systems..................................................................................................... 11
4.8 Miscellaneous................................................................................................................................ 12
5 WELL PADS........................................................................................................................................... 13
5.1 WAN and LAN Data Network......................................................................................................... 13
5.2 CCTV System................................................................................................................................ 14
5.2.1 Well Pad PPi1.............................................................................................................................................. 14
5.2.2 Well Pad PPi3.............................................................................................................................................. 14
5.3 Telephone System......................................................................................................................... 15
5.4 General Alarm System................................................................................................................... 15
5.4.1 Well Pad PPi1.............................................................................................................................................. 15
5.4.2 Well Pad PPi3.............................................................................................................................................. 15
5.5 Radio Communication Systems..................................................................................................... 16
5.6 Miscellaneous................................................................................................................................ 16
5.6.1 Well Pad PPi1.............................................................................................................................................. 16
5.6.2 Well Pad PPi3.............................................................................................................................................. 16
6 CURARAY TERMINAL SITE.................................................................................................................. 17
6.1 Backbone Fibre-Optic Bearer........................................................................................................ 17
6.2 Back Up VSAT System.................................................................................................................. 17
6.3 WAN and LAN Data Network......................................................................................................... 18
6.4 CCTV System................................................................................................................................ 18
6.5 Telephone System......................................................................................................................... 19
6.6 General Alarm System................................................................................................................... 20
6.7 Radio Communication Systems..................................................................................................... 20
6.8 Microwave Line Of Sight Link........................................................................................................ 21
6.9 Miscellaneous................................................................................................................................ 21

WARNING: This document as printed may not be the latest version. Please refer to the electronic file in the EDMS
/conversion/tmp/activity_task_scratch/757748754.doc
Doc. Ref.: PP67-PE-GEN-00-DOR-LS-L-001
Peru Block 67 Field
Development Revision: 02 Rev Date : 20-Jul-2011

Status: IFD Class: 1


Telecom Equipment List
Page 3 of 24

7 DORADO TIE-IN INFRA-STRUCTURE SUPPORT...............................................................................22


7.1 Backbone Fibre-Optic Bearer........................................................................................................ 22
7.2 Virtual LAN.................................................................................................................................... 22
7.3 Miscellaneous................................................................................................................................ 23
8 ARABELA RIVER CROSSING BLOCK VALVE STATION...................................................................23
8.1 Backbone Fibre-Optic Bearer........................................................................................................ 23
8.2 Virtual LAN.................................................................................................................................... 23
8.3 Miscellaneous................................................................................................................................ 24
9 LBC SITE NEAR CURARAY TERMINAL.............................................................................................. 24
10 LIMA OFFICE......................................................................................................................................... 24
11 PARIS OFFICE....................................................................................................................................... 24

WARNING: This document as printed may not be the latest version. Please refer to the electronic file in the EDMS
/conversion/tmp/activity_task_scratch/757748754.doc
Doc. Ref.: PP67-PE-GEN-00-DOR-LS-L-001
Peru Block 67 Field
Development Revision: 02 Rev Date : 20-Jul-2011

Status: IFD Class: 1


Telecom Equipment List
Page 4 of 24

1 GENERAL

1.1 The Project Overview

Block 67 is an oil field located on the Maranon Basin, in the north east part of Peru and is situated in the
Amazon rainforest between the Andean Cordillera and the Guyana Shield. It covers an area in excess of
200 000 km².
The exploitation of Block 67 will be developed through a limited number of well platforms (or pads) to
minimise the environmental impact. All wells will be deviated to maximise production volumes. Produced
fluids from each field will be gathered and treated in dedicated Central Production Facilities (CPF) prior to
export.
Block 67 initial two project phases consist of two integrated field developments, i.e. Piraña and Dorado, with
a total production capacity of up to 12 000 barrels per day of heavy oil. The field development will initially
focus on Piraña, and then on Dorado as follows:
The first phase, “phase 0”, is dedicated to Piraña field development where the best results have been
obtained in terms of volumes and oil quality.
The second phase, “phase 1”, will extend the development of Piraña and initiate the development of Dorado.
For the Dorado Phase 1 site, there will be some pre-investment infra-structure needed in Phase 0, in order to
provide facilities for the management of a pipeline Section Valve, and to provide access into and out of main
backbone fibres in the fibre-optical cable bundle.

1.2 Purpose

This document presents a listing of all major telecom equipment required to implement Phase 0 of the PP67
Project telecom scope. Neither portable/mobile equipment, battery chargers, test equipment, nor telecom
cables, have been included in the following tables. Equipment required for the Lima office is undecided.

The remote end of the LOS MW link at CT is to be located on the LBC site, and for the purposes of this list,
Tag Numbers have been allocated as “LB”.

2 REFERENCE DOCUMENTS

2.1 Project Documents

All Project document numbers commence with PP67, so this has been omitted.

[1] PE-GEN-00-DOR-PR-L-001 Telecom Equipment Numbering Procedure


[2] PE-EXT-CT-DOR-DW-L-101 CT – Telecom Equipment Llayout & Main Cable Routing
Layout
[3] PE-PI-CF-DOR-DW-L-101 Pirana - Telecom Equipment layout & Main Cable Routing
Layout
[4] PE-PIR-01-DOR-DW-L-101 etc Well Pads - Telecom Equipment layouts & Main Cable
Routing Layout (01, 02, 03, 04, 05)
[5] PE-GEN-00-DOR-DW-L-010 Main Backbone Block Diagram
[6] PE-GEN-00-DOR-DW-L-020 VSAT Back-Up Block Diagram
[7] PE-GEN-00-DOR-DW-L-030 WAN and LAN Data Network Block Diagram
[8] PE-GEN-00-DOR-DW-L-040 Well Platform Wide Area Network Block Diagram
[9] PE-GEN-00-DOR-DW-L-050 CCTV Block Diagram

WARNING: This document as printed may not be the latest version. Please refer to the electronic file in the EDMS
/conversion/tmp/activity_task_scratch/757748754.doc
Doc. Ref.: PP67-PE-GEN-00-DOR-LS-L-001
Peru Block 67 Field
Development Revision: 02 Rev Date : 20-Jul-2011

Status: IFD Class: 1


Telecom Equipment List
Page 5 of 24

[10] PE-GEN-00-DOR-DW-L-060 Telephone Network Block Diagram


[11] PE-GEN-00-DOR-DW-L-070 VHF Radio Block Diagram
[12] PE-PIR-CF-DOR-DW-L-202 Pirana-CPF Administration and Technical Building Telecom
Cabinet Faces
[13] PE-EXT-CT-DOR-DW-L-202 CT Technical Equipment Room Telecom Cabinet Faces
[14] PE-PIR-03-DOR-DW-L-202 Well Pad Technical Equipment Room Telecom Cabinet
Faces
[15] PE-GEN-TL-DOR-DW-L-202 Dorado Block Valve Station Telecom Cabinet Faces
[16] PE-PIR-AT-DOR-DW-L-202 Arabela Block Valve Station Telecom Cabinet Faces

2.2 Company Documents

None are relevant to the Equipment List

2.3 Codes and Standards

None are relevant to the Equipment List.

