REPORT CALCULATION SHEET FOR

FOUNDATION OF CRUDE OIL PALM

Document No. Rev. Contract No : Pages :


CLARIFICATION SETTLING TANK cap. 130m³ 0 1

PROJECT : PONDASI PENDUKUNG PKS

CLIENT : PT. INECDA

LOCATION : PEKAN BARU - RIAU

SCOPE :
CLARIFICATION SETTLING TANK cap. 130m³
REPORT CALCULATION SHEET FOR
FOUNDATION OF CRUDE OIL PALM

Document No. Rev. Contract No : Pages :


CLARIFICATION SETTLING TANK cap. 130m³ 0 2

1. GENERAL
1.1 Pondasi
Pondasi yang digunakan adalah tiang pancang
Kedalaman pondasi adalah 6m

1.2 Spesifikasi beton


Mutu beton pondasi, sloof, pedestal digunakan K-225
Mutu beton lantai kerja digunakan K-100

1.3 Spesifikasi besi


Mutu besi tulangan adalah BJTD 420B

1.3 Spesifikasi anchor bolt


Mutu besi anchor bolt adalah A-307
REPORT CALCULATION SHEET FOR
FOUNDATION OF CRUDE OIL PALM

Document No. Rev. Contract No : Pages :


CLARIFICATION SETTLING TANK cap. 130m³ 0 3

2. KRITERIA DISAIN
3.1 Standard dan Kode yang digunakan

Tabel 3.1. Standard/kode


SNI 2847-2019
Persyaratan beton struktural untuk bangunan Gedung

SNI 1727 -2020


Beban Minimum untuk perancangan bangunan gedung dan Struktur Lain

SNI 1726 - 2019


Tata Cara Perencanaan Ketahanan Gempa Untuk Struktur Gedung dan Non Gedung

SNI 1729-2020
Spesifikasi untuk bangunan gedung baja struktural

SNI 2052-2017
Baja Tulangan Beton
REPORT CALCULATION SHEET FOR
FOUNDATION OF CRUDE OIL PALM

Document No. Rev. Contract No : Pages :


CLARIFICATION SETTLING TANK cap. 130m³ 0 4

3. Drawing
REPORT CALCULATION SHEET FOR
FOUNDATION OF CRUDE OIL PALM

Document No. Rev. Contract No : Pages :


CLARIFICATION SETTLING TANK cap. 130m³ 0 2

4. Beban - beban yang bekerja


4.1 Dead Load (DL)
Beban Mati DL = 20,5 T (dari DATA OWNER)
4.2 Operasional Load (LL)
Beban Operasional (LL) = 117 T

4,3 Seismic Load


REPORT CALCULATION SHEET FOR
FOUNDATION OF CRUDE OIL PALM

Document No. Rev. Contract No : Pages :


CLARIFICATION SETTLING TANK cap. 130m³ 0 5
5. DATA TANAH
0

Document No. Rev. Contract No : Pages :


CLARIFICATION SETTLING TANK cap. 130m³ 0 6
Pondasi Pile
Piling Specification

qc = 182,00 kg/cm2
Type © 10cm Cerocok
h =. 0,6 m (kedalaman galian pile cap)
H= 3,0 m (kedalaman pondasi)

Pile Cap
Tebal tanah diatas pile cap 0,4 m
Jarak antar tiang pancang (as ke as) 1,2 m
Jarak tiang pancang tepi terhadap sisi luar beton 0,6 m
Daya Dukung = 5,58 T (lihat detail perhitungan di lembar berikut nya)

Nilai CPT Rencana


Nilai CPT di sekitar dasar tiang, dihitung dari 8.D di atas dasar tiang s.d 4.D di bawah
Berdasarkan hasil pengujian CPT diperoleh data sbb.
+ 0,80 qc 191
- 0,40 JHP 92
No Kedalaman qc1 JHP1
2
z1 (m) kg/cm kg/cm
0,00 0 0
0,20 3 2,7
0,40 5 5,3
0,60 3 8
0,8 0,80 6 10,7
1,0 1,00 4 13,3
1,2 1,20 6 16
1,4 1,40 4 18,7
1,6 1,60 9 24
1,8 1,80 14 29,3
2,0 2,00 82 38,7
2,2 2,20 159 52
2,4 2,40 174 65,3
2,6 2,60 196 80
2,8 2,80 202 98,7
3,0 3,00 206 117,3
3,2 3,20 211 136
3,4 3,40
25,00

qc (8D+4D) 191 191


JHP (8D+4D) 92 92
REPORT CALCULATION SHEET FOR
FOUNDATION OF CRUDE OIL PALM

Document No. Rev. Contract No : Pages :


STERILIZER 0 5
6. DAYA DUKUNG PONDASI
S1

25 TON
0

Document No. Rev. Contract No : Pages :


STERILIZER 0 6

S2
0

Document No. Rev. Contract No : Pages :


STERILIZER 0 7

S3
10/14/2023

Project Na. : ACI


Calculation Sheet
of Project No. : CLARIFICATION

Foundation Client : MKS Page 2

CONTENTS

1. GENERAL
1.1 CODE & STANDARD
1.2 MATERIALS & UNIT WEIGHT
1.3 SUBSOIL CONDITION & SAFETY FACTORS
1.4 LOAD COMBINATION

2. DRAWING
2.1 LOCATION PLAN
2.2 DETAIL SKETCH

3. FOUNDATION DATA
3.1 FOOTING DATA
3.2 PIER DATA
3.3 SECTION DATA
3.4 LOAD CASE
3.5 LOAD COMBINATION

4. CHECK OF STABILITY
4.1 CHECK OF PILE REACTION

5. DESIGN OF FOOTING
5.1 DESIGN MOMENT AND SHEAR FORCE
5.2 REQUIRED REINFORCEMENT
5.3 ONE WAY SHEAR FORCE
5.4 TWO WAY SHEAR FORCE
5.5 PILE PUNCHING SHEAR FORCE

Copyright (c) GS E&C. All Rights Reserved


10/14/2023

Project Na. : ACI


Calculation Sheet
of Project No. : CLARIFICATION

Foundation Client : MKS Page 3

1. GENERAL
1.1 CODE & STANDARD
Items Description
Design Code American Concrete Institute (ACI 318) [Metric]
Horizontal Force for Wind AMERICAN SOCIETY OF CIVIL ENGINEERS [ASCE 7-05]
Horizontal Force for Seismic AMERICAN SOCIETY CIVIL ENGINEERS [ASCE 7-05]
Unit System Input : MKS, Output : MKS, Calculation Unit : IMPERIAL

1.2 MATERIALS & UNIT WEIGHT


Items Value
2
Concrete (fck : compressive strength) 180.000 kgf/cm
2
Lean Concrete (Lfck : compressive strength) 100.000 kgf/cm
2
Reinforcement (10M ~ 16M , yield strength) 4200.000 kgf/cm
Reinforcement (19M ~ , yield strength) 4200.000 kgf/cm2
Rs (Soil unit weight) 2.000 ton/m3
Rc (Concrete unit weight) 2.400 ton/m3
Es (Steel Modulus of Elasticity) 2.000 106 kgf/cm2
Ec (Concrete Modulus of Elasticity) 250998.000 kgf/cm2

- Pile Capacity
Items Value
Pile Name BP30
Footing List F1
Diameter 300 mm
Length 4m
Thick 0 mm
Shape Circle
Capacity ( Ha , Ua , Va ) 0.2 , 2.5 , 25 tonf

1.3 SUBSOIL CONDITION & SAFETY FACTORS


Items Description
Allowable Increase of Soil (Wind) 33.33 %
Allowable Increase of Soil (Seismic) 33.33 %
Allowable Increase of Soil (Test) 20 %
Allowable Increase of Pile Horizontal (Wind) 33.33 %
Allowable Increase of Pile Horizontal (Seismic) 33.33 %
Allowable Increase of Pile Horizontal (Test) 20 %
Allowable Increase of Pile Vertical (Wind) 33.33 %
Allowable Increase of Pile Vertical (Seismic) 33.33 %
Allowable Increase of Pile Vertical (Test) 20 %

Copyright (c) GS E&C. All Rights Reserved


10/14/2023

Project Na. : ACI


Calculation Sheet
of Project No. : CLARIFICATION

Foundation Client : MKS Page 4

Allowable Increase of Pile Uplift (Wind) 33.33 %


Allowable Increase of Pile Uplift (Seismic) 33.33 %
Allowable Increase of Pile Uplift (Test) 20 %
Safety factor against overturning for OVM1(FO1) 1.5
Safety factor against overturning for OVM2(FO2) 1.7
Safety factor against overturning for OVM3(FO3) 1.8
Safety factor against overturning for OVM4(FO4) 2.1
Safety factor against sliding for the SL1(FS1) 1.5
Safety factor against sliding for the SL2(FS2) 1.6
Safety factor against sliding for the SL3(FS3) 1.7
Safety factor against sliding for the SL4(FS4) 1.8
Friction factor () 0.35

1.4 LOAD COMBINATION


Comb . ID Load Combination for stability
1 1.0 SW + 1.0 DL + 1.0 Operation
17 1.0 SW + 1.0 Operation
18 1.0 SW + 1.0 DL + 1.0 Operation
Comb . ID Load Combination for Reinforcement
102 1.4 SW + 1.4 DL + 1.4 Operation

