WORK LIST FOR PHASE II

KHOKON MEMORIAL HOSPITAL GUEST HOUSE

1. BRICK CLADDING WORK


1. Plinth level Wall (East and North side).
2. Planter wall (Front Side).
3. Planter wall (Courtyard Side).
4. On the walls on both sides of the stairs located in the Courtyard.
2. PUMP ROOM WORK
1. Pump Room design.
2. Construction.
3. RECEPTION SPACE
1. Back wall cladding and painting.
2. Electrical board shifting and electrical work.
3. Fan location shifting.
4. Reception table.
5. Seating arrangement.
4. GATE
1. Gate next to the kitchen.
2. Gate next to the pump room.
5. LANDSCAPE
1. The courtyard area needs to be leveled, and grass planted.
2. The area behind the kitchen should be filled.
3. Leveling the soil of the inner & outer plant box, laying gravel, planting grass and planting trees.
4. garden light installed.
5. BOUNDRY WALL
1. A tin fence extension should be added above the kitchen's boundary wall.
2. Boundary Wall Light.
3. Renovation work of boundary wall in front of courtyard.
4. paint and finishing work.
6. RAIN WATER GUTTR
1. Rainwater gutter on the rear side of the roof.
7. RAINWATER DISCHARGE POINT
1. for planet box front and inside planter.
8. INTERIOR UNFINISHED WORK
1. Paint finishing work for wall, falls styling and furniture.
2. Basing riser marble work.
3. Corner shelf for shower tray.
4. Coat hanger.
5. Kitchen Paint and Cabinet finishing work.
6. Dining table finishing work.
7. Casement Window with Louver work in dining and living space.
8. Store Room Cabinet.
9. Fire alarm, smoke detector, heat detector (A.P.D)
10. CCTV work (A.P.D)
11. Lighting arrester work.
12. Toilet Duct adjustment.
13. Outside falls styling construction and painting.
14. Kitchen Hood and Duct work.