Package 1ehs December 2022

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 16

FORM 1

TNUFIP– UNDERGROUND SEWERAGE SYSTEM FOR PHASE II AND PHASE III OF


VELLORE MUNICIPAL CORPORATION
Monthly Progress Report of EMP Implementation for Month of December 2022

A Project Details
1 Name of Package Package 1
2 Name and address of the Subaya constructions Co LTD ,Chennai -83
Contractor
3 Contract date and duration 31.12.2021 ,36 months
B Progress of Implementation of Work
Progress of Implementation
Overall
During Total Progress up
Details of Work Upto Previous Progress
Current to the end of
Month (%)
Month Reporting Month
1 2 3 4 5 (=3 + 4) 6
1 Construction Site Camp
2 Labour Camp
3 Waste Disposal Area
4 Laying of sewers, km 93617 1527 95144
5 Sewer Pumping Main, km 3942 159 4101
6 Sewerage pumping SPS-4 all The lift
Station, Nos works in wells
such as wet,
screen chamber,
grid well chambers
completed.
Sps-3work-
completed
7 Sewerage Lifting Station, Ls-7 Fifth lift
Nos completed & top
slap work
Ls-7 completed &
thermal chamber
to complete with
top slap on to it.
8
Brick Manholes, Nos 3910 3938
28
9 RCC Manholes, Nos 112 36 150
10 House Service
Connection, Nos (Upto 17183 97 17280
boundary)
11 House service Connection 16892 388 17280-
Supply and laying of Connections
UPVC pipe 110 mm Dia
(KM) Domestic

1
12 House service Connection
Supply of UPVC pipe 160
202-Connections
mm Dia (KM) Non
domestic
C Compliance with Statutory Environmental Clearance Requirements
Status of Compliance If Obtained,
Statutory Environmental
Date of Validity
Requirements Date of Receipt
Application
1 Applied on Valid up to 06-
Labour License 03.03.2022
27.03.2022 03-2023
2 Labour Insurance 27.03.2022 26-03-2023
3 Permission to laying sewer line
Work Processing
along and across NH48
4 Permission to lay Sewer line
along and across State Work Processing
Highways
5 Permission for laying sewer line
and pumping main across Work Processing
Railway line
6 Consent to Establish from
Work Processing
TNPCB
7 NOC from ASI Work Processing
8 Permission for construction of
Work Processing
Pipe Carrying Bridge from PWD
9 Permission for discharge
treated effluent into Pandian Work Processing
Channel from PWD
D Implementation Status of Health and Safety Measures
Implementatio
n
Sl. No Health & Safety Measures Remarks
Status (Yes /
No)
Appointment of Qualified Environment and Safety Engineer Mr.
1 YES Zahiruddin
Z
Approval for Construction Safety Management Plan by the
2 YES
Engineer
3 Provision of Flags and Warning Lights for Potential Hazards YES
Provision of Adequate staging, Form Work and Access
4 (Ladders with Handrails) for works at height more than 3.0 YES
M
Provision of adequate shoring / bracing / barricading /
5 YES
lighting for all deep excavations of more than 3.0 m
Provision for sufficient lighting especially for night time
6 YES
work
Construction workers safety - provision of personnel
7 YES
protective equipment

2
Workers engaged in welding work shall be provided with
8 N/A
welder protective shield
9 All vehicles are provided with reverse horns YES
All scaffolds, Ladders and other safety devices shall be
10 YES
maintained in a safe and sound conditions
Regular health checkup for labourers / contractor’s Every Three
11 YES
personnel 3 months
Ensuring the sanitary conditions and all waste disposal
12 YES
procedures and methods in the camp
13 Provision for insurance coverage to the workers YES
E Status of EMP Implementation
Environmental Impact Location Mitigation Measures Taken Remarks
1 Dust generated during Nethaji bose Dust Certain was Provided
construction activities street, pf for avoid dust
office
backside,
cmc colony,
cmc main
road
2 Accumulation of excess
excavated earth (spoils)
Nethaji bose
3 street, pf Muffler is used to reduce
Noise and Vibration due to office sound in jack hammers and
operation of construction backside, proper safety measures
machineries cmc colony, such ear muff and ear plug
cmc main provided
road
Nethaji bose
4 street, pf
office Walk away Trenches
Access to House obstructed backside, provided for quick access
cmc colony, from home
cmc main
road
Nethaji bose
street, pf
Sign board provided at
5 office
Accessibility and Traffic location and reflecting
backside,
Disruptions stickers are provided at
cmc colony,
boards
cmc main
road
6 Community Health and Safety
7 Damage to utilities like water
supply lines / sewer lines /
telephone lines / electric lines
etc

3
8 Impact on water quality due to
silt run off
9 Others, specify
F Details of Complaints Received
No of
Sl.
Nature of grievance Grievances Status Remarks
No.
received
1 Damage to water line 7 Completed
2 Damage to drain line
3 Removal of surplus earth 4 Completed
4 Damage to electric/telephone connection
5 Access to house obstructed
6 Lack of safety measures
7 Others, specify
Direct
complaint
Rectified on
spot itself
Total no. 11 Completed

G Environmental Quality Monitoring


Sl. No of Date of Date of Receipt Is Report
Parameter
No. Locations monitoring of Results Attached (Y/N)
1 Air and noise 2 (Sps- 11/06/2022 Waiting for reports
5,thottaplayam)
H Health Camp and HIV/AIDs Awareness Program conducted( vaccine drive camp)
Date of No of Persons Outcome of the
Type of Tests conducted Remarks
Camp attended Camp
1 15/12/2022 General medical 48 All persons are
camp (such as founded healthy and
B.P ,sugar ,blood safe
test, fitness test)
I Training/Awareness Program conducted:
Date of No of
Type of training Topics covered Remarks
Training Participants
1 1/12/2022 Induction Health and hygiene 20
& Excavation safety
2 08/12/202 Toolbox talks, OHS, E&S, Health and hygiene 40
2 Flagmen training & Excavation
3 15/12/202 Gender Sensitization Gender 30
2 Sensitization
4 HIV/AIDS Awareness HIV/AIDS
Awareness
5 22/12/202 Others, specify Covid -19 30
2 awareness&

4
sanitization
procedures
J Submission Details
Signature
Name Zahiruddin z
Designation Safety officer
Date of Submission 31/12/2022

Barrication photos at site:-

5
6
Sps5:-

7
General-medical-camp:-

8
9
10
11
12
Environmental air and noise monitoring photos:-

Sps 5:-

13
14
15
16

You might also like