3 DEFINITIONS

3.1 Parties Involved

Company Perenco Peru Petroleum Limited


Contractor The organisation responsible for implementing the procurement, design
integration, installation and testing of all telecom systems

3.2 Technical Abbreviations

AC Alternating Current electrical supply

CAT 6 Category 6 cable for gigabit transmission defined by IEEE

CCTV Closed Circuit Television

CR Control Room

DC Direct Current

DVR Digital Video Recorder

FOPP Fibre-Optic Patch Panel

GA General Alarm

ICSS Integrated Control and Safety Systems (ESD, Fire & Gas)

IDU In Door Unit

WARNING: This document as printed may not be the latest version. Please refer to the electronic file in the EDMS
/conversion/tmp/activity_task_scratch/757748754.doc
Doc. Ref.: PP67-PE-GEN-00-DOR-LS-L-001
Peru Block 67 Field
Development Revision: 02 Rev Date : 20-Jul-2011

Status: IFD Class: 1


Telecom Equipment List
Page 6 of 24

IPBX Internet Protocol Branch Exchange

LAN Local Area Network

LOS Line Of Sight

MUX Multiplex of several transmission channels over a single carrier

MW Micro Wave radio link system (frequency above 1000 MHz)

ODU Out Door Unit

PAGA Public Address and General Alarm Systems

POE Power Over Ethernet

PP Patch Panel enabling cable route configuration changes

TER Technical Equipment Room

UPS Uninterruptible Power Supply

VHF Very High Frequency

VoIP Voice over IP

VSAT Very Small Aperture Terminal

W Watts

WAN Wide Area Network

WARNING: This document as printed may not be the latest version. Please refer to the electronic file in the EDMS
/conversion/tmp/activity_task_scratch/757748754.doc
Doc. Ref.: PP67-PE-GEN-00-DOR-LS-L-001
Peru Block 67 Field Development
Revision: 02 Rev Date : 20-Jul-2011

Status: IFD Class: 1


Telecom Equipment List
Page 7 of 24

4 PIRANA LISTING

4.1 Backbone Fibre-Optic Bearer

DESCRIPTION SHELTER OR ZONE TAG NUMBER HAZ/NON HAZ OPERATING LOAD


CERT SUPPLY
Battery Limits Interface JB Near Secondary Road Gate PI-L-TX-IJB-01 NON None Zero
Main Backbone Router #1 Control Building TER Cabinet 1 PI-L-TX-BRT-01A Non 230V AC UPS 400 watts
Main Backbone Router #2 Control Building TER Cabinet 1 PI-L-TX-BRT-01B Non 230V AC UPS 400 watts
Fibre-Optic Patch Panel Control Building TER Cabinet 1 PI-L-TX-FOP-01 Non None Zero
Fibre Manager cassette Control Building TER Cabinet 1 PI-L-TX-CAS-01 Non None Zero
Fibre Manager cassette CPF TER for Well Pads Link PI-L-TX-CAS-02 Non None Zero
Copper CAT 6 Patch Panel CPF TER PI-L-VL-PPS-01 Non None Zero
TOTAL UPS LOAD 800 W

The above are derived from Ref [5].

4.2 Back Up Transmission System

DESCRIPTION SHELTER OR ZONE LOCATION TAG NUMBER HAZ/ NON HAZ OPERATING LOAD
CERT SUPPLY
VSAT ODU Electronics Control Building Roof PI-L-VS-ODU-01 Non 230V AC UPS 600 watts
VSAT Antenna Pedestal Control Building Roof PI-L-VS-ANT-01 Non 230V AC UPS 50 watts
VSAT IDU Router Control Building TER Cabinet 3 PI-L-VS-IDU-01 Non 230V AC UPS 250 watts
Transmission Control PC Control Building TER Cabinet 3 PI-L-OP-SUP-01 Note 1 Non 230V AC UPS 250 watts
Vendor Composite Cable Interlinking the ODU and IDU PI-L-VS-CAB-01 Non None Zero
TOTAL UPS LOAD 1150

The above are derived from Ref [6].


Note 1: The Transmission Manager PC also handles the TMR, WAN, and the IPBX equipment configuration using appropriate corresponding software.

WARNING: This document as printed may not be the latest version. Please refer to the electronic file in the EDMS
/conversion/tmp/activity_task_scratch/757748754.doc
Doc. Ref.: PP67-PE-GEN-00-DOR-LS-L-001
Peru Block 67 Field Development
Revision: 02 Rev Date : 20-Jul-2011

Status: IFD Class: 1


Telecom Equipment List
Page 8 of 24

4.3 WAN and LAN Data Network

DESCRIPTION SHELTER OR ZONE TAG NUMBER HAZ/ NON HAZ OPERATING LOAD
CERT or NON SUPPLY
Layer 3 Dual LAN Switch Control Building TER Cabinet 2 PI-L-VL-SW3-01A Non 230V AC UPS 360 watts
Layer 3 Dual LAN Switch Control Building TER Cabinet 2 PI-L-VL-SW3-01B Non 230V AC UPS 360 watts
Layer 2 Dual LAN Switch Control Building TER Cabinet 2 PI-L-VL-SW2-01A Non 230V AC UPS 360 watts
Layer 2 Dual LAN Switch Control Building TER Cabinet 2 PI-L-VL-SW2-01B Non 230V AC UPS 360 watts
LAN Server Instrument & Control Building TER PI-L-VL-SRV-01 Non 230V AC UPS 250 watts
Email Server Instrument & Control Building TER PI-L-VL-SRV-02 non 230V AC UPS 250 watts
Layer 2 LAN Switch MCC PI-SW-101 Utilities Area PI-L-VL-SW2-02 Non 230V AC UPS 250 watts
Layer 2 LAN Switch MCC PI-SW-201 Utilities Area PI-L-VL-SW2-03 Non 230V AC UPS 250 watts
Layer 2 LAN Switch MCC PI-SW-202 Utilities Area PI-L-VL-SW2-04 Non 230V AC UPS 250 watts
Layer 2 LAN Switch MCC PI-SW-203 Process Area PI-L-VL-SW2-05 Non 230V AC UPS 250 watts
Fibre-Optic PP 48 port Instrument & Control Building TER PI-L-VL-FOP-01 Non None Zero
Fibre-Optic PP 12 port MCC PI-SW-101 for site LAN PI-L-VL-FOP-02 Non None Zero
Fibre-Optic PP 12 port MCC PI-SW-201 for site LAN PI-L-VL-FOP-03 Non None Zero
Fibre-Optic PP 12 port MCC PI-SW-202 for site LAN PI-L-VL-FOP-04 Non None Zero
Fibre-Optic PP 12 port MCC PI-SW-203 for site LAN PI-L-VL-FOP-05 Non None Zero
Copper Cable PP 96 port Instrument & Control Building TER PI-L-VL-PPS-02 Non None Zero
Copper Cable PP 6 port Security Main Gatehouse LAN PI-L-VL-PPS-03 Non None Zero
Copper Cable PP 12 port Laboratory for LAN termination PI-L-VL-PPS-04 Non None Zero
Copper Cable PP 6 port Workshop for LAN termination PI-L-VL-PPS-05 Non None Zero
Copper Cable PP 12 port MCC PI-SW-101 for copper LAN PI-L-VL-PPS-06 Non None Zero
Copper Cable PP 12 port MCC PI-SW-201 for copper LAN PI-L-VL-PPS-07 Non None Zero
Copper Cable PP 12 port MCC PI-SW-202 for copper LAN PI-L-VL-PPS-08 Non None Zero
Copper Cable PP 12 port MCC PI-SW-203 for copper LAN PI-L-VL-PPS-09 Non None Zero
TOTAL UPS LOAD 3740 W

The above are derived from Ref [7] sheet 3. The complement of Patch Panels covers Data LAN and Telephony LAN requirements.

WARNING: This document as printed may not be the latest version. Please refer to the electronic file in the EDMS
/conversion/tmp/activity_task_scratch/757748754.doc
Doc. Ref.: PP67-PE-GEN-00-DOR-LS-L-001
Peru Block 67 Field Development
Revision: 02 Rev Date : 20-Jul-2011

Status: IFD Class: 1


Telecom Equipment List
Page 9 of 24

4.4 CCTV System

DESCRIPTION SHELTER OR ZONE TAG NUMBER HAZ/NON HAZ OPERATING LOAD


CERT or NON SUPPLY
CCTV Server PC CPF TER cabinet 5 PI-L-TV-SRV-01 NON 230V AC UPS 300 watts
Digital Video Recorder CPF TER Cabinet PI-L-TV-STO-01 NON 230V AC UPS 400 watts
Cabinet display monitor CPF TER cabinet PI-L-TV-MON-01 NON 230V AC UPS Incl in PC
Control Room Telecom Desk CCR Console PI-L-TV-CON-02 NON None zero
Control Room Monitor 1 CCR PI-L-TV-MON-02 NON 230V AC UPS 350 watts
Control Room Monitor 2 CCR PI-L-TV-MON-03 NON 230V AC UPS 350 watts
Plant Manager’s Monitor CPF Administration Offices PI-L-TV-MON-04 NON 230V AC UPS 250 watts
Security Room Monitor CPF Security Gatehouse PI-L-TV-MON-05 NON 230V AC UPS 250 watts
Safety Officer’s Monitor CPF Administration Offices PI-L-TV-MON-06 NON 230V AC UPS 250 watts
CR Display Server PC CPF CCR PI-L-TV-SRV-01 NON 230V AC UPS 300 watts
Exterior camera Gatehouse Roof PI-L-TV-CAM-01 NON 230V AC UPS 50 watts
Exterior camera Gatehouse Roof PI-L-TV-CAM-02 NON 230V AC UPS 50 watts
Exterior camera West fence north view PI-L-TV-CAM-03 NON 230V AC UPS 50 watts
Exterior camera West fence south view PI-L-TV-CAM-04 NON 230V AC UPS 50 watts
Exterior camera Looking at PI-TR-400 PI-L-TV-CAM-05 NON 230V AC UPS 50 watts
Exterior camera Looking at PI-D-411 PI-L-TV-CAM-06 NON 230V AC UPS 50 watts
Exterior camera Looking at PI-TF-161A/B PI-L-TV-CAM-07 NON 230V AC UPS 50 watts
Exterior camera Looking at PI-D-150C PI-L-TV-CAM-08 NON 230V AC UPS 50 watts
Exterior camera Looking at PI-D-160B PI-L-TV-CAM-09 NON 230V AC UPS 50 watts
Exterior camera Looking at PI-TF-150A PI-L-TV-CAM-10 NON 230V AC UPS 50 watts
Exterior camera South fence (west) looking north PI-L-TV-CAM-11 NON 230V AC UPS 50 watts
Exterior camera South fence (east) looking north PI-L-TV-CAM-12 NON 230V AC UPS 50 watts
Washer Tank/pump system Serving TV-CAM-01 PI-L-TV-PMP-01 NON 230V AC UPS 25 watts
Washer Tank/pump system Serving TV-CAM-02 PI-L-TV-PMP-02 NON 230V AC UPS 25 watts
Washer Tank/pump system Serving TV-CAM-03 PI-L-TV-PMP-03 NON 230V AC UPS 25 watts
Washer Tank/pump system Serving TV-CAM-04 PI-L-TV-PMP-04 NON 230V AC UPS 25 watts
Washer Tank/pump system Serving TV-CAM-05 PI-L-TV-PMP-05 NON 230V AC UPS 25 watts
Washer Tank/pump system Serving TV-CAM-06 PI-L-TV-PMP-06 NON 230V AC UPS 25 watts
Washer Tank/pump system Serving TV-CAM-07 PI-L-TV-PMP-07 NON 230V AC UPS 25 watts
Washer Tank/pump system Serving TV-CAM-08 PI-L-TV-PMP-08 NON 230V AC UPS 25 watts
Washer Tank/pump system Serving TV-CAM-09 PI-L-TV-PMP-09 NON 230V AC UPS 25 watts

WARNING: This document as printed may not be the latest version. Please refer to the electronic file in the EDMS
/conversion/tmp/activity_task_scratch/757748754.doc
Doc. Ref.: PP67-PE-GEN-00-DOR-LS-L-001
Peru Block 67 Field Development
Revision: 02 Rev Date : 20-Jul-2011

Status: IFD Class: 1


Telecom Equipment List
Page 10 of 24

Washer Tank/pump system Serving TV-CAM-10 PI-L-TV-PMP-10 NON 230V AC UPS 25 watts
Washer Tank/pump system Serving TV-CAM-11 PI-L-TV-PMP-11 NON 230V AC UPS 25 watts
Washer Tank/pump system Serving TV-CAM-12 PI-L-TV-PMP-12 NON 230V AC UPS 25 watts
TOTAL UPS LOAD 3350 W

4.5 Telephone & Office Systems

DESCRIPTION SHELTER OR ZONE TAG NUMBER HAZ/NON HAZ OPERATING LOAD


CERT or NON SUPPLY
IPBX Main Switch Control Building TER Cabinet 3 PI-L-TP-IPX-01 NON 230V AC UPS 400 watts
Telephony FO Patch Panel Control Building TER PI-L-TP-OPP-01 NON None zero
Telephony Over IP Phone Technical Equipment Room PI-L-TP-TEL-01 NON None POE (none)
Telephony Over IP Phone Control Room PI-L-TP-TEL-02 NON None POE (none)
Telephony Over IP Phone Control Room PI-L-TP-TEL-03 NON None POE (none)
Telephony Over IP Phone Site Manager PI-L-TP-TEL-04 NON None POE (none)
Telephony Over IP Phone Logistics Manager PI-L-TP-TEL-06 NON None POE (none)
Telephony Over IP Phone Duty Supervisor Office PI-L-TP-TEL-07 NON None POE (none)
Telephony Over IP Phone Gatehouse Security PI-L-TP-TEL-08 NON None POE (none)
Telephony Over IP Phone Admin Office PI-L-TP-TEL-09 NON None POE (none)
Telephony Over IP Phone Admin Office PI-L-TP-TEL-10 NON None POE (none)
Telephony Over IP Phone Laboratory PI-L-TP-TEL-11 NON None POE (none)
Telephony Over IP Phone Workshop PI-L-TP-TEL-12 NON None POE (none)
Telephony Over IP Phone MCC PI-SW-202 PI-L-TP-TEL-13 NON None POE (none)
Telephony Over IP Phone MCC PI-SW-203 PI-L-TP-TEL-14 NON None POE (none)
TOTAL UPS LOAD 400 W

The above are derived from Ref. [10].

4.6 General Alarm System

DESCRIPTION SHELTER OR ZONE LOCATION TAG NUMBER HAZ/ NON HAZ OPERATING LOAD
CERT SUPPLY
Ring Main Contactor A loop Control Building TER Cabinet 5 PI-L-GA-CTR-01 Non From PSU 20 watts
Ring Main Contactor B Loop Control Building TER Cabinet 5 PI-L-GA-CTR-02 Non From PSU 20 watts

WARNING: This document as printed may not be the latest version. Please refer to the electronic file in the EDMS
/conversion/tmp/activity_task_scratch/757748754.doc
Doc. Ref.: PP67-PE-GEN-00-DOR-LS-L-001
Peru Block 67 Field Development
Revision: 02 Rev Date : 20-Jul-2011

