CUTTING LIST

W.O. No. : 428-482-16 Dt. 26-08-2016 Date : ……………….


Fabrication of 15x61.0m span Open Web Girder (25t Loading) for Br.No. 10 (Koshi
Name of work : bridge)at
15 Spans)
Katareah-Kursela section in Eastern Central Rly. (Drg. No. RDSO B-17182 =
(Note:- Weight
only One Span)

Name of Components : Bottom Chord (L0-L1), (L1-l2), (L2-l3), (L3-L4)


Drg. No. : RDSO B-17182/4 SSE/Cutting Shop
Consignee: SSE/Works/ SSE/Fabrication
Work alloted to : (PF No.3) SSE/Steel
Description of material Total Wt. with
S.No. 10% wastage
SM No. Item Section Length 1 Thick Length 2 Qty.
1 5/5X Web Plate 16 Th. MSP 620 16 8325 8 5704.90
2 -do- Fl. Plate 16 Th. MSP 150 16 8325 16 2760.44
3 -do- End batten plate 10 Th. MSP 540 10 710 8 264.85
4 -do- Int. batten plate 10 Th. MSP 395 10 540 24 442.04
6 -do- Diaphragm web 10 Th. MSP 530 10 614 12 337.20
7 6/6X Web Plate 16 Th. MSP 620 16 7975 8 5465.06
8 -do- Fl. Plate 16 Th. MSP 150 16 7975 16 2644.38
9 -do- End batten plate 10 Th. MSP 540 10 710 8 264.85
10 -do- Int. batten plate 10 Th. MSP 395 10 540 24 442.04
12 -do- Diaphragm web 10 Th. MSP 530 10 614 12 337.20
13 7/7X Web Plate 20 Th. MSP 620 20 7975 8 6831.32
14 -do- Addl. Plate 20 Th. MSP 500 20 7975 8 5509.13
15 -do- Fl. Plate 20 Th. MSP 150 20 7975 16 3305.48
16 -do- End batten plate 10 Th. MSP 540 10 710 8 264.85
17 -do- Int. batten plate 10 Th. MSP 395 10 540 24 442.04
19 -do- Diaphragm web 10 Th. MSP 500 10 564 12 292.21
20 8/8X Web Plate 20 Th. MSP 620 20 7975 8 6831.32
21 -do- Addl. Plate 20 Th. MSP 500 20 7975 8 5509.13
22 -do- Fl. Plate 20 Th. MSP 150 20 7975 16 3305.48
23 -do- End batten plate 10 Th. MSP 540 10 710 8 264.85
24 -do- Int. batten plate 10 Th. MSP 395 10 540 24 442.04
26 -do- Diaphragm web 10 Th. MSP 500 10 564 12 292.21
Total weight (Kgs.)= 51953.04

SSE/PCO SSE/Steel SSE/BWS/JRC


Qty. for Qty. for 9929.2
Actual weight
Cutting Length 1 15 2
143120.00 5186.28 8 120 4964.6
271200.00 2509.49 16 240
20000.00 240.78 8 120 9573.3
44880.00 401.86 24 360
27456.00 306.55 12 180
137520.00 4968.23 8 120
260000.00 2403.98 16 240
20000.00 240.78 8 120
44880.00 401.86 24 360
27456.00 6210.29 12 180
137520.00 5008.30 8 120 17041.3
135600.00 3004.98 8 120 3
260000.00 240.78 16 240 12780.975
20000.00 306.55 8 120
44880.00 401.86 24 360
25536.00 265.64 12 180
137520.00 6210.29 8 120
135600.00 5008.30 8 120
260000.00 3004.98 16 240
20000.00 240.78 8 120
44880.00 401.86 24 360
25536.00 265.64 12 180
2243584.00 47230.03
CUTTING LIST
W.O. No. : 428-482-16 Dt. 26-08-2016 Date : ……………….

Fabrication of 15x61.0m span Open Web Girder (25t Loading) for Br.No. 10 (Koshi
Name of work : bridge)at
15 Spans)
Katareah-Kursela section in Eastern Central Rly. (Drg. No. RDSO B-17182 =
(Note:- Weight
only One Span)

Name of Components : Top Chord (U1-U2), (U2-U3), (U3-U4)


Drg. No. : RDSO B-17182/5 SSE/Cutting Shop
Consignee: SSE/Works/ SSE/Fabrication
Work alloted to : PF No.7 SSE/Steel
Description of material Total Wt. with
S.No. 10% wastage
SM No. Item Section Length 1 Thick Length 2 Qty.
1 2/2x Top Plates 16 Th. MSP 670 16 8105 4 3001.03
2 -do- Side plates 12 Th. MSP 620 12 8099 8 4162.52
3 -do- Flange plates 16 Th. MSP 150 16 7817 8 1296.00
4 -do- End/Int. Batten Plates 10 Th. MSP 530 10 650 12 356.97
6 -do- Diaphragm web 10 Th. MSP 510 10 620 4 109.22
8 3/3X Top Plates 16 Th. MSP 670 16 7982 4 2955.49
9 -do- Side plates 12 Th. MSP 620 12 7982 8 4102.39
10 -do- Flange plates 16 Th. MSP 150 16 7982 8 1323.35
11 -do- End/Int. Batten Plates 10 Th. MSP 530 10 650 12 356.97
13 -do- Diaphragm web 10 Th. MSP 510 10 620 4 109.22
15 4/4X Top Plates 20 Th. MSP 678 20 7982 4 5469.85
16 -do- Side plates 16 Th. MSP 620 16 7982 8 5469.85
17 -do- Flange plates 20 Th. MSP 150 20 7982 8 1654.19
18 -do- End/Int. Batten Plates 10 Th. MSP 530 10 650 12 356.97
20 -do- Diaphragm web 10 Th. MSP 510 10 610 4 107.45
Total weight (Kgs.)= 30831.47