Copyright (c) GS E&C. All Rights Reserved


10/14/2023

Project Na. : ACI


Calculation Sheet
of Project No. : CLARIFICATION

Foundation Client : MKS Page 5

2. DRAWING
2.1 LOCATION PLAN
2.2 DETAIL SKETCH

Copyright (c) GS E&C. All Rights Reserved


10/14/2023 Page 6

REFERENCE DWGS
A01 NO. DWG NO. DWG TITLE

63

NOTES
* OUTPUT UNIT : mm

68 64

01

ACI PROJECT

67 65

FOUNDATION LOCATION PLAN


TANK2 SAMPLE

SQUAD CHECK
F1

66
Y PROCESS PIPING VESSELS STRUCT. ELEC. INST.

Z X SCALE JOB NO. MICROFILM NO.

AS SHOWN CLARIFICATION

Copyright (c) GS E&C. All Rights Reserved


10/14/2023 Page 7

OUTPUT UNIT : mm

Copyright (c) GS E&C. All Rights Reserved


10/14/2023 Page 8

REFERENCE DWGS
5300 CL FOOTING CL FOOTING NO. DWG NO. DWG TITLE

1000 3300 1000 TOP BOTTOM TOP BOTTOM


60

40 0
P.
5
TY
0
14

-1
-
13

13
D

1D
13M@140 13M@140

NOTES
* PILE
FOUNDATION PLAN FOOTING REINF. PLAN REBAR ARRANGEMENT 6X1-¥õ300 BP30
* OUTPUT UNIT : mm

Ø300 PIPE, FILL IN


CONCRETE K-300

Ø300 PIPE, FILL IN


CONCRETE K-300
TOC EL. + 200
100 75
D8-150
800

ACI PROJECT
600

D12-150

500x2
75
50

825x2
400

1650
150

LEAN CONC. 50 THK


FOUNDATION DETAIL FOR
400
SECTION PILE ARRANGEMENT F1
(6 EA)
50

SQUAD CHECK
TYP.
CONT.

D8-150
PROCESS PIPING VESSELS STRUCT. ELEC. INST.

D12-150
PEDESTAL SCALE JOB NO. MICROFILM NO.
(6 EA)
REV. DATE DESCRIPTION DRWNCHKDAPPDAPPD APPD
AS SHOWN CLARIFICATION

Copyright (c) GS E&C. All Rights Reserved


10/14/2023

Project Na. : ACI


Calculation Sheet
of Project No. : CLARIFICATION

Foundation Client : MKS Page 9

3. FOUNDATION DATA
3.1 FOOTING DATA
Unit : mmFt. Name F1
5300 Ft. Type TANK 2
1000 1000 Area 13.509 m2
3300 Ft. Thickness 400.00 mm
Ft. Volume 5.404 m3
63 Ft. Weight 12.970 tonf
Outer Soil Height 600.00 mm

68 64
Soil Volume 7.529 m3
Soil Weight 15.058 tonf
Buoyancy Not Consider
Self Weight (except Pr.SW) 28.028 tonf

67 65

800
600

66

The Origin coordinate


400

The Center of Gravity & Pile (0,0) mm

3.2 PIER DATA


Off X , Off Y is offset position from the Center of the footing
If Pier Shape is Circle or Circle wall, Pl is a Diameter. and Pw is a Inner Diameter
Area is pier concrete area
Weight is pier and inner soil weight in case circle wall except Tank1 Type(Circle Ring Footing Shape)
Unit( Length : mm , Weight : tonf , Area : m2 )
Ft.Name Pr.Name Shape Pl Pw Ph Area Weight Off X Off Y
63 Rectangle 400.000 400.000 800.000 0.160 0.307 0.000 2150.000
64 Rectangle 400.000 400.000 800.000 0.160 0.307 1861.955 1075.000
65 Rectangle 400.000 400.000 800.000 0.160 0.307 1861.955 -1075.000
F1
66 Rectangle 400.000 400.000 800.000 0.160 0.307 0.000 -2150.000
67 Rectangle 400.000 400.000 800.000 0.160 0.307 -1861.955 -1075.000
68 Rectangle 400.000 400.000 800.000 0.160 0.307 -1861.955 1075.000

Copyright (c) GS E&C. All Rights Reserved


10/14/2023

Project Na. : ACI


Calculation Sheet
of Project No. : CLARIFICATION

Foundation Client : MKS Page 10

3.3 SECTION DATA


Ft.Name / Sec.Name F1 / S1
5300 Unit : mm
1000 1000
3300

Direction All Direct Section Area 13.509 m2


F.Volume 5.404 m3 F.Weight 12.970 tonf
S.Volume 7.529 m 3
S.Weight 15.058 tonf
Pier Wt 1.843 tonf Total Weight 29.871 tonf

3.4 LOAD CASE


Fz
Fy
Mz
Input the point loads in the global coordinate system direction. Positive directions of moments (shown in the sketch) are
My based on the right hand rule.
Fx
Mx

Index Load Case Name


1 SW
2 Empty
3 DL
4 Operation
5 Test
6 Wlx
7 Wly
8 Friction
9 Bundle Pull
10 Op EQx
11 Op EQy
12 Er EQx
13 Er EQy
14 TL

Unit( tonf , tonf-m )


Ft.Name Pr.Name Load Case Fx Fy Fz Mx My
1 0.000 0.000 -0.307 0.000 0.000
F1 63
2 0.000 0.000 0.000 0.000 0.000

Copyright (c) GS E&C. All Rights Reserved


10/14/2023

Project Na. : ACI


Calculation Sheet
of Project No. : CLARIFICATION

Foundation Client : MKS Page 11

3 0.000 0.000 0.000 0.000 0.000


4 0.000 0.000 0.000 0.000 0.000
5 0.000 0.000 0.000 0.000 0.000
6 0.000 0.000 0.000 0.000 0.000
7 0.000 0.000 0.000 0.000 0.000
8 0.000 0.000 0.000 0.000 0.000
9 0.000 0.000 0.000 0.000 0.000
10 0.000 0.000 0.000 0.000 0.000
11 0.000 0.000 0.000 0.000 0.000
12 0.000 0.000 0.000 0.000 0.000
13 0.000 0.000 0.000 0.000 0.000
14 0.000 0.000 0.000 0.000 0.000
1 0.000 0.000 -0.307 0.000 0.000
2 0.000 0.000 0.000 0.000 0.000
3 0.000 0.000 0.000 0.000 0.000
4 0.000 0.000 0.000 0.000 0.000
5 0.000 0.000 0.000 0.000 0.000
6 0.000 0.000 0.000 0.000 0.000
7 0.000 0.000 0.000 0.000 0.000
64
8 0.000 0.000 0.000 0.000 0.000
9 0.000 0.000 0.000 0.000 0.000
10 0.000 0.000 0.000 0.000 0.000
11 0.000 0.000 0.000 0.000 0.000
12 0.000 0.000 0.000 0.000 0.000
13 0.000 0.000 0.000 0.000 0.000
14 0.000 0.000 0.000 0.000 0.000
1 0.000 0.000 -0.307 0.000 0.000
2 0.000 0.000 0.000 0.000 0.000
3 0.000 0.000 0.000 0.000 0.000
4 0.000 0.000 0.000 0.000 0.000
5 0.000 0.000 0.000 0.000 0.000
6 0.000 0.000 0.000 0.000 0.000
7 0.000 0.000 0.000 0.000 0.000
65
8 0.000 0.000 0.000 0.000 0.000
9 0.000 0.000 0.000 0.000 0.000
10 0.000 0.000 0.000 0.000 0.000
11 0.000 0.000 0.000 0.000 0.000
12 0.000 0.000 0.000 0.000 0.000
13 0.000 0.000 0.000 0.000 0.000
14 0.000 0.000 0.000 0.000 0.000
1 0.000 0.000 -0.307 0.000 0.000
2 0.000 0.000 0.000 0.000 0.000
3 0.000 0.000 0.000 0.000 0.000
4 0.000 0.000 0.000 0.000 0.000
66 5 0.000 0.000 0.000 0.000 0.000
6 0.000 0.000 0.000 0.000 0.000
7 0.000 0.000 0.000 0.000 0.000
8 0.000 0.000 0.000 0.000 0.000
9 0.000 0.000 0.000 0.000 0.000