Status: IFD Class: 1


Telecom Equipment List
Page 11 of 24

Ring Main Contactor C Loop Control Building TER Cabinet 5 PI-L-GA-CTR-03 Non From PSU 20 watts
Contactor AC/DC PSU Control Building TER Cabinet 5 PI-L-GA-PSU-01 Non AC UPS 230V 20 watts
Contactor AC/DC PSU Control Building TER Cabinet 5 PI-L-GA-PSU-02 Non AC UPS 230V 20 watts
Interior Sounder Admin Offices Corridor PI-L-GA-SIR-01-A Non AC UPS 230V 10 watts
Interior Sounder Admin Offices Corridor PI-L-GA-SIR-02-A Non AC UPS 230V 10 watts
Interior Sounder Control Bldg Control Room PI-L-GA-SIR-03-A Non AC UPS 230V 10 watts
Interior Sounder CPF Workshop PI-L-GA-SIR-04-A Non AC UPS 230V 10 watts
Interior Sounder CPF Workshop PI-L-GA-SIR-05-A Non AC UPS 230V 10 watts
Exterior Klaxon Siren Gatehouse Roof PI-L-GA-SIR-01-B Haz Cert Zone 2 AC UPS 230V 250 watts
Exterior Klaxon Siren Workshop roof PI-L-GA-SIR-02-B Haz Cert Zone 2 AC UPS 230V 250 watts
Exterior Klaxon Siren West Fence facing east PI-L-GA-SIR-03-B Haz Cert Zone 2 AC UPS 230V 250 watts
Exterior Klaxon Siren Central facing south PI-L-GA-SIR-04-B Haz Cert Zone 2 AC UPS 230V 250 watts
Exterior Klaxon Siren Central facing north PI-L-GA-SIR-05-B Haz Cert Zone 2 AC UPS 230V 250 watts
Exterior Klaxon Siren South facing east PI-L-GA-SIR-06-B Haz Cert Zone 2 AC UPS 230V 250 watts
Exterior Klaxon Siren Process PI-TP-912 PI-L-GA-SIR-01-C Haz Cert Zone 2 AC UPS 230V 250 watts
Exterior Klaxon Siren Process PI-TF-161B PI-L-GA-SIR-02-C Haz Cert Zone 2 AC UPS 230V 250 watts
Exterior Klaxon Siren Process PI-TF-160A PI-L-GA-SIR-03-C Haz Cert Zone 2 AC UPS 230V 250 watts
Exterior Klaxon Siren See layout PI-L-GA-SIR-04-C Haz Cert Zone 2 AC UPS 230V 250 watts
TOTAL UPS LOAD 2650 W
The above are derived from Ref. [3]

4.7 Radio Communication Systems

DESCRIPTION SHELTER OR ZONE TAG NUMBER HAZ/ NON HAZ OPERATING LOAD
CERT SUPPLY
Trunked Mobile Base T/R CPF Control Bldg TER Cabinet 4 PI-L-TR-BTR-01 Non From PSU None
Trunk Switch CPF Control Bldg TER Cabinet 4 PI-L-TR-TSW-01 Non 230V AC UPS 400 W
Dedicated AC/DC PSU CPF Control Bldg TER Cabinet 4 PI-L-TR-PSU-01 Non 230V AC UPS 200 W
Base Antenna On Radio Mast PI-L-TR-ANT-01 Non None None
VHF Aero Radio Base CPF Control Bldg TER Cabinet 4 PI-L-TR-BTR-02 Non See below None
Aero Base Antenna On Radio Mast PI-L-TR-ANT-02 Non None None
AC-DC Power Unit TMR CPF Control Bldg TER PI-L-TR-PSU-01 Non AC UPS 230V 50 watts
AC-DC Power Unit Aero CPF Control Bldg TER PI-L-TR-PSU-02 Non AC UPS 230V 75 watts
TMR radio Security Gatehouse PI-L-TR-TVR-01 Non From PSU None

WARNING: This document as printed may not be the latest version. Please refer to the electronic file in the EDMS
/conversion/tmp/activity_task_scratch/757748754.doc
Doc. Ref.: PP67-PE-GEN-00-DOR-LS-L-001
Peru Block 67 Field Development
Revision: 02 Rev Date : 20-Jul-2011

Status: IFD Class: 1


Telecom Equipment List
Page 12 of 24

TMR radio Power Unit Security Gatehouse PI-L-TR-PSU-03 Non AC UPS 230V 25 watts
TMR Radio Antenna Gatehouse roof on TV Camera mast PI-L-TR-ANT-03 Non None None
TMR radio Plant manager’s office PI-L-TR-TVR-02 Non From PSU None
TMR radio Power Unit Plant manager’s office PI-L-TR-PSU-04 Non AC UPS 230V 25 watts
TMR Radio Antenna Roof of Admin Building PI-L-TR-ANT-04 Non None None
TMR radio CPF Control Room console PI-L-TR-TVR-03 Non From PSU None
TMR radio Power Unit Under base radio Control Room PI-L-TR-PSU-05 Non AC UPS 230V 25 watts
TMR Radio Antenna Roof of Control Building PI-L-TR-ANT-05 Non None None
TOTAL UPS LOAD 800 W
The above is derived from Ref. [11].
The above list details the fixed installation elements. The Table above does not list the mobile and portable elements, because these have no fixed position. They
have no Tag Number because the Tag Number is applied to the location and not to the equipment.

4.8 Miscellaneous

DESCRIPTION SHELTER OR ZONE TAG NUMBER HAZ CERT or OPERATING NOTES


NON SUPPLY
Radio Mast Behind Main Security Building PI-L-MT-STR-01 Non None Approx 2 tonnes
Aviation Lights On Mast at the top PI-L-MT-LMP-01 Non 230 V AC UPS 150 W at night only
Aviation Lights On Mast at the top PI-L-MT-LMP-02 Non 230 V AC UPS 150 W at night only
Aviation Lights On Mast at 25 m level PI-L-MT-LMP-03 Non 230 V AC UPS 150 W at night only
Aviation Lights On Mast at 25 m level PI-L-MT-LMP-04 Non 230 V AC UPS 150 W at night only
Transmission Cabinet 19” Control Bldg TER PI-L-TX-RAK-01 Non 230 V AC UPS 800 x 800 x 2100
LAN/WAN Cabinet 19” Control Bldg TER PI-L-VL-RAK-01 Non 230 V AC UPS 800 x 800 x 2100
IPBX Cabinet 19” Control Bldg TER PI-L-TP-RAK-01 Non 230 V AC UPS 800 x 800 x 2100
Radio Cabinet 19” Control Bldg TER PI-L-TR-RAK-01 Non 230 V AC UPS 800 x 800 x 2100
CCTV Cabinet 19” Control Bldg TER PI-L-TV-RAK-05 Non 230 V AC UPS 800 x 800 x 2100
Console CCR extension on ICSS PI-L-OP-CON-01 Non 230 V AC UPS 2400 x 600 x 700 hi
Mast for Camera & Siren Supporting TV-CAM-01 & siren PI-L-MT-STR-02 Non None 6 m high hinged at centre
Mast for Camera & Siren Supporting TV-CAM-02 & siren PI-L-MT-STR-03 Non None 6 m high hinged at centre
Mast for Camera & Siren Supporting TV-CAM-03 & siren PI-L-MT-STR-04 Non None 6 m high hinged at centre
Mast for Camera & Siren Supporting TV-CAM-04 & siren PI-L-MT-STR-05 Non None 6 m high hinged at centre
Mast for Camera & Siren Supporting TV-CAM-05 & siren PI-L-MT-STR-06 Non None 6 m high hinged at centre
Mast for Camera & Siren Supporting TV-CAM-06 & siren PI-L-MT-STR-07 Non None 6 m high hinged at centre

WARNING: This document as printed may not be the latest version. Please refer to the electronic file in the EDMS
/conversion/tmp/activity_task_scratch/757748754.doc
Doc. Ref.: PP67-PE-GEN-00-DOR-LS-L-001
Peru Block 67 Field Development
Revision: 02 Rev Date : 20-Jul-2011

Status: IFD Class: 1


Telecom Equipment List
Page 13 of 24

Mast for Camera & Siren Supporting TV-CAM-07 & siren PI-L-MT-STR-08 Non None 6 m high hinged at centre
Mast for Camera & Siren Supporting TV-CAM-08 & siren PI-L-MT-STR-09 Non None 6 m high hinged at centre
Mast for Camera & Siren Supporting TV-CAM-09 & siren PI-L-MT-STR-10 Non None 6 m high hinged at centre
Mast for Camera & Siren Supporting TV-CAM-10 & siren PI-L-MT-STR-11 Non None 6 m high hinged at centre
Mast for Camera & Siren Supporting TV-CAM-09 & siren PI-L-MT-STR-10 Non None 6 m high hinged at centre
Mast for Camera & Siren Supporting TV-CAM-10 & siren PI-L-MT-STR-11 Non None 6 m high hinged at centre
Mast for Camera & Siren Supporting TV-CAM-11 & siren PI-L-MT-STR-12 Non None 6 m high hinged at centre
Mast for Camera & Siren Supporting TV-CAM-12 & siren PI-L-MT-STR-13 Non None 6 m high hinged at centre
Radio Op Console Control Bldg TER PI-L-OP-CON-02 Non UPS see above 2400 x 600 x 700 hi
Interface JB Main FOC At Secondary Access Gate PI-L-TX-IJB-01 Non None Zero
Interface JB Well Pad FOC At Secondary Access Gate PI-L-TX-IJB-02 Non None Zero
TOTAL UPS LOAD 600 Watts at night only

The above is derived from Refs [3] and the system Block Diagrams.
Total UPS Telecom .electrical load for the CPF is approximately 13 750 watts.

5 WELL PADS

There are 5 Well Pads, on which the CCTV cameras and GA Siren quantities differ. In those cases, separate tables are given below for those systems.
Well Pads 1 and 3 are to be implemented in Phase 0, with the remaining Pads in Phase 1. Only Phase 0 elements are listed below.
Note: ** means Tag Numbers range therefore from P1 through P5 denoting which Well Pad is relevant.

5.1 WAN and LAN Data Network

DESCRIPTION SHELTER OR ZONE TAG NUMBER HAZ/ NON HAZ OPERATING LOAD
CERT SUPPLY
Layer 3 Dual VLAN Switch Well Pad Control Building Cabinet P**-L-TX-SW3-01 NON 230 V AC UPS 360 watts
Layer 3 Dual VLAN Switch Well Pad Control Building Cabinet P**-L-TX-SW3-02 NON 230 V AC UPS 360 watts
Fibre-Optic cassette Well Pad Control Building Cabinet P**-L-TX-CAS-01 NON None Zero
Fibre-Optic Patch Panel Well Pad Control Building Cabinet P**-L-TX-OPP-01 NON None Zero
Copper CAT6 Patch Panel Well Pad Control Building Cabinet P**-L-VL-PPS-01 NON None Zero
Battery Limits Interface JB Near the Fibre Optic Cable arrival on site P**-L-TX-IJB-01 NON None Zero
TOTAL UPS LOAD 720 watts

WARNING: This document as printed may not be the latest version. Please refer to the electronic file in the EDMS
/conversion/tmp/activity_task_scratch/757748754.doc
Doc. Ref.: PP67-PE-GEN-00-DOR-LS-L-001
Peru Block 67 Field Development
Revision: 02 Rev Date : 20-Jul-2011

Status: IFD Class: 1


Telecom Equipment List
Page 14 of 24

The above is derived from Ref [7]

5.2 CCTV System

5.2.1 Well Pad PPi1

DESCRIPTION SHELTER OR ZONE TAG NUMBER HAZ/ NON HAZ OPERATING LOAD
CERT SUPPLY
CCTV VLAN switch Control Shelter Bldg P1-L-TV-SW2-01 NON 230 V AC UPS 360 watts
CCTV Camera See layouts P1-L-TV-CAM-01 NON 230 V AC UPS 50 watts
CCTV Camera See layouts P1-L-TV-CAM-02 NON 230 V AC UPS 50 watts
CCTV Camera See layouts P1-L-TV-CAM-03 NON 230 V AC UPS 50 watts
CCTV Camera See layouts P1-L-TV-CAM-04 NON 230 V AC UPS 50 watts
Washer Tank/pump system Serving TV-CAM-01 P1-L-TV-PMP-01 NON 230 V AC UPS 25 watts
Washer Tank/pump system Serving TV-CAM-02 P1-L-TV-PMP-02 NON 230 V AC UPS 25 watts
Washer Tank/pump system Serving TV-CAM-03 P1-L-TV-PMP-03 NON 230 V AC UPS 25 watts
Washer Tank/pump system Serving TV-CAM-04 P1-L-TV-PMP-04 NON 230 V AC UPS 25 watts
TOTAL UPS LOAD 670 Watts

5.2.2 Well Pad PPi3

DESCRIPTION SHELTER OR ZONE TAG NUMBER HAZ/ NON HAZ OPERATING LOAD
CERT SUPPLY
CCTV VLAN switch Control Shelter Bldg P3-L-TV-SW2-01 NON 230 V AC UPS 360 watts
CCTV Camera See layouts P3-L-TV-CAM-01 NON 230 V AC UPS 50 watts
CCTV Camera See layouts P3-L-TV-CAM-02 NON 230 V AC UPS 50 watts
Washer Tank/pump system Serving TV-CAM-01 P3-L-TV-PMP-01 NON 230 V AC UPS 25 watts
Washer Tank/pump system Serving TV-CAM-02 P3-L-TV-PMP-02 NON 230 V AC UPS 25 watts
TOTAL UPS LOAD 510 Watts

The above is derived from Ref [4]

WARNING: This document as printed may not be the latest version. Please refer to the electronic file in the EDMS
/conversion/tmp/activity_task_scratch/757748754.doc
Doc. Ref.: PP67-PE-GEN-00-DOR-LS-L-001
Peru Block 67 Field Development
Revision: 02 Rev Date : 20-Jul-2011

Status: IFD Class: 1


Telecom Equipment List
Page 15 of 24

5.3 Telephone System

DESCRIPTION SHELTER OR ZONE TAG NUMBER HAZ/ NON HAZ OPERATING LOAD
CERT SUPPLY
Telephony Over IP Phone Control Shelter Bldg P**-L-TP-TEL-01 NON From LAN switch POE (none)

The above is derived from Ref [10]

5.4 General Alarm System

5.4.1 Well Pad PPi1


DESCRIPTION SHELTER OR ZONE TAG NUMBER HAZ/ NON HAZ OPERATING LOAD
CERT SUPPLY
Ring Main Contactor ring A Control Shelter P1-L-GA-CTR-01 Non From AC/DC PSU Zero
GA AC/DC PSU Control Shelter P1-L-GA-PSU-01 Non AC UPS 230V 50 watts
Interior Sounder Control Shelter P1-L-GA-SIR-03C Non AC UPS 230V 10 watts
Exterior Klaxon Siren See layout drawing for the site P1-L-GA-SIR-01-A Haz Cert Zone 2 AC UPS 230V 250 watts
TOTAL UPS LOAD 310 watts
The above is derived from Ref [4]
Note: the quantity of sirens varies from site to site.

5.4.2 Well Pad PPi3

DESCRIPTION SHELTER OR ZONE TAG NUMBER HAZ/ NON HAZ OPERATING LOAD
CERT SUPPLY
Ring Main Contactor ring A Control Shelter P3-L-GA-CTR-01 Non From AC/DC PSU Zero
GA AC/DC PSU Control Shelter P3-L-GA-PSU-01 Non AC UPS 230V 50 watts
Interior Sounder Control Shelter P3-L-GA-SIR-03C Non AC UPS 230V 10 watts
Exterior Klaxon Siren See layout drawing for the site P3-L-GA-SIR-01-A Haz Cert Zone 2 AC UPS 230V 250 watts
Exterior Klaxon Siren See layout drawing for the site P3-L-GA-SIR-02-A Haz Cert Zone 2 AC UPS 230V 250 watts
TOTAL UPS LOAD 560 watts

WARNING: This document as printed may not be the latest version. Please refer to the electronic file in the EDMS
/conversion/tmp/activity_task_scratch/757748754.doc
Doc. Ref.: PP67-PE-GEN-00-DOR-LS-L-001
Peru Block 67 Field Development
Revision: 02 Rev Date : 20-Jul-2011

Status: IFD Class: 1


Telecom Equipment List
Page 16 of 24

5.5 Radio Communication Systems

DESCRIPTION SHELTER OR ZONE TAG NUMBER HAZ/ NON HAZ OPERATING LOAD
CERT SUPPLY
Trunked Radio Base VHF Control Shelter one per site P**-L-TR-BTR-01 NON From PSU-01 Zero
AC/DC Power Unit Control Shelter one per site P**-L-TR-PSU-01 NON AC UPS 230V 50 watts
VHF Antenna On pole one per site P**-L-TR-ANT-01 NON None None
The above is derived from Ref [4]
One system as above is required per Well Pad site. UPS load is therefore 50 watts per site.