SSE/PCO SSE/Steel SSE/BWS/JRC


Actual Qty. for Qty. for
Cutting Length weight 1 15
70200.00 2728.21 4 60
139504.00 3784.11 8 120
127472.00 1178.18 8 120
28320.00 324.52 12 180
9040.00 99.29 4 60 2
69216.00 2686.81 4 60
137632.00 3729.45 8 120
130112.00 1203.05 8 120
28320.00 324.52 12 180
9040.00 99.29 4 60
69280.00 4972.59 4 60
137632.00 #REF! 8 120
130112.00 1503.81 8 120
28320.00 324.52 12 180
8960.00 97.69 4 60
1123160.00 #REF!
CUTTING LIST
W.O. No. : 428-482-16 Dt. 26-08-2016 Date : ……………….
Fabrication of 15x61.0m span Open Web Girder (25t Loading) for Br.No. 10 (Koshi
Name of work : bridge)at
Spans)
Katareah-Kursela section in Eastern Central Rly. (Drg. No. RDSO B-17182 = 15
(Note:- Weight only
One Span)

Name of Components : End Raker (L0-U1), (L8-U7)


Drg. No. : RDSO B-17182/6 SSE/Cutting Shop
Consignee: SSE/Works/ SSE/Fabrication
Work alloted to : PF No. 4 SSE/Steel
Description of material Total Wt. with
S.No. 10% wastage
SM No. Item Section Length 1 Thick Length 2 Qty.
1 1/1X Top Plates 16 Th. MSP 688 16 10910 4 4148.16
2 -do- Side plates 20 Th. MSP 620 20 11791 8 10100.08
3 -do- Flange plates 12 Th. MSP 150 12 11791 8 1466.14
4 -do- End Batten Plates 10 Th. MSP 540 10 650 8 242.47
6 -do- Diaphragm web 10 Th. MSP 540 10 604 16 450.62
7 -do- Lacing flat 65x16 16 Th. MSP 65 16 591 96 509.51
Total weight= 16916.98

SSE/PCO SSE/Steel SSE/BWS/JRC


Actual Qty. for Qty. for
Cutting Length weight 1 15
92784.00 3771.05 4 60
198576.00 9181.89 8 120
191056.00 1332.85 8 120
19040.00 220.43 8 120
36608.00 409.66 16 240
125952.00 463.19 96 1440
664016.00 15379.07
CUTTING LIST
W.O. No. : 428-482-16 Dt. 26-08-2016 Date : ……………….
Fabrication of 15x61.0m span Open Web Girder (25t Loading) for Br.No. 10 (Koshi
Name of work : bridge)at
15 Spans)
Katareah-Kursela section in Eastern Central Rly. (Drg. No. RDSO B-17182 =
(Note:- Weight
only One Span)

Name of Components : Portal Bracing Girder & Knee bracing


Drg. No. : RDSO B-17182/6 SSE/Cutting Shop
Consignee: SSE/Works/ SSE/Fabrication
Work alloted to : PF No.1 SSE/Steel
Description of material Total Wt. with
S.No. 10% wastage
SM No. Item Section Length 1 Thick Length 2 Qty.
1 PB1 T&B Flange Plates 10 Th. MSP 200 10 4918 4 339.74
2 -do- Web plate 10 Th. MSP 400 10 4918 2 339.74
10 PB6 Gusset at portal end 10 Th. MSP 251 10 440 2 19.07
11 PB7 Bracing Gusset (Middle) 10 Th. MSP 310 10 512 4 54.82
12 PB8 Gusset with ER (Corner) 10 Th. MSP 228 10 322 4 25.36
13 PB9 Gusset with ER (Middle) 10 Th. MSP 200 10 220 4 15.20
14 PB10 Gusset plate Top 10 Th. MSP 245 10 267 4 22.59
15 - Packing plate 16 Th. MSP 200 16 260 4 28.74
Total weight (Kg.) = 845.25

SSE/PCO SSE/Steel SSE/BWS/JRC


Actual Qty. for Qty. for
Cutting Length weight 1 15
40944.00 308.85 4 60
21272.00 308.85 2 30
2764.00 17.34 2 30
6576.00 49.84 4 60
4400.00 23.05 4 60
3360.00 13.82 4 60
4096.00 20.54 4 60
3680.00 26.12 4 60
87092.00 768.41
CUTTING LIST
W.O. No. : 428-482-16 Dt. 26-08-2016 Date : ……………….
Fabrication of 15x61.0m span Open Web Girder (25t Loading) for Br.No. 10 (Koshi
Name of work : bridge)at
15 Spans)
Katareah-Kursela section in Eastern Central Rly. (Drg. No. RDSO B-17182 =
(Note:- Weight
only One Span)

Name of Components : Verticals (U1&U7-L1&L7), (U2,U4&U6-L2,L4&L6), (U3&U5-L3&L5)


Drg. No. : RDSO B-17182/7 SSE/Cutting Shop
Consignee: SSE/Works/ SSE/Fabrication
Work alloted to : (PF No. 1) SSE/Steel
Description of material Total Wt. with
S.No. 10% wastage
SM No. Item Section Length 1 Thick Length 2 Qty.
1 9/9X T&B Flange Plates 10 Th. MSP 250 10 8157 8 1408.71
2 -do- Web plate 10 Th. MSP 630 10 8157 4 1774.98
3 10/12 T&B Flange Plates 10 Th. MSP 250 10 8372 12 2168.77
4 -do- Web plate 10 Th. MSP 630 10 8372 6 2732.65
5 11 T&B Flange Plates 10 Th. MSP 250 10 8370 8 1445.50
6 -do- Web plate 10 Th. MSP 630 10 8370 4 1821.33
Total weight= Total 11351.93

SSE/PCO SSE/Steel SSE/BWS/JRC


Actual Qty. for Qty. for
Cutting Length weight 1 15
134512.00 1280.65 8 120
70296.00 1613.62 4 60
206928.00 1971.61 12 180
108024.00 2484.22 6 90
137920.00 1314.09 8 120
72000.00 1655.75 4 60
729680.00 10319.94
CUTTING LIST
W.O. No. : 428-482-16 Dt. 26-08-2016 Date : ……………….

Fabrication of 15x61.0m span Open Web Girder (25t Loading) for Br.No. 10 (Koshi
Name of work : bridge)at
15 Spans)
Katareah-Kursela section in Eastern Central Rly. (Drg. No. RDSO B-17182 =
(Note:- Weight
only One Span)

Name of Components : Diagonals (U1&U7-L2&L6), (U3&U5-L2&L6), (U3&U5-L4)


Drg. No. : RDSO B-17182/8 SSE/Cutting Shop
Consignee: SSE/Works/ SSE/Fabrication
Work alloted to : (P.F. No. 5) SSE/Steel
Description of material Total Wt. (Kg.)
S.No. with 10%
SM No. Item Section Length 1 Thick Length 2 Qty. wastage

1 13 Side plates 20 Th. MSP 400 20 11325 8 6258.65

2 -do- Flange Plates 12 Th. MSP 150 12 11325 16 2816.39

3 -do- End Bat. Plate 10 Th. MSP 480 10 550 16 364.74

4 -do- Int. Bat. Plate 10 Th. MSP 240 10 550 24 273.56

5 14/15 Side plates 12 Th. MSP 400 12 11341 16 7520.99

6 -do- Flange Plates 12 Th. MSP 150 12 11341 32 5640.74

7 -do- End Bat. Plate 10 Th. MSP 480 10 550 32 729.48

8 -do- Lacing flat 65x16 16 Th. MSP 65 16 591 416 2207.89

Total weight= 25812.44

SSE/PCO SSE/Steel SSE/BWS/JRC


Actual Qty. for Qty. for
Cutting Length weight 1 15
187600.00 5689.68 8 120

367200.00 2560.36 16 240

32960.00 331.58 16 240

37920.00 248.69 24 360

375712.00 6837.26 16 240

735424.00 5127.95 32 480

65920.00 663.17 32 480

545792.00 2007.17 416 6240

2348528.00 23465.85
CUTTING LIST
W.O. No. : 428-482-16 Dt. 26-08-2016 Date : ……………….
Fabrication of 15x61.0m span Open Web Girder (25t Loading) for Br.No. 10 (Koshi
Name of work : bridge)at
15 Spans)
Katareah-Kursela section in Eastern Central Rly. (Drg. No. RDSO B-17182 =
(Note:- Weight
only One Span)

Name of Components : Cross Girders (G1, G2 & G3)


Drg. No. : RDSO B-17182/11 SSE/Cutting Shop
Consignee: SSE/Works/ SSE/Fabrication
Work alloted to : (PF No. 4) SSE/Steel
Description of material Total Wt. with
S.No. 10% wastage
SM No. Item Section Length 1 Thick Length 2 Qty.
1 G1/G2/G3 T&B Flange Plates 25 Th. MSP 400 25 4878 18 7581.88
2 -do- Web plates 12 Th. MSP 1390 12 4878 9 6323.28
3 -do- End Plates 20 Th. MSP 350 20 1440 18 1566.73
5 -do- Stiffner plates 20 Th. MSP 312 20 940 32 1620.78
6 G1 Pad Plates 12 Th. MSP 305 12 375 4 47.41
Total weight= Total 17140.08

SSE/PCO SSE/Steel SSE/BWS/JRC

CUTTING LIST
W.O. No. : 428-482-16 Dt. 26-08-2016 Date : ……………….

Fabrication of 15x61.0m span Open Web Girder (25t Loading) for Br.No. 10 (Koshi
Name of work : bridge)at
15 Spans)
Katareah-Kursela section in Eastern Central Rly. (Drg. No. RDSO B-17182 =
(Note:- Weight
only One Span)

Name of Components : Brackets for Cross Girders (G2 & G3)


Drg. No. : RDSO B-17182/11 SSE/Cutting Shop
Consignee: SSE/Works/ SSE/Fabrication
Work alloted to : (PF No. 2) SSE/Steel

Description of material Total Wt. (Kg.)


