Professional Documents
Culture Documents
DHS CLARIFICATION SETTLING TANK 130m - 2
DHS CLARIFICATION SETTLING TANK 130m - 2
DHS CLARIFICATION SETTLING TANK 130m - 2
SCOPE :
CLARIFICATION SETTLING TANK cap. 130m³
REPORT CALCULATION SHEET FOR
FOUNDATION OF CRUDE OIL PALM
1. GENERAL
1.1 Pondasi
Pondasi yang digunakan adalah tiang pancang
Kedalaman pondasi adalah 6m
2. KRITERIA DISAIN
3.1 Standard dan Kode yang digunakan
SNI 1729-2020
Spesifikasi untuk bangunan gedung baja struktural
SNI 2052-2017
Baja Tulangan Beton
REPORT CALCULATION SHEET FOR
FOUNDATION OF CRUDE OIL PALM
3. Drawing
REPORT CALCULATION SHEET FOR
FOUNDATION OF CRUDE OIL PALM
qc = 182,00 kg/cm2
Type © 10cm Cerocok
h =. 0,6 m (kedalaman galian pile cap)
H= 3,0 m (kedalaman pondasi)
Pile Cap
Tebal tanah diatas pile cap 0,4 m
Jarak antar tiang pancang (as ke as) 1,2 m
Jarak tiang pancang tepi terhadap sisi luar beton 0,6 m
Daya Dukung = 5,58 T (lihat detail perhitungan di lembar berikut nya)
25 TON
0
S2
0
S3
10/14/2023
CONTENTS
1. GENERAL
1.1 CODE & STANDARD
1.2 MATERIALS & UNIT WEIGHT
1.3 SUBSOIL CONDITION & SAFETY FACTORS
1.4 LOAD COMBINATION
2. DRAWING
2.1 LOCATION PLAN
2.2 DETAIL SKETCH
3. FOUNDATION DATA
3.1 FOOTING DATA
3.2 PIER DATA
3.3 SECTION DATA
3.4 LOAD CASE
3.5 LOAD COMBINATION
4. CHECK OF STABILITY
4.1 CHECK OF PILE REACTION
5. DESIGN OF FOOTING
5.1 DESIGN MOMENT AND SHEAR FORCE
5.2 REQUIRED REINFORCEMENT
5.3 ONE WAY SHEAR FORCE
5.4 TWO WAY SHEAR FORCE
5.5 PILE PUNCHING SHEAR FORCE
1. GENERAL
1.1 CODE & STANDARD
Items Description
Design Code American Concrete Institute (ACI 318) [Metric]
Horizontal Force for Wind AMERICAN SOCIETY OF CIVIL ENGINEERS [ASCE 7-05]
Horizontal Force for Seismic AMERICAN SOCIETY CIVIL ENGINEERS [ASCE 7-05]
Unit System Input : MKS, Output : MKS, Calculation Unit : IMPERIAL
- Pile Capacity
Items Value
Pile Name BP30
Footing List F1
Diameter 300 mm
Length 4m
Thick 0 mm
Shape Circle
Capacity ( Ha , Ua , Va ) 0.2 , 2.5 , 25 tonf
2. DRAWING
2.1 LOCATION PLAN
2.2 DETAIL SKETCH
REFERENCE DWGS
A01 NO. DWG NO. DWG TITLE
63
NOTES
* OUTPUT UNIT : mm
68 64
01
ACI PROJECT
67 65
SQUAD CHECK
F1
66
Y PROCESS PIPING VESSELS STRUCT. ELEC. INST.
AS SHOWN CLARIFICATION
OUTPUT UNIT : mm
REFERENCE DWGS
5300 CL FOOTING CL FOOTING NO. DWG NO. DWG TITLE
40 0
P.
5
TY
0
14
-1
-
13
13
D
1D
13M@140 13M@140
NOTES
* PILE
FOUNDATION PLAN FOOTING REINF. PLAN REBAR ARRANGEMENT 6X1-¥õ300 BP30
* OUTPUT UNIT : mm
ACI PROJECT
600
D12-150
500x2
75
50
825x2
400
1650
150
SQUAD CHECK
TYP.
CONT.
D8-150
PROCESS PIPING VESSELS STRUCT. ELEC. INST.
D12-150
PEDESTAL SCALE JOB NO. MICROFILM NO.
(6 EA)
REV. DATE DESCRIPTION DRWNCHKDAPPDAPPD APPD
AS SHOWN CLARIFICATION
3. FOUNDATION DATA
3.1 FOOTING DATA
Unit : mmFt. Name F1
5300 Ft. Type TANK 2
1000 1000 Area 13.509 m2
3300 Ft. Thickness 400.00 mm
Ft. Volume 5.404 m3
63 Ft. Weight 12.970 tonf
Outer Soil Height 600.00 mm
68 64
Soil Volume 7.529 m3
Soil Weight 15.058 tonf
Buoyancy Not Consider
Self Weight (except Pr.SW) 28.028 tonf
67 65
800
600
66
3.5.3 Load Combination in Footing Bottom Center (With Pier & Footing SW)
Load Combination of Elastic Condition
p : PileType
- C.G. of Load is coordinate from left bottom. Unit : mm Unit( tonf , tonf-m )
Ft.Name L.Comb. Fx Fy Fz Mx My C.G. of Loads
1 0.000 0.000 -29.871 0.000 0.000 2650.0 , 2650.0
F1 p 17 0.000 0.000 -29.871 0.000 0.000 2650.0 , 2650.0
18 0.000 0.000 -29.871 0.000 0.000 2650.0 , 2650.0
4. CHECK OF STABILITY
4.1 CHECK OF PILE REACTION (Uni-Axial)
4.1.1 Formula
if footing is checked in Buoyancy Fz means Fz - Fb
Fz My X Fz Mx Y
- Uni Axial : Rx = 2 , Ry = 2
Np Xi Np Yi
- Ru = Max[ Rxmax , Ry max ]
- Uf = Min[ 0 , Rxmin , Ry min ]
- Ru < Va => OK
Max(Hxi , Hyi)
b. Horizontal - Hmax = < Ha => OK
Np
c. Uplift - Uf < Ua => OK
Ver. / Uf. = Vertical / Uplift
Unit( tonf )
Ft.Name L.Comb. Pile R Max R Min Ru Uf Ra Ua Result
X-Dir 4.978 4.978
F1 18 BP30 4.978 0 33.333 3.333 OK
Y-Dir 4.978 4.978
F1 18 BP30 0 0.333 OK
5. DESIGN OF FOOTING
5.1 DESIGN MOMENT AND SHEAR FORCE
Footing design is in accordance with unltimate strength method at footing bottom.
Calculated total pier load as
Q = Fz - Self Weight Factor (Soil Weight + Footing Weight)
Ft.Name : Footing Name , Sec.Name : Strip Name for Footing Reinforcement Design
Dir. : Direction , L.Comb. : Load Combination Index , Sl or Sw : Strip X or Y width
Unit(kgf/cm2,mm)
(Flexure) (Shear) fck fy1 fy2 f_cl f_clt fp_clb
0.9 0.75 250.00 4200.00 4200.00 50.0 50.0 150.0
Note : The reinforcement is calculated bases on the maximum moment under the foundation in each direction.
But, the 'ISO' , 'OCT' , 'HEX' , 'COMB' , 'TANK1' foundations are calaulated as face pier
Where,
Mu 0.85 fck 2Rn
Rn =
bd
2 , = 0.9 , .req =
fy (
1- 1-
0.85fck )
L=2R
360 L = Max( L1 , L2 )
W L2 Mutop = 0
Mutop =
16 W L2
W L2 Mubottom =
Mubottom = 2
10
Calculated by Calculated by
Conventional Conventional
Rigid Method Rigid Method
- Radial direction
L=2R
360 L = Max( L1 , L2 )
L' = L - Pier Width - 2 d L' = L - d
WL' Vu = WL
Vu =
2
Calculated by Calculated by
Conventional Conventional
Rigid Method Rigid Method
5300 Unit : mm
1000 1000
3300
63
68 64
67 65
66
c / s 1 / 40 Result OK
d 243.5mm Result OK
OUTPUT GAMBAR
REPORT CALCULATION SHEET FOR
FOUNDATION OF CRUDE OIL PALM
OUTPUT GAMBAR
REPORT CALCULATION SHEET FOR
FOUNDATION OF CRUDE OIL PALM
GAMBAR KONSTRUKSI
REPORT CALCULATION SHEET FOR
FOUNDATION OF CRUDE OIL PALM
GAMBAR KONSTRUKSI