Copyright (c) GS E&C. All Rights Reserved


10/14/2023

Project Na. : ACI


Calculation Sheet
of Project No. : CLARIFICATION

Foundation Client : MKS Page 12

10 0.000 0.000 0.000 0.000 0.000


11 0.000 0.000 0.000 0.000 0.000
12 0.000 0.000 0.000 0.000 0.000
13 0.000 0.000 0.000 0.000 0.000
14 0.000 0.000 0.000 0.000 0.000
1 0.000 0.000 -0.307 0.000 0.000
2 0.000 0.000 0.000 0.000 0.000
3 0.000 0.000 0.000 0.000 0.000
4 0.000 0.000 0.000 0.000 0.000
5 0.000 0.000 0.000 0.000 0.000
6 0.000 0.000 0.000 0.000 0.000
7 0.000 0.000 0.000 0.000 0.000
67
8 0.000 0.000 0.000 0.000 0.000
9 0.000 0.000 0.000 0.000 0.000
10 0.000 0.000 0.000 0.000 0.000
11 0.000 0.000 0.000 0.000 0.000
12 0.000 0.000 0.000 0.000 0.000
13 0.000 0.000 0.000 0.000 0.000
14 0.000 0.000 0.000 0.000 0.000
1 0.000 0.000 -0.307 0.000 0.000
2 0.000 0.000 0.000 0.000 0.000
3 0.000 0.000 0.000 0.000 0.000
4 0.000 0.000 0.000 0.000 0.000
5 0.000 0.000 0.000 0.000 0.000
6 0.000 0.000 0.000 0.000 0.000
7 0.000 0.000 0.000 0.000 0.000
68
8 0.000 0.000 0.000 0.000 0.000
9 0.000 0.000 0.000 0.000 0.000
10 0.000 0.000 0.000 0.000 0.000
11 0.000 0.000 0.000 0.000 0.000
12 0.000 0.000 0.000 0.000 0.000
13 0.000 0.000 0.000 0.000 0.000
14 0.000 0.000 0.000 0.000 0.000
Footing SW 0.000 0.000 -28.028 0.000 0.000

Copyright (c) GS E&C. All Rights Reserved


10/14/2023

Project Na. : ACI


Calculation Sheet
of Project No. : CLARIFICATION

Foundation Client : MKS Page 13

3.5 LOAD COMBINATION


In Pier Top In Footing Bottom In Footing Bottom Center
without Self Weight with Pier Self Weight, with Pier & Footing Self Weight & Soil Weight,
But without Footing Self Weight, Case PileType
in centroid of Pile Group
Case NonPileType
in centroid of Footing

3.5.1 Load Combination in Pier Top (Without SW)


Unit( tonf , tonf-m )
Ft.Name Pr.Name L.Comb.  Fx  Fy  Fz  Mx  My
1 0.000 0.000 0.000 0.000 0.000
17 0.000 0.000 0.000 0.000 0.000
63
18 0.000 0.000 0.000 0.000 0.000
102 0.000 0.000 0.000 0.000 0.000
1 0.000 0.000 0.000 0.000 0.000
17 0.000 0.000 0.000 0.000 0.000
64
18 0.000 0.000 0.000 0.000 0.000
102 0.000 0.000 0.000 0.000 0.000
1 0.000 0.000 0.000 0.000 0.000
17 0.000 0.000 0.000 0.000 0.000
65
18 0.000 0.000 0.000 0.000 0.000
102 0.000 0.000 0.000 0.000 0.000
F1
1 0.000 0.000 0.000 0.000 0.000
17 0.000 0.000 0.000 0.000 0.000
66
18 0.000 0.000 0.000 0.000 0.000
102 0.000 0.000 0.000 0.000 0.000
1 0.000 0.000 0.000 0.000 0.000
17 0.000 0.000 0.000 0.000 0.000
67
18 0.000 0.000 0.000 0.000 0.000
102 0.000 0.000 0.000 0.000 0.000
1 0.000 0.000 0.000 0.000 0.000
17 0.000 0.000 0.000 0.000 0.000
68
18 0.000 0.000 0.000 0.000 0.000
102 0.000 0.000 0.000 0.000 0.000

3.5.2 Load Combination in Footing Bottom (With Pier SW)


Unit( tonf , tonf-m )
Ft.Name Pr.Name L.Comb.  Fx  Fy  Fz  Mx  My
F1 1 0.000 0.000 -0.307 0.000 0.000
17 0.000 0.000 -0.307 0.000 0.000
63
18 0.000 0.000 -0.307 0.000 0.000
102 0.000 0.000 -0.430 0.000 0.000
64 1 0.000 0.000 -0.307 0.000 0.000

Copyright (c) GS E&C. All Rights Reserved


10/14/2023

Project Na. : ACI


Calculation Sheet
of Project No. : CLARIFICATION

Foundation Client : MKS Page 14

17 0.000 0.000 -0.307 0.000 0.000


18 0.000 0.000 -0.307 0.000 0.000
102 0.000 0.000 -0.430 0.000 0.000
1 0.000 0.000 -0.307 0.000 0.000
17 0.000 0.000 -0.307 0.000 0.000
65
18 0.000 0.000 -0.307 0.000 0.000
102 0.000 0.000 -0.430 0.000 0.000
1 0.000 0.000 -0.307 0.000 0.000
17 0.000 0.000 -0.307 0.000 0.000
66
18 0.000 0.000 -0.307 0.000 0.000
102 0.000 0.000 -0.430 0.000 0.000
1 0.000 0.000 -0.307 0.000 0.000
17 0.000 0.000 -0.307 0.000 0.000
67
18 0.000 0.000 -0.307 0.000 0.000
102 0.000 0.000 -0.430 0.000 0.000
1 0.000 0.000 -0.307 0.000 0.000
17 0.000 0.000 -0.307 0.000 0.000
68
18 0.000 0.000 -0.307 0.000 0.000
102 0.000 0.000 -0.430 0.000 0.000