S.No. with 10%
SM No. Item Section Length 1 Thick Length 2 Qty. wastage

1 54 Bracket plates 10 Th. MSP 260 10 250 14 78.58


2 -do- Bracket plates 10 Th. MSP 250 10 250 28 151.11
Total weight= Total 229.69
SSE/PCO SSE/Steel SSE/BWS/JRC
Actual Qty. for Qty. for
Cutting Length weight 1 15
190008.00 6892.61 18 270
112824.00 5748.44 9 135
64440.00 1424.30 18 270
80128.00 1473.44 32 480
5440.00 43.10 32 480
1904.4536 452840.00 15581.89
2
3808.9073

Qty. for Qty. for


Actual
weight
Cutting Length 1 2

14280.00 71.44 14 28
28000.00 137.38 14 28
42280.00 208.81
CUTTING LIST
W.O. No. : 428-482-16 Dt. 26-08-2016 Date : ……………….
Fabrication of 15x61.0m span Open Web Girder (25t Loading) for Br.No. 10 (Koshi
Name of work : bridge)at
15 Spans)
Katareah-Kursela section in Eastern Central Rly. (Drg. No. RDSO B-17182 =
(Note:- Weight
only One Span)

Name of Components : End Brackts


Drg. No. : RDSO B-17182/12/1 & RDSO B-17182/12/2 SSE/Cutting Shop
Consignee: SSE/Works/ SSE/Fabrication
Work alloted to : (PF No.4) SSE/Steel
Description of material Total Wt. with
S.No. 10% wastage
SM No. Item Section Length 1 Thick Length 2 Qty.
1 EB/EBX Top Plates 25 Th. MSP 450 25 2000 1 194.29
2 -do- Bottom plates 20 Th. MSP 450 20 2000 1 155.43
3 -do- Web plates 12 Th. MSP 890 12 2000 1 184.44
4 -do- Side Plates 10 Th. MSP 290 10 390 4 39.06
5 -do- Side Plates 10 Th. MSP 390 10 747 4 100.63
Total 673.85

SSE/PCO SSE/Steel SSE/BWS/JRC


CUTTING LIST
W.O. No. : 428-482-16 Dt. 26-08-2016 Date : ……………….

Fabrication of 15x61.0m span Open Web Girder (25t Loading) for Br.No. 10 (Koshi
Name of work : bridge)at
15 Spans)
Katareah-Kursela section in Eastern Central Rly. (Drg. No. RDSO B-17182 =
(Note:- Weight
only One Span)

Name of Components : Stringers


RDSO B-17182/12/1 & RDSO B-17182/12/2 SSE/Cutting Shop
Consignee: SSE/Works/ SSE/Fabrication
Work allotted to : (PF N. 6) SSE/Steel
Description of material Total Wt. with
S.No. 10% wastage
SM No. Item Section Length 1 Thick Length 2 Qty.
1 S T&B Flange Plates 25 Th. MSP 450 25 7913 24 18448.76
2 -do- Web plates 12 Th. MSP 890 12 7913 12 8757.01
5 S1/S1X Top Flange Plates 25 Th. MSP 450 25 7724 4 3001.35
6 -do- Bottom Flange Plates 25 Th. MSP 450 25 7919 4 3077.13
7 -do- Web plates 12 Th. MSP 890 12 7915 4 2919.74
Total 36204.00

SSE/PCO SSE/Steel SSE/BWS/JRC

CUTTING LIST

W.O. No. : 428-482-16 Dt. 26-08-2016 Date : ……………….


Fabrication of 15x61.0m span Open Web Girder (25t Loading) for Br.No. 10 (Koshi
Name of work : bridge)at
15 Spans)
Katareah-Kursela section in Eastern Central Rly. (Drg. No. RDSO B-17182 =
(Note:- Weight
only One Span)

Name of Components : Stringer bracings


RDSO B-17182/12/1 & RDSO B-17182/12/2 SSE/Cutting Shop
Consignee: SSE/Works/ SSE/Fabrication
Work allotted to : (PF No. 1) SSE/Steel
Description of material Total Wt. with
S.No. 10% wastage
Total Wt. with
S.No. 10% wastage
SM No. Item Section Length 1 Thick Length 2 Qty.
4 CB3/3A Str. Bracing Gusset Plate 10 Th. MSP 230 10 660 16 209.73
5 CB4/CB5 Str. Bracing Bent Plate 10 Th. MSP 360 10 330 16 164.13
Total weight= Total 373.86

SSE/PCO SSE/Steel SSE/BWS/JRC

CUTTING LIST

W.O. No. : 428-482-16 Dt. 26-08-2016 Date : ……………….


Fabrication of 15x61.0m span Open Web Girder (25t Loading) for Br.No. 10
(Koshi bridge)at Katareah-Kursela section in Eastern Central Rly. (Drg. No.
Name of work :
RDSO B-17182 = 15 Spans)
(Note:- Weight only One Span)
Name of Components : Expansion Bracket with G3

Drg. No. : RDSO B-17182/12/2 SSE/Cutting Shop

Consignee: SSE/Works/ SSE/Fabrication

Work alloted to : (PF No. 6) SSE/Steel

Description of material
Total Wt. with
S.No. 10% wastage
SM No. Item Section Length 1 Thick Length 2 Qty.

1 E.B MS Plate 12 Th. MSP 525 12 750 4 163.20

2 -do- Pack Plate 12 Th. MSP 274 12 750 4 85.18

5 -do- MS Plate 12 Th. MSP 130 12 372 4 20.40

6 -do- MS Plate 16 Th. MSP 160 16 750 4 66.31

Total weight= Total 335.09

SSE/PCO SSE/Steel SSE/BWS/JRC


Actual Qty. for Qty. for
Cutting Length weight 1 15
4900.00 176.63 1 15
for I-section 4900.00 141.30 1 15
5780.00 167.68 1 15
5440.00 35.51 4 60
9096.00 91.48 4 60
30116.00
Cutting Length
401424.00 16771.60 24 360 29193.54
211272.00 7960.92 12 180 8
65392.00 2728.50 4 60 9687.23
66952.00 2797.39 4 60 1
70440.00 2654.31 4 60 2421.8075
2262.75 815480.00
5.00
11313.75
Cutting Length
28480.00 190.66 16 240
22080.00 149.21 16 240
50560.00 38615.13

Qty. for Qty. for


Actual
weight
Cutting Length 1 15

10200.00 148.37 4 60

8192.00 77.43 4 60

4016.00 94.20 4 60

7280.00 125.60 4 60

29688.00 72313.32
CUTTING LIST
W.O. No. : 428-482-16 Dt. 26-08-2016 Date : ……………….
Fabrication of 15x61.0m span Open Web Girder (25t Loading) for Br.No. 10 (Koshi
Name of work : bridge)at
15 Spans)
Katareah-Kursela section in Eastern Central Rly. (Drg. No. RDSO B-17182 =
(Note:- Weight
only One Span)

Name of Components : Sway Bracings (SB)


Drg. No. : RDSO B-17182/13 SSE/Cutting Shop
Consignee: SSE/Works/ SSE/Fabrication
Work alloted to : (PF No. 1) SSE/Steel
Description of material Total Wt. with
S.No. 10% wastage
SM No. Item Section Length 1 Thick Length 2 Qty.
1 SB T&B Flange Plates 10 Th. MSP 160 10 4918 10 679.47
2 -do- Web plates 10 Th. MSP 620 10 4918 5 1316.47
9 SB5 Gusset plates 10 Th. MSP 228 10 433 5 42.62
11 SB6 Gusset plates 10 Th. MSP 237 10 261 10 53.41
14 SB7 Gusset plates 10 Th. MSP 246 10 500 10 106.21
15 SB8 Gusset plates 10 Th. MSP 150 10 220 10 28.50
16 SB9 Gusset plates 10 Th. MSP 228 10 241 10 47.45
18 SB 13 Pack Plate 16 Th. MSP 150 16 260 20 107.76
Total 2381.90

SSE/PCO SSE/Steel SSE/BWS/JRC


Actual Qty. for Qty. for
Cutting Length weight 1 15
101560.00 617.70 10 150
55380.00 1196.80 5 75
6610.00 38.75 5 75
9960.00 48.56 10 150
14920.00 96.55 10 150
7400.00 25.91 10 150
9380.00 43.13 10 150
16400.00 97.97 20 300
221610.00 2165.37
CUTTING LIST
W.O. No. : 428-482-16 Dt. 26-08-2016 Date : ……………….
Fabrication of 15x61.0m span Open Web Girder (25t Loading) for Br.No. 10 (Koshi
Name of work : bridge)at
15 Spans)
Katareah-Kursela section in Eastern Central Rly. (Drg. No. RDSO B-17182 =
(Note:- Weight
only One Span)

Name of Components : Top Lateral Bracings (LT1, LT2 & LT3) (Builtup section for 1 span only)
Drg. No. : RDSO B-17182/15 SSE/Cutting Shop
Consignee: SSE/Works/ SSE/Fabrication
Work alloted to : (PF No. 1) SSE/Steel
Description of material Total Wt. with
S.No. 10% wastage
SM No. Item Section Length 1 Thick Length 2 Qty.
1 LT1 Flange plates T&B 10 Th. MSP 8500 10 250 6 1100.96
-do- Web plate 10 Th. MSP 8500 10 305 3 671.59
2 LT2 Flange plates T&B 10 Th. MSP 8500 10 250 6 1100.96
-do- Web plate 10 Th. MSP 8500 10 305 3 671.59
3 LT3 Gusset plates 12 Th. MSP 386 12 892 6 214.07
Total weight= 3759.16

SSE/PCO SSE/Steel SSE/BWS/JRC


Actual Qty. for Qty. for
Cutting Length weight 1 12
105000.00 1000.88 6 72
52830.00 610.53 3 36
105000.00 1000.88 6 72
52830.00 610.53 3 36
15336.00 194.61 6 72
330996.00 3417.42
CUTTING LIST
W.O. No. : 428-482-16 Dt. 26-08-2016 Date : ……………….
Fabrication of 15x61.0m span Open Web Girder (25t Loading) for Br.No. 10 (Koshi
Name of work : bridge)at
15 Spans)
Katareah-Kursela section in Eastern Central Rly. (Drg. No. RDSO B-17182 =
(Note:- Weight
only One Span)

Name of Components : Bottom Lateral Bracings (LB1 to LB12)


Drg. No. : RDSO B-17182/14 SSE/Cutting Shop
Consignee: SSE/Works/ SSE/Fabrication
Work alloted to : (PF.No. 11) SSE/Steel
Description of material Total Wt. with
S.No. 10% wastage
SM No. Item Section Length 1 Thick Length 2 Qty.
7 LB9 Plate 10 Th. MSP 565 10 420 16 327.85
8 LB9A Plate 10 Th. MSP 535 10 420 16 310.45
10 - Batten plates 10 Th. MSP 145 10 270 80 270.45
14 LB3 Gusset plates 10 Th. MSP 717 10 1727 2 213.85
15 LB6 Gusset plates 10 Th. MSP 586 10 1468 2 148.56
16 LB10 Gusset plates 10 Th. MSP 470 10 1121 4 181.98
17 - Batten plates 10 Th. MSP 145 10 210 80 210.35
Total 1663.49