5.6 Miscellaneous

5.6.1 Well Pad PPi1

DESCRIPTION SHELTER OR ZONE TAG NUMBER HAZ CERT OPERATING NOTES


or NON SUPPLY
Radio Mast pole Next to shelter P1-L-MT-STR-01 NON None 6 m high
Camera/Siren pole See layout drawings per site P1-L-MT-STR-02 Non None 6 meter high
Camera/Siren pole See layout drawings per site P1-L-MT-STR-03 Non None Hinged at centre,
Camera/Siren pole See layout drawings per site P1-L-MT-STR-04 Non None with winch.
WAN Cabinet 19” Control Shelter P1-L-OP-RAK-01 NON AC 230V normal For test instruments

The above is derived from Ref [4]. Note: 1 CCTV camera (CAM-02) is mounted under the roof of a sun shelter and does not require a mast.

5.6.2 Well Pad PPi3

DESCRIPTION SHELTER OR ZONE TAG NUMBER HAZ CERT OPERATING NOTES


or NON SUPPLY
Radio Mast pole Next to shelter P3-L-MT-STR-01 NON None 6 meters high
Camera/Siren pole See layout drawings per site P3-L-MT-STR-02 Non None 6 meter high. Hinged
Camera/Siren pole See layout drawings per site P3-L-MT-STR-03 Non None at centre, with winch.
WAN Cabinet 19” Control Shelter P3-L-OP-RAK-01 NON AC 230V normal For test instruments

The above is derived from Ref [4]

WARNING: This document as printed may not be the latest version. Please refer to the electronic file in the EDMS
/conversion/tmp/activity_task_scratch/757748754.doc
Doc. Ref.: PP67-PE-GEN-00-DOR-LS-L-001
Peru Block 67 Field Development
Revision: 02 Rev Date : 20-Jul-2011

Status: IFD Class: 1


Telecom Equipment List
Page 17 of 24

6 CURARAY TERMINAL SITE

6.1 Backbone Fibre-Optic Bearer

DESCRIPTION SHELTER OR ZONE TAG NUMBER HAZ/NON HAZ OPERATING LOAD


CERT SUPPLY
Main Backbone Router #1 TER TX Cabinet CT-L-TX-BRT-01 Non 230V AC UPS 400 watts
Main Backbone Router #2 TER TX Cabinet CT-L-TX-BRT-02 Non 230V AC UPS 400 watts
Fibre-Optic Patch Panel TER TX Cabinet CT-L-TX-FOP-01 Non None Zero
Fibre Manager cassette TER TX Cabinet CT-L-TX-CAS-01 Non None Zero
Copper CAT 6 Patch Panel TER CT-L-VL-PPS-01 Non None Zero
Total UPS Load 800 Watts

The above is derived from Ref [7] sheet 2

6.2 Back Up VSAT System

DESCRIPTION SHELTER OR ZONE TAG NUMBER HAZ/NON HAZ OPERATING LOAD


CERT or NON SUPPLY
VSAT ODU Electronics North of north boundary road CT-L-VS-ODU-01 Non 230V AC UPS 600 watts
VSAT Antenna Pedestal North of north boundary road CT-L-VS-ANT-01 Non 230V AC UPS 50 watts
VSAT IDU and Router Control Building TER Cabinet 3 CT-L-VS-IDU-01 Non 230V AC UPS 225 watts
VSAT Manager PC Note 1 Control Building TER Cabinet 3 CT-L-OP-SUP-01 Non 230V AC UPS 250 watts
Vendor Composite Cable Interlinking the ODU and IDU CT-L-VS-CAB-01 Non None Zero
Total UPS Load 1125 Watts

The above is derived from Ref [5].


Note 1 this unit is common with the IPBX, WAN, and TMR Radio System as a combined operations system manager PC with 4 groups of software

WARNING: This document as printed may not be the latest version. Please refer to the electronic file in the EDMS
/conversion/tmp/activity_task_scratch/757748754.doc
Doc. Ref.: PP67-PE-GEN-00-DOR-LS-L-001
Peru Block 67 Field Development
Revision: 02 Rev Date : 20-Jul-2011

Status: IFD Class: 1


Telecom Equipment List
Page 18 of 24

6.3 WAN and LAN Data Network

DESCRIPTION SHELTER OR ZONE TAG NUMBER HAZ CERT /NON OPERATING LOAD
HAZ SUPPLY
Layer 3 Dual LAN Switch Instrument & Control Building TER CT-L-VL-SW3-01A Non 230V AC UPS 400 watts
Layer 3 Dual LAN Switch Instrument & Control Building TER CT-L-VL-SW3-01B Non 230V AC UPS 400 watts
Fibre-Optic Patch Panel Instrument & Control Building TER CT-L-VL-FOP-01 Non None Zero
LAN Server PC Instrument & Control Building TER CT-L-VL-SRV-01 Non 230V AC UPS 250 watts
Email Server PC Instrument & Control Building TER CT-L-VL-SRV-02 non 230V AC UPS 250 watts
Dual Layer 2 switch Control Bldg TER CT-L-VL-SW2-01A Non 230V AC UPS 250 watts
Dual Layer 2 switch Control Bldg TER CT-L-VL-SW2-01B Non 230V AC UPS 250 watts
Layer 2 switch MCC CT-L-VL-SW2-03 Non 230V AC UPS 250 watts
CAT6 Copper Patch Panel Control Building TER CT-L-VL-PPS-03 Non None Zero
CAT6 Copper Patch Panel Laboratory CT-L-VL-PPS-02 Non None Zero
CAT6 Copper Patch Panel MCC CT-L-VL-PPS-04 Non None Zero
Total UPS Load 3450 W

6.4 CCTV System

DESCRIPTION SHELTER OR ZONE TAG NUMBER HAZ CERT /NON OPERATING LOAD
HAZ SUPPLY
CCTV Server PC CPF TER cabinet CT-L-TV-SRV-01 NON 230V AC UPS 350 watts
Cabinet display monitor CPF TER cabinet CT-L-TV-MON-01 NON 230V AC UPS Incl in PC
Control Room Telecom Desk CCR Console CT-L-TV-CON-02 NON None Zero
Control Room Monitor 1 CCR CT-L-TV-MON-02 NON 230V AC UPS 400 watts
Control Room Monitor 2 CCR CT-L-TV-MON-03 NON 230V AC UPS 400 watts
CR Display Server PC CPF CCR CT-L-TV-SRV-01 NON 230V AC UPS 360 watts
Plant Manager’s Monitor CPF Administration Offices CT-L-TV-MON-04 NON 230V AC UPS 150 watts
Security Room Monitor CPF Admin Security Office CT-L-TV-MON-05 NON 230V AC UPS 150 watts
Safety Officer’s Monitor CPF Administration Offices CT-L-TV-MON-06 NON 230V AC UPS 150 watts
Digital Video Recorder CPF TER Cabinet CT-L-TV-STO-01 NON 230V AC UPS 400 watts
Exterior camera See layout Ref [2] CT-L-TV-CAM-01 NON 230V AC UPS 50 watts
Exterior camera - .. - CT-L-TV-CAM-02 NON 230V AC UPS 50 watts

WARNING: This document as printed may not be the latest version. Please refer to the electronic file in the EDMS
/conversion/tmp/activity_task_scratch/757748754.doc
Doc. Ref.: PP67-PE-GEN-00-DOR-LS-L-001
Peru Block 67 Field Development
Revision: 02 Rev Date : 20-Jul-2011

Status: IFD Class: 1


Telecom Equipment List
Page 19 of 24

Exterior camera - .. - CT-L-TV-CAM-03 NON 230V AC UPS 50 watts


Exterior camera - .. - CT-L-TV-CAM-04 NON 230V AC UPS 50 watts
Exterior camera - .. - CT-L-TV-CAM-05 NON 230V AC UPS 50 watts
Washer Tank/pump system Serving TV-CAM-01 CT-L-TV-PMP-01 NON 230V AC UPS 25 watts
Washer Tank/pump system Serving TV-CAM-02 CT-L-TV-PMP-02 NON 230V AC UPS 25 watts
Washer Tank/pump system Serving TV-CAM-03 CT-L-TV-PMP-03 NON 230V AC UPS 25 watts
Washer Tank/pump system Serving TV-CAM-04 CT-L-TV-PMP-04 NON 230V AC UPS 25 watts
Washer Tank/pump system Serving TV-CAM-05 CT-L-TV-PMP-05 NON 230V AC UPS 25 watts
Total UPS Load 2735 W

The above schedule is taken from Ref. [4]

6.5 Telephone System

DESCRIPTION SHELTER OR ZONE TAG NUMBER HAZ / NON HAZ OPERATING LOAD
SUPPLY
Slave IPBX TER CT-L-TP-IPX-01 NON AC UPS 230V 600 watts
Telephony Over IP Phone Control Room CT-L-TP-TEL-01 NON From IPBX POE (none)
Telephony Over IP Phone Control Room CT-L-TP-TEL-02 NON From IPBX POE (none)
Telephony Over IP Phone Plant Manager CT-L-TP-TEL-03 NON From IPBX POE (none)
Telephony Over IP Phone Logistics Manager CT-L-TP-TEL-04 NON From IPBX POE (none)
Telephony Over IP Phone Admin Offices CT-L-TP-TEL-05 NON From IPBX POE (none)
Telephony Over IP Phone Admin Offices CT-L-TP-TEL-06 NON From IPBX POE (none)
Telephony Over IP Phone Admin Offices CT-L-TP-TEL-07 NON From IPBX POE (none)
Telephony Over IP Phone Security Office CT-L-TP-TEL-08 NON From IPBX POE (none)
Telephony Over IP Phone Canteen CT-L-TP-TEL-09 NON From IPBX POE (none)
Total UPS LOad 600 W

Telephones use Power-Over-Ethernet supply, and are supplied from the IPBX. For the system manager see Note 1 above

WARNING: This document as printed may not be the latest version. Please refer to the electronic file in the EDMS
/conversion/tmp/activity_task_scratch/757748754.doc
Doc. Ref.: PP67-PE-GEN-00-DOR-LS-L-001
Peru Block 67 Field Development
Revision: 02 Rev Date : 20-Jul-2011

Status: IFD Class: 1


Telecom Equipment List
Page 20 of 24

6.6 General Alarm System

DESCRIPTION SHELTER OR ZONE TAG NUMBER HAZ/ NON HAZ OPERATING LOAD
SUPPLY
Contactor A Loop Control Building TER CT-L-GA-CTR-01 Non AC UPS 230V From PSU
AC/DC Power Supply Unit Control Building TER CT-L-GA-PSU-01 NON AC UPS 230V 20 watts
Interior Sounder Control Room CT-L-GA-SIR-01-A NON AC UPS 230V 10 watts
Interior Sounder Admin offices CT-L-GA-SIR-02-A NON AC UPS 230V 10 watts
Interior Sounder Laboratory CT-L-GA-SIR-03-A NON AC UPS 230V 10 watts
Interior Sounder Canteen CT-L-GA-SIR-04-A NON AC UPS 230V 10 watts
Exterior Siren Klaxon See layout drawings CT-L-GA-SIR-01-B Cert for Zone 2 AC UPS 230V 250 watts
Exterior Siren Klaxon See layout drawings CT-L-GA-SIR-02-B Cert for Zone 2 AC UPS 230V 250 watts
Exterior Siren Klaxon See layout drawings CT-L-GA-SIR-03-B Cert for Zone 2 AC UPS 230V 250 watts
Total UPS Load 810 W
The above schedule is taken from Ref. [2]

6.7 Radio Communication Systems

DESCRIPTION SHELTER OR ZONE TAG NUMBER HAZ/ NON HAZ OPERATING LOAD
CERT SUPPLY
Trunked Mobile Base TR Control Building TER CT-L-TR-BTS-01 NON From PSU-01 Zero
Trunked Radio Switch Control Building TER CT-L-TR-TRS-01 NON AC UPS 230V 120 watts
Supervisory PC Control Building TER Cabinet 3 See Note 1 under VSAT See Note 1 See Note 1 See Note 1
Base Antenna Radio Mast CT-L-TR-ANT-01 NON None Zero
VHF Marine Radio Base Control Building TER CT-L-TR-BTS-02 NON From PSU-02 75 watts
Marine radio Antenna Radio Mast CT-L-TR-ANT-02 NON None Zero
AC-DC Power Unit TMR Control Building TER CT-L-TR-PSU-01 NON AC UPS 230V 150 watts
AC-DC Power Unit Marine Control Building TER CT-L-TR-PSU-02 NON AC UPS 230V 50 watts
Local TMR antenna Control Building roof CT-L-TR-ANT-03 NON None Zero
TMR Desk top radio Plant Manager’s office CT-L-TR-TVR-01 NON From PSU-03 25 watts
AC-DC Power Unit TMR Plant Manager’s office CT-L-TR-PSU-03 NON AC UPS 230V 25 watts
TMR Radio Antenna Admin office roof CT-L-TR-ANT-04 NON None Zero
TMR Desk top radio Security office CT-L-TR-TVR-02 NON From PSU zero
AC-DC Power Unit TMR Security office CT-L-TR-PSU-04 NON AC UPS 230V 25 watts

WARNING: This document as printed may not be the latest version. Please refer to the electronic file in the EDMS
/conversion/tmp/activity_task_scratch/757748754.doc
Doc. Ref.: PP67-PE-GEN-00-DOR-LS-L-001
Peru Block 67 Field Development
Revision: 02 Rev Date : 20-Jul-2011

Status: IFD Class: 1


Telecom Equipment List
Page 21 of 24

TMR Radio Antenna North of north boundary road CT-L-TR-ANT-05 NON None Zero
Total UPS Load 470 W
Note that the System manager is software loaded on the Supervisory PC mentioned under 6.2 above.