3.5.3 Load Combination in Footing Bottom Center (With Pier & Footing SW)
Load Combination of Elastic Condition
p : PileType
- C.G. of Load is coordinate from left bottom. Unit : mm Unit( tonf , tonf-m )
Ft.Name L.Comb.  Fx  Fy Fz  Mx  My C.G. of Loads
1 0.000 0.000 -29.871 0.000 0.000 2650.0 , 2650.0
F1 p 17 0.000 0.000 -29.871 0.000 0.000 2650.0 , 2650.0
18 0.000 0.000 -29.871 0.000 0.000 2650.0 , 2650.0

Load Combination of Ultimate Condition


p : PileType
- C.G. of Load is coordinate from left bottom. Unit : mm Unit( tonf , tonf-m )
Ft.Name Sec.Na L.Comb.  Fx  Fy  Fz  Mx  My C.G. of Loads
F1 p S1 102 0.000 0.000 -41.819 0.000 0.000 2650.0 , 2650.0

Copyright (c) GS E&C. All Rights Reserved


10/14/2023

Project Na. : ACI


Calculation Sheet
of Project No. : CLARIFICATION

Foundation Client : MKS Page 15

4. CHECK OF STABILITY
4.1 CHECK OF PILE REACTION (Uni-Axial)
4.1.1 Formula
if footing is checked in Buoyancy Fz means Fz - Fb
Fz My X Fz Mx Y
- Uni Axial : Rx = 2 , Ry = 2
Np  Xi Np  Yi
- Ru = Max[ Rxmax , Ry max ]
- Uf = Min[ 0 , Rxmin , Ry min ]
- Ru < Va => OK
Max(Hxi , Hyi)
b. Horizontal - Hmax = < Ha => OK
Np
c. Uplift - Uf < Ua => OK
Ver. / Uf. = Vertical / Uplift

4.1.2 Check of Vertical & Uplift Reaction


2 2 2 2
Ft.Name Np(EA) Fl (mm) Fw (mm)  Xi (m )  Yi (m )
F1 6 5300 5300 13.87 13.87

Unit( tonf )
Ft.Name L.Comb. Pile R Max R Min Ru Uf Ra Ua Result
X-Dir 4.978 4.978
F1 18 BP30 4.978 0 33.333 3.333 OK
Y-Dir 4.978 4.978

4.1.3 Check Of Horizontal Reaction


Ft.Name L.Comb. Pile Hmax (tonf) Ha (tonf) Result

F1 18 BP30 0 0.333 OK

Copyright (c) GS E&C. All Rights Reserved


10/14/2023

Project Na. : ACI


Calculation Sheet
of Project No. : CLARIFICATION

Foundation Client : MKS Page 16

5. DESIGN OF FOOTING
5.1 DESIGN MOMENT AND SHEAR FORCE
Footing design is in accordance with unltimate strength method at footing bottom.
Calculated total pier load as
Q = Fz - Self Weight Factor (Soil Weight + Footing Weight)
Ft.Name : Footing Name , Sec.Name : Strip Name for Footing Reinforcement Design
Dir. : Direction , L.Comb. : Load Combination Index , Sl or Sw : Strip X or Y width

5.1.1 Data Unit( mm , tonf , tonf-m )


Ft.Name Sec.Na Dir. L.Comb. Fl or Fw Sl or Sw  Fz M Q
F1 p S1 Long 102 5300.00 5300.00 41.819 0.00 2.580
S1 Ridial 102 5300.00 5300.00 41.819 0.00 2.580

5.1.2 Design Parameters


Yield Strength - 10M ~ 16M : fy1 , 19M ~ : fy2
f_cl : Clear Cover for edge of footing reinforcement
f_clt : Clear Cover for top of footing reinforcement
fp_clb : Clear Cover for bottom of footing reinforcement (Pile Foundation)
Loc. : Location of Critical Point from left side of footing

Unit(kgf/cm2,mm)
(Flexure) (Shear) fck fy1 fy2 f_cl f_clt fp_clb
0.9 0.75 250.00 4200.00 4200.00 50.0 50.0 150.0

5.2 REQUIRED REINFORCEMENT


5.2.1 Reinforcement Formula
- Shrinkage And Temperature Reinforcement ---- ACI CODE 7.12.2
As As1 = fac b h , fac = following
Area of shrinkage and temperature reinforcement shall provide at least the following ratio
of reinforcement area to gross concrete area, but not less than 0.0014
(a) Slabs where Grade 40 or 50 deformed bars are used ........................................................................0.0020
(b) Slabs where Grade 60 deformed bars or welded wire reinforcement are used....................................0.0018
(c) Slabs where reinforcement with yield stress exceeding 60,000 psi measured at a yield
0.0018 60,000
strain of 0.35 percent is used .......................................................................................................
fy
- Required Reinforcement by Analysis
As As2 = .req b d
- At every section of flexural members where tensile reinforcement is required
3 fck 200
As (As5 = bw d) (As4 = b d) ---- ACI Eq (10-3)
fy fy
- The requirements of Eq (10-3) need not be applied, if every section As provided is
at least one -third greater then that required by analysis ---- ACI CODE 10.5.3
As3 = 1.333 .req b d
Asmax = 0.75 b b d
fck 0.003 Es
b = 0.85  1 f 0.003 Es + fy
y

Copyright (c) GS E&C. All Rights Reserved


10/14/2023

Project Na. : ACI


Calculation Sheet
of Project No. : CLARIFICATION

Foundation Client : MKS Page 17

Selected As = Max ( As1 , As2 , Min ( As3 , Max ( As4 , As5 ) ) )


If Selected As < Using As < Asmax , then OK!!

Note : The reinforcement is calculated bases on the maximum moment under the foundation in each direction.
But, the 'ISO' , 'OCT' , 'HEX' , 'COMB' , 'TANK1' foundations are calaulated as face pier
Where,
Mu 0.85 fck 2Rn
Rn =
bd
2 ,  = 0.9 , .req =
fy (
1- 1-
0.85fck )


L=2R
360 L = Max( L1 , L2 )
W L2 Mutop = 0
Mutop =
16 W L2
W L2 Mubottom =
Mubottom = 2
10

Calculated by Calculated by
Conventional Conventional
Rigid Method Rigid Method

5.2.2 Check of Footing Reinforcement


Footing Name : F1 GroupType : Tank_2
- Longitudinal direction

Sec.Nam L.Comb. Using Bar (mm) qmax (tonf/m )


2
Width b (m) d (cm) As (cm )
2

102 top 8 - 13M @ 140 6.970 1.000 34.350 10.619


S1
102 botom 8 - 13M @ 140 6.970 1.000 24.350 10.619

Sec.Nam L.Comb. Mu (tonf-m) Rn .Req


102 top - - -
S1
102 bottom 0.016 0.030 0.0000

Sec.Nam L.Comb. As1(cm )


2
As2(cm )
2
As3(cm )
2
As4(cm )
2
As5(cm )
2
Asmax(cm )
2

102 top - - - 11.500 10.287 65.173


S1
102 bottom 7.200 0.017 0.023 8.152 7.292 46.200

Copyright (c) GS E&C. All Rights Reserved


10/14/2023

Project Na. : ACI


Calculation Sheet
of Project No. : CLARIFICATION

Foundation Client : MKS Page 18

Sec.Nam L.Comb. Using As(cm )


2
Select As(cm )
2
Result
102 top 10.619 0.000 OK
S1
102 bottom 10.619 7.200 OK

- Radial direction

Sec.Nam L.Comb. Using Bar (mm) 2


qmax (tonf/m ) Width b (m) d (cm) As (cm )
2

102 top 8 - 13M @ 140 6.970 1.000 33.050 10.619


S1
102 botom 8 - 13M @ 140 6.970 1.000 23.050 10.619

Sec.Nam L.Comb. Mu (tonf-m) Rn .Req


102 top - - -
S1
102 bottom 0.016 0.034 0.0000

Sec.Nam L.Comb. As1(cm )


2
As2(cm )
2
As3(cm )
2
As4(cm )
2
As5(cm )
2
Asmax(cm )
2

102 top - - - 11.065 9.897 62.706


S1
102 bottom 7.200 0.018 0.025 7.717 6.903 43.733

Sec.Nam L.Comb. Using As(cm )


2
Select As(cm )
2
Result
102 top 10.619 0.000 OK
S1
102 bottom 10.619 7.200 OK

Copyright (c) GS E&C. All Rights Reserved


10/14/2023

Project Na. : ACI


Calculation Sheet
of Project No. : CLARIFICATION

Foundation Client : MKS Page 19

5.3 ONE WAY SHEAR FORCE


5.3.1 One-Way Shear Formula
ACI 318-05 CODE 11.3.1.1
- For members subject to shear and flexure only.
-  Vc = 0.75 2 fck B'w d (eq 11-3)
- Vu <=  Vc , then OK!!


L=2R
360 L = Max( L1 , L2 )
L' = L - Pier Width - 2 d L' = L - d
WL' Vu = WL
Vu =
2

Calculated by Calculated by
Conventional Conventional
Rigid Method Rigid Method

Copyright (c) GS E&C. All Rights Reserved


10/14/2023

Project Na. : ACI


Calculation Sheet
of Project No. : CLARIFICATION

Foundation Client : MKS Page 20

5.3.2 Check of One-Way Shear


Footing Name : F1 GroupType : Tank_2 PileType : True

5300 Unit : mm
1000 1000
3300

63

68 64

67 65

66

- Longitudinal direction One-Way Shear


Sec.Nam L.Comb. Loc. (mm) d (mm) Bw (mm) Vc (tonf) Vu (tonf) Result
S1 102 - 243.5 1000 15.313 0 OK
- Radial direction One-Way Shear
Sec.Nam L.Comb. Loc. (mm) d (mm) Bw (mm) Vc (tonf) Vu (tonf) Result
S1 102 - 230.5 1000 14.495 0 OK

Copyright (c) GS E&C. All Rights Reserved


10/14/2023

Project Na. : ACI


Calculation Sheet
of Project No. : CLARIFICATION

Foundation Client : MKS Page 21

5.4 TWO WAY SHEAR FORCE


5.4.1 Two-Way Shear Formula
Vu = Fz Shade Ratio
(a)  Vc1 = 0.75 2 (1 + 2/ c) fck bo d (eq 11-33) <- Vc1
(b)  Vc2 = 0.75 2 (1 + s d / 2 bo) fck bo d (eq 11-34) <- Vc2
(c)  Vc3 = 0.75 4 fck bo d (eq 11-35) <- Vc3
 Vc = Min( Vc1 ,  Vc2 ,  Vc3) ACI 318-05 CODE 11.12.2.1
Vu  Vc , then OK
where
 = ratio of long side to short side of the column, concentrated load or reaction area
s = 40 for interior colimns
= 30 for edge columns
= 20 for corner columns
bo = perimeter of critical section
Footing Area - Punching Area
Shade Ratio =
Footing Area

5.4.2 Check of Two-WayShear

Ft.Name F1 Punching Area 4140.921 cm2


5300
1000 1000 Pr.Name 68 Pile effect 5/6
3300
Shape Rectangle  Vc1 118.245 tonf
63
L.Comb. 102  Vc2 113.988 tonf
68 64

Pl 400 mm  Vc3 78.830 tonf

67 65 Pw 400 mm  Vc 78.830 tonf

66 bo / d 2574 / 243.5 mm Vu 0.358 tonf

 c / s 1 / 40 Result OK

5.5 PILE PUNCHING SHEAR FORCE


5.5.1 Pile Punching Shear Formula
Vu = Fz Shade Ratio
(a)  Vc1 = 0.75 2 (1 + 2/c) fck bo d (eq 11-33) <- Vc1
(b)  Vc2 = 0.75 2 (1 + s d / 2 bo) fck bo d (eq 11-34) <- Vc2
(c)  Vc3 = 0.75 4 fck bo d (eq 11-35) <- Vc3
 Vc = Min( Vc1 ,  Vc2 ,  Vc3) ACI 318-05 CODE 11.12.2.1
Vu  Vc , then OK
where
 = ratio of long side to short side of the column, concentrated load or reaction area
s = 40 for interior colimns
= 30 for edge columns
= 20 for corner columns
bo = perimeter of critical section
Footing Area - Punching Area
Shade Ratio =
Footing Area

Copyright (c) GS E&C. All Rights Reserved


10/14/2023

Project Na. : ACI


Calculation Sheet
of Project No. : CLARIFICATION

Foundation Client : MKS Page 22

5.5.2 Check of Pile Punching Shear

Ft.Name F1 Punching Area 2285.786 cm2


5300
1000 1000 Pile No. 1  c / s 1 / 20
3300
Shape Circle  Vc1 72.143 tonf
1

L.Comb. 102  Vc2 61.334 tonf


2 6

PileName BP30  Vc3 48.096 tonf

3 5 Diameter 300mm  Vc 48.096 tonf


4
bo 1570.44mm Vu 6.970 tonf

d 243.5mm Result OK

Copyright (c) GS E&C. All Rights Reserved


REPORT CALCULATION SHEET FOR
FOUNDATION OF CRUDE OIL PALM

Document No. Rev. Contract No : Pages :


#REF! 0 1

OUTPUT GAMBAR
REPORT CALCULATION SHEET FOR
FOUNDATION OF CRUDE OIL PALM

Document No. Rev. Contract No : Pages :


#REF! 0 1

OUTPUT GAMBAR
REPORT CALCULATION SHEET FOR
FOUNDATION OF CRUDE OIL PALM

Document No. Rev. Contract No : Pages :


#REF! 0 1

GAMBAR KONSTRUKSI
REPORT CALCULATION SHEET FOR
FOUNDATION OF CRUDE OIL PALM

Document No. Rev. Contract No : Pages :


#REF! 0 1

GAMBAR KONSTRUKSI

You might also like