SSE/PCO SSE/Steel SSE/BWS/JRC


Actual Qty. for Qty. for
Cutting Length weight 1 12
31520.00 298.05 16 192
30560.00 282.22 16 192
66400.00 245.86 80 960
9776.00 194.41 2
8216.00 135.06
12728.00 165.44 4 48
56800.00 191.23 80 960
216000.00 1512.26
CUTTING LIST
W.O. No. : 428-482-16 Dt. 26-08-2016 Date : ……………….
Fabrication of 15x61.0m span Open Web Girder (25t Loading) for Br.No. 10 (Koshi
Name of work : bridge)at
15 Spans)
Katareah-Kursela section in Eastern Central Rly. (Drg. No. RDSO B-17182 =
(Note:- Weight
only One Span)

Name of Components : Bottom Chord Joints (L0 & L8)


Drg. No. : RDSO B-17182/9/1 SSE/Cutting Shop
Consignee: SSE/Works/ SSE/Fabrication
Work alloted to : (PF No.2) SSE/Steel
Description of material Total Wt. with
S.No. 10% wastage
SM No. Item Section Length 1 Thick Length 2 Qty.
1 32 Side Gusset Plate 16 Th. MSP 1440 16 1586 8 2524.28
2 33/33X Bottom Lateral Gusset 10 Th. MSP 1149 10 1554 4 616.73
3 34/34X Bent Plate 10 Th. MSP 917 10 1223 4 387.36
4 40 Pack Plate 10 Th. MSP 130 10 1226 4 55.05
5 41 Pack Plate 10 Th. MSP 130 10 826 4 37.09
7 37 End Diaphragm fl. plate 10 Th. MSP 250 10 3300 2 142.48
8 37 End Diaphragm web pl. 10 Th. MSP 630 10 3300 1 179.52
9 38/38X Bracket Plate 10 Th. MSP 362 10 566 4 70.77
10 -do- Bracket Rib Plate 10 Th. MSP 260 10 410 8 73.64
11 -do- Bracket Web Plate 10 Th. MSP 260 10 566 4 50.83
14 -do- Diaphragm web plate 10 Th. MSP 530 10 614 4 112.40
15 - Packing Plate (L0-L8) 10 Th. MSP 270 10 566 4 86.35
Total 4336.50

SSE/PCO SSE/Steel SSE/BWS/JRC

CUTTING LIST
W.O. No. : 428-482-16 Dt. 26-08-2016 Date : ……………….
Fabrication of 15x61.0m span Open Web Girder (25t Loading) for Br.No. 10 (Koshi
Name of work : bridge)at
15 Spans)
Katareah-Kursela section in Eastern Central Rly. (Drg. No. RDSO B-17182 =
(Note:- Weight
only One Span)

Name of Components : Bottom Chord Joints (L1 & L7)


Drg. No. : RDSO B-17182/9/1 SSE/Cutting Shop
Consignee: SSE/Works/ SSE/Fabrication
Work alloted to : (PF No.2) SSE/Steel
Description of material Total Wt. with
S.No. 10% wastage
SM No. Item Section Length 1 Thick Length 2 Qty.
1 42 Side Gusset Plate 16 Th. MSP 1440 16 1100 8 1750.76
2 46 Bottom Lateral Gusset 10 Th. MSP 1100 10 2332 4 886.02
3 44/45 T&B Inner Cover Plates 10 Th. MSP 566 10 930 8 363.62
4 76/77 Pack Plate Web 16 Th. MSP 300 16 930 8 308.37
5 43 Inner side cover Plate 10 Th. MSP 500 10 1100 8 379.94
6 48 Pack Plate Outer 10 Th. MSP 130 10 1815 4 81.50
7 47 Pack Plate Inner 10 Th. MSP 130 10 1065 4 47.82
Total weight= 3818.04

SSE/PCO SSE/Steel SSE/BWS/JRC

CUTTING LIST
W.O. No. : 428-482-16 Dt. 26-08-2016 Date : ……………….
Fabrication of 15x61.0m span Open Web Girder (25t Loading) for Br.No. 10 (Koshi
Name of work : bridge)at
15 Spans)
Katareah-Kursela section in Eastern Central Rly. (Drg. No. RDSO B-17182 =
(Note:- Weight
only One Span)

Name of Components : Bottom Chord Joints (L2 & L6)


Drg. No. : RDSO B-17182/9/2 SSE/Cutting Shop
Consignee: SSE/Works/ SSE/Fabrication
Work alloted to : (PF No.2) SSE/Steel
Description of material Total Wt. with
S.No. 10% wastage
SM No. Item Section Length 1 Thick Length 2 Qty.
1 49 Side Gusset Plate 16 Th. MSP 1440 16 2040 8 3246.87
2 53 Bottom Lateral Gusset 10 Th. MSP 1024 10 2063 4 729.66
3 71 Outer Cover Plate (Top) 10 Th. MSP 566 10 2010 4 392.95
4 51/52 Inner Cover Plate (T&B) 10 Th. MSP 566 10 930 8 363.62
5 76A/77A Pack plate 20 Th. MSP 300 20 930 8 385.47
6 50 Inner side cover Plate 25 Th. MSP 500 25 2040 8 1761.54
7 55 Inner side Pack Plate 20 Th. MSP 500 20 1020 8 704.62
8 55A -do- 4 Th. MSP 500 4 1020 8 140.92
9 58 Pack plate 4 Th. MSP 140 4 465 16 35.98
10 56 Pack plate outer 10 Th. MSP 130 10 1706 4 76.60
11 57 Pack Plate Inner 10 Th. MSP 130 10 1033 4 46.38
Central packing between Lat.
12 78 Gusset & central pack plate for 10 Th. MSP 300 10 930 8 192.73
L1/L7 & L2/L6
Total weight= 8077.35

SSE/PCO SSE/Steel SSE/BWS/JRC

CUTTING LIST
W.O. No. : 428-482-16 Dt. 26-08-2016 Date : ……………….
Fabrication of 15x61.0m span Open Web Girder (25t Loading) for Br.No. 10 (Koshi
Name of work : bridge)at
15 Spans)
Katareah-Kursela section in Eastern Central Rly. (Drg. No. RDSO B-17182 =
(Note:- Weight
only One Span)

Name of Components : Bottom Chord Joints (L3 & L5)


Drg. No. : RDSO B-17182/9/2 SSE/Cutting Shop
Consignee: SSE/Works/ SSE/Fabrication
Work alloted to : (PF No.2) SSE/Steel
Description of material Total Wt. with
S.No. 10% wastage
SM No. Item Section Length 1 Thick Length 2 Qty.
1 59 Side Gusset Plate 16 Th. MSP 1440 16 1900 8 3024.05
2 64 Bottom Lateral Gusset 10 Th. MSP 939 10 1955 4 634.07
3 61/62/63 Cover Plates inner (T&B) 10 Th. MSP 566 10 930 12 545.43
4 60 Inner Side Cover Plate 25 Th. MSP 500 25 1900 8 1640.65
5 76A/77A Pack plate 20 Th. MSP 295 20 930 8 379.04
6 65 Pack plate outer 10 Th. MSP 130 10 1646 4 73.91
7 66 Pack plate inner 10 Th. MSP 130 10 1019 4 45.76
Central packing bet. Lateral
8 78A Gusset & central pack plate 10 Th. MSP 310 10 930 4 99.58

Total weight= 6442.48

SSE/PCO SSE/Steel SSE/BWS/JRC


CUTTING LIST
W.O. No. : 428-482-16 Dt. 26-08-2016 Date : ……………….
Fabrication of 15x61.0m span Open Web Girder (25t Loading) for Br.No. 10 (Koshi
Name of work : bridge)at
15 Spans)
Katareah-Kursela section in Eastern Central Rly. (Drg. No. RDSO B-17182 =
(Note:- Weight
only One Span)

Name of Components : Bottom Chord Joints (L4)


Drg. No. : RDSO B-17182/9/3 SSE/Cutting Shop
Consignee: SSE/Works/ SSE/Fabrication
Work alloted to : (PF No.2) SSE/Steel
Description of material Total Wt. with
S.No. 10% wastage
SM No. Item Section Length 1 Thick Length 2 Qty.
1 67 Side Gusset Plate 16 Th. MSP 1440 16 1900 4 1512.02
2 72 Bottom Lateral Gusset 10 Th. MSP 939 10 1955 2 317.03
3 71A Outer Cover Plate 10 Th. MSP 566 10 1830 2 178.88
4 69/70 Inner Cover Plate (T&B) 10 Th. MSP 566 10 930 4 181.81
5 68 Inner Side Cover Plate 25 Th. MSP 500 25 1900 4 820.33
6 76A/77A Pack plates 20 Th. MSP 295 20 930 4 189.52
Central packing bet. Lateral
7 78A Gusset & central pack plate 10 Th. MSP 310 10 930 2 49.79

8 73 Pack plate outer 10 Th. MSP 130 10 1646 2 36.95


9 74 Pack plate inner 10 Th. MSP 130 10 1019 2 22.88
Total weight= 3309.21

SSE/PCO SSE/Steel SSE/BWS/JRC


Actual Qty. for Qty. for
Cutting Length weight 1 12
T 48416.00 2294.80 8 96
T 21624.00 560.66 4 48
T 17120.00 352.15 4 48
T 10848.00 50.05 4 48
T 7648.00 33.72 4 48
14200.00 129.53 2 24
7860.00 163.20 1 12
7424.00 64.34 4 48
10720.00 66.94 8 96
6608.00 46.21 4 48
9152.00 102.18 4 48
6688.00 78.50 4 48
168308.00 3863.77

Actual Qty. for Qty. for


Cutting Length weight 1 12
T 40640.00 1591.60 8 96
T 27456.00 805.47 4 48
23936.00 330.57 8 96
19680.00 280.34 8 96
25600.00 345.40 8 96
T 15560.00 74.09 4 48
T 9560.00 43.47 4 48
162432.00 3470.94

Actual Qty. for Qty. for


Cutting Length weight 1 12
T 55680.00 2951.70 8 96
T 24696.00 663.33 4 48
20608.00 357.23 4 48
23936.00 330.57 8 96
19680.00 350.42 8 96
40640.00 1601.40 8 96
24320.00 640.56 8 96
24320.00 128.11 8 96
19360.00 32.71 16 192
T 14688.00 69.64 4 48
T 9304.00 42.17 4 48
19680.00 175.21 4 48

296912.00 7343.04

Actual Qty. for Qty. for


Cutting Length weight 1 12
T 53440.00 2749.13 8 96
T 23152.00 576.42 4 48
35904.00 495.85 12 144
38400.00 1491.50 8 96
19600.00 344.58 8 96
T 14208.00 67.19 4 48
T 9192.00 41.60 4 48

T 9920.00 90.53 2 24

203816.00 5856.80
Actual Qty. for Qty. for
Cutting Length weight 1 12
T 26720.00 1374.57 4 48
T 11576.00 288.21 2 24
9584.00 162.62 2 24
11968.00 165.28 4 48
19200.00 745.75 4 48
9800.00 172.29 4 48

4960.00 45.26 1 12

T 7104.00 33.59 2 24
T 4596.00 20.80 2 24
105508.00 3008.38
CUTTING LIST
W.O. No. : 428-482-16 Dt. 26-08-2016 Date : ……………….
Fabrication of 15x61.0m span Open Web Girder (25t Loading) for Br.No. 10
Name of work : (Koshi bridge)at Katareah-Kursela section in Eastern Central Rly. (Drg. No. RDSO
B-17182 = 15 Spans)
(Note:- Weight only One Span)

Name of Components : Top Chord Joints Loose material (U1 to U7) (For 1 span only)
Drg. No. : RDSO B-17182/10/1 SSE/Cutting Shop
Consignee: SSE/Works/ SSE/Fabrication
Work alloted to : (PF No. 6) SSE/Steel
Description of material Total Wt.
S.No. with 10%
SM No. Item Section Length 1 Thick Length 2 Qty. wastage
1 16 Top gusset plate U2,U3,U4,U5 & U6 10 Th. MSP 920 10 1829 10 1452.99 T
2 17 Inner cover pl. top U2,U3,U4,U5 & U6 10 Th. MSP 590 10 830 10 422.86
3 17A Bottom cover pl. U2,U3,U4,U5 & U6 10 Th. MSP 540 10 550 10 256.46
4 18 Web cover plate inner U2,U6 10 Th. MSP 530 10 920 8 336.83
5 18A Web cover Plate inner U4 10 Th. MSP 530 10 1200 4 219.67
6 19 Web cover plate inner U3,U5 10 Th. MSP 530 10 1580 8 578.48
7 20 Pack plate side U3 U5 4 Th. MSP 530 4 790 8 115.70
8 21 Pack plate top U2,U6 4 Th. MSP 670 4 1780 4 164.77
9 22 Pack plate top U3 U5 4 Th. MSP 670 4 850 4 78.68
10 23/23X Bend plate Top U1,U7 10 Th. MSP 920 10 1740 4 552.92 T
11 24 (T) Pack Plate top U1, U7 4 Th. MSP 670 4 1040 4 96.27
12 25 Side Gusset Plate U1,U7 16 Th. MSP 1314 16 1642 8 2384.74 T
13 26 Web cover plate inner U1,U7 10 Th. MSP 530 10 1624 8 594.59
14 30 Side Gusset Plate U2,U6 16 Th. MSP 920 16 1102 8 1120.58 T
15 30A Side Gusset Plate U4 16 Th. MSP 1102 16 1200 4 730.81 T
16 31 Side Gusset Plate U3,U5 16 Th. MSP 1580 16 1102 8 1924.47 T
17 24-E Packing Plate Top U1-U7 4 Th. MSP 670 4 630 4 58.32
18 24-A Packing Plate U1-U7 8 Th. MSP 980 8 610 8 362.46
Total weight= 11451.58

SSE/PCO SSE/Steel SSE/BWS/JRC


Actual Qty. for Qty. for
Cutting Length weight 1 12
54980.00 1320.90 10 120
28400.00 384.41 10 120
21800.00 233.15 10 120
23200.00 306.21 8 96
13840.00 199.70 4 48
33760.00 525.89 8 96
21120.00 105.18 8 96
19600.00 149.79 4 48
12160.00 71.53 4 48
21280.00 502.65 4 48
13680.00 87.52 4 48
47296.00 2167.94 8 96
34464.00 540.53 8 96
32352.00 1018.71 8 96
18416.00 664.37 4 48
42912.00 1749.52 8 96
10400.00 53.02 4 48
25440.00 329.51 8 96
475100.00
Cutting Length, Welding Length & No's of Hole in Open Web Girder (30.5 M, 45.7 M, 61.0 M & 76.2 M)
30.5 M (OWG) 45.7 M (OWG) 61.0 M (OWG) 76.2 M (OWG)
S.N. Component Name
Cutting Welding Hole Cutting Welding Hole Cutting Welding Hole Cutting Welding Hole

1 Bottom Chord 1439088 2243584

2 Top Chord 844264 1123160

3 End Raker 443712 664016

4 Portals 95400 87092

5 Vertical 614411 729680

6 Diagonal 1465784 2348528

7 X-Girder 428034 452840

8 Brackets for Cross Girders 36680 42280

9 Stringers 625248 815480

10 End Brackets 39280 30116

11 Stringer Bracing 39200 50560

12 Expension Brackets 0 29688

13 Sway Bracing 186740 221610

14 Top Literal Bracing 272460 330996

15 Bottom Literal Bracing 183936 216000

16 Bottom Chord Joints 511912 936976

17 Top Chord Joints 267328 475100

18

19
20 Total 0 0 0 7493477 0 0 10797706 0 0 0 0 0