CRITICAL WORKS

L/I ACTIVITIES REMARKS


Procurement of AFT ACU condenser awarded to
29 REPAIR OF CENTRALIZED AIRCONDITIONING UNIT
supplier, waiting for purchase order for contractor.
Pull out STBD hydraulic cylinder for servicing of breaking
84 REPAIR OF LOITER DRIVE HYDRAULIC SYSTEM mechanism.
Waiting for delivery of potentiometer.
FOR CORRECTION
L/I ACTIVITIES REMARKS
6 REPAIR OF MAIN SEACHEST VALVES AND STRAINERS COMPLIED
11 REPAIR OF STARBOARD DECK CRANE COMPLIED
12 REPAIR OF PORT DECK CRANE COMPLIED
REPLACEMENT OF HEAD BOWLS, WASH BOWLS AND URINAL
13 BOWLS ASSEMBLIES AND DRAINAGE PIPES AT DIFFERENT COMPLIED
LOCATIONS
REPLACEMENT OF FUEL OIL LEVEL GAUGE WITH SENSOR AT
23 COMPLIED
STORAGE TANK NR 3
REPLACEMENT OF MONITORING GAUGES, SENSORS AND VISUAL
34 COMPLIED
ALARMS AT MCR
REPLACEMENT OF OVERHEAD CEILING AT DIFFERENT
44 COMPLIED
COMPARTMENT
49 REPAIR OF WATERTIGHT ENCLOSURES COMPLIED
56 PRESERVATION OF TWO (2) FRESH WATER TANKS COMPLIED
FABRICATION AND INSTALLATION OF FIVE (5) SINGLE BUNKS, FIVE
66 (5) DOUBLE BUNKS AND SIX (6) TRIPLE BUNKS WITH CURTAINS AT COMPLIED
DIFFERENT COMPARTMENT
REPAIR OF CABINETS, LOCKERS AND TABLES AT DIFFERENT
67 COMPLIED
LOCATIONS
68 REPAIR OF CO AND OFFICER'S HEAD COMPLIED
REPAIR AND SERVICING OF TURBO CHARGERS OF PORT AND
77 STARBOARD MAIN PROPULSION DIESEL ENGINE MODEL SEMT COMPLIED, for final testing during TIAC
PIELSTICK 18 PA6 V280
REPLACEMENT OF FUEL BOOSTER PUMP UNIT OF MAIN
78 PROPULSION DIESEL ENGINES NR 1 AND 2 MODEL SEMT COMPLIED
PIELSTICK 18 PA6 V280

LACK OF DOCUMENTS
L/I ACTIVITIES REMARKS
REPLACEMENT OF 0.56KW VENT EXHAUST BLOWER MOTOR
18 COMPLIED
ASSEMBLY AT GALLEY
REPLACEMENT OF 0.4KW VENT SUPPLY BLOWER MOTOR
19 COMPLIED
ASSEMBLY AT GALLEY
REPLACEMENT OF FRESH WATER FLUSHING PUMP GUN
20 COMPLIED
CONTROLLER
21 REPLACEMENT OF FIRE DETECTION SYSTEM COMPLIED
REPLACEMENT OF TWELVE (12) WIND SHIELD WIPER MOTORS AT
22 COMPLIED
BRIDGE
REPLACEMENT OF SELF- CONTAINED AIR-CONDITIONING
26 COMPLIED
UNITS AT AFT COMPARTMENT
REPLACEMENT OF VENT EXHAUST BLOWER MOTOR AND
27 CONTROLLER ASSEMBLY OF DOMESTIC REFRIGERATION COMPLIED
MACHINERY AT DECK1 FWD PASSAGEWAY
37 REPLATING OF DECK AT DIFFERENT LOCATIONS COMPLIED
72 GENERAL DOCKYARD SERVICES COMPLIED

REPLACEMENT OF HIGH PRESSURE AIR COMPRESSOR (HPAC) AT


82 COMPLIED
AFT ENGINE ROOM
REPLACEMENT OF DOMESTIC FRESH WATER PUMP AND MOTOR
90 COMPLIED
ASSEMBLY AT FWD ENGINE ROOM
REPLACEMENT OF DOMESTIC SALT WATER PUMP AND MOTOR
91 COMPLIED
ASSEMBLY AT FWD ENGINE ROOM