6.8 Microwave Line Of Sight Link

DESCRIPTION SHELTER OR ZONE TAG NUMBER HAZ/ NON HAZ OPERATING LOAD
CERT SUPPLY
MW LOS ODU CT On Radio Mast CT-L-MW-ODU-01 Non From PSU zero
MW LOS Antenna CT On Radio Mast CT-L-MW-ANT-01 Non None Zero
MW LOS IDU Router Control Building TER CT-L-MW-IDU-01 Non 230 V AC UPS 120 watts
MW LOS PSU Control Building TER CT-L-MW-PSU-01 Non 230 V AC UPS 150 watts
Total UPS Load 270 watts

6.9 Miscellaneous

DESCRIPTION SHELTER OR ZONE TAG NUMBER HAZ/ NON OPERATING NOTES


CERT SUPPLY
Radio Mast North Fence see layout NON None Approx 2 tonnes 50 m high
WAN Cabinet 19” Control Building TER CT-L-TX-RAK-01 NON None 800 x 800 x 2000
LAN & CCTV Cabinet 19” Control Building TER CT-L-VL-RAK-01 NON None 800 x 800 x 2000
Radio & IPBX Cabinet 19” Control Building TER CT-L-TR-RAK-01 NON None 800 x 800 x 2000
Battery Limits Interface JB Backbone cable arrival point CT-L-TX-IJB-01 NON None
Console Control room CT-L-OP-CON-01 NON 230 V AC UPS Per individual systems
Aviation Masthead Light Radio Mast CT-L-MT-LMP-01 NON 230 V AC UPS 150 watts load
Aviation Masthead Light Radio Mast CT-L-MT-LMP-02 NON 230 V AC UPS 150 watts load
Aviation Masthead Light Radio Mast CT-L-MT-LMP-03 NON 230 V AC UPS 150 watts load
Aviation Masthead Light Radio Mast CT-L-MT-LMP-04 NON 230 V AC UPS 150 watts load
Camera and Siren pole see layout CT-L-TV-STR-01 NON None 6 m high hinged at centre
Camera and Siren pole see layout CT-L-TV-STR-02 NON None 6 m high hinged at centre
Camera and Siren pole see layout CT-L-TV-STR-03 NON None 6 m high hinged at centre
Camera and Siren pole see layout CT-L-TV-STR-04 NON None 6 m high hinged at centre
Camera and Siren pole see layout CT-L-TV-STR-05 NON None 6 m high hinged at centre

WARNING: This document as printed may not be the latest version. Please refer to the electronic file in the EDMS
/conversion/tmp/activity_task_scratch/757748754.doc
Doc. Ref.: PP67-PE-GEN-00-DOR-LS-L-001
Peru Block 67 Field Development
Revision: 02 Rev Date : 20-Jul-2011

Status: IFD Class: 1


Telecom Equipment List
Page 22 of 24

Total UPS Load 600 watts at night only

The above schedule is taken from Ref. [2]


Total UPS consumption will be approximately 11 000 watts.

7 DORADO TIE-IN INFRA-STRUCTURE SUPPORT

These equipment items are needed to support the Phase 0 operations, in particular the Block Valve, prior to this site that will be developed for production in Phase 1.

7.1 Backbone Fibre-Optic Bearer

DESCRIPTION SHELTER OR ZONE TAG NUMBER HAZ/ NON HAZ OPERATING SUPPLY LOAD
CERT
Main Backbone layer 3 switch Tie-In Shelter DO-L-TX-BRT-01A Non 230V AC UPS 400 watts
Main Backbone layer 3 switch Tie-In Shelter DO-L-TX-BRT-01B Non 230V AC UPS 400 watts
Fibre-Optic Cassette Unit Tie-In Shelter DO-L-TX-CAS-01 Non None Zero
Fibre-Optic Patch Panel Tie-In Shelter DO-L-TX-FOP-01 Non None Zero
Total UPS Load 800 W

7.2 Virtual LAN

DESCRIPTION SHELTER OR ZONE TAG NUMBER HAZ/ NON HAZ OPERATING SUPPLY LOAD
CERT
VLAN Layer 3 switch Communications cabin DOR-L-VL-SW3-01 Non 230V AC UPS 360 watts
VLAN Layer 3 switch Communications cabin DOR-L-VL-SW3-02 Non 230V AC UPS 360 watts
CAT6 Copper Patch Panel Communications cabin DO-L-VL-PPS-01 Non None Zero
Fibre-Optic Patch Panel Communications cabin DO-L-VL-OPP-01 Non None Zero
Total UPS Load 720 W

WARNING: This document as printed may not be the latest version. Please refer to the electronic file in the EDMS
/conversion/tmp/activity_task_scratch/757748754.doc
Doc. Ref.: PP67-PE-GEN-00-DOR-LS-L-001
Peru Block 67 Field Development
Revision: 02 Rev Date : 20-Jul-2011

Status: IFD Class: 1


Telecom Equipment List
Page 23 of 24

7.3 Miscellaneous

DESCRIPTION SHELTER OR ZONE TAG NUMBER HAZ /NON HAZ OPERATING SUPPLY NOTES
CERT
Cabinet 19” Communications DO-L-TX-RAK-01 Non 230V AC UPS test gear 800 x 800 x 2000

The total UPS power consumption for telecom equipment is 1520 Watts.

8 ARABELA RIVER CROSSING BLOCK VALVE STATION

The main backbone fibre-optic cable passes through this site, not far from the Pirana CPF, in order that fibre pairs dedicated to the 2 Block Valve Stations (Dorado
and Arabela) can receive control signals and report valve status.

8.1 Backbone Fibre-Optic Bearer

DESCRIPTION SHELTER OR ZONE TAG NUMBER HAZ/ NON HAZ OPERATING SUPPLY LOAD
CERT
Main Backbone layer 3 switch Tie-In Shelter AR-L-TX-BRT-01A Non 230V AC UPS 400 watts
Main Backbone layer 3 switch Tie-In Shelter AR-L-TX-BRT-01B Non 230V AC UPS 400 watts
Fibre-Optic Cassette Unit Tie-In Shelter AR-L-TX-CAS-01 Non None Zero
Fibre-Optic Patch Panel Tie-In Shelter AR-L-TX-FOP-01 Non None Zero

8.2 Virtual LAN

DESCRIPTION SHELTER OR ZONE TAG NUMBER HAZ/ NON HAZ OPERATING SUPPLY LOAD
CERT
VLAN Layer 3 switch Communications cabin AR-L-VL-SW3-01 Non 230V AC UPS 360 watts
VLAN Layer 3 switch Communications cabin AR-L-VL-SW3-02 Non 230V AC UPS 360 watts
CAT6 Copper Patch Panel Communications cabin AR-L-VL-PPS-01 Non None Zero
Fibre-Optic Patch Panel Communications cabin AR-L-VL-OPP-01 Non None Zero

WARNING: This document as printed may not be the latest version. Please refer to the electronic file in the EDMS
/conversion/tmp/activity_task_scratch/757748754.doc
Doc. Ref.: PP67-PE-GEN-00-DOR-LS-L-001
Peru Block 67 Field Development
Revision: 02 Rev Date : 20-Jul-2011

Status: IFD Class: 1


Telecom Equipment List
Page 24 of 24

8.3 Miscellaneous

DESCRIPTION SHELTER OR ZONE TAG NUMBER HAZ /NON HAZ OPERATING SUPPLY NOTES
CERT
Cabinet 19” Communications cabin AR-L-TX-RAK-01 Non 230V AC UPS test gear 800 x 800 x 2000

As for Dorado, the total UPS power consumption for telecom equipment is 1520 Watts.

9 LBC SITE NEAR CURARAY TERMINAL

DESCRIPTION SHELTER OR ZONE TAG NUMBER HAZ/ NON HAZ OPERATING SUPPLY LOAD
CERT
MW LOS ODU CT On Radio Mast LB-L-MW-ODU-01 Non From PSU in IDU From IDU PSU
MW LOS Antenna CT On Radio Mast LB-L-MW-ANT-01 Non None None
MW LOS IDU Router Control Building TER LB-L-MW-IDU-01 Non 230V AC UPS 120 watts
MW LOS PSU Control Building TER LB-L-MW-PSU-01 Non 230V AC UPS 150 watts
Equipment cabinet 19” Control Building TER LB-L-MW-RAK-01 non 230V AC UPS Occasional services

The expected UPS load for telecom equipment is 270 watts.

10 LIMA OFFICE

To Be Advised by Company.

11 PARIS OFFICE

Existing site. Out of Contractor Scope