muck and other unsuitable foundation shall be excavated and removed, to BRIDGE
CU.M - CUBIC METER
II. DESIGN CRITERIA: expose suitable bed that is satisfactory to the Project Engineer.
SQ.M - SQUARE METER NORTH
1. DPWH STANDARD SPECIFICATION (2013) 5. EMBANKMENT: DIRECTION
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP): DIANA R. ABALOS
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS
GENERAL NOTES
ENGINEER II (CTO) PDS
REGIONAL OFFICE II (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC 3
CAGAYAN 2ND DISTRICT ENGINEERING INFRASTRUCTURE/FACILITIES - CONSTRUCTION OF SEAWALL ABBREVIATION PREPARED BY: CSDEO
ALONG THE SHORELINE OF CLAVERIA, CAGAYAN
LEGENDS KRISTIAN T. RAGUIRAG ROMEO D. YAQUIN RELLIE V. SIMBE OSCAR G. GUMIRAN, MPA
OFFICE CLAVERIA, CAGAYAN
ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER HDU 16
LIBERTAD, ABULUG, CAGAYAN JERICK U. QUINES
ENGINEER II DATE: DATE: DATE: DATE: