BẢN VẼ HOÀN CÔNG


--
E-00
ARCH-01
ARCH-02
ARCH-03
ARCH-04
ARCH-05
E-06
E-07
E-08
A-09

KS:

E-00
36m

OPERATION 2D
PALLET
L*W=7*4M
1.5m 36m
CONVEYOR

H=3m

2D PALLET
CUTTING
ROOM 1.5m

L*W=7*5M

H=3m 19.45m
H=3.2m KS:

CNC
PALLET
CUTTING 2m
ROOM

L*W=7*11M

6.75m
x
x
VACUUM ABSORBING
PUMP M/C
L*W = 1.5*1.5M
L*W = 1.5*3.2M

ARCH-01
200 200

800 800

3200 1210 3200 1210

2200 2170

990 990

2000 1500

200

800 800 KS:

3200 1210 3000 1210

990 990

ARCH-02
36m

Absorbing
M/C
L*W = 1.5*3.2M
x
x

2m
x

x
TOOLING AREA
x
6.28m L*W= 7*9M
x

PALLET x

STORAGE x

AREA x
2.48m
L*W=7*5M x

x
CS TRIAL
AREA x

2.48m
L*W=7*6M x 36m
x

TOOLING W3 x

AREA x

L*W=7*6M x
2.48m
7m x

x KS:

L*W= 7*7M x
5.97m
x

x
TOOLING DIR
AREA x
1.98m L*W= 7*3M x
x
VACUUM ABSORBING
PUMP M/C
L*W = 1.5*1.5M
L*W = 1.5*3.2M

ARCH-03
1600
1100
820

1700

KS:

ARCH-04
36m

Absorbing
M/C
L*W = 1.5*3.2M
x

6.75m
OPERATION 2D
PALLET
L*W=7*4M 36m

2D PALLET
CUTTING
ROOM
L*W=7*5M

19.45m
KS:

CNC
PALLET
CUTTING
ROOM

L*W=7*11M

x
x
VACUUM ABSORBING
PUMP M/C
L*W = 1.5*1.5M
L*W = 1.5*3.2M

ARCH-05
36m

Absorbing
M/C
L*W = 1.5*3.2M
x
x

x
TOOLING AREA
x
L*W= 7*9M
x

PALLET x

INSTALL STORAGE x

PALLET AREA x

ROOM L*W=7*5M x

x
CS TRIAL
OPERATION 2D
PALLET AREA x

L*W=7*4M
L*W=7*6M x 36m
CONVEYOR

2D PALLET x

CUTTING TOOLING W3 x

ROOM AREA x

L*W=7*5M L*W=7*6M x

x
KS:
x
CNC
x
PALLET L*W= 7*7M
x
CUTTING
x
ROOM
x
L*W=7*11M
x
TOOLING DIR
AREA x
L*W= 7*3M x
x
VACUUM ABSORBING
PUMP M/C
L*W = 1.5*1.5M
L*W = 1.5*3.2M

E-06
36m

Absorbing
M/C
L*W = 1.5*3.2M
x
x

x
TOOLING AREA
x
L*W= 7*9M
x

PALLET x

INSTALL STORAGE x

PALLET AREA x

ROOM L*W=7*5M x

1P
x
1P
x
CS TRIAL
OPERATION
3P
2D 1P

PALLET AREA x

3P
L*W=7*4M
L*W=7*6M
1P 1P
x 36m
CONVEYOR

3P 1P
1P 1P 1P x

3P
2D PALLET 1P
x

CUTTING TOOLING W3 x
1P
3P ROOM AREA x

L*W=7*5M L*W=7*6M 1P x
3P 3P

x
3P

x
3P KS:
CNC
x
PALLET L*W= 7*7M
x
CUTTING
x
ROOM
x
L*W=7*11M
3P x 3P
TOOLING DIR
1P
AREA x

3P
L*W= 7*3M x
1P

x
VACUUM ABSORBING
PUMP M/C
L*W = 1.5*1.5M
L*W = 1.5*3.2M

E-07
36m

Absorbing
M/C
L*W = 1.5*3.2M
x
x

x
TOOLING AREA
x
L*W= 7*9M
x

PALLET x

INSTALL STORAGE x

PALLET AREA x

ROOM L*W=7*5M x

x
CS TRIAL
OPERATION 2D
PALLET AREA x

L*W=7*4M
L*W=7*6M x 36m
CONVEYOR

2D PALLET x

CUTTING TOOLING W3 x

ROOM AREA x

L*W=7*5M L*W=7*6M x

x KS:
CNC
x
PALLET L*W= 7*7M
x
CUTTING
x
ROOM
x
L*W=7*11M
x
TOOLING DIR
AREA x
L*W= 7*3M x
x
VACUUM ABSORBING
PUMP M/C
L*W = 1.5*1.5M
L*W = 1.5*3.2M

E-08
36m

Absorbing
M/C
L*W = 1.5*3.2M
x
x

x
TOOLING AREA
x
L*W= 7*9M
x

PALLET x

INSTALL STORAGE x

PALLET AREA x

ROOM L*W=7*5M x

x
CS TRIAL
OPERATION 2D
PALLET AREA x

L*W=7*4M
L*W=7*6M x 36m
CONVEYOR

2D PALLET x

CUTTING TOOLING W3 x

ROOM AREA x

L*W=7*5M L*W=7*6M x

x KS:
CNC
x
PALLET L*W= 7*7M
x
CUTTING
x
ROOM
x
L*W=7*11M
x
TOOLING DIR
AREA x
L*W= 7*3M x
x
VACUUM ABSORBING
PUMP M/C
L*W = 1.5*1.5M
L*W = 1.5*3.2M